  • EMCAL CATANIA

    A. Palmeri - F. Noto

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STATUS OF THE MODULES ASSEMBLY HALL IN CT Let start this presentation with the picture showing the involved people. The photographer is also participant to the assembly activities. At the present time the agreement with the local management is ALL OF THEM ARE ALLOCATED TO THE ALICE EMCAL COLLABORATIONFor 3 Years

    A. Palmeri - F. Noto I.N.F.N. Catania

  • The high number does not correspond to a great full time occupancy. Really they will be organized in turnover: two people for ONE MODULE ASSEMBLY. In case of need, in the future, their part time contribution may be extended to a large fraction of their weekly working time (max 50%). All of them will work on the stacking and compression phases and some one on the STRIP ASSEMBLY. STATUS OF THE MODULE ASSEMBLY HALL IN CT

    A. Palmeri - F. Noto I.N.F.N. Catania

  • MENUMANPOWERASSEMBLY HALLMODULEAssembly STATIONCompression STATION STRIPS Assembly STATIONSHIPPING TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • . In our program it was supposed to be ready in April /2008It will be ready by end of September/2008.The main problem we have had has been the strong delay of the University in the MOVE OUT the area where the Hall has to be built.For unknown raisons, while the Call for tenders was achieved the end of January/2008 , the PO was placed only begin of June. The University is the owner of the land and, of course, its transformation.The building, electric network, cooling air system , are in charge of the INFN. All INFN PO were placed by the end of December/2007! STATUS OF THE ASSEMBLY HALL IN CT

    A. Palmeri - F. Noto I.N.F.N. Catania

  • Ground : cleaning and concrete screed. (see the next slides) call for tenders Jan/2008 PO delivered to the winner firm only on June/12th 2008 !!!!!!!! Catania University (28 working days) anyway JOB ACCOMPLISHED ON JULY/11 2008

    STILL REMAIN (too much but.) Hall construction : PO Dec/2007 INFN (4 weeks)Electric network : PO Dec/2007 INFN (1 week)Air conditioned : PO Dec/2007 INFN (2 days)STATUS OF THE ASSEMBLY HALL IN CT

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STATUS OF THE ASSEMBLY HALL IN CTSTATUS OF THE GROUND ON JUNE/12 2008

    A. Palmeri - F. Noto I.N.F.N. Catania

  • ASSEMBY HALLSTATUS of the GROUND on JUNE/12 2008:

    A. Palmeri - F. Noto I.N.F.N. Catania

  • WORKSHOP HALL The status @ 25/6/2008

    A. Palmeri - F. Noto I.N.F.N. Catania

  • WORKSHOP HALL The status @ 08//July/2008

    A. Palmeri - F. Noto I.N.F.N. Catania

  • ASSEMBLY HALLAbout 80 m2Ergonomics estimated by FrancescoOne small hall equipped with two PC to guarantee the access to INTERNET to the operators (+a refrigerator)Room for several Stations:2 Assembly (????)3 (or more) Compression (????)1 STRIP assembly desk 2x0.8 m2

    OfficeAssembly/Compression stationStrip Assembly Station

    A. Palmeri - F. Noto I.N.F.N. Catania

  • MODULEThe Assembly/Compression Station(made in Frascati)

    A. Palmeri - F. Noto I.N.F.N. Catania

  • MODULEThe Assembly/Compression Station(made in Catania)

    A. Palmeri - F. Noto I.N.F.N. Catania

  • MARBLE 190x80 cm2

    A. Palmeri - F. Noto I.N.F.N. Catania

  • AVAILABLE FACILITIES 1 ASSEMBLY STATION (from Frascati) 2 COMPRESSION STATIONS (Ct) Completely equipped 11 Load Cells (one spare)MODULEThe Assembly/Compression Station

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIP ASSEMBLY TOOL(preliminary)Design ok Procurement of the Material okMachining INFN CATANIA (?)

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIP ASSEMBLY TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • Lifting a Module by a little crane The precision of the position is guarantee by the PINS using the FP precision holesSTRIP ASSEMBLY TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • Lifting the Strongback by the little craneSTRIP ASSEMBLY TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIP ASSEMBLY TOOLGuideBearingDIMAStrongback

    Winder

    Bosh Profile 45x45

    Worm Screw M16

    Threaded Support

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIP ASSEMBLY TOOL Module

    PIN

    DIMAThe position precision is give by the pins connecting the plates and the DIMA.The StrongBack positioning is operated by the screw.

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIPS SHIPPING TOOLDesign Machining in the INFNProcurement Material (ok)6 Wire Rape Isolator (ok) Transportation to GRENOBLE by INFN Staff (high probability)

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIPS SHIPPING TOOLINGBosch profiles

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIPS SHIPPING TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • Transportation to Grenoble should be operate by our technical staff.Costs are lower than that of any external firm for , at least, 3 STRIPSSTRIPS SHIPPING TOOL

    A. Palmeri - F. Noto I.N.F.N. Catania

  • STRIPS SHIPPING TOOLWire Rape Isolator

    A. Palmeri - F. Noto I.N.F.N. Catania

  • ALICE EMCAL CRADLESReceived on july/11 2008 long side plates

    A. Palmeri - F. Noto I.N.F.N. Catania

  • 4 SM crates in construction upper long side (face superieur) ready saw tooth side construction started on July/14 and ready by the END OF THIS WEEK. Assembly for shipping foreseen by the first week of August ALICE EMCAL CRADLES

    A. Palmeri - F. Noto I.N.F.N. Catania

  • We are ready to receive the componentsof Modules & Strips for ASSEMBLY.

    First MODULE ready beginning of OCTOBER

    All the CT technical activities will be managed by FrancescoCONCLUSIONS