Page 1: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-1

Page 2: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-2

Activity-Based Costing18

Learning Objectives

Discuss the difference between traditional costing and activity-based costing.

Apply activity-based costing to a manufacturer.

Explain the benefits and limitations of activity-based costing.

3

Apply activity-based costing to service industries.

2

1

4

Page 3: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-3

Allocates overhead using a

predetermined rate.

► Job order costing: direct labor

cost may be the relevant activity

base.

► Process costing: machine hours

may be the relevant activity base.

Traditional Costing Systems

LEARNINGOBJECTIVE

Discuss the difference between traditional costing and activity-based costing.

1

LO 1

Illustration 18-1Traditional one-stage costing system

Page 4: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-4

Atlas Company produces two abdominal fitness products—the Ab

Bench and the Ab Coaster. The direct materials cost per unit is $40 for

the Ab Bench and $30 for the Ab Coaster. The direct labor cost is $12

per unit for each product. Both products require one direct labor hour

per unit, both products are allocated overhead cost of $30 per unit.

Illustration 18-3Total unit costs—traditional costing

Illustration of a Traditional Costing System

LO 1

Page 5: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-5

Tremendous change in manufacturing and service

industries.

Decrease in amount of direct labor usage.

Significant increase in total overhead costs.

Inappropriate to use plantwide predetermined overhead

rates when a lack of correlation exists.

Complex manufacturing processes may require

multiple allocation bases; this approach is called

activity-based costing (ABC).

The Need for a New Approach

LO 1

Page 6: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-6

An approach for allocating overhead costs.

Allocates overhead to multiple activity cost pools.

Assigns the activity cost pools to products or services by

means of cost drivers.

Activity-Based Costing

LO 1

Page 7: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-7

2. Identify the cost driver that has a strong correlation to the costs accumulated in each cost pool.

Activity-Based Costing (Four Steps)

1. Identify and classify the activities involved in the manufacture of specific products and assign overhead to cost pools.

3. Compute the activity-based overhead rate for each cost pool.

4. Allocate overhead costs to products using the overhead rates determined for each cost pool.

LO 1

Page 8: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-8

ABC allocates overhead in a two-stage process:

Stage 1: Overhead costs are assigned to activity cost

pools (Step 1).

Stage 2: Allocates overhead assigned to the activity cost

pools to products, using cost drivers (Steps 2-4).

The more complex a product’s manufacturing operation, the

more activities and cost drivers are likely to be present.

Activity-Based Costing

LO 1

Page 9: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-9

Illustration 17-2Activities and related cost drivers

Illustration 18-5Activities and related cost drivers LO 1

Page 10: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-10

Solution: 1. False. 2. True. 3. True. 4. False. 5. True.

Indicate whether the following statements are true or false.

1. A traditional costing system allocates overhead by means of multiple overhead rates.

2. Activity-based costing allocates overhead costs in a two-stage process.

3. Direct material and direct labor costs are easier to trace to products than overhead.

4. As manufacturing processes have become more automated, more companies have chosen to allocate overhead on the basis of direct labor costs.

5. In activity-based costing, an activity is any event, action, transaction, or work sequence that incurs cost when producing a product.

1 Costing Systems

LO 1

Page 11: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-11

Activity-Based Costing

Involves the following four steps.

1. Identify and classify the activities involved in the manufacture

of specific products and assign overhead to cost pools.

2. Identify the cost driver that has a strong correlation to the

costs accumulated in each cost pool.

3. Compute the activity-based overhead rate for each cost pool.

4. Allocate overhead costs to products, using the overhead

rates determined for each cost pool.

LEARNINGOBJECTIVE

Apply activity-based costing to a manufacturer.

2

LO 2

Page 12: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-12

Overhead costs are assigned directly to the appropriate activity

cost pool.

Identify and Classify Activities and Allocate Overhead to Cost Pools (Step 1)

Illustration 18-6Activity cost pools and estimated overhead

LO 2

Page 13: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-13

Cost driver must accurately measure the actual consumption

of the activity by the various products.

Illustration 18-7: Cost drivers that Atlas Company identifies

and their total expected use per activity cost pool.Illustration 18-7

Identify Cost Drivers (Step 2)

LO 2

Page 14: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-14

Illustration 18-8

Illustration 18-9

Next, the company computes an activity-based overhead rate

per cost driver.

