    Ministry of Urban Development,Government of India

    Capacity Building for UrbanDevelopment Project-

    Nagpur

    Draft Report

    October 2013

    CRISIL Risk and Infrastructure Solutions Limited

  • 8/11/2019 18 Nagpur Draft Report

    2/129

    Ministry of Urban Development

    [ii]Rapid Baseline Assessment - Nagpur Draft Report

    Certification

    Report Prepared by CRISIL Infrastructure Advisory Team

    Report Reviewed by Dr Ravikant JoshiBrijgopal Ladda

    Report Validated by Request for validation has been sent to nodalofficer 1

    1

    Once the certificate is received from the ULB, the same shall be submitted to CBUD Cell

  • 8/11/2019 18 Nagpur Draft Report

    3/129

    Ministry of Urban Development

    [iii]

    List of Abbreviations

    ARV Annual Rental Value

    BPL Below Poverty Line

    BRTS Bus Rapid Transit System

    BSUP Basic Service to Urban Poor

    CAA Constitutional Amendment Act

    CAGR Compounded Annual Growth rate

    CGG Center for Good Governance

    CRIS CRISIL Risk and Infrastructure Solutions Limited

    DEAS Double Entry Accounting System

    DPR Detailed Project Report

    DTCP Director of Town and Country Planning

    ESR Elevated Service Reservoir

    EWS Economically Weaker Sections

    GAD General Administration Department

    GIS Geographical Information System

    HRD Human Resource Development

    IALA Industrial Area Local Authority

    JNNURM Jawaharlal Nehru National Urban Renewal Mission

    LIG Low Income GroupsNHAI National highway Authority of India

    NMAM National Municipal Accounting Manual

    NRW

    NMC

    NIT

    MSRDC

    Non-revenue water

    NMC

    Nagpur Improvement Trust

    Maharashtra state roads development authority

    OBS Opening Balance Sheet

    PHED Public Health and Engineering Department

    PPP Public Private Partnership

    SEZ Special Economic zones

    SPS Sewerage Pumping Stations

    STP

    SRA

    Sewerage Treatment Plants

    Slum Rehabilitation Authority

    SWD Strom Water Drainage

    SWM Solid Waste Management

    TDS Transferable Development Services

    UFW Unaccounted For WaterULB Urban Local Body

  • 8/11/2019 18 Nagpur Draft Report

    4/129

    Ministry of Urban Development

    [iv]Rapid Baseline Assessment - Nagpur Draft Report

    WTP Water Treatment Plant

  • 8/11/2019 18 Nagpur Draft Report

    5/129

    Ministry of Urban Development

    [v]Rapid Baseline Assessment - Nagpur Draft Report

    Contents

    Certification ........................................................................................................................................... ii

    List of Abbreviations ........................................................................................................................... iii

    Contents ................................................................................................................................................. v

    List of Tables ...................................................................................................................................... viii

    1. Project Background ...................................................................................................................... 1

    1.1 CBUD Project .......................................................................................................................... 1 1.2 Rapid Baseline Assessment ................................................................................................... 1 1.3 Brief Approach and Methdology .............................................................................................. 2 1.4 Methodology ............................................................................................................................ 2

    2. Executive Summary ...................................................................................................................... 3

    2.1 General information ................................................................................................................. 3 2.2 Municipal Governance ............................................................................................................ 3 2.3 Municipal Financial Management ........................................................................................... 7 2.4 Urban Service Delivery ........................................................................................................... 9 2.5 Urban Planning ..................................................................................................................... 15 2.6 Key issues ............................................................................................................................. 16 2.6.1 Municipal Governance ..................................................................................................... 16 2.6.2 Municipal Financial Management .................................................................................... 16 2.6.3 Urban Service Delivery .................................................................................................... 17 2.6.4 Urban Planning ................................................................................................................ 18 2.7 Capacity Building .................................................................................................................. 18 2.7.1 Municipal Governance ..................................................................................................... 18 2.7.2 Municipal Financial Management .................................................................................... 19 2.7.3 Urban Service Delivery .................................................................................................... 20 2.7.4 Urban Planning ................................................................................................................ 21

    3. Brief City Profile .......................................................................................................................... 22

    3.1 Population Trends ................................................................................................................. 22 3.2 Indicators ............................................................................................................................... 23

    4. Urban Governance ...................................................................................................................... 24

    4.1 Existing status ....................................................................................................................... 24 4.1.1 Empowering ULBs Status of 74th CAA ........................................................................ 24 4.1.2 Functions, roles and responsibilities of NMC and parastatals ........................................ 25 4.1.3 NMC- Status of Municipal Administration ........................................................................ 26 4.2 Key Concerns ........................................................................................................................ 29 4.3 Capacity building areas ......................................................................................................... 30

    5. Municipal Financial Management .............................................................................................. 31

    5.1 Budget Preparation ............................................................................................................... 31 5.2 Audit of Accounts .................................................................................................................. 32 5.3 Municipal Accounting system ................................................................................................ 32 5.4 Municipal Financial status ..................................................................................................... 32 5.5 Assessment of Property tax System at NMC ........................................................................ 35

  • 8/11/2019 18 Nagpur Draft Report

    6/129

    Ministry of Urban Development

    [vi]Rapid Baseline Assessment - Nagpur Draft Report

    5.5.1 Institutional Arrangement ................................................................................................ 35 5.5.2 Assessment of Property tax ............................................................................................ 35 5.5.3 Coverage of properties .................................................................................................... 36 5.5.4 Billing and Collection ....................................................................................................... 36 5.5.5 Demand, Collection and Balance Statement .................................................................. 37 5.6 Key Issues ............................................................................................................................. 38 5.7 Key municipal financial assessment Indicators.................................................................. 39 5.8 Capacity building areas ......................................................................................................... 40

    6. Urban Service Delivery ............................................................................................................... 42

    6.1 Roles and responsibilities of NMC and Parastatals .............................................................. 42 6.2 Water Supply ......................................................................................................................... 42 6.2.1 Water supply system ....................................................................................................... 42 6.2.2 Service-level indicators ................................................................................................... 45 6.2.3 Planning, financing, procurement, and implementation .................................................. 46

    6.2.4 JNNURUM Project implementation ................................................................................. 47 6.2.5 Best Practices.................................................................................................................. 48 6.3 Sewerage and Sanitation ...................................................................................................... 48 6.3.1 Sewerage system ............................................................................................................ 48 6.3.2 Service-level Indicators ................................................................................................... 49 6.3.3 JNNURM project implementation .................................................................................... 49 6.4 Solid Waste Management ..................................................................................................... 50 6.4.1 Solid waste management system.................................................................................... 50 6.4.2 Service-level Indicators ................................................................................................... 52 6.5 Storm Water Drainage .......................................................................................................... 53 6.5.1 Service-level Indicators ................................................................................................... 53

    6.6 Roads and Streetlights .......................................................................................................... 54 6.7 Housing and infrastructure for Urban Poor ........................................................................... 55 6.7.1 JNNURM project implementation .................................................................................... 56 6.8 Key issues ............................................................................................................................. 57 6.9 Capacity building areas ......................................................................................................... 58

    7. Urban Planning ........................................................................................................................... 60

    7.1.1 City Planning Status of MPCs and DPCs ..................................................................... 60 7.2 Status of master plans and land use plans ........................................................................... 61 7.3 Existing practice for planning process .................................................................................. 62 7.4 Status of key reforms implementation .................................................................................. 63 7.5 Key issues ............................................................................................................................. 65 7.6 Capacity building areas ......................................................................................................... 65

    8. Annexure ...................................................................................................................................... 66

    8.1 List of References ................................................................................................................. 66 8.2 Websites/Related Links ......................................................................................................... 66 8.3 List of Officials met during ULB visits .................................................................................... 67 8.4 Minutes of the meetings ........................................................................................................ 68 8.5 Annexure -Qualitative Questionnaire .................................................................................... 71 8.6 Annexure -Quantitative Questionnaire ................................................................................ 102

    8.7 General Information ............................................................................................................ 102 8.8 Land use .............................................................................................................................. 103

  • 8/11/2019 18 Nagpur Draft Report

    7/129

    Ministry of Urban Development

    [vii]Rapid Baseline Assessment - Nagpur Draft Report

    8.9 Municipal Financial management ....................................................................................... 103 8.9.1 Property tax Details ....................................................................................................... 105 8.10 Urban Service Delivery ....................................................................................................... 106 8.10.1 Water supply .............................................................................................................. 106 8.10.2 Sewerage & Sanitation .............................................................................................. 109 8.10.3 Solid Waste Management .......................................................................................... 111 8.10.4 Storm water drains ..................................................................................................... 113 8.10.5 Roads and Urban transport ....................................................................................... 113 8.10.6 Services to Urban Poor .............................................................................................. 114 8.11 Municipal Governance ........................................................................................................ 114 8.12 Status of Reforms under JNNURM ..................................................................................... 116

  • 8/11/2019 18 Nagpur Draft Report

    8/129

    Ministry of Urban Development

    [viii]Rapid Baseline Assessment - Nagpur Draft Report

    List of Tables

    Table 3-1: Population trend of Nagpur city ........................................................................................... 23 Table 3-2: Demographic Indicators of Nagpur city ............................................................................... 23 Table 4-1: Status of transfer of functions as per 74th CAA .................................................................. 25 Table 4-2: Department-wise staff strength ............................................................................................ 26 Table 5-1: Financial details ................................................................................................................... 33 Table 5-2: Coverage of the properties .................................................................................................. 36 Table 5-3: Schedule of Billing & Collection process ............................................................................. 37 Table 5-4: Demand, Collection and Balance table for property tax ...................................................... 38 Table 6-1: Annual water reservation and withdrawal ............................................................................ 42 Table 6-2: Treated water supply