Maximise Yield, Increase Reliability and Reduce Costs Across your Wind Portfolio OPERATORS TALKING INCLUDE: OVERALL O&M FOCUS > ROTOR BLADE O&M: Explore new strategies to achieve optimum performance of blades with minimum expenditure > DESIGN A PERFECT CONTRACT: Understand how to design your O&M contracts to ensure maximised yields and higher availability > ADVANCED MONITORING TECHNIQUES: Explore innovative technologies to improve turbine availability and reduce expensive reactive maintenance ONSHORE FOCUS > O&M STRATEGY: Identify the key elements of a successful O&M strategy to fit your business model and risk appetite > SPARE PART STRATEGY: Explore the latest methods to ensure 24 / 7 availability of spare parts to prevent prolonged downtime > DATA ANALYSIS AND IMPLEMENTATION: See how to collect, organise and access turbine data to predict turbine failures, forecast costs and reduce downtime > RETROFITTING AND LIFE EXTENSION: Explore case studies on the cost effectiveness of retrofit and life extension technologies OFFSHORE FOCUS > OFFSHORE LOGISTICAL SOLUTIONS: Find out the most suitable means for safe, fast and cost effective maintenance in far shore locations > OPTIMISE MANAGEMENT & STRATEGY: Hear the pros and cons of various operational structures for pre and post warranty offshore O&M > SUBSTRUCTURE PROTECTION AND MAINTENANCE: Look at foundation monitoring systems for optimised O&M and life-time assessment SPONSORS: GOLD SPONSOR: 6th Annual International Onshore and Offshore Wind O&M Forum 27-28 January 2014 | Sofitel, Hamburg, Germany SAVE €200 by booking early OPEN NOW to review the program, speaker line up and opportunities open to you! COMPLETELY NEW FORMAT, EXCLUSIVE TO WIND O&M: 1 3 4 2 Industry first USER GROUP sessions for owners of particular turbine models 14 Owner / Operators Speaking - more opportunity to both sell and learn than anywhere else Simultaneous sessions on ONSHORE O&M and OFFSHORE O&M More real life project case studies from both ONSHORE and OFFSHORE projects “I was seeking the latest O&M insights to get London Array off to a good start as operations begin in 2013. I got that, some excellent contacts and more at the professionally run 5th Annual International O&M Forum.” Mike O’Hare, General Manager, London Array Ltd.
Transcript
Page 1: 140816-208541.windomeurope

Maximise Yield, Increase Reliability and Reduce Costs Across your Wind Portfolio

OPERATORS TALKING INCLUDE:OVERALL O&M FOCUS> ROTOR BLADE O&M: Explore new strategies to achieve

optimum performance of blades with minimum expenditure

> DESIGN A PERFECT CONTRACT: Understand how to design your O&M contracts to ensure maximised yields and higher availability

> ADVANCED MONITORING TECHNIQUES: Explore innovative technologies to improve turbine availability and reduce expensive reactive maintenance

ONSHORE FOCUS> O&M STRATEGY: Identify the key elements of a

successful O&M strategy to fit your business model and risk appetite

> SPARE PART STRATEGY: Explore the latest methods to ensure 24 / 7 availability of spare parts to prevent prolonged downtime

> DATA ANALYSIS AND IMPLEMENTATION: See how to collect, organise and access turbine data to predict turbine failures, forecast costs and reduce downtime

> RETROFITTING AND LIFE EXTENSION: Explore case studies on the cost effectiveness of retrofit and life extension technologies

OFFSHORE FOCUS> OFFSHORE LOGISTICAL SOLUTIONS: Find out the

most suitable means for safe, fast and cost effective maintenance in far shore locations

> OPTIMISE MANAGEMENT & STRATEGY: Hear the pros and cons of various operational structures for pre and post warranty offshore O&M

> SUBSTRUCTURE PROTECTION AND MAINTENANCE: Look at foundation monitoring systems for optimised O&M and life-time assessment

SPONSORS:

GOLD SPONSOR:

6th Annual International Onshore and Offshore Wind O&M Forum 27-28 January 2014 | Sofitel, Hamburg, Germany

SAVE €200

by booking early

OPEN NOW to review the program, speaker line up and opportunities open to you!