Compute Activity-Based Overhead Rates (Step 3)

LO 2

Page 15: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-15

In allocating overhead costs, it is necessary to know the

expected use of cost drivers for each product. Because of its

low volume and higher number of components, the Ab Coaster

requires more setups and purchase orders than the Ab Bench.

Illustration 17-8

Allocate Overhead Costs to Products (Step 4)

Illustration 18-10Expected use of cost drivers per product

LO 2

Page 16: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-16

Illustration 18-11Allocation of activity cost poolsto products

To allocate overhead costs, Atlas multiplies the activity-based

overhead rates per cost driver (Ill. 18-9) by the number of cost

drivers expected to be used per product (Ill. 18-10).

LO 2

Allocate Overhead Costs to Products (Step 4)

Page 17: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-17

Illustration 18-11

LO 2

To allocate overhead costs, Atlas multiplies the activity-based

overhead rates per cost driver (Ill. 18-9) by the number of cost

drivers expected to be used per product (Ill. 18-10).

Allocate Overhead Costs to Products (Step 4)

Page 18: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-18

Likely consequence of differences in assigning overhead.

Overpricing the Ab Bench and possibly losing market

share to competitors.

Sacrificing profitability by underpricing the Ab Coaster.

Illustration 17-10

Comparing Unit Costs

Illustration 18-12Comparison of unit product costs

LO 2

Page 19: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-19

ABC Evaluated

Surveys of companies often show ABC usage of approximately 50%. Yet, in recent years, articles about ABC have expressed mixed opinions regarding its usefulness. To evaluate ABC practices and user satisfaction with ABC, a survey was conducted of 348 companies worldwide. Some of the interesting findings included the following: ABC methods are widely used across the entire value chain, rather than being primarily used to allocate production-specific costs; only 25% of non-ABC companies think they are accurately tracing the costs of activities, while 70% of ABC companies think their company does this well; and respondents felt that ABC provides greater support for financial, operational, and strategic decisions. More than 87% of respondents said that their ideal costing system would include some form of ABC. Since this significantly exceeds the 50% of the respondents actually using it, ABC usage may well increase in the future.

Source: William Stratton, Denis Desroches, Raef Lawson, and Toby Hatch, “Activity-Based Costing: Is It Still Relevant?” Management Accounting Quarterly (Spring, 2009), pp. 31–39.

Management Insight

LO 2

Page 20: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-20

2 Apply ABC to Manufacturer

Casey Company has five activity cost pools and two products. It expects to

produce 200,000 units of its automobile scissors jack and 80,000 units of

its truck hydraulic jack. Having identified its activity cost pools and the cost

drivers for each cost pool, Casey Company accumulated the following data

relative to those activity cost pools and cost drivers.

LO 2

Page 21: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-21

Casey Company has five activity cost pools and two products. It expects to

produce 200,000 units of its automobile scissors jack and 80,000 units of

its truck hydraulic jack. Having identified its activity cost pools and the cost

drivers for each cost pool, Casey Company accumulated the following data

relative to those activity cost pools and cost drivers.

Using the data provided,

a. Prepare a schedule showing the computations of the activity-based

overhead rates per cost driver.

b. Prepare a schedule assigning each activity’s overhead cost to the

two products.

c. Compute the overhead cost per unit for each product.

d. Comment on the comparative overhead cost per unit.

2 Apply ABC to Manufacturer

LO 2

Page 22: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-22

a. Prepare a schedule showing the computations of the activity-based overhead rates per cost driver.

2 Apply ABC to Manufacturer

LO 2

Page 23: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-23

2 b. Prepare a schedule assigning each activity’s overhead cost to the two products.

LO 2

Page 24: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-24

c. Compute the overhead cost per unit for each product.

These data show that the total overhead assigned to 80,000 hydraulic jacks exceeds the overhead assigned to 200,000 scissors jacks. The overhead cost per hydraulic jack is $34.25. It is only $12.80 per scissors jack.

d. Comment on the comparative overhead cost per unit.

2 Apply ABC to Manufacturer

LO 2

Page 25: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-25

ABC has three primary benefits:

1. More cost pools, therefore more accurate product costing.

2. Enhanced control over overhead costs.

3. Better management decisions.

LEARNINGOBJECTIVE

Explain the benefits and limitations of activity-based costing.

3

LO 3

Page 26: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-26

Multiple cost pools

Used instead of one plantwide pool and a single cost driver.

Numerous activity cost pools with more relevant cost drivers.

