+ All Categories
Home > Documents > 150 Pm 63-69parts Manual

150 Pm 63-69parts Manual

Date post: 21-Nov-2015
Category:
Upload: mary-oc
View: 21 times
Download: 1 times
Share this document with a friend
Description:
manual de partes de avión cessna 150
Popular Tags:
486
Transcript
  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • MTG

  • This page intentionally left blank.

  • McCurtain Technology GroupS1356-1

  • This page intentionally left blank.

  • McCurtain Technology Group279

  • McCurtain Technology Group279

  • This page intentionally left blank.

  • This page intentionally left blank.

  • McCurtain Technology Group279

  • This page intentionally left blank.

  • MTG

    MTG

  • This page intentionally left blank.

  • McCurtain Technology Group#

    McCurtain Technology Group0456004-2

    McCurtain Technology Group- 6 #

    McCurtain Technology GroupLINE - VENT ----- 150-67199 & ON, F150-0220 & ON

    McCurtain Technology GroupR

    McCurtain Technology Group1

  • This page intentionally left blank.

  • McCurtain Technology GroupOrder 0453006-1 for any and/or all replacements

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • McCurtain Technology Group

    McCurtain Technology Group154-13

    McCurtain Technology Group3021

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • This page intentionally left blank.

  • CoverList of Effective PagesRevision - 10/15/70IntroductionUpholstery & Interior TrimAlphabetical IndexA - BCDEFG - HIJ - LMN - PRSTU - VW