COMPLETELY NEW FORMAT, EXCLUSIVE TO WIND O&M:

1

3

4

2

Industry first USER GROUP sessions for owners of particular turbine models

14 Owner / Operators Speaking - more opportunity to both sell and learn than

anywhere else

Simultaneous sessions on ONSHORE O&M and OFFSHORE O&M

More real life project case studies from both ONSHORE and OFFSHORE

projects

“I was seeking the latest O&M insights to get London Array off to a good start as operations begin in 2013. I got that, some excellent contacts and more at the professionally run 5th Annual International O&M Forum.” Mike O’Hare, General Manager, London Array Ltd.

Page 2: 140816-208541.windomeurope

Start defining your future portfolio strategy today, visit: www.windenergyupdate.com/hamburg

“The value of the global operations and maintenance (O&M) market is expected to increase from $3 billion in 2008 to $19 billion by 2020” GlobalData

ONSHORE WIND O&MRecently there have been significant improvements in the performance of wind turbines. So much so that the on-going cost of operating and maintaining them has decreased by roughly 38% since 2008 - a recent Bloomberg report stated.

Operational performance and efficiency of wind assets has increased in importance for owners and investors, and now they want to take a further step in the path towards cost reduction by taking more control of their own assets.

To manage their operational expenditure OPEX spend more effectively, owners need to know how their assets operate, what steps they must take for constant optimised performance and how to prevent unplanned downtime. This means strategies for on-going O&M are being heavily scrutinised.

Who to use and how to perform on-going maintenance is not a simple issue. Do owners need to maintain a good relationship with their turbine supplier to ensure access to spare parts when needed or can independent suppliers handle this effectively? How should contracts be structured to ensure maximum profits and minimised losses? What technologies should be invested in to enhance performance and where is this possible?

Given the post warranty landscape, now is the time for operators to review their strategies and renegotiate their service contracts. Issues most crucial to the industry include:

• Blade maintenance

• Contracting strategies

• Spare parts management

• Data analysis and implementation

• Retrofitting and life extension

OFFSHORE WIND O&MGiven its infancy there are currently no standardised technical or commercial practices for offshore O&M. This work however still accounts for roughly a quarter of the life-time cost of an offshore wind farm. A recent Scottish Enterprise study claims that the O&M of more than 5,500 offshore turbines could be worth almost £2bn per annum by 2025.

Effectively operating and maintaining these offshore wind farms in increasingly hard to reach locations can be a costly, technically challenging and an extremely hazardous experience for both the company and its workforce. If costs are to remain within budget then careful planning, preparation, supplier and contractor selection is essential.

When it comes to the turbine itself, many issues onshore and offshore are the same. The key differences for offshore O&M is that, due to its age, operators need to effectively plan for end of warranty [EOW] - scrutinising warranty agreements and how to best carry out EOW inspections to avoid defective components and rejected claims.

Urgent attention also needs to be given to:

• Offshore management structure and strategy

• Offshore logistical solutions

• Access to the turbines for maintenance

• Export cable and array cable maintenance

• Substation failure prevention

• Substructure protection and maintenance

Find out how offshore O&M practices are adapting to make far-offshore and deep-water projects more financially and technically viable.

COMPLETE O&M COVERAGEAttend the largest and most significant event in your 2014 calendar – the 6th International Onshore and Offshore Wind O&M Forum – you’ll hear major players discuss and debate their O&M successes downfalls and lessons learnt.

Building on the success of the previous O&M Summits in the USA and Europe, this market leading event has been optimised to provide the only meeting place for operators of wind farms both onshore and offshore. With commitment from 12 of Europe’s thought leading operators and an annual attendance of over 200 participants; this event will focus on providing a crucial forum for operators, turbine manufacturers and service providers to collaborate, learn and discuss the key issues relating to reducing OPEX to achieve maximum yield and profits possible.

This event will cater for EVERYONE in the wind O&M sector – relevant to all disciplines – with dedicated conference tracks and plenary sessions outlining critical solutions to the industry’s most pressing challenges. Our focussed multiple conference tracks provide you with more detailed, result orientated case studies and real life experiences.

See what you need to get your project’s costs down and power production up by joining our tailored sessions on:

• Overall O&M strategy

• Improving operational efficiency

• Ensuring effective maintenance

• Offshore logistics

• Offshore foundation maintenance

Now returning in its 6th year, the original O&M focussed forum returns to Hamburg, bringing together over 200 wind O&M experts for three days of business critical information sharing and networking opportunities. With senior level representatives from major and independent operators, lead contractors (not used before) and specialist service companies – you can’t afford to miss out

We look forward to welcoming you to Hamburg in January 2014.

