BEFORE YOU BEGIN
IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
•BUILDINGRESTRICTIONSANDAPPROVALS
Be sure to check with local building department and homeowners association for specific restrictions and/ or requirements before building
. •ENGINEEREDDRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
•SURFACEPREPARATION
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are
listed on page 7.
•CHECKALLPARTS
Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.
•ADDITIONALMATERIALS
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
09/12/2012
KEEP THIS MANUAL FOR FUTURE REFERENCE
ACTUAL FLOOR SIZE IS 120" x 90" (304,8 x 228,6 cm)
16752
ASTON 10' x 7'-6" (304,8 x 228,6 cm)
ASSEMBLY MANUALABackyardProductsCompany
2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have fi nished the assembly or installation.
= Level
� Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
� Safety Glasses
� Tape Measure
� Paint Tools
� Ladder
� Caulk Gun
� Hammer
� Level
FINISH
BEGIN
� Pencil
� Phillips Screwdriver
� Drill / Driver� 1/4" Drill Bit� 3/8" Drill Bit� 1/2" Drill Bit� #2 Philips Drive Bit
� Tool Belt/ Nail Pouch
� Chalk Line
� Nail Gun
• gun nails
� Tin Snips (for drip edge)
� Square or
� Utility Knife
� Shingle Blades
B C
3
COMPLETING YOUR SHED You will need these additional materials:
TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING:
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIPEDGE.....................50Feet #15ROOFINGFELTTo cover 99 Sq. Ft. of roof area.
1"GALVANIZEDROOFINGNAILS.........1/4LbFor roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TABSHINGLES............................4Bundles
PAINTFORSIDING..........................2GallonsUse 100% acrylic latex exterior paint. (2) coats recommended. CAULK.................................................3TubesUse acrylic latex exterior caulk that is paintable.
1"GALVANIZEDROOFINGNAILS....3Lbs For shingles. PAINTFORTRIM.............................1QuartUse 100% acrylic latex exterior paint. WOODGLUE.......................ExteriorRated
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below). Below is a list of additional materials (not included):
x2
x8
2 x 4 x 87" (5 x 10 x 221 cm) Treated Lumber ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
• This shed kit includes a complete wood floor system.
• This shed kit does not include ANY leveling materials.
• SeetheFLOORLEVELINGsectiononpage7forrecommendedmethodsandsuggestedmaterialstoproperlylevelyour floor,asthiswillvarydependingonyourspecificsite.
Optional 12" (30,1 cm) spacing.
• Standard spacing is 16" (40,7 cm).
WOODSIZECONVERSIONCHARTNominalBoardSize ActualSize
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)
PARTS IDENTIFICATION AND SIZES
RS RS
Part identification letters are stamped on some parts.
Check these locations for part stamp.
Treated lumber is stamped:
Alltreatedlumberisstamped:
WA
LLS
x4 2 x 4 x 86" (5,1 x 10,2 x 218,4 cm) BLA
x2 2 x 4 x 79-1/8" (5,1 x 10,2 x 201,3 cm) BJA
x2 2 x 4 x 74-1/4" (5,1 x 10,2 x 188,6 cm) BNA
x2 2 x 4 x 72-5/8" (5,1 x 10,2 x 184,5 cm) BFA
x3 2 x 4 x 72" (5,1 x 10,2 x 91,4 cm) TM
x2 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) UM
PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
RA
FT
ER
S
x2 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm)
x1 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)
TR
IM
x2 19/32 x 3-1/2 x 48" (1,5 x 8,8 x 121,9 cm)
x1 19/32 x 3-1/2 x 52 - 3/8" (1,5 x 8,8 x 133 cm)
x2 2 x 3 x 33-1/8" (5,1 x 7,6 x 84,1 cm)
x1
x4 19/32 x 2 - 1/2 x 9" (1,5 x 6,3 x 22,9 cm)
x9 2 x 3 x 10-1/2" (5,1 x 7,6 x 26,7 cm)
x2 1 x 3 x 33 - 1/8" (2,5 x 7,6 x 84,1 cm)BPA
x1 19/32 x 3-1/2 x 35-1/4" (1,5 x 8,8 x 89,5 cm)BYA
x6
x3
x2
x2
2 x 4 x 64" (5,1 x 10,2 x 162,5 cm)
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
2 x 4 x 28" (5,1 x 10,2 x 71,1 cm)
2 x 4 x 45 - 5/8" (5,1 x 10,2 x 115,8 cm)
UX
SP
RR
BUA
BQA
FS
EY
x2 2 x 4 x 85-1/2" (5,1 x 10,2 x 217,2 cm) BKA
2 x 4 x 16 - 1/2" (5,1 x 10,2 x 41,9 cm) x4 3/4"(1,9 cm)
RD
BMA
GAA
BRA
HJ
x9 2 x 4 x 93-3/16" (1,5 x 10,2 x 236,7 cm)BOA
2 x 3 x 35-1/4" (5,1 x 7,6 x 89,5 cm)
ZT
x1 19/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)BXR
x1 19/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)BXL
x1 UN 2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
4
FLO
OR
x2
2 x 4 x 87" (5,1 x 10,2 x 220,9 cm)
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x9
2 x 4 x 72" (5,1 x 10,2 x 182,8 cm)
SO
FFIT
DO
OR
PARTS LIST continued...
x2
TRIM
CO
RN
ER
/FR
EIZ
E T
RIM
OY 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm)
19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)
19/32 x 3-1/2 x 80" (1,5 x 8,8 x 203,2 cm)
19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm)
x1
x1
x2
BTA
BSA
ZX
x1 PT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
35-3/4 x 10-3/8 x 3/8" (90,8 x 26,3 x 1 cm)
x1
95-3/8 x 10-3/8 x 3/8" (242,2 x 26,3 x 1 cm)x1
95-1/2 x 5-1/4 x 3/8" (242,5 x 13,3 x 1 cm)x2
19/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm)x4 AH
x2 OO 2 x 3 x 69" (5,1 x 7,6 x 175,2 cm)
x1 3/8 x 2 x 25-3/8" (0,9 x 5,1 x 64,4 cm)
x2 3/8 x 2 x 68-3/4" (0,9 x 5,1 x 174,6 cm)
x1 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)
x1 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)
x2 3/8 x 2 x 91-1/4" (0,9 x 5,1 x 231,7 cm)
x1 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)
x1 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)
x1 3/8 x 2 x 96" (0,9 x 5,1 x 243,8 cm)
5
PANEL PARTS LIST
RO
OF
PAN
ELS
FLO
OR
NOTE:Panelpartsarenotstamped.
Floorpanelsare5/8"(1,6cm)thick.Roofpanelsare7/16"(1,1cm)thick.
