Tollgate Guiding Thoughts Projects are now performed per the 15 deliverable format. As such, project tollgates will focus on the work done in each phase to satisfy the 15 deliverables. Note that slides are sequenced from deliverable to deliverable. Tollgates should focus on showing the thought process through the phase. The deliverables and primary tools are structured/selected to show this logical flow for most projects. Primary tools are not mandatory use tools, but they will usually be the best way to show the project progression. Use and show secondary tools as needed to aid working a project. After showing the work done to complete a phase, each presentation should have a slide which lists the tasks and associated dates for the next phase. Highlight any expected barriers to the project and describe what assistance is needed from the Champion, PO, etc. to complete the project per that timeline.
Transcript
Page 1: 15 Deliv template

Tollgate Guiding Thoughts

• Projects are now performed per the 15 deliverable format. As such, project tollgates will focus on the work done in each phase to satisfy the 15 deliverables. Note that slides are sequenced from deliverable to deliverable.

• Tollgates should focus on showing the thought process through the phase. The deliverables and primary tools are structured/selected to show this logical flow for most projects. Primary tools are not mandatory use tools, but they will usually be the best way to show the project progression. Use and show secondary tools as needed to aid working a project.

• After showing the work done to complete a phase, each presentation should have a slide which lists the tasks and associated dates for the next phase. Highlight any expected barriers to the project and describe what assistance is needed from the Champion, PO, etc. to complete the project per that timeline.

Page 2: 15 Deliv template

DMAGIC Focus by Phase

Y

Better

Y

VerifiedRootCause # 1

VerifiedRootCause # 3

VerifiedRootCause # 2

X’s# 1

# 2

# 3

# 4

# 5

# 6

Impact on Root Cause

Time to Imple-ment Action

Y/N

Cost vs. Bene-fit Acceptance

# 7

N

N

N

N

Y

Y

Y

Solutions

Better

DefineY=ƒ(x)

1. Define VOC, VOB and CTQs2. Define Project Boundaries

o SIPOC, Project Charter• Quantify Project Value

o COPQ, Customer Satisfaction• Develop Project Management Plan

MeasureY= ƒ(x)

1. Document the Process2. Prioritize List of X’s3. Create a Data Collection Plan4. Validate Measurement System5. Establish Baseline Process Capability

AnalyzeY= ƒ(x)

1. Determine Critical X’so Use statistical and graphical tools to

verify and quantify X-Y relationships

Green It UpY= ƒ(x)

1. Investigate interactions between root causes and the project environment

2. Investigate interactions between root causes and the process environment

3. Establish bounds of possible countermeasures to maximize the positive impact of the project

ImproveY= ƒ(x)

1. Prioritized List of Solutionso Computer Simulationo Process Standardizationo DOEo Decision Matrix

• Pilot Best Solution

ControlY= ƒ(x)

1. Create Control Systemo Control Plano Mistake Proofo Control Charts

• Finalize Project Documentationo Final COPQ Summaryo Update Process Capabilityo Final Project Presentation

Page 3: 15 Deliv template

<Project Title><Review Date>

BB: (Name)Champion: (Name)

Assigned Define Measure Analyze Green Improve Control

Sched Date Date Date Date Date Date Date

Actual Date Date Date Date Date Date Date

Page 4: 15 Deliv template

Define Phase

Page 5: 15 Deliv template

Deliverable 1: DefineDefine VOC, VOB

• Voice of the customer

• Voice of the business

• Include any operating definition on this or a separate slide

For this and all subsequent phases, add charts as appropriate to show “the story” for that phase. Example – a descriptive statistics chart is not listed with any specific deliverable, but it would probably be appropriate to show in the Define section.

Page 6: 15 Deliv template

Customer CTQ Tree

• .

Need Drivers CTQ’s

Q1=

p2 =

p1 =

Q2 =

KPI =

Driver 1

Driver 2

Driver 3

GeneralHard to measure

SpecificEasy to measure

Q2 =

Page 7: 15 Deliv template

Deliverable 1: Define Pareto Charts/ Basic Graphs

Include Pareto Charts, trend charts, histograms etc to characterize existing process.

The purpose of the chart(s) on this page is to explore what is happening with the Y or Y’s that will make this an appropriate project to execute. Plot your primary metric here.

Good!