Page 3: 140816-208541.windomeurope

Call +44 (0)207 375 7575 today or e-mail [email protected] to reserve your place

WORKSHOPS & COMPLETE FORUM ADDRESSBringing you a wealth of commercial & technical expertise to cover your entire operations

THROUGH LIFE MANAGEMENT PRINCIPLES TO REDUCE LCOE

• See how adopting asset management principles, promoted by the Institute of Asset Management (IAM), PAS 55:2008 and the ISO 55000, can reduce capital costs in wind energy

• With lessons from the aviation and maritime industries, see how lifecycle cost savings can be realised in the design phase

• Understand how tools like Failure Mode Effect and Criticality Analysis (FMECA), Reliability-Centred Maintenance (RCM) and Condition-Based Maintenance (CBM) can aid design for support

Mark Willis, Head of Business Management, LSC Group Limited

CASE STUDY

ADVANCED MONITORING TECHNIQUES: YOUR GATEWAY TO AN ACCELERATED RATE OF RETURN

• Learn how Advanced Monitoring Techniques, applied to SCADA data, have increased early critical components failure detection

• Understand the direct effect that these Advanced Monitoring Techniques have on the systems reliability and availability

• Explore the overall O&M costs reduction obtained in different Wind Farms (with different WT maker and models)

Ms. Nagore Guarretxena, Sales Director, NEM Solutions

STRATEGY CASE STUDY

O&M STRATEGY – HOW TO RESCUE COST IN OPERATIONS, STRATEGY AND METHODOLOGY

• With an focus on onshore and offshore explore E.ON C&Rs hybrid model functions and how it works

• Discuss and debate the overall O&M approach adopted by E.ON C&R and why particular choices were made

• See how energy yield and efficiency improvement have been achieved as a result of this model

Katja Bartsch-Wuenschel, Director Asset Management, E.ON Climate & Renewables

OPTIMISING CONTRACT NEGOTIATION WITH OEMS OR SERVICE PROVIDERS

• Understand the need to be clear about operational strategies: Explore the risks during operational lifetime in OEM or 3rd party service provider O&M

• Cost saving potential over a turbine’s 20 year lifecycle: How you could save 40/50% by choosing the right mix of services

• Contract content behind the contract: the scope of material, the handover of information after takeover, the access of the owner to the operational data

Thilo Langfeldt, Partner & Managing Director, Strategy Engineers GmbH & Co. KG Germany Filial

STRATEGY CASE STUDY

LONG TERM BLADE SERVICES STRATEGY

• Find out how to identify and select the most fitting strategy for blade maintenance on your wind park

• See how to plan for blade O&M post warranty and what considerations must be looked at before EOW

• Effectively executing blade O&M work: With examples, see the latest techniques developed for effective maintenance work

Thorsten Zander, Technical Manager, WKA-Service-Fehmarn GmbH

BLADE INSPECTIONS AND REPAIRS

• With 20 years’ experience of inspecting and repairing blades, explore the most common damages on blade that can directly impact your turbines productivity

• Upgrading blades: Explore data from a system developed on a 1,3MW wind turbine where 15% more energy was gained and see how this is being applied to larger turbines

• Explore the development of a de-icing system, retrospectively installed, that recognises conditions under which ice forms and how it avoids ice build up

Alexander Backs, Composite Engineer, SPITZNER ENGINEERS GmbH

Henry von Helldorff, Head of Sales, BayWa r.e. Rotor Service GmbH

CASE STUDY

POWER OPTIMISATION: REPOWERING VS. ROTOR BLADE EXTENSION

• Explore the cost benefits of rotor blade extension as found through ENERGIEKONTOR testing

• The repowering of existing turbines: See what options are available for repowering and if they prove effective

• Cost comparison between the two: what is more effective

Stephan Schnitger, Head of Innovation & Optimization, ENERGIEKONTOR AG

ASSET MANAGEMENT CERTAINTY

• Explore how to streamline and fully optimise service procedures including electronic work control, proof of visit, location time stamp, electronic audit trail, elimination of paperwork and safety certification checks so you completely know the status of your units

Andrew Segers, Project Manager HV and Substations, SEMCO

MAIN BEARINGS WORKSHOP

Challenges in operation, maintenance and improving reliabilityThis workshop will focus on wind turbine main bearings to illustrate best practice for managing and monitoring your fleet.