7/16 x 11-7/8 x 96"(1,1 x 30,2 x 243,8 cm)x1
7/16 x 11-7/8 x 35-7/8"(1,1 x 30,2 x 91,1 cm)x1
7/16 x 35-7/8 x 96"(1,1 x 91,1 x 243,8 cm)
x1
7/16 x 48 x 96"(1,1 x 121,9 x 243,8 cm)
x2
5/8 x 23-7/8 x 90"(1,5 x 60,6 x 228,6 cm)
x1
5/8 x 42 x 96"(1,5 x 106,6 x 243,8 cm)
x1
5/8 x 48 x 96"(1,5 x 121,9 x 243,8 cm)
x1
x23/8 x 11-7/8 x 96"
(1 x 30,1 x 243,8 cm)
WALL PANEL & DOORS PARTS LIST
x1LEFTDOOR
x1RIGHTDOOR
x2 BOXES
x3 BOXES
x210
x180
NAIL BOXES
VENT, DOOR HARDWARE, AND WINDOW
FASTENER/HARDWARE BAG
x23/8 x 48 x 72"
(1 x 113,3 x 121,9 cm)
x13/8 x 42 x 83-1/8"
(1 x 106,6x 211,1 cm)
x13/8 x 48 x 96"
(1 x 121,9x 243,8 cm)
x13/8 x 48 x 96"
(1 x 121,9x 243,8 cm)
x13/8 x 42 x 83-1/8"
(1 x 106,6x 211,1 cm)
x13/8 x 23-7/8 x 72"
(1 x 60,6 x 182,9 cm)
x13/8 x 48 x 96"
(1 x 121,9x 243,8 cm)
x13/8 x 48 x 96"
(1 x 121,9x 243,8 cm)
6
2" (5,1 cm)
3" (7,6 cm)
x75
x56
x88
x2 1-1/4" (3,2 cm)
3/4" (1,9 cm)
2" (5,0 cm)
3" (7,6 cm)
2" (5,1 cm)
1-1/2" (3,8 cm)
x1x2
x8x3
x2
8 x 16" (20,3 x 35,6 cm)
1/2" (1,2 cm)
x121" (2,5 cm)
x21-1/2" (3,8 cm)
9 X 27" (22,8 x 68,5 cm)
7
DOOR
FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS
Measurementsto centerof4x4's.
• 3" Screws angled into 4x4.• (2) at each point frame• and 4x4 touch.
• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.
LEVELINGMETHODS
• If you are building your shed on a concrete foundation see the following page.
CONCRETE
MATERIALREQUIRED
x2 4" x 4" x 10' (10 x 10 x 304,8 cm)Treated Lumber
FastenersforFrameto4"x4". (3" Screws shown as one option.) Minimum (40) 3" screws / exterior grade.
Useonlywoodtreatedforgroundcontactandfastenersapprovedforusewithtreatedwood.
Alwayssupportframeseams.
Levelinghigherthan16"notrecommended.
LEVELINGMATERIALSGravel
2x4 Treated Lumber
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
8" Block
4" BlockGravelGravel
Do not exceed 16".
4x4 Runner
Shingle
ShingleMaximum between leveling
material locations.48"
12"
2x4 Treated Lumber
2" Block
Level
12"
12"(30,5 cm)
12"(30,5 cm)
8
CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit
on a concrete slab refer to the diagram below.
• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint:Usetreatedlumberinyourkitor purchasefulllengthtreatedlumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fastenersnotincluded). • Check local code for concrete foundation requirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
2" x 4" x 10'-0" (5,1 x 10,2 x 304,8 cm)
2" x 4" x 7'-6" (5,1 x 10,2 x 229,6 cm)
Caulk
Requires:
x2
x2
x1
MUSTbetreatedlumber.
MUSTbetreatedlumber.
120"(243,9cm)120"x90"(304,8x228,6cm) 83"(210,9cm)10'x7'-6"(304,8x228,6cm) 90"(228,6cm)
AActualSize B CBuildingSize
A
BC
4"(10,2 cm)
3-1/2"(8,9 cm)
DOOR
TreatedSillPlate
Caulkbetweensillplateandconcrete.
9
DOOR
3" (7,6 cm) x9
x2
x40
2 x 4 x 87" (5,1 x 10,2 x 221 cm)
2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
PARTSREQUIRED:
Centeronmarks
DOOR
FLOOR FRAME
Flush
Flush
Look for
StampTREATED
HINT:Foreasiernailingstandonframe.
2
1
Use two 3" nails at each mark.
Orient parts as shown on fl at surface. Measure and mark.BEGIN
You have fi nished your fl oor frame. Proceed to level and square frame.
FINISH
3
Notethismeasurement
TOENAILING
48"(121,9 cm)
32"(81,3 cm)
16"(40,6 cm)
16"(40,6 cm)
48"(121,9 cm)
64"(162,6 cm)
80"(203,2 cm)
90"(228,6 cm)
87"(221 cm)
96"(243,8 cm)
107-5/8"(273,4 cm)
120"(304,8 cm)
72"(182,9 cm)
72"(182,9 cm)
12-1/4"(31 cm)
11-5/8"(29,5 cm)
10
DOOR
FINISH
5
LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.
A level and square fl oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying fl oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 150" (381 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig.A).
Once the fl oor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners.
See page 7 for the preferred fl oor leveling method.
First,secureatendswithonefastener.
Second,secureatendswithonefastener.
150"(381 cm)
150"(381 cm)
Fig.A
11
48"(121,9 cm)
120"(304,8 cm)
6"(15,2 cm)
12"(30,5 cm)
DOORMove to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is flush to the floor frame (Fig.B).Secure panel with two 2" nails in the corners.
2
BEGIN1
3
4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.
Ensureyourfloorframeissquarebyinstallingonepanelandsquaringframe.
Fig.A
Fig.B
Check the floor frame is square by measuring diagonally across the frame corners. If the measurements are the same your floor frame is square. The measurement will be approximately 150" (381 cm) (Fig.C).
PARTSREQUIRED:
x1
x50
5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
Gridlinesup
Seam
Seam
2" (5,1 cm)
Flush
Flush
Flush
(2)Nails
(2)Nails
FLOOR PANELS
3/4" (1,9 cm)
3/4" (1,9 cm)
DOOR
150"(381 cm)
150"(381 cm)
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (FigA). Secure panel with two 2" nails in the corners.
Fig.C
DOOR
12
42"(106,7 cm)
120"(304,8 cm)
6"(15,2 cm)
23-7/8"(60,6 cm)
12"(30,5 cm)
DOOR
PARTSREQUIRED:
FINISH
7 You have fi nished attaching your fl oor panels.
Continue installing panels with rough side up (painted grid lines).
Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.
5
76
x1 x1
x91
5/8 x 23-7/8 x 90"(1,6 x 60,6 x 228,6 cm)
5/8 x 42 x 96"(1,6 x 106,7 x 243,8 cm)
Gridlinesup
2" (5,1 cm)
FLOOR PANELS
Flush
Flush
Flush
FlushDOOR
13
DOOR
Backwall
Frontwall
Checkthefloorframeislevelafterinstallingfloorpanels.Re-levelifneeded.
HINT:
IMPORTANT!
•Thefloorshouldbeusedasastableworksurfaceforwallconstruction.
• Organizeyourassemblyprocedureduringthebuildprocess toavoidover-handlingofthewalls.