Page 8: 15 Deliv template

Project Charter{Project Name Here}

Assigned Define Measure Analyze Green Improve Control

Sched Date Date Date Date Date Date Date

Actual Date Date Date Date Date Date Date

Process Map Number: Number here

Green Belt: Name hereProcess Owner: Name hereChampion: Name hereImplementation Coordinator: Name hereData Coordinator: Name hereTeam Members:Name & function hereName & function hereName & function hereName & function hereName & function here

Expected Benefits: Hard Savings –$ xxx KSoft Savings –$ xxx KOther Benefits:List benefit hereList benefit here

Project Timeline:

Customer CTQ(s): Describe customer CTQ (customer need/defect and spec limit.)

Problem Statement: List the 4 elements of a problem statement: * Defect identification * Magnitude of the defect (events/unit time, etc) * Where is the defect (location/group/segment) * Why this project is important to work now ($, strategy support, etc)

Project Scope:List project/process boundaries here by using includes … and excludes …

Goal Statement: Increase(/decrease) the {primary metric} from {baseline state} to {improved state} by {date} without negatively impacting {secondary metric}.

Baseline Metric Performance (Time Frame here): Short Term Long TermZbench x.x x.xDPMO xxxxxx xxxxxx

Page 9: 15 Deliv template

Deliverable 2: Define Improve Computer Delivery Time Proj. No. 12345

Assigned Define Measure Analyze Green Improve Control

Sched 7/1/08 7/15/08 8/30/08 9/30/08 10/7/08 10/20/08 11/20/08

Actual 7/1/08 7/12/08 9/5/08 9/28/08

Process Map Number: 1234

Black Belt: I. CantwaitProcess Owner: Weneedta Getbetter Champion: Ima GonnahelpImplementation Coordinator: Iwill PutinplaceData Coordinator: Ilove NumbersTeam Members:John – InstallerPaul – InstallerGeorge – Supervisor Ringo - Purchasing

Expected Benefits: Hard Savings – $15 KSoft Savings – $225 KOther Benefits:Internal Customer Satisfaction Scores

Project Timeline:

Customer CTQ(s): Configured computer delivered to new employee within 10 working days

Problem Statement: From 7/1/08 through 6/30/08, new JEA employees located in downtown Jacksonville received their configured laptop/desktop computer at an average of 11.0 days (standard deviation = 2.04) vs. a 10 day USL. This translates to an estimated productivity loss of $225K/yr.

Project Scope:Includes new hires and transferred employees to the downtown tower and CCC. Excludes all other locations or electronic

Goal Statement: Decrease the average computer delivery time from 11.0 days to 9.0 days by 11/20/08 without negatively impacting new computer inventory or expediting costs.

Baseline Metric Performance (7/08-6/08): Short Term Long TermZbench -0.72 -0.50DPMO 763,253 692,088

Example charter for project in Green phase

Page 10: 15 Deliv template

Deliverable 2: Define; SIPOC

Suppliers Inputs Process Outputs Customers

????

Process Description

??

?? ?? ?? ?? ??

Process StepsProject Boundary

Project Boundary

??

??

??

??

??

??

??

??

??

??

??

Page 11: 15 Deliv template

Included/Excluded

INCLUDED

• What __________________

• Where _________________

• When __________________

• Who ___________________

• Other __________________

EXCLUDED

• _____________________

• _____________________

• _____________________

• _____________________

• _____________________

Page 12: 15 Deliv template

Deliverable 3: Define Quantify Project Value

• Hard $$ savings

• Soft $$ savings

• Productivity improvement

• Internal customer satisfaction

• External customer satisfaction

Describe Project Benefits in terms of COPQ, non-financial benefits, etc.Show enough detail for reader to understand how COPQ is calculated as well as the total value. Be sure to show

• $ broken down by savings category• Cost Center number which will receive the savings

This slide is to be submitted to Finance for review and approval. If necessary, schedule a meeting to resolve any issues about the approach for calculating dollar impact to the business.

Page 13: 15 Deliv template

Savings Categories• Revenue Growth - is used when a process change results in an increase in cash flow from existing

revenue sources or from a new revenue source. Revenues do not include liquidation of assets that were not purchased for resale.

• Increased Capacity - is used when process changes result in additional benefits from existing facilities. The amount to estimate depends on how the additional capacity will be used.

• Expense Reduction - for routine recurring O&M expenses that will be reduced in both current and future years, as a result of a process change.

• Expense Avoidance - is used when a process change makes an anticipated future O&M expense unnecessary.