Romax will present case studies from around the world to demonstrate potentially costly main

bearing problems, methods for understanding bearing health, how best to maintain your main bearings and assess their remaining useful life. Specific topics will include:

• Failure investigations

• Reducing risk at end of warranty

• Ongoing health monitoring

• Managing problems and extending bearing life

• Remaining useful life and predictive maintenance

For more information on this workshop, please contact Jon Harman who will put you in touch directly with the presenters

Wind Turbine User Group SessionsWe will break out into groups of people that work on particular turbine types for extended discussion and debate. This will not be recorded or discussed on the microphone. This will be an intimate knowledge sharing user group session discussing

• The typical failures / faults that occur on specific models

• The solution to prevent, repair or replace these common failure/ faults

“A well-structured forum, dynamic with personal enrichment by sharing of experiences”

Sérgio Mota, Acciona

Page 4: 140816-208541.windomeurope

Check out the online agenda for updates: www.windenergyupdate.com/hamburg

THE OWNER LIFE CYCLE STRATEGY

• See how capital investment strategy and establishing a relationship with your manufacturer can ensure flexibility and optimise life cycle impact for return on investment

• Strategic choices during project development

• Achieving a post construction flexibility in contract negotiations

• The critical owner strategic process towards EOW

Helge Larsen, Asset Manager & Sr. Advisor Wind Power, Meventus AS

REDUCING SPARE PARTS O&M COST AND DOWNTIME EXPOSURE OF WIND POWER ASSETS

• Understand why and when you expose yourself to major threat and to what extent depending on the situation

• Find out what strategies are available to mitigate this exposure and how to employ them into your strategy

• Analyse spare parts pooling strategies and multi-echelon strategies for less risk exposure

Jean Lemaire, Director Asset Management, AKUO Energy

CASE STUDY

OPTIMUM AFTER GUARANTEE O&M APPROACH FOR A MID-SIZE OPERATOR

• Get a revised assessment of ERG Renew’s hybrid model suitable for a 500MW portfolio

• Understand why ERG Renew have decided that a fully insourced model is the best choice for a 1GW portfolio

Massimo Derchi, Managing Director, ERG Renew

PANEL DISCUSSION

THE ISP ROLE IN THE ONSHORE WIND TURBINE AFTER MARKET

• How wind park owners best can utilise a combination of the OEM warranty and service concept and the professional ISP offer for flexibility and tailoring an O&M concept

• Debate what value can an ISP bring to your wind farm over an OEM, including tools that are proven to optimise availability and durability of components

• Explore how an ISP can offer a hybrid O&M solution in combination with the OEM or turbine owners service organisation

Carsten Brinck, Vice President of Sales, DMP Mølleservice

Matthias Brandt, Director, Deutsche Windtechnik AG

Michael Richter, Global Sales, Availon

MITIGATING YOUR SPARE PARTS SUPPLY CHAIN RISK

• Explore best practice spare parts management and see how you can negotiate a contract with your supplier to supply spare parts at short notice

• Find out what you can do to be mutually beneficial in collaborating with another company

• Is it cheaper to procure your spare parts in a different country and transport it or purchase internally, close by?

Eduardo Garcia Perez, Head Of Central Maintenance for Europe, EDP Renewables

INCREASE IN EFFICIENCY AND AVAILABILITY – WHAT IS POSSIBLE AND USEFUL?

• Analyse the potentials of an increase of efficiency and which opportunities exist: calculation of efficiency, availability and productivity

• Consider technical guidelines, standards and laws to understand what is permitted, how to check if the investment paid off and if there are any side effects

• Discuss the limits of such increase: what is sense and what is nonsense of efficiency-increasing measures at wind energy plants

Matthias Brandt, Director, Deutsche Windtechnik AG

INDEPENDENT DATA ANALYSIS, A KEY FACTOR FOR MANAGING YOUR WIND FARM ASSET

• Explore how data analysis should be approached, and how it can best be done

• Financial aspects – what the REAL cost of WTG downtime is

• New tools to investigate: analyse performance, different KPIs, see performance in several ways, compare, see what to avoid future problems

• Several tools related with specific parts of turbine

Giuseppe Madia, Head of Asset Management & Optimisation, Axpo Power

ONSHORE WIND STREAM A separate conference room running in parallel to the Offshore Wind Stream