DOOR
BACK WALL FRAMEPARTSREQUIRED:
120"(304,8 cm)
96"(243,8 cm)
72"(182,9 cm)
48"(121,9 cm)
48"(121,9 cm)
72"(182,9 cm)
24"(61 cm)
64"(162,5 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
48"(121,9 cm)
HINT: Foreasiernailing standonframe.
x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) TM
x6 2 x 4 x 64" (5,1 x 10,2 x 162,5 cm) UX
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) SPx28
14
3" (7,6 cm)
DOOR
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
For back wall, orient parts on edge on floor. Measure and mark.
2
UXx6
SP
TMSP
TM
48"(121,9 cm)
3/4"(1,9 cm)
4"(10,2 cm)
3/4"(1,9 cm)
12"(30,5 cm)
6"(15,2 cm)
15
Forsquarenessmaintain3/4"measurementalongpaneledges.
BACK WALL PANELS
48 x 72"(121,9 x 213,4 cm)
PARTSREQUIRED:
x1
x452" (5,1 cm)
Fig.B
BEGINHERE
Fig.A
3/4" (1,9 cm)
3/4" (1,9 cm)
2Nails
2Nails
DOOR
Place 48x72" panel onto wall frame flush to top of frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig.A).
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig.B).
4
5
3
3/4"GAUGEBLOCK
GAA
3/4"GAUGEBLOCK
Primedsideup
16
48"(121,9 cm)
3/4"(1,9 cm)
4"(10,2 cm)
3/4"(1,9 cm)
12"(30,5 cm)
6"(15,2 cm)
23-7/8"(60,6 cm)
4"(10,2 cm)
6"(15,2 cm)
Forsquarenessmaintain3/4"measurementalongpaneledges.
Forsquarenessmaintainflushalongpaneledges.
Place center 48"x72" panel on frame as shown with primed side facing up.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
6
Place end 23-7/8"x72"panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.
7
You have fi nished building your back wall.FINISH
9
48 x 72"(121,9 x 213,4 cm)
23-7/8 x 72"(60,6 x 213,4 cm)
x1 x1
x75
BACK WALL PANELS
PARTSREQUIRED:2" (5,1 cm)
DOOR
8 Carefully fl ip the BACK wall over.
DOOR
3/4"GAUGEBLOCK
GAA
3/4"GAUGEBLOCK
Flush
Primedsideup
Primedsideup
17
FRONT WALL FRAME
PARTSREQUIRED:
HINT: Foreasiernailing standonframe.
x1x2x1x4x1
2 x 4 x 86" (5,1 x 10,2 x 218,4 cm)
2 x 4 x 94-1/2" (5,1 x 10,2 x 240,1 cm)
2 x 4 x 74-1/4" (5,1 x 10,2 x 188,6 cm)
2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
2 x 4 x 45-5/8" (5,1 x 10,2 x 115,8 cm) BMA
UM
BNA
BLA
UN
2 x 4 x 28" (5,1 x 10,2 x 71,2 cm) x2 RR2 x 4 x 16-1/2" (5,1 x 10,2 x 42 cm) x1 RDx34
3" (7,6 cm)
DOOR
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams.
For front wall, orient parts on edge on floor. Measure and mark.
2
Flush
Flush
Flush
Flush
28" (72,2 cm)
16-1/2" (42 cm)
28" (71,2 cm)
28" (71,2 cm)
74-1/4" (188,6 cm)
45-5/8" (115,8 cm)
74-1/4" (188,6 cm)
94-1/2" (240,1 cm)86"
(218,4 cm)
68" (172,7 cm)
92" (233,7 cm)
120" (304,8 cm)
108" (274,3 cm)
12" (30,5 cm)
12" (30,5 cm)
12" (30,5 cm)
16" (40,6 cm)
16" (40,6 cm)
BLAX2
BLAX2
UM
UNRD
BNABMA
UM
RR RR64" (162,6cm)
27-1/2"(69,9 cm)
27-1/2"(69,9 cm)
18
DOOR
FRONT WALL FRAME
PARTSREQUIRED:
HINT:Foreasiernailingstandonframe.
2 x 4 x 16" (5,1 x 10,2 x 42 cm) x3 RDx12
3" (7,6 cm)
Use two 3" nails at each mark.
Orient parts on edge as shown. Measure and mark.3
4
27-1/2"(69,9 cm)
64"(162,6cm)
RD RD
You have fi nished building your front wall frame.FINISH
5
3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)x1
19
5-1/2"(14 cm)
PARTSREQUIRED:
FRONT WALL PANELS
x402" (5,1 cm)
DOOR
Place 48x96" left panel primed side up onto wall frame centered in door opening as shown.• Ensure top of panel is overhanging the top of frame by 5-1/2".
Nail panel with two 2" nails 6" (15,2 cm) apart. Maintain 64" (162,5 cm) measurement between studs and square frame.
2
1
MAINTAIN64"DIMENSIONBETWEENSTUDS
Handlepanelswithcaretoavoidbreakage.
Hold the 3/4" measurement along left edge of panel. Use a gauge block.
Forsquarenessmaintain3/4"measurementalongpaneledge.
Primedsideup
CENTERCENTER CENTER
3/4"GAUGEBLOCK
Handlepanelswithcaretoavoidbreakage.
3/4"GAUGEBLOCK
UNTILFRONTPANELSAREINSTALLED,HANDLECAREFULLYTOAVOIDBREAKINGATCORNERSANDEDGES.
6"(15,2 cm)
3/4"(1,9cm)
BEGINHERE
MaintainSquare
3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)
x1
OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm) TEMPORARY SUPPORT
20
Flush
Flush
6"(15,2 cm)
PARTSREQUIRED:
FRONT WALL PANELS
x402" (5,1 cm)
InstallOOafterpanelsfortemporarybrace.
DOOR
x23" (7,6 cm)
5-1/2"(14 cm)
Place 48x96" right panel primed side up onto wall frame flush to left panel.
Nail panel with two 2" nails 6" (15,2 cm) apart. Maintain 64" (162,5 cm) measurement between studs and square frame.
4
5
3
Use OO as a brace to maintain 64" (162,6 cm) opening. Use two 3" screws to attach.
MAINTAIN64"DIMENSIONBETWEENSTUDS
Hold the 3/4" measurement along right edge of panel. Use a gauge block.
3"(7,6cm)Screw
3"(7,6cm)Screw
Primedsideup
Forsquarenessmaintain3/4"measurementalong
paneledge.
3/4"GAUGEBLOCK
3/4"(1,9cm)
MaintainSquare
3/4"GAUGEBLOCK
3/8 x 11-7/8 x 96" (1 x 30,5 x 243,8 cm)
x2
21
DOOR
6"(15,2 cm)
PARTSREQUIRED:
FRONT WALL PANELS
x602" (5,1 cm)
Flush
FlushFlush
Flush
DOOR
5-1/2"(14 cm)
5-1/2"(14 cm)
MAINTAIN64"DIMENSIONBETWEENSTUDS
Repeat steps 6 and 7 to attach the right panel.8
10
Place 11-7/8x96" panel onto wall frame fl ush to left 48x96" panel with primed side up as shown.• Ensure top of panel is overhanging the top of frame by 5-1/2".
Nail the panel using 2" nails 6" apart on edges.7
6
6"(15,2 cm)
You have fi nished building your front wall.FINISH
9
Carefully fl ip the FRONT WALL over.