• Capital Reduction - is like expense reduction except that it applies to capital budget expenditures instead of O&M.

• Capital Avoidance - is like expense avoidance except that it applies to anticipated capital budget expenditures not O&M.

• Inventory Reduction - is a “soft” dollar classification based on the presumption that the “carrying cost” of inventory is 14.7% (as claimed in an old Stone & Webster study).

• Financial Adjustment - is intended to identify amounts associated with accounting changes.• Cycle Time/ Productivity - is used to identify COPQ estimates for process changes that reduce time

and effort spent on tasks without a corresponding reduction in work force.

Page 14: 15 Deliv template

Deliverable 4: Define ; A.R.M.I.

Key Stakeholders Define Measure Analyze Green Improve Control

John M M M M M M

Paul A A A A A A

George R M M R R R

Ringo I R I I I

A - Approval of team decisions outside their charter/authorities, i.e., sponsor, business leader.R - Resource to the team, one whose expertise, skills, “clout” may be needed on an ad-hoc basis.M - Member of team, with the authorities and boundaries of the charter.I - Interested party, one who will need to be kept informed on direction, findings, if later support is to be forthcoming.

Project Phase

Page 15: 15 Deliv template

Deliverable 4: Define; Project Plan

Show the Excel project plan template, Gantt chart, or other type of project task & milestone summary here

Page 16: 15 Deliv template

Critical Checkpoints for Measure

Item Description /Comment

Responsibility Date

Measure tollgate Tollgate review BB, Champion, MBB, other (list names)

List date and time here

Use this slide to list the things the BB/team need help with in order for the project to maintain the project schedule. Be specific. The champion, PO, and all others should be clear on what they need to do to help keep the project on schedule when they leave the tollgate. If you need no specific actions on their part, state that as well.

Page 17: 15 Deliv template

Measure Phase

Page 18: 15 Deliv template

Deliverable 5: MeasureDocument Existing Process

• Show a detailed process map here. This will produce a list of X’s for the next deliverable.o Sufficient detail to show X’s and key decisions o List X’s for each process stepo List Y’s for each process step (This should include your primary metric)

Page 19: 15 Deliv template

Deliverable 5: MeasureDocument Existing Process

Page 20: 15 Deliv template

Deliverable 6: MeasureXY Matrix

Show the XY Matrix here. Use it to take the X’s from the previous phase and prioritize them for data gathering and

analysis

Page 21: 15 Deliv template

Deliverable 6: MeasureSecondary Tools

• Show any secondary tools used to narrow the list of “possible X’s” into a “most likely list of X’s” for data collection. These tools could include:

• Graphical analysis• Pareto charts• Box plot• Concentration diagram• Histogram etc.• Or Nothing

Page 22: 15 Deliv template

Deliverable 6: MeasureFMEA

Show the FMEA here. It takes the high priority X’s from the XY matrix and refines them for data gathering plus highlighting any immediate fixes that can/should be put in place until the final project recommendations are developed

Page 23: 15 Deliv template

Deliverable 6: MeasureFocus of Investigation

• Project Ys

• Summary of prioritized list of potential X’s

Page 24: 15 Deliv template

Deliverable 6: Measure Root Cause Investigation Matrix

Root Cause Investigation Matrix

Problem State-ment “Y"

Probable / Possible Root Cause(s) "Xs"

Statistical or Logical Analysis

Explain "WHY" - (Logic Flow for Verification Method)

MBB Con-currsY/N

Statistical Test or Description of non-Stat Treatment

Page 25: 15 Deliv template

Deliverable 7: MeasureData Collection Plan

• Show the Data Collection Plan here• It should use the project Y and the X’s listed in deliverable 6

• How you collect your data should be guided to address any issues from:o Sampling strategyo Auto correlation

Page 26: 15 Deliv template

Deliverable 8: MeasureValidate Measurement System

• Show how you validated the Y measurement system. If it was with a GR&R, show the Minitab output.o Data integrity audito Attribute R&Ro Gage R&Ro In-line gage R&R

Page 27: 15 Deliv template

Deliverable 9: MeasureBaseline Data Control Chart

• For the baseline data and/or the data collected to date (as appropriate), show the Y data on a control chart.

• The purpose of this analysis is to show the process is in a state of control and therefore appropriate for a capability analysis

Page 28: 15 Deliv template

Deliverable 9: MeasureBaseline Process Capability

• Show the process capability . If done in Minitab, show Minitab output.