CASE STUDY

LATEST TECHNOLOGY TO COMBINE SCADA AND DATA MANAGEMENT SYSTEMS

• Explore how juwi combined meteosystems with energy predictive systems and data banks to estimate power production, predict precise error and improve production of turbine

• Understand how real time data can be made available and visualised for a data control room include status of and activities happening to a turbine

• O&M portal access: see how to view all a wind farms data which has been produced from service report to real time data and invoices

Klaus Krüder, Geschäftsführer, juwi Operations & Maintenance GmbH

LESSONS LEARNED FROM A LARGE SCALE CMS RETROFIT

• Project management: look at the hands-on structuring principles and installation preparation challenges in dealing with local site “cultures”

• Installation work by others: how to stay in touch with your partners through “remote control” and communications in the team and physically in the wind farm

• Data base preparation: look at the minimum required features to stay on top of your fleet

Dr. Steffen Biehl, Managing Director, Bachmann Monitoring GmbH

TOPIC TBC

Ralf Neulinger, Director Operations & Asset Management, EnBW Erneuerbare und Konventionelle Erzeugung AG

RETROFIT . . . A MUST FOR POST-WARRANTY

• Learn how using condition monitoring after the warranty period still provides essential cost-savings

• Compare factory installations to retrofit installations

• Find the optimal time for your retrofit installation

• Hear about a real-life TCM® retrofit application on a GE 1.5 MW turbine in Shiloh, California as we look at design, planning, installation, and commissioning

Axel Juhl, CEO, Gram & Juhl

Page 5: 140816-208541.windomeurope

EOW INSPECTIONS AS AN INVESTMENT

• EOW strategy: Find out how to negotiate your contract to ensure the most from your first few years of operation

• Understand the importance of CMS and how this links in to the preparation for EOW

• The inspection itself: With lessons learned from recent projects, see what critical inspections must happen and the size of sample you need to take

Dr. Florian Biehl, Member of the executive board, 8.2 Consulting AG

PERFORMANCE IMPROVEMENT AND COST REDUCTION WITH A HANDS-ON O&M STRATEGY

• Explore the special needs and requirements of O&M at E.ON’s offshore sites

• Explore the opportunities available to operators by “hands on” service concepts

• Get an idea of how mixed teams work in relation to self-performance at dedicated Offshore sites

Rudolf Neuwirth, Head of Operations (Offshore), E.ON Climate & Renewables

HORNS REV1 CASE STUDY

A DECADE IN OPERATION - A DECADE OF LEARNING

• Hear a candid explanation of how Vattenfall achieves a high performance on the oldest large scale offshore plant

• See how Vattenfall developed a competent organisation and got a grip on technical challenges early on to ensure a high availability under safe conditions

Martin Reinholdsson, Head of Generation, Vattenfall

Steen Bode, Site Manager, Horns Rev1 Site Manager, Vattenfall

MAINTENANCE STRATEGY: O&M COST ESTIMATOR

• Look at the software available to analyse and then select the best O&M strategy

• Explore procedures and tools to collect, analyse, report and feedback O&M data in a structured way

• Discuss how this approach has been implemented at one of RWE’s wind farms

Luc Rademakers, Researcher O&M Offshore Wind Farms, ECN

PRACTICAL EXPERIENCES OF MANAGING DRIVETRAIN FAILURES

• Demonstrate real life drivetrain problems from the field and how these were managed effectively

• Explore failure investigations, end of warranty issues, health monitoring, de-rating and extending drivetrain life

Richard Smith, Principal Engineer, Fleet Maintenance, Romax Technology

A GUIDE TO BEST PRACTICE HV / MV MAINTENANCE

• Explore ways to perform and standardise maintenance to your offshore substation within budget and on time

• See how vibration from larger substations can cause issues substructures and how to avoid costly repairs

• See who is best to carry out the substation O&M and why particular strategies work better than others

Session available – contact [email protected]

PANEL DISCUSSION

THE OPERATOR’S VIEW ON OFFSHORE O&M MANAGEMENT

• Discuss how best to manage shift systems for operating staff to avoid health and safety risks and improve workforce efficiency

• Explore how these operators currently manage their high voltage and medium voltage maintenance and how they

• See how vessels are currently managed, including jack up vessels, service vessels and their organisation for streamlined O&M