► Costs allocated on basis of cost drivers used to produce

each product.

The Advantage of Multiple Cost Pools

LO 3

Page 27: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-27

Illustration 18-13A more detailed view of Atlas’s machining activities

The Advantage of Multiple Cost Pools

LO 3

Page 28: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-28

Batch-level

Facility-level

Performed for each unit of production.

► Example: Assembly of cell phones

Unit-level

Product-level

The Advantage of Multiple Cost Pools

CLASSIFICATION OF ACTIVITY LEVELS

LO 3

Page 29: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-29

Batch-level

Facility-level

Performed every time a company produces another

batch of a product.

► Example: Batch of ice cream

Unit-level

Product-level

The Advantage of Multiple Cost Pools

CLASSIFICATION OF ACTIVITY LEVELS

LO 3

Page 30: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-30

Batch-level

Facility-level

Performed every time a company produces a new type

of product.

► Example: Time spent testing a new drug by a

pharmaceutical company

Unit-level

Product-level

The Advantage of Multiple Cost Pools

CLASSIFICATION OF ACTIVITY LEVELS

LO 3

Page 31: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-31

Batch-level

Facility-level

Required to support or sustain an entire production

process.

► Example: A hospital

Unit-level

Product-level

The Advantage of Multiple Cost Pools

CLASSIFICATION OF ACTIVITY LEVELS

LO 3

Page 32: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-32

Illustration 18-14Hierarchy of activity levels

LO 3

Page 33: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-33

Increase the perceived value of a product or service to customers, such as:

Value-Added Activities

Manufacturing Company

Engineering design

Machining services

Assembly

Painting

Service Company

Performing surgery

Legal research

Delivering packages

The Advantage of Enhanced Cost Control

LO 3

Page 34: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-34

Adds cost to, or increases the time spent on, a product/service without increasing its perceived value, such as:

Manufacturing Company

Storage of inventory

Moving of inventory

Inspections

Fixing defective goods

Set up machines

Service Company

Taking appointments

Reception

Bookkeeping and billing

Traveling

Ordering supplies

Advertising

Non-Value-Added Activities

The Advantage of Enhanced Cost Control

LO 3

Page 35: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-35

General MillsManagement Insight

LO 3

What Does NASCAR Have to Do with Breakfast Cereal?

Often the best way to improve a process is to learn from observing a different process. Production-line technicians from food producer General Mills were flown to North Carolina to observe firsthand how race-car pit crews operate. In a NASCAR race, the value-added activity is driving toward the finish line; any time spent in the pit is non–value-added. Every split second saved in the pit increases the chances of winning. From what the General Mills’ technicians learned at the car race, as well as other efforts, they were able to reduce setup time from 5 hours to just 20 minutes.

Page 36: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-36

Activity-based management (ABM), a management tool that

focuses on reducing costs and improving processes and

decision-making.

Managers use ABC via ABM

for both strategic and operational decisions or perspectives.

to help managers evaluate employees, departments, and

business units.

to establish performance standards, as well as benchmark

against other companies.

Advantage of Better Management Decisions

LO 3

Page 37: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-37

Limitations and Knowing When to use ABC

Limitations

Expensive to use.

Arbitrary allocations remain.

When to Use

1. Product lines differ in volume and manufacturing complexity.

2. Product lines are numerous and diverse.

3. Overhead costs constitute a significant portion of total costs.

4. Manufacturing process or the number of products has

changed significantly.

5. Production or marketing managers are ignoring data.

LO 3

Page 38: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-38

a. Engineering design

b. Machine setup

c. Toy design

d. Interviews of prospective employees

e. Inspections after each setup

f. Polishing parts

g. Assembling parts

h. Health and safety

Morgan Toy Company manufactures six primary product lines in its

Morganville plant. As a result of an activity analysis, the accounting

department has identified eight activity cost pools. Each of the toy

products is produced in large batches, with the whole plant devoted to one

product at a time. Classify each of the following activities as either unit-

level, batch-level, product-level, or facility-level:

3 Classify Activity Levels

a. Product-level

b. Batch-level

c. Product-level

d. Facility-level

e. Batch-level

f. Unit-level

g. Unit-level

h. Facility-levelLO 3

Page 39: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-39

LEARNINGOBJECTIVE

Apply activity-based costing to service industries.

4

Overall objective: Identify key activities that generate costs

and keep track of how many of those activities are completed

for each service performed.

General approach is to identify activities, cost pools, and

cost drivers.

Labeling of activities as value-added or non-value-added.

Sometimes, a larger proportion of overhead costs are

company-wide costs that cannot be directly traced to

specific services provided by the company.

LO 4

Page 40: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-40

The public accounting firm of Check and Doublecheck prepares

the following condensed annual budget.

Illustration 18-16Condensed annual budget of a service firm under traditionalcosting

Traditional Costing Example

LO 4

Page 41: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-41

Assume that Check and Doublecheck records $140,000 of actual

direct professional labor cost during its audit of Plano Molding

Company, which was billed an audit fee of $260,000. Under

traditional costing, using 50% as the rate for applying overhead to

the job, Check and Doublecheck would compute applied

overhead and operating income as shown in Illustration 18-17.

Traditional Costing Example

Illustration 18-17

LO 4

Page 42: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-42

Check and Doublecheck distributes its estimated annual

overhead costs of $600,000 to three activity cost pools.

Activity-Based Costing Example

Illustration 18-18Condensed annual budget of a service firm under activity-based costing

LO 4

Page 43: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-43

Assigning overhead in a service industry.

Activity-Based Costing Example

Illustration 18-19Assigning overhead in a service company

LO 4

Page 44: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-44

Under activity-based costing, Check and Doublecheck assigns

overhead costs of $57,200 as compared to $70,000 under

traditional costing.

Activity-Based Costing Example

Illustration 18-20Comparison of traditional costing with ABC in a service company

LO 4

Page 45: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-45

American AirlinesService Company Insight

LO 3

Traveling Light

Have you flown on American Airlines since baggage fees have been implemented? Did the fee make you so mad that you swore that the next time you flew, you would pack fewer clothes so you could use a carry-on bag instead? That is exactly how American Airlines (and the other airlines that charge baggage fees) hoped that you would react. Baggage handling is extremely labor intensive. All that tagging, sorting, loading on carts, loading in planes, unloading, and sorting again add up to about $9 per bag. Baggage handling also involves equipment costs: sorters, carts, conveyors, tractors, and storage facilities. That’s about another $4 of equipment-related overhead per bag. Finally, there is additional fuel cost of a 40-pound item—about $2 in fuel for a 3-hour flight. These costs add up to $15 ($9+$4+$2). Since airlines have implemented their baggage fees, fewer customers are checking bags. Not only does this save the airlines money, it also increases the amount of space available for hauling cargo. An airline can charge at least $80 for hauling a small parcel for same-day delivery service.

Source: Scott McCartney, “What It Costs an Airline to Fly Your Luggage,” Wall Street Journal Online (November 25, 2008).

Page 46: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-46

4 Apply ABC to Service Company

(a) Compute the activity-based overhead rates for each pool.

LO 4

Page 47: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-47

4 Apply ABC to Service Company

(b) Determine the overhead allocated to Job A1027 which has 150 pieces, requires200 miles of driving, and 0.75 hours of logistics.

(150 x $0.70) + (200 x $0.50) + (0.75 x $30) = $227.50

LO 4

Page 48: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-48

JIT manufacturing is dedicated to having the right amount of materials, parts, or products just as they are needed.

.

Illustration 18A-1

LEARNINGOBJECTIVE 5 APPENDIX 18A: Explain just-in-time (JIT)

processing.

LO 5

Page 49: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-49

Objective of JIT Processing

To eliminate all manufacturing inventories.

Elements of JIT Processing

Dependable suppliers.

Multiskilled work force.

Total quality control system.

LO 5

Just-In-Time Inventory Processing

Page 50: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-50

Benefits of JIT Processing

Significant reduction or elimination of manufacturing

inventories.

Enhanced product quality.

Reduction or elimination of rework costs and inventory

storage costs.

Production cost savings from the improved flow of goods

through the processes.

LO 5

Just-In-Time Inventory Processing

Page 51: 18-1. 18-2 Activity-Based Costing 18 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based.

18-51

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved.

Reproduction or translation of this work beyond that permitted in

Section 117 of the 1976 United States Copyright Act without the

express written permission of the copyright owner is unlawful.

Request for further information should be addressed to the

Permissions Department, John Wiley & Sons, Inc. The purchaser

may make back-up copies for his/her own use only and not for

distribution or resale. The Publisher assumes no responsibility for

errors, omissions, or damages, caused by the use of these

programs or from the use of the information contained herein.

Copyright


Recommended