• Process capability analysis• Box-Cox transformation if it is necessary• Weibull & other non-normal distributions if the data can’t be transformed

Page 29: 15 Deliv template

Deliverable 9: MeasureBaseline Process Capability

Defect being assessed: Invoice Accuracy

Is this Short Term or Long Term data? Long Term

Sigma Shift (Set to 1.5 unless data indicates otherwise) 1.5

No. of Units Inspected 85

No. of Opportunities For Defects / Unit 1

No. of Defects observed in units inspected 3

   

Long Term DPMO (Defects Per Million Opportunities) 35294

Long Term Zbench (Sigma Level) 1.81

   

Short Term DPMO (Defects Per Million Opportunities) 470

Short Term Zbench (Sigma Level) 3.31

Page 30: 15 Deliv template

Deliverable 9: MeasureBaseline Process Capability

Page 31: 15 Deliv template

Critical Checkpoints for Analyze

Item Description /Comment

Responsibility Date

Analyze tollgate Tollgate review BB, Champion, MBB, other (list names)

List date and time here

Use this slide to list the things the BB/team need help with in order for the project to maintain the project schedule. Be specific. The champion, PO, and all others should be clear on what they need to do to help keep the project on schedule when they leave the tollgate. If you need no specific actions on their part, state that as well.

Page 32: 15 Deliv template

Analyze Phase

Page 33: 15 Deliv template

Deliverable 10: Analyze Root Cause Investigation Matrix

Root Cause Investigation Matrix

Problem State-ment “Y"

Probable / Possible Root Cause(s) "Xs"

Statistical or Logical Analysis

Explain "WHY" - (Logic Flow for Verification Method)

MBB Con-currsY/N

Statistical Test or Description of non-Stat Treatment

Page 34: 15 Deliv template

Deliverable 10: AnalyzeDetermine Critical X’s

• Use as many slides as necessary to show how data was used to assess which X’s from deliverable 6 are the true X’s for the process. Typically, this section includes logical, graphical and statistical analysis. You must address each X listed on the RCIM with either logical or statistical analysis.o Statistical testso Show which Xs cause changes in Y

Page 35: 15 Deliv template

Graph Selection

X Continuous Data

X Discrete Data One Variable

Y Contin-uous data

Scatter PlotMatrix PlotDraftsman PlotMarginal PlotControl ChartRun Chart

BoxplotDotplotBar ChartPie ChartMulti-vari

Graphical SummaryBoxplotDotplotHistogramNormality

Y Discrete Data

Run ChartControl Chart

Concentration Diagram

Pareto

Graphical SummaryPareto

Page 36: 15 Deliv template

Deliverable 10: AnalyzeDetermine Critical X’s

Measurable Result

Contributor 1

Contributor 4

Contributor 2

Contributor 3

Area 1 Area 2

Area 3

Contributor 1

Contributor 4

Contributor 2

Contributor 3

Contributor 1

Contributor 4

Contributor 2

Contributor 3

Area 4

Contributor 1

Contributor 4

Contributor 2

Contributor 3

Page 37: 15 Deliv template

Deliverable 10: AnalyzeA Tree Diagram

1st cause (level 2 why from fishbone)

2nd cause why why why

2nd cause (level 2 why from fishbone)

2nd cause why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why why

2nd cause why why wh ywhy why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

1st cause why why why

1st cause why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

Page 38: 15 Deliv template

Deliverable 10: AnalyzeAnother Tree Diagram

1st cause (level 2 why from fishbone)

2nd cause why why why

2nd cause why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why

2nd cause why why why why why

2nd cause why why wh ywhy why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

2nd cause why why why why why

1st cause why why why

1st cause why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

1st cause why why why why why

Page 39: 15 Deliv template

Hypothesis: Describe what the team thinks is causing the poor results.

Method: Describe what specific method(s) you will use to prove or disprove the hypothesis.

Statistical Conclusion: List the results of your statistical tests and explain what the results mean.

Practical Conclusion: Describe your results using easily understood language.

Item being investigated

Deliverable 10: AnalyzeDetermine Critical X’s

Page 40: 15 Deliv template

Hypothesis: The new purchasing system has reduced ordering time by 25%.

Method: We obtained random samples form the “before” process and the “after” process. We made sure both samples were normally distributed. We then used a 2-Sample t test to compare the process before the change and after the change.