Michael Boll, Head of Operations Wind Offshore, EnBW

Steen Bode, Site Manager, Horns Rev1 Site Manager, Vattenfall

Rudolf Neuwirth, Head of Operations (Offshore), E.ON Climate & Renewables

Cedric Vanden Haute, O&M Package Manager Foundations and Cables, Parkwind

CASE STUDY

PARKWIND FOUNDATIONS: A LONG TERM ASSET

• Explore the research carried out at the Belwind wind farm foundation and what critical information was logged

• See how ParkWind will now look for improvements: understand what midlife corrective improvement actions will/can be carried out and why

• Attempt to estimate the real lifetime of the asset compared to the theoretical calculated lifetime

Cedric Vanden Haute, O&M Package manager Foundations and Cables, Parkwind NV

SUPPORT STRUCTURE MONITORING SYSTEMS FOR OPTIMIZED O&M AND LIFE-TIME ASSESSMENT

• Discuss crucial insights to extend the lifetime of offshore structures and reduce their operation and maintenance costs

• Parameters to see if the grouted connection is deteriorating and update the remaining life time estimates

• Corrosion and water ingress in the grouted connection will have an influence on the remaining life time of the foundation

Christof Devriendt, Scientific Coordinator, Offshore Wind Infrastructure Lab

O&M STRATEGY AND EXPERIENCES IN THE BALTIC SEA

• Availability versus accessibility: Look at the key challenges in getting to the offshore wind farm to ensure its availability

• Understand key Balance of Plant challenges faced by EnBW in the Baltics and what measures were taken to solve these issues

• See how EnBW approached the maritime logistics for their wind farm and how these have evolved and will continue to evolve

Michael Boll, Leiter Betrieb Wind Offshore, EnBW Erneuerbare und Konventionelle Erzeugung AG

OFFSHORE WIND STREAM A separate conference room running in parallel to the Onshore Wind Stream

“As site manager for the windfarm “Prinses Amaliawindpark” I enjoyed the forum and will join again in the future” Eneco “The O&M Summit has been an

excellent platform to hear about and to discuss latest technologies and methods to enhance performance of operating wind farms in a very valuable way!”

Matti Scheu, Ramboll

For more information on the workshops, turbine user group session, discussion topics and timings, please keep checking the website: www.windenergyupdate.com/hamburg

Page 6: 140816-208541.windomeurope

For more information visit the SPONSORSHIP & EXHIBITION ZONE at www.windenergyupdate.com/hamburg

Be involved in 2014Make the right connections and secure new business

3 reasons to come on board:

We are dedicated to providing a forum where our attendees can learn about the latest technologies and advances in the market

There are a limited number of spaces available for companies to showcase products and services

This event will build new prospects and strengthen current business relationships

Our bespoke packages can include…

Ideal Placement – showcase your latest products and demonstrate your technical expertise

Thought leadership – take the stage and show what your company is doing to drive the industry forward

Brand Awareness – make sure you are recognised and show what sets you apart from the competition

Exclusive Networking – host interactive sessions with core clients and prospects and much more…

If you want to maximise your return on investment at this industry-leading event by being involved in our exclusive range of sponsorship opportunities, contact:

Who will be going?See which companies attended the 2013 event and who we expect to return for 2014

1

23

OLIVER BANCROFTBusiness Development Manager Wind Energy Update

+44 (0)20 7375 7182

[email protected]

Spaces are limited

Consultant

45%

11%

10%

17%

7%6%4%

Operator

OEM

Specialist Services

Service Provider

Tier 1/2 SupplierAsset Investment

Consultant

Company Type

NorthAmerica

6% CEE2%

Europe89%

Asia - Pacific

2%

SouthAmerica

1%

Region

Page 7: 140816-208541.windomeurope

Act now for the best ratesFax this form now +44 (0)207 375 7576

REGISTER NOW IN 3 EASY STEPS:

TERMS & CONDITIONS Places are transferable without any charge. Notice must be given in writing to [email protected] at least 7 days prior to the event start date to ensure that transferred places are valid. Cancellations before 20th December 2013 incur an administrative charge of 25%. If you cancel your registration on or after 20th December 2013 we will be obliged to charge you the full fee.Please note - you must notify FC Business Intelligence (holding company of Wind Energy Update) in writing, of a cancellation, or we will be obliged to charge you the full fee.The organizers reserve the right to make changes to the programme without notice. FC Business Intelligence takes every care to ensure that prices quoted are correct at time of publishing however, bookings will only be accepted if there is no material error in the price advertised on the website Designed by www.TheCreativeTree.co.uk

MORE WAYS TO REGISTERONLINE: Secure & simple registration online at

www.windenergyupdate.com/hamburg

EMAIL: [email protected] Just give us your details and pass type – we’ll do the rest!