Primedsideup
Primedsideup
DOOR
22
2" (5,1 cm)
PARTSREQUIRED:
DOOR
First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig.A).
2
You have fi nished standing your BACK WALL.FINISH
5
Secure side wall bottom plate to fl oor using 3" nails (Fig.A). 3
3" (7,6 cm)x10
x22
BACK WALL INSTALLATION
DOOR
3"Nailsintobottomplate.
BEGINStand backwall on fl oor. It is important to secure the backwall in the following order. ENSURE4"MEASUREMENTISATTOPOFBACKWALLASSEMBLY.
Center back wall assembly on the 120" fl oor dimension.1
120"(304,8 cm)
4"(10,2 cm)
Nail2"nailsfirst.
2"(5,1cm)Nails
3"(7,6cm)Nails
Fig.A
23
DOOR
2" (5,1 cm)
3" (7,6 cm)PARTSREQUIRED(TEMPORARY):
3" (7,6 cm)
DOOR
First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig.A).
3
You have fi nished standing your FRONT WALL. FINISH
5
Secure front wall bottom plates to fl oor using (8) 3" nails (Fig.A). 4
x8
x4
x10
FRONT WALL INSTALLATION
DOOR3"(7,6cm)Screwsx4
BOAx2
3"Nailsintobottomplate.
BEGINStand front wall on fl oor.
Center front wall assembly on the 120" front fl oor dimension.
Use (2) BOA as temporary braces. Level wall and secure BOA with two 3" screws.
2
1120"
(304,8 cm)
Nail2"nailsfirst.
2"(5,1cm)Nails
3"(7,6cm)Nails
Fig.A
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x2 BOA
24
DOOR
3" (7,6 cm)PARTSREQUIRED:
DOOR
DOOR
You have fi nished installing your DOUBLERS. FINISH
4
x28
DOUBLER INSTALLATION
x1x1
x1x1
2 x 4 x 74-1/4" (5,1 x 10,2 x 188,6 cm)
2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
2 x 4 x 45-5/8" (5,1 x 10,2 x 115,8 cm)
2 x 4 x 48" (5,1 x 10,2 x 122 cm)
BMA
SP
TM
BNATM
SP
3"(7,6cm)Nails
Staggerseams
3"(7,6cm)Nails
Flush
Flush
Flush
Flush
Flush
FlushBMA
BNA
Staggerseams
BEGIN
1
2
3
Use two 3" nails at each stud and four 3" nails at seam.
For front wall, use 3" nails as shown. Use (4) 3" nails at seam.
For back wall, orient parts on fl at on top of wall frame.
BESUREDOUBLERSAREFLUSH.
BESUREDOUBLERSAREFLUSH.
DOOR
25
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x2 BOA
BOA
BOA
3" (7,6 cm)x8
OUTER RAFTER INSTALLATION
PARTSREQUIRED:
DOOR
3"(7,6cm)Screw
3"(7,6cm)Screw
Remove all temporary braces.6
You have fi nished installing your outer rafters.FINISH
7
BEGINRest one outer rafter on front and back wall doublers. Ensure rafter is fl ush to back wall panel (Fig.A) and fl ush to end of back wall doubler (Fig.B).
Secure back of outer rafter using 3" screw installed centered into outer rafter end (Fig.A) and afterwards toenailed into inside of rafter (Fig.B).
Secure front of outer rafter using 3" screws installed centered into outer rafter end (Fig.C) and afterwards toenailed into inside of rafter (Fig.D).
Repeat steps 1 through 4 for opposite side outer rafter.
Orient front of outer rafter fl ush to front wall panel (Fig.C) and fl ush to end of front wall doubler (Fig.D).
1
2
4
5
3
3"(7,6cm)Screw
Flush
Fig.A
3"(7,6cm)Screw
Flush
Fig.C
3"(7,6cm)Screwtoenailed
Flush
Fig.B
3"(7,6cm)Screw
toenailed
Flush
Fig.D
DONOTOVER-DRIVESCREWTHROUGHPANEL.
26
3" (7,6 cm)x42
RAFTERS
PARTSREQUIRED:
DOOR
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x7 BOA
You have fi nished installing your rafters.FINISH
7
Place rafter on front and back wall doublers. Line up rafter centered with marks. Ensure rafter is fl ush to back wall panel (Fig.A) and fl ush down on top of back wall doubler (Fig.B).
Secure back of rafter using 3" screw installed centered into outer rafter end (Fig.A).
Toenail each end of rafter into doubler using 3" screws (Fig.B,Fig.D).
Repeat steps 2 through 5 to install (6) remaining rafters.
Line up rafter centered with marks on front doubler. Ensure rafter is fl ush to front wall panel (Fig.C). and resting fl ush on top of front doubler (Fig.C). Secure front of rafter using 3" screw installed centered into outer rafter end (Fig.C).
2
3
5
6
3"(7,6cm)Screw
Flush
Fig.A
3"(7,6cm)ScrewstoenailedFlush
Fig.B
3"(7,6cm)Screwstoenailed
Fig.D
DONOTOVER-DRIVESCREWTHROUGHPANEL.
BEGINStarting at end as shown, measure and mark location of each rafter.1
4
10"(25,4 cm)
26"(66,1 cm)
42"(106,7 cm)
58"(147,4 cm)
90"(228,6 cm)
106"(269,3 cm)
74"(188 cm)
DOOR
3"(7,6cm)Screw
Flush
Fig.CFlush
BEGINHERE
27
x2
RAFTER EXTENSIONS
PARTSREQUIRED:
DOOR
2 x 3 x 10-1/2" (5,1 x 7,6 x 26,7 cm) x9 BRA 3" (7,6 cm)
DONOTOVER-DRIVESCREWTHROUGHPANEL.
You have fi nished installing your RAFTER EXTENSIONS.FINISH
4
BEGINLocate rafter extension above top of front wall panels (FigB). Use another rafter extension (BRA)as a guide to line-up rafter extension with top of main rafter (FigA).
Repeat steps 1 and 2 to install remaining (8) rafter extensions.
Secure rafter extension using (2) 3" screws toenailed through front wall panel into BRA (Fig.B).
1
2
3
DOOR
Fig.B
Flush3"(7,6cm)Screwstoenailed
TOPVIEW3"(7,6cm)Screws
Fig.A
Flush
3"(7,6cm)Screw
3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)
3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)
3/8 x 42 x 83"(1 x 106,7 x 210,9 cm)
3/8 x 42 x 83"(1 x 106,7 x 210,9 cm)
x1 x1 x1 x1
Fig.EPrimedsideup
28
PARTSREQUIRED:
SIDE WALL PANELS
x121-1/2" (3,2 cm)
DOOR
x32" (5,1 cm)
Repeat steps 1, 2 and 3 to attach the opposite side panels.4
Place 48x96" panel onto side wall flush with front wall stud and flush to bottom front wall sheathing, with 1" overhang and with primed side up as shown. Secure panel with two 2" nails in the corners (Fig.A). Ensure the measurement between the panel edges are the same along the entire length (Fig.B). Angle nails to hit floor frame (Fig.C).