Statistical Conclusion: The 2-Sample t test resulted in a p-value of 0.00. If the p-value is less that .05, we can reject the Null hypothesis. The before and after process is different.

Practical Conclusion: The process ordering time has been reduced from 100 days to 36 days. That is a 64% reduction!

New Purchasing Ordering System

Deliverable 10: AnalyzeDetermine Critical X’s

EXAMPLE

Page 41: 15 Deliv template

Hypothesis: Inadequate staffing levels in the Call Center are causing an increased level of overflow calls.

Method: We used regression analysis to check for a relationship between staff levels and call overflow. We compared the 15 minute staffing interval levels to the call overflows from the same period.

Statistical Conclusion: Regression analysis revealed a R-Squared of 6.7%. Call center staffing levels alone do not explain the increased level of call overflow.

Practical Conclusion: Staffing levels do not explain the increase in call overflows. We need to look for other causes of call overflow.

Call Center Overflow Calls

Deliverable 10: AnalyzeDetermine Critical X’s

EXAMPLE

Page 42: 15 Deliv template

Deliverable 10: Analyze Root Cause Investigation Matrix

Root Cause Investigation Matrix

Problem State-ment “Y"

Probable / Possible Root Cause(s) "Xs"

Statistical or Logical Analysis

Explain "WHY" - (Logic Flow for Verification Method)

MBB Con-currsY/N

Statistical Test or Description of non-Stat Treatment

Page 43: 15 Deliv template

Critical Checkpoints for Green

Item Description /Comment

Responsibility Date

Green tollgate Tollgate review BB, Champion, MBB, other (list names)

List date and time here

Use this slide to list the things the BB/team need help with in order for the project to maintain the project schedule. Be specific. The champion, PO, and all others should be clear on what they need to do to help keep the project on schedule when they leave the tollgate. If you need no specific actions on their part, state that as well.

Page 44: 15 Deliv template

Green It Up Phase

Page 45: 15 Deliv template

Green Phase Guiding Thoughts

• Evaluating the project and process context is critical for the selection of the best possible countermeasures to deploy.

• The Green Phase of the project is when the Improvement Team stops to consider the relationships between each of the identified critical X’s and our environment.

• It is the intent of every project to improve the performance profile of the process that is the focus of the project. We must also manage risk.

• During this phase we explore the relationships between each root cause and the business outcomes that can be affected both positively and negatively to assure the countermeasures to be developed in the Improve Phase optimize the outcome of the project.

Page 46: 15 Deliv template

Deliverable 11: Green It UpRelationship Matrix

Show the Relationship Matrix here. Use it to take the critical X’s from the Analyze Phase and determine their relationship to the

environment of the process being investigated.

Page 47: 15 Deliv template

Deliverable 11: Green It UpCountermeasure Issue List

• Issues to consider during countermeasure development

Page 48: 15 Deliv template

Critical Checkpoints for Improve

Item Description /Comment

Responsibility Date

Improve tollgate Tollgate review BB, Champion, MBB, other (list names)

List date and time here

Use this slide to list the things the BB/team need help with in order for the project to maintain the project schedule. Be specific. The champion, PO, and all others should be clear on what they need to do to help keep the project on schedule when they leave the tollgate. If you need no specific actions on their part, state that as well.

Page 49: 15 Deliv template

Improve Phase

Page 50: 15 Deliv template

Deliverable 12: ImprovePrioritized List of Solutions

• Use as many charts as necessary to lead the audience through the flow of work done in this phase. Example – if a DOE is performed, you may want to use one chart to describe the DOE set-up, another to show the final Minitab session window list of terms, and graphical charts as appropriate to convey the results to your audience.

• If a Pugh or Criteria Decision Matrix are used, show those tools.• Show best solution selection among alternate solutions

o Pugh matrixo Criteria based decision matrix o Computer simulationo Risk assessmento DOE o DOE FMEA

Page 51: 15 Deliv template

Deliverable 12: ImprovePrioritized List of Solutions

  Net Process Total   0 0 0 0 0 0 0

  Sum of Better (+)   0 0 0 0 0 0 0

  Sum of Worse (-)   0 0 0 0 0 0 0

  Sum of "Same" (s)   0 0 0 0 0 0 0

Key Criteria for Comparison Design Concept 1 (Baseline)

Design Concept 2

Design Concept 3

Design Concept 4

Design Concept 5

Design Concept 6

Design Concept 7

Design Concept 8

1                

2                

3                  

4                  

5                  

6                  

7                  

8                  

9                  

10

Page 52: 15 Deliv template

Deliverable 12: Improve Criteria Based XY Matrix

Show the Criteria-based XY Matrix here. It takes the alternative improvement strategies and them for decision-making about

which one or ones to pursue

Page 53: 15 Deliv template

Deliverable 13: ImprovePilot Best Solution

• Show results of pilot. Use whatever tools are best to convey results. o Run chart, Process Capability, DDS, etc.o Pilot sampling and communication plano Results of piloto Transition plan to permanent changeo B vs. C testingo Pilot FMEA

Page 54: 15 Deliv template

Critical Checkpoints for Control

Item Description /Comment

Responsibility Date

Control tollgate Tollgate review BB, Champion, MBB, other (list names)

List date and time here

Use this slide to list the things the BB/team need help with in order for the project to maintain the project schedule. Be specific. The champion, PO, and all others should be clear on what they need to do to help keep the project on schedule when they leave the tollgate. If you need no specific actions on their part, state that as well.

Page 55: 15 Deliv template

Control Phase

Page 56: 15 Deliv template

Deliverable 14: ControlTransition Plan

• Notes as needed

Show the transition plan here. The transition plan is a list of actions required to put the new, permanent process improvements in place.Identify the tasks to be completedShow responsibilities and due dates

Item Description /Comment

Responsibility DueDate

DateDone

1 Write new procedures John 1/1/2010 1/1/2007

2 Train all employees Ringo 1/1/2010 1/2/2007

3 Get VP approval Paul 1/1/2009 12/30/2006

4 Hang out and be cool George Now Ongoing

Page 57: 15 Deliv template

Deliverable 14: Control Dashboard / Control Plan

• Show the control measurement metrics and how they will be monitored

• If the indicators required to control the process are included on a Standard Process Map, include a copy of the new Standard Process Map on a single slide.

Page 58: 15 Deliv template

Deliverable 15Updated Process Capability

• Show the updated process capability graph/calculations here. This sets a standard for future operation to meet.

• There are samples of attribute and continuous data capability calculations with Deliverable 9 earlier in this presentation.

Page 59: 15 Deliv template

Deliverable 15Updated Process Capability

• Show Before & After Graphs

Page 60: 15 Deliv template

Deliverable 15Updated Process Capability

• Show statistical test of the improvement on the primary metric• Two-sample T for Average Defect

• Stage N Mean StDev SE Mean• Before 12 0.355 0.382 0.11• Second 10 0.071 0.124 0.039

• Difference = mu (Before) - mu (Second)• Estimate for difference: 0.284000• 95% CI for difference: (0.020452, 0.547548)• T-Test of difference = 0 (vs not =): T-Value = 2.25 P-Value = 0.036 DF

= 20

Page 61: 15 Deliv template

Deliverable 15Updated Benefits Document

• Show the updated project benefits on the next slide. • In deliverable 3, these were estimated. By deliverable 15, the

data will almost always show benefits to be somewhat different than originally expected.

• PO, Champion, and MBB need to agree on benefits calculations.

• Be sure to showo $ broken down by TS savings categoryo Cost Center number which will receive the savingso Final posted version should state that savings have been reviewed with

Champion and that the Champion agrees with values

Page 62: 15 Deliv template

Deliverable 15Updated Benefits Document

• Hard $$ savings

• Soft $$ savings

• Productivity improvement

• Internal customer satisfaction

• External customer satisfaction

Describe Project Benefits in terms of COPQ, non-financial benefits, etc.Show enough detail for reader to understand how COPQ is calculated as well as the total value. Be sure to show

• $ broken down by savings category• Cost Center number which will receive the savings

Final posted version of this slide should state that savings have been reviewed with your Champion and that the Champion agrees with values. It is also to be submitted to Finance for Audit Review.

Page 63: 15 Deliv template

Deliverable 15 Final Presentation/Closing Report

• This document is the final report for this project.

• Transition information to support the flow of the report is included in the speaker notes.

• If there are further questions, please contact <Green Belt> at 665-XXXX

This document will suffice for a final presentation/closing report if the author uses the speaker notes section to add whatever detail is needed to make this a stand alone document. IE – a person who is unfamiliar with the project or process should be able to view this presentation along with the speaker notes and understand what was done and why. A presentation that simply shows the tools and relies on the speaker to communicate the key points to the audience is not an adequate closing report.