PHONE: Wind Energy Update on +44 (0)207 375 7575

6th Annual International Onshore and Offshore Wind O&M Forum27-28 January 2014 | Sofitel, Hamburg, Germany

2. ENTER ATTENDEE DETAILS: Mr/Mrs/Ms/Dr: First name: Last name:

Company: Position/Title:

Telephone: Fax: Email:

Address: Postcode: Country:

I enclose a cheque/draft for:

(Payable to FC Business Intelligence Ltd)

Please invoice my company:

Purchase Order Number:

Please charge my credit card: Amex Visa Mastercard

Credit card number:

Expiry date: Security number:

Name on card:

Signature:

3. PAYMENT OPTIONS:

DISCOUNT CODE: • this is your unique discount code, use it online or via this form to get an extra €50 off

DIAMOND PASS GOLD PASS BASIC PASS

Early Bird - expires 22 November 2013 €2650 €1395 €1195

Last Chance - expires 20 December 2013 €2750 €1495 €1295

Full Price €2850 €1595 €1395

1. SELECT YOUR REGISTRATION PACKAGE:

GOLD PASS• Full access to 2 day Forum

• Unlimited access to both tracks (onshore and offshore)

• Post event access to presentations sides

• Post event access to audio webcast package

• 6 week access to online messaging and meeting planner system (pre and post event)

• Access to Wind Turbine Main Bearings workshopBASIC PASS

• Basic access to Forum only

MOST POPULAR

DIAMOND PASS• Full access to 2 day Forum

• Unlimited access to both tracks (onshore and offshore)

• Post event access to presentations sides

• Post event access to audio webcast package

• 6 week access to online messaging and meeting planner system (pre and post event)

!Plus! access to the Onshore O&M Strategies Report 2014 worth €2850

Page 8: 140816-208541.windomeurope

Maximise Yield, Increase Reliability and Reduce Costs Across your Wind Portfolio

OPERATORS TALKING INCLUDE:OVERALL O&M FOCUS> ROTOR BLADE O&M: Explore new strategies to achieve

optimum performance of blades with minimum expenditure

> DESIGN A PERFECT CONTRACT: Understand how to design your O&M contracts to ensure maximised yields and higher availability

> ADVANCED MONITORING TECHNIQUES: Explore innovative technologies to improve turbine availability and reduce expensive reactive maintenance

ONSHORE FOCUS> O&M STRATEGY: Identify the key elements of a

successful O&M strategy to fit your business model and risk appetite

> SPARE PART STRATEGY: Explore the latest methods to ensure 24 / 7 availability of spare parts to prevent prolonged downtime

> DATA ANALYSIS AND IMPLEMENTATION: See how to collect, organise and access turbine data to predict turbine failures, forecast costs and reduce downtime

> RETROFITTING AND LIFE EXTENSION: Explore case studies on the cost effectiveness of retrofit and life extension technologies

OFFSHORE FOCUS> OFFSHORE LOGISTICAL SOLUTIONS: Find out the

most suitable means for safe, fast and cost effective maintenance in far shore locations

> OPTIMISE MANAGEMENT & STRATEGY: Hear the pros and cons of various operational structures for pre and post warranty offshore O&M

> SUBSTRUCTURE PROTECTION AND MAINTENANCE: Look at foundation monitoring systems for optimised O&M and life-time assessment

SPONSORS:

GOLD SPONSOR:

6th Annual International Onshore and Offshore Wind O&M Forum 27-28 January 2014 | Sofitel, Hamburg, Germany

SAVE €200

by booking early

OPEN NOW to review the program, speaker line up and opportunities open to you!

COMPLETELY NEW FORMAT, EXCLUSIVE TO WIND O&M:

1

3

4

2

Industry first USER GROUP sessions for owners of particular turbine models

14 Owner / Operators Speaking - more opportunity to both sell and learn than

anywhere else

Simultaneous sessions on ONSHORE O&M and OFFSHORE O&M

More real life project case studies from both ONSHORE and OFFSHORE

projects

“I was seeking the latest O&M insights to get London Array off to a good start as operations begin in 2013. I got that, some excellent contacts and more at the professionally run 5th Annual International O&M Forum.” Mike O’Hare, General Manager, London Array Ltd.