Place 42x83" panel onto side wall flush with bottom of 48 x 96" panel with primed side up, as shown. Secure panel with 2" nails in three corners (Fig.E). Ensure the measurement between the panel edges are the same along the entire length (Fig.B). Angle nails to hit floor frame (Fig.C).
Move to the top of panel. Using the long edge of the panel as a lever move the panel side-to-side until top of panel is flush with front wall stud. Secure upper corner with (1) 1-1/2" nail into rafter (Fig.D). Ensure 1" panel overhang at bottom of panel (Fig.D).
2
1
3
Fig.A
Fig.C
Fig.B
Fig.CFig.B
Fig.D
2"Nails
1-1/2"Nails
1-1/2"Nail
2"NailFlush
Flush
Flush
48"(121,9 cm)
1"(2,5 cm)
1"(2,5 cm)
42"(106,7 cm)
Primedsideup
BEGIN
Flush
Flush
SameMeasurement
SameMeasurement
29
PARTSREQUIRED:
SIDE WALL PANELS (continued)
x162" (5,1 cm)
DOOR
Fig.A
2"(5,1cm)Nail
2"(5,1cm)Nails
1-1/2"(3,2cm)Nails
1-1/2"(3,2cm)Nails
1-1/2"(3,2cm)Nails
6"(15,2 cm)
6"(15,2 cm)
6"(15,2 cm)
6"(15,2 cm)
x451-1/2" (3,2 cm)
5 Nail lower edge of panel to floor using 2" nails 6" apart. Angle nail to hit floor frame (Fig.A).
Nail side wall panels to rafter and wall studs using 1-1/2" nails 6" apart as shown.6
Repeat steps 1 and 2 to attach the opposite side panels.7
You have TEMPORARILY finished installing your side panels. Proceed to install SIDE WALL STUDS.8
30
PARTSREQUIRED:
SIDE WALL STUDS
DOOR
x2
x2
x2
2 x 4 x 79-1/8" (5,1 x 10,2 x 201,3 cm)
2 x 4 x 85-1/2" (5,1 x 10,2 x 217,2 cm)
2 x 4 x 72-5/8" (5,1 x 10,2 x 184,5 cm) BJA
BKA
BFA 3" (7,6 cm)x18
Repeat steps 1 and 2 to attach the opposite side SIDE WALL STUDS.
3
Fig.B
Fig.A
CenterBKAonseamofwall
panels.
BKABJA BFA
3"(7,6cm)Screw
DOOR
MARK
BEGINInstall BJA centered at seam of side wall panels (FigA). Use a square to ensure 90 degree squareness of studs (BKA,BFAandBJA).
Mark locations of studs and ensure 90 degrees angle at top of each stud.
Secure side wall studs with 3" screws into end rafters and fl oor frame (FigB).
1
2
2
You have fi nished installing your SIDE WALL STUDS.
Proceed to fi nish nailing side wall panels.
FINISH
4
Flushtorafter
FlushtorafterFlushtorafter
31
PARTSREQUIRED:
SIDE WALL PANELS (continued)
DOOR
1-1/2"(3,2cm)Nails
6"(15,2 cm)
12"(30,5 cm)
x581-1/2" (3,2 cm)
You have fi nished nailing your SIDE WALL PANELS.
FINISH
11
Nail side wall panels to inside wall studs using 1-1/2" nails 6" apart along panel seam and 12" apart in middle of panels as shown.
Measure, align and mark side wall studs 24" from center of panel seam and as shown.
9
9
Repeat step 9 to nail the opposite side panels.10
24"(61 cm)
24"(61 cm)
32
x1
x4
ROOF PANELS
PARTSREQUIRED:2" (5,1 cm)
DOOR
7/16 x 48 x 96"(1,1 x 121,9 x 244 cm)
48 x 96"(121,9 x 244 cm)
3/4"GAUGEBLOCK
GAA
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is at 1/2" (1,3 cm) measurement overhanging the rafter extension (FigB).
You may need to move your entire roof frame to make panel line up with 1/2" overhang measurement (Fig.B). Secure panel with two 2" nails into rafters.
2
You must square the roof by attaching one panel first. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.
Roofpanelsmaycauseseriousinjuryuntilsecurelyfastened.
1BEGIN
Attach the 48x96"panel with the rough side up (painted-grid lines side) with 1/2" (1,3 cm) measurement overhanging the rafter extension (FigB) and the panel is 3/4" (1,9 cm) along the the length of the rafter(Fig.A). Nail panel with two nails as shown.
48"(121,9 cm)
TwoNails
TwoNails
3/4" (1,9 cm)
Fig.A
GaugeBlock
DOOR
DOOR
1/2" (1,3 cm)
Fig.B
NOTE:Measurement from rafter extension.
1/2" (1,3 cm)
Fig.B
NOTE:Measurement from rafter extension.
33
7/16 x 48 x 96"(1,1 x 121,9 x 244 cm)
48x96"(121,9x244cm)
7/16 x 36-3/8 x 96"(1,1 x 92,4 x 244 cm)
7/16 x 11-7/8 x 96"(1,1 x 30,2 x 244 cm)
11-7/8x96"(30,2x244cm)
x1 x1 x1
x120
ROOF PANELS
PARTSREQUIRED:2" (5,1 cm)
36-3/8x96"(92,4x244cm)
1/2" (1,3 cm)
Fig.B
DOOR
Flush
7/16 x 11-7/8 x 36-3/8(1,1 x 30,2 x 92,4 cm)
11-7/8x36-3/8"(30,2x92,4cm)
x1
12"(30,5 cm)
12"(30,5 cm)
12"(30,5 cm)
6" (15,2 cm)
6" (15,2 cm)
6"(15,2 cm)
6"(15,2 cm)
6" (15,2 cm)
Flush
Flush
FlushFlush
Fig.D
Flush
Fig.E
Flush
Flush
Flush
DOOR
DOOR
Nail the first 48x96"roof panel using 2" nails 6" apart on edge and 12" apart inside panel.
Locate the second 48x96" roof panel with the rough side up flush to first panel along edge and at both corners (Fig.C,D). Repeat nailing pattern.
Nail the 36-3/8x96"roof panel with the rough side up using 2" nails 6" apart on edge and 12" apart inside panel.Ensure the 36-3/8x96"roof panel is flush to installed 48x96" roof panels and overhang is at 1/2" (Fig.B,E).
Nail the 11-7/8x96"roof panel with the rough side up using 2" nails 6" apart on edges.Ensure the 11-7/8x96"roof panel is flush to installed roof panels (Fig.E).
Nail the 11-7/8x36-3/8"roof panel with the rough side up using 2" nails 6" apart on edges.Ensure the 11-7/8x36-3/8"roof panel is flush to all (3) installed roof panels (Fig.E).
3
4
5
6
Fig.C
Flush
34
90o
ROOF PANELS
PARTSREQUIRED:
DOOR
x222" (5,1 cm)
Line up each rafter extension 90 degrees square with roof rafters as shown. Secure rafter extensions with screws through roof panels (Fig.A).
At roof panel seams use 4 screws (Fig.B).