    Parts Listing / FiguresFig 1. Miscellaneous Bulk ItemsFig 1A. Placards & Nameplates InstallationFig 1B. (Sheet 1 of 3) Placards, Nameplates & Exterior MarkingsFig 1B. (Sheet 2 of 3) Placards, Nameplates & Exterior MarkingsFig 1B. (Sheet 3 of 3) Placards, Nameplates & Exterior MarkingsFig 1C. Wing Assembly CompleteFig 1D. Patroller Wing Assembly CompleteFig 2. Wing Structure AssemblyFig 2A. Patroller Wing Structure AssemblyFig 3. Wing Leading Edge AssemblyFig 4. Fuel Tank InstallationFig 4A. Patroller Wing Fuel Tank InstallationFig 4B. Fuel Tank Drain Valve InstallationFig 5. Aileron InstallationFig 6. Flap InstallationFig 7. Wing Strut AssemblyFig 7A. Wing Strut AssemblyFig 8. Stabilizer and Elevator InstallationFig 9. Vertical Fin, Rudder and Dorsal InstallationFig 9A. Fin InstallationFig 9B. Rudder InstallationFig 10. Fuselage AssemblyFig 10A. Fuselage AssemblyFig 10B. Fuselage AssemblyFig 11. Fuselage Front and Center Section AssemblyFig 11A. Front & Center Section - FuselageFig 11B. Landing Gear Bulkhead AssemblyFig 12. Fuselage Front Section AssemblyFig 12A. Fuselage Front Section AssemblyFig 12B. Fuselage Front Section AssemblyFig 12C. Fuselage Front Section AssemblyFig 13. Front Doorpost Bulkhead AssemblyFig 13A. Front Doorpost Bulkhead AssemblyFig 14. Fuselage Tailcone AssemblyFig 14A. Fuselage Tailcone AssemblyFig 14B. Fuselage Tailcone AssemblyFig 14C. Aft Tailcone AssemblyFig 15. Windshield InstallationFig 15A. Message Drop Tube InstallationFig 16. Nose Gear InstallationFig 16A. Nose Gear InstallationFig 16B. Nose Gear Installation - Heavy DutyFig 17. Nose Gear Strut AssemblyFig 17A. Nose Gear Strut AssemblyFig 17B. Heavy Duty Nose Gear Strut AssemblyFig 18. Main Landing Gear InstallationFig 18A. Main Landing Gear InstallationFig 18B. Main Landing Gear InstallationFig 19. Seat InstallationFig 19A. Child Seat InstallationFig 19B. Reclining Seat InstallationFig 19C. Auxiliary Seat InstallationFig 19D. Auxiliary Seat InstallationFig 20. Upholstery InstallationFig 20A. Upholstery InstallationFig 20B. Upholstery InstallationFig 20C. Cabin Top and Firewall Upholstery InstallationFig 20D. Cabin Side Panels & Floorboard Upholstery InstallationFig 21. Left Cabin Door AssemblyFig 22. Right Cabin Door AssemblyFig 22A. Patroller Door AssemblyFig 22B. Cabin Door InstallationFig 22C. Cabin Door InstallationFig 22D. Cabin Door Latch AssemblyFig 23. Instrument Panel Equipment InstallationFig 23A. Instrument Panel Equipment InstallationFig 23B. Instrument Panel Equipment InstallationFig 23C. Instrument Panel Equipment InstallationFig 23D. Instrument Panel Equipment InstallationFig 23E. Instrument Panel Equipment InstallationFig 23F. Switch Panel AssemblyFig 24. Glove Box InstallationFig 24A. Map Case and Door InstallationFig 24B. Glove Box InstallationFig 24C. Glove Box InstallationFig 25. Fuselage Equipment InstallationFig 25A. Fuselage Equipment InstallationFig 25B. Compass InstallationFig 25C. Compass & Sun Visor InstallationFig 26. Propeller and Spinner InstallationFig 27. Engine Winterization InstallationFig 27A. Winterization Equipment InstallationFig 28. Engine Cowl AssemblyFig 28A. Engine Cowl AssemblyFig 29. Engine InstallationFig 30. Engine AssemblyFig 31. Engine Exhaust Stacks AssemblyFig 32. Engine Baffles InstallationFig 33. Cabin Heating and Ventilating System InstallationFig 33A. Cabin Heating and Ventilating System InstallationFig 33B. Cabin Heating & Ventilating System InstallationFig 34. Brake and Rudder Pedal InstallationFig 35. Control Tee InstallationFig 35A. Control Y InstallationFig 35B. Control Y InstallationFig 36. Rudder Control System InstallationFig 36A. Rudder Control System InstallationFig 37. Aileron Control System InstallationFig 37A. Aileron Control System InstallationFig 37B. Wing Leveler InstallationFig 37C. Wing Leveler ComponentsFig 38. Flap Control System InstallationFig 38A. Flap Control System InstallationFig 38B. Electric Flap System InstallationFig 38C. Flap Position Indicator InstallationFig 39. Elevator Control System InstallationFig 40. Elevator Trim Control System InstallationFig 40A. Elevator Trim Control System InstallationFig 40B. Elevator Trim Control System InstallationFig 41. Pitot System InstallationFig 41A. Stall Warning Horn InstallationFig 42. Brake System InstallationFig 42A. Brake System InstallationFig 43. Fuel System InstallationFig 43A. Fuel System InstallationFig 43B. Fuel Strainer AssemblyFig 44. Oil System InstallationFig 45. Vacuum System InstallationFig 45A. Vacuum System InstallationFig 45B. Vacuum System InstallationFig 45C. Useage Table For C661002-0201 & C661001-0201 GyrosFig 45D. Vacuum System InstallationFig 45E. Vacuum System InstallationFig 46. Electrical Equipment InstallationFig 46A. Electrical Equipment InstallationFig 46B. Instrument Panel Lights InstallationFig 46C. 60 Amp Alternator InstallationFig 47. Landing Light InstallationFig 48. Rotating Beacon InstallationFig 48A. Flashing Beacon Light InstallationFig 49. Courtesy Light InstallationFig 50. Control Wheel Maplight InstallationFig 51. Main Landing Gear Wheel and Brake AssemblyFig 51A. Main Landing Gear Wheel and Brake AssemblyFig 51B. Main Landing Gear Wheel & Brake Assembly 6.00x6Fig 51C. Main Wheel & Brake AssemblyFig 52. Nose Gear Wheel AssemblyFig 52A. Nose Gear Wheel AssemblyFig 52B. Nose Gear Wheel Assembly - Heavy DutyFig 53. Shimmy Dampener AssemblyFig 53A. Shimmy Dampener AssemblyFig 54. Master Brake Cylinder AssemblyFig 54A. Master Brake Cylinder AssemblyFig 55. Floatplane Fittings InstallationFig 56. Oil Cooler Installation - Floatplane

    Numerical Index


Recommended