7
DOOR
FINISH
8
Fig.B
Fig.A
SQUARE
SQUARE
DOOR
You have fi nished installing your ROOF PANELS.
x21 x 3 x 72" (2,5 x 7,6 x 182,8 cm)
x21 x 3 x 33 - 1/8" (2,5 x 7,6 x 84,1 cm)BPA
HJ
35
2" (5,1 cm)x16
Fig.B
PARTSREQUIRED:
GABLE RAKE FRAMING
1 Align BPAedge fl ush with BRA(FigA). Attach with (3) 2" nails (FigB).BEGIN
HJ
BPA
BRA
2
3
4
Attach HJ fl ush with BPAwith (5) 2" nails. (FigA,B)
Repeat Steps 1-2 on opposite side.
You have fi nished installing your gable rake framing.
FINISH
2"finishnail
Flush Flushatseam
AngledEndsFlush
Fig.A
FRONT EAVE FASCIA TRIM
36
PARTSREQUIRED:2" (5,1 cm)
x20
FINISH
4
x119/32 x 3-1/2 x 52 - 3/8" (1,5 x 8,8 x 133 cm)
BUA
19/32 x 3-1/2 x 80" (1,5 x 8,8 x 203,2 cm)x1 BTA
You have fi nished installing your front eave trim.
Attach BUA to BRA(Fig.A,C). Extend approximately 1/4" beyond roof panel (Fig.B). Secure BUA with 2" fi nish nails (Fig.C).
BEGIN
1
Attach BTA to BRA(Fig.A,C) fl ush with BUA. Secure with 2" fi nish nails. BTA extends approximately 1/4" beyond roof panel (Fig.D).
Nail BUA and BTAends toBRAwith (4) 2" nails (Fig.E).
2
3
Fig.C
Fig.D
Fig.B
Fig.A
BTABTA
BUA
BRA
BUA
2"FinishNails
Fig.E
BRA
BTABUA
1/4"
1/4"
Flush
SIDE FASCIA TRIM ASSEMBLY
37
FINISH
4 You have fi nished assembling the side fascia trim.
Place BXRandZT fl ush with BQA and OY. Attach with 2" fi nished nails as shown (Fig.B,C).
Repeat steps 1-2 for the opposite side usingBXL and ZT.
Fig.A
Fig.B
Fig.C
PARTSREQUIRED: x282" (5,1 cm)
x219/32 x 3-1/2 x 48" (1,5 x 8,8 x 121,9 cm)
x22 x 3 x 33-1/8" (5,1 x 7,6 x 84,1 cm)BQA
x2
ZT
x1
x119/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)
19/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)
BXL
BXR
OY2 x 3 x 72" (5,1 x 7,6 x 182,8 cm)
BEGIN
1
2
3
EdgesofBXRandBQAareflush. BXR ZT
OY
OYBQA
BQA
Begin rear Fascia assembly on a fl at surface. Place BQA and OY end to end (Fig.A).
Flush
SIDE FASCIA TRIM
38
PARTSREQUIRED: x4
x12
2" (5,1 cm)
2" (5,1 cm)
BEGIN
1 Hold the side fascia assembly fl ush with roof sheathing and front fascia trim (Fig.B).
Fig.A
Fig.D
You are fi nished installing your side fascia trim.FINISH
5
Makesurethereisa5-1/4"spaceasshown.(Fig.C)
4 Repeat steps 1-3 on opposite side.
3 Nail front fascia to side fascia with (2) 2" fi nished nails (Fig.D).
5-1/4"(13,3 cm)
Fig.C
2"Screws
Attach assembly underneath roof panels fl ush with front fascia board using 2" screws through roof sheathing (Fig.C).
2
Fig.B
ASSEMBLEDSIDEFASCIA
FRONTFASCIA
ROOFSHEATHING
ROOFSHEATHING
2"FinishNails
Flush
Flush
x119/32 x 3-1/2 x 35-1/4" (1,5 x 8,8 x 89,5 cm)BYA
x1 FS2 x 3 x 35-1/4" (5,1 x 7,6 x 89,5 cm)
19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)x1 ZX
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) x1 PT
REAR FASCIA TRIM
PARTSREQUIRED:
39
x2
x10x122" (5,1 cm) 2" (5,1 cm)
3" (7,6 cm)
BYAorZX
2"Nails
ZT
Place PTandFSfl ush to roof sheathing and to ZT. (Fig.B,C)BEGIN
1
Attach PTand FS with 2" wood screws through roof sheathing and (1) 3" screw at OYon both ends (Fig.B,C).
2
PT
FS
ZX
BYA
ZT
OY
3"Screw
2"Screw
2"Nail
Nail BYA and ZXto PT and FS and to ZTusing 2" nails (Fig.A,D,E).3
FINISH
4 You are fi nished installing your rear fascia trim.
Fig.E
ZX
Fig.A
Fig.D
Fig.B Fig.C
Flush
35-3/4 x 10-3/8 x 3/8" (90,8 x 26,3 x 1 cm)x1
95-3/8 x 10-3/8 x 3/8" (242,2 x 26,3 x 1 cm)x1
40
PARTSREQUIRED:
SOFFIT
x202" (5,1 cm)
1
2
Attach 35-3/4" soffit board under BRA using (6) 2" finish nails as shown, primed side down (Fig.A,B).
Align 95-3/8"soffit board flush with 35-3/4". Attach soffit board with (14) 2" finished nails underneath BRA(Fig.D).
Fig.A
35-3/4"(90,8cm)
95-3/8"(242,2cm)
2"FinishNails
Fig.B
BRA
Fig.C
35-3/4"(90,8cm)
95-3/8"(242,2cm)
95-1/2"(242,5cm)
BEGIN
95-1/2"(242,5cm)
95-1/2 x 5-1/4 x 3/8" (242,5 x 13,3 x 1 cm)
x2
41
PARTSREQUIRED: x282" (5,1 cm)
SOFFIT continued........
Attach95-1/2" soffi t board under fascia backer and side rake framing (Fig.C,D) using (14) 2" nails.
RepeatStep3 on opposite side.4
3
You have fi nished installing your soffi t panels.FINISH
5
Fig.C
95-1/2"(242,5cm)
Fig.D
5-1/4"
2"FinishNails
FlushFlush
1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)x1 GAA
42
Orient parts as shown on flat surface. 3/8"offsetistotop.Lookforred(right)andgreen(left)onhingeboard.
PARTSREQUIRED:
x1x1Left Door Right Door
BEGIN1
DOORS
1-1/4" (3,2 cm)
2
3
Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely.
Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.
HINT:Lookfor3/8"SPACERattachedtodoors.
OO
GAA
Makesurespacerisattached.
Tightenscrewssecurely.
OFFSET
(4)3"(7,6cm) Screws
Screws 1-1/4"(3cm)
Bottomedgesflush.
NOTE: Screw hole will be used later.
3/8"(1 cm)3/8"
(1 cm)
3/8"(1 cm)
3/8"(1 cm)
OFFSETGREEN RED
3" (7,6 cm)
OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
3/4" (1,9 cm)
23-1/2"(59,7 cm)
23-1/2"(59,7 cm)
3/4"(1,9 cm)
x2
x4
43
PARTSREQUIRED: x133" (7,6 cm)
DOORS
Fig.C
Fig.D
Seam
Fig.B
3/8"(1 cm)
Angle 3" (7,6 cm)Screw
4
OO
Center doors on panel seam as shown (Fig.B).5
6
7 Remove temporary supports and check doors open properly.
FINISH
8 You have fi nished installing your doors.
Attach temporary support OO as a ledger board fl ush under wall panels for doors to rest on using 3" screws (Fig.A).
Screw hinge boards into wall frame and fl oor using ten 3" screws as shown.Makesurescrewsgointoframingandfloor (Fig.C,D).
Checkledgerboardisstillflushunderpanels.
3"(7,6cm)Screwsintothewallsupportandfloorframe.
x1 OO 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
OO
Fig.A
Flushagainstwallpanels
x419/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm)AH
44
You have finished securing your door and trim.
DOOR
PARTSREQUIRED:
FINISH
4
BEGIN
3
2
1
3/4" (1,9 cm)
Reinforce the door trim using 3/4" screws through door panel into trim (Fig.A). Locate screws as shown in Fig.B. Use two screws at seams.
Place AH 9" from top and lower cross brace and level (Fig.B). Secure from behind using three 3/4" screws.
Repeatstep1-2 to attach two AH's to other door.
x44
CENTER CENTER
7” (17,8 cm)
7” (17,8 cm)
Center
9"(22,8cm)
9"(22,8cm)
Fig.B
Nailintoframing.
TwoScrews
Door Trim
Hinge Board
Fig.A
Door Panel
AHAH
9"(22,8cm)
9"(22,8cm)
45
You have fi nished installing your door weatherstrips.
BEGIN
With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig.A). OO will offset the left door 1" OUT past the door trim 1" (Fig.B).
1
PARTSREQUIRED:
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)x2
x102" (5,1 cm)
DOOR WEATHERSTRIP
OO
FINISH
5
On right door center OO vertically in door opening (Fig.A). OO will offset the right door 1" IN from the door trim (Fig.C).
3
Secure OO using fi ve 3" screws through outside trim into OO (Fig.C).4
OO
Screws2"
(5,1cm)x10
1"(2,5 cm)
OFFSETScrews
2"(5,1cm)
1"(2,5 cm)
OFFSET
Secure OO using fi ve 3" screws through outside trim into OO (Fig.B)2
Fig.A Fig.B Fig.C
CenterOOindooropening.
17" (43,1 cm)
Approximately
46
1" (2,5 cm)
BEGIN
Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.
Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.
Place bolt onto OO in open position with bolt end 1/2" up from fl oor. Bolt is open when loop is contacting base (FigB).
3
4
2
Place bolt onto OO in open position with bolt end 3/8" down from frame. Bolt is open when loop is contacting base (FigA).
Mark and pre-drill holes for screws.
Mark and pre-drill holes for screws.
1
LEFTDOOR
Fig.B
PARTSREQUIRED:
DOOR
x2
x8
5/16" (0,8 cm) Drill Bit
You have fi nished installing your barrel bolts.FINISH
5
Fig.A
FLOOR
Loopcontactsbase.
x4
x4
1/2"5/16"drillforbolt:1"deep.
Loopcontactsbase.
PRE-DRILL(4)HOLES
PRE-DRILL(4)HOLES
2 x 3 x 69"
2 x 3 x 69"
3/8"withboltinopenposition.
OPENPOSITION,Springisloose.
OPENPOSITION,Springisloose.
5/16"drillforbolt:1"deep.
OVERDOORFRAME
OO
OO
LOCATEANDPRE-DRILLHOLESTOAVOIDSPLITTINGWOOD
47
1-1/2"(3,8cm)Screws
SETSCREW
You have fi nished installing your T-handle and decorative hinges.FINISH
4
Attach inside handle and secure with set screw as shown. 3
Insert handle in hole and secure using 1-1/2" (3,8 cm) screws.2
35-3/4"90 cm
RIGHTDOOR.
1-1/2"3,8 cm
TOPVIEW
1/4"Pre-drilland1/2"Drill-through.
DOOR HARDWARE
x1
x2PARTSREQUIRED:1-1/2" (3,8 cm)
Re-drill hole with 1/2" drill.
Keep drilled hole square to trim to avoid breaking edge of 2x3".
BEGIN
1 Measure and mark location of hole on outside of right door as shown (Fig.A). Pre-drill hole with 1/4" drill.
1/2" (1,3 cm) Drill Bit
1/4" (0,6 cm) Drill Bit
Fig.A
1-1/2" (3,8 cm)
48
x3 9 X 27" (22,8 x 68,5 cm)
PARTSREQUIRED:
WINDOWS
3/4" (1,9 cm) x6
BEGIN
1̧
From outside of shed, position window in center of opening and level. Use two screws at top of windows.
Do not fully tighten screws.
2
HINT: Caulk behind frame near edge before installing.
Approximately1"(2,5cm)
2Screwsperwindow
Youmustcaulkaroundwindowstovalidatewarranty.
Apply high quality exterior-grade caulk behind frame near edge before installing to seal window.
2Screwsperwindow
19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm)x2 BSA
49
2" (5,1 cm)
TRIMPARTSREQUIRED:
WINDOWS
Do not nail into window flange.
3
4
5
Center BSA over door. Secure using (7) 2" finish nails as shown.
Position EY at ends and in between window frame as shown. Secure using (8) 2" finish nails.Remove1-1/4"screws.
Position BSA centered on window frame as shown. Secure using (4) 2" finish nails.
x419/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm)
EY
x19
EYx4
26-1/2"(78,7cm)Centered
Removescrews Removescrews
MarkCenter
Flush
Flush
BSACentered
3/4"(1,9 cm)
BSACentered
FRAMINGBEYOND
FRAMINGBEYOND
50
PARTSREQUIRED:
WINDOWS
x123/4" (1,9 cm)
6
You have fi nished installing your window.FINISH
7
Install (12) 3/4" screws from inside, as shown.
Do not screw into window fl ange.
FRAMINGBEYOND
INSIDEOFSHED
Install3/4"(1,9cm)screwsfrominside.
Install3/4"(1,9cm)screwsfrominside.
x23/8 x 2 x 68-3/4" (0,9 x 5,1 x 174,6 cm)
x13/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)
x13/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)
51
BACK CORNER TRIM
PARTSREQUIRED: x242" (5,1 cm)
BEGIN
1̧ Place68-3/4" back corner trim fl ush to bottom of back soffi t board (Fig.A,B,F) and fl ush with side panel along the length (Fig.A). Attach using (6) 2" fi nish nails into corner wall framing (Fig.A,C). Space nails equally (Fig.C).
You have attached your back corner trim.4
Repeat for other side.3
2
FINISH
Fig.C
68-3/4"(174,6cm)
69-1/4"(175,8cm)
(AngledEndup)
Place69-1/4" back side corner trim angled end up (Fig.E) fl ush up under side soffi t panel and fl ush with back corner trim along the length (Fig.E). Attach trim using (6) 2" fi nish nails into corner wall stud (Fig.D,C). Space nails equally (Fig.C).
Fig.DFig.E
2"Nail
69-1/4"(175,8cm)
AngledendFlushatsoffit.
Flushwithbackcornertrim.
Seamisflush.Caulkseambefore
paintingtrim.
Fig.AFig.B
68-3/4"(174,6cm)
2"Nail
Flushwithsidewallpanel.
Flushattop
BACKOFSHED
Fig.F
Flushatsoffitboard.
2"x68-3/4"CornerTrim
x13/8 x 2 x 25-3/8" (0,9 x 5,1 x 64,4 cm)
x13/8 x 2 x 96" (0,9 x 5,1 x 243,8 cm)
52
PARTSREQUIRED: x12
BEGIN
1̧ Attach25-3/8"(64,4cm)and96"(243,8cm)front horizontal frieze boards using 2" fi nish nails as shown (Fig.A). Leave 3/8" (0,95 cm) overhang on both ends (Fig.B).
FRONT FRIEZE TRIM
FINISH
You have fi nished attaching your front frieze trim.2
3/8"(0,95 cm)
Fig.A
Fig.B
96"(243,8cm)
25-3/8"(174,6cm)
Flush
2" (5,1 cm)
x23/8 x 2 x 91-1/4" (0,9 x 5,1 x 231,7 cm)
53
Fig.A
Fig.B
Fig.C
Flush
3/8"(0,95 cm)
PARTSREQUIRED: x122" (5,1 cm)
FRONT CORNER TRIM
Attach both vertical 91-1/4"(231,7cm) front corner trim on both sides, fl ush to bottom edge of previously installed horizontal frieze trim using (6) 2" nails per trim (Fig.A,B,C).
FINISH
You have fi nished attaching your front trim boards.2
91-1/4"(231,7cm)
BEGIN
1̧
x13/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)
x13/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)
54
PARTSREQUIRED: x122" (5,1 cm)
FRONT SIDE TRIM
FINISH
You have fi nished attaching your front side trim boards.2
Attach 93-1/4"(236,8cm) front side corner trims on both sides fl ush with front frieze trim. Use (6) 2" (5,1 cm) nails to secure side trim to side wall(Fig.A,B,C).
BEGIN
1̧
Fig.A
Fig.C
Fig.B
Flush
55
PARTSREQUIRED:
FINISH
3
2
BEGIN
1̧ Locate and mark for two vents in side walls as shown. (1) at top and (1) at bottom
Cut out marked openings.
Caulk behind vent fl anges.
Secure using 1/2" (1,3 cm) screws.
You have fi nished installing your vents.
x121/2" (1,3 cm)
x2
VENTS
8 x 16" (20,3 x 35,6 cm)
6"(15,2 cm)
3 – 5"(7,6 – 12,7 cm)
14"(35,6 cm)
Caulk
4"(10,1 cm)
Caulk
4"(10,1 cm)
4"(10,1 cm)
14"(35,6 cm)
6"(15,2 cm)
56
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges
Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)
(Follow directions provided by manufacturer.)
Youmustinstalldripedgetovalidatewarranty.
PAINT & CAULK- NOT INCLUDED -
ROOF FELT- NOT INCLUDED -
DRIP EDGE- NOT INCLUDED -
• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.
3"OVERLA
P
Flush
Flush
Youmustinstallrooffelttovalidatewarranty.
DripEdgeflushtotrim.
• Install drip edge over roof felt on side of shed and under roof felt on back side (Fig.A). • Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown.
RoofFelt
DripEdge
DripEdge
Fig.A
BACKOF
SHED
SIDEOF
SHED
57
•Followdirectionsprovidedbymanufacturerandtheseinstructions.
SHINGLES - NOT INCLUDED -
NEVERDRIVEFASTENERSINTOORABOVESEALINGSTRIPS.
Familiarizeyourselfwitha3-TabShingle.
SHINGLE NAIL PATTERN
1"(2,5 cm)
NAILS
Sealing Strip 1"(2,5 cm)
1/2"(1,3 cm)
Full Rain Slot
Half A Rain Slot
NotchNotch
Install first starter row upside down, color up and flush to drip edge at bottom of roof panel. Use (4) nails per shingle. Starterrowmustbestraightandlevelallthewayacrosswithloweredgeofroofdeck.
Begin where indicated on image below, install first row of shingles with notch flush with drip edge.22
DripEdge
Notch
BACKOFSHED
STARTHERE
BACKOFSHED
TABSUP
BEGIN
Shingleoverlapsroofdecking.
(4)Nails
Flushtodripedge.
Flushwithstarterrow.
1"(2,5cm)
Flushtodripedge.
DOOR
DOOR
BEGIN
1̧
58
Continue installing rows of shingles by staggering at front.
Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at front side, stagger each row.
Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a utility knife.
1"(2,5 cm)
5"(12,7 cm)
5"(12,7 cm)or less.
BACKOFSHED
Flushwithrainslots.
Notch
Notch
Using your shingle hooked blade carefully cut shingles along chalk line.
3
5
4
6
SHINGLES continued...
•Ifmorethan5"torainslotyoumustinstallanotherrowofshingles.
BACKOFSHED
Flushwithrainslots.
Topofrainslot.
CutOff.
Cut
DOOR
59
SHINGLES - DRIP EDGE
1"(2,5cm)
Install drip edge over top shingle row with 1" overhang over roof edge.
Align remaining shingles with edge of the front drip edge.
Using your shingle hooked blade carefully cut shingles on a fl at surface along the rain slots, using a chalk line for reference.
You have fi nished shingling your roof.FINISH
10
7
9
8
60
WARRANTYBackyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for one year.2. All hardware and metal components are warranted for two years.3. Trim is warranted for 15 years.4. Waferboard siding and sheathing is warranted for two years.5. SmartSide™ siding is warranted for 15 years on all Marco series buildings and 15 years on all Premier Series buildings.6. Timber series buildings’ siding and trim are warranted for 10 years.7. Solar Shed windows are warranted for 1 year.8. Cedar lumber is warranted for 15 years.9. Cedar doors and Cedar Garden Center are warranted for 10 years.10. Metal roof is warranted for 25 years.
Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC paythe cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on anaffected part, it will be prorated from the date of purchase.
CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions.2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification
of the failure in writing within the warranty period specified above.5. B
6. Drip edge and felt are installed.
ackyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notificationto inspect and verify the failure prior to commencement of any repair work.
REQUIREMENTSStorage Buildings & PlayhousesTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;
above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide™ andwaferboard siding to include all exterior walls and all sides and all edges of doors.
Gazebos, Pergolas & Timber BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of theexposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-basedsemi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as neededthereafter to maintain your warranty.
Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. Theminimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the groundwhen building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard
events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (whichleads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred
to construct your unit. This warranty gives you certain specific rights that vary from state to state.
CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or prepare a letter. Please have ready the information below whenyou call or include the information when writing:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.4. Run code, as listed on the yellow warranty card enclosed in the product package.
Mail the above information to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162
Limited ConditionalWarranty *
*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.IMPORTANT: This is your warranty certificate.Please complete and mail your warranty card to properly validate your warranty.
Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by
eventually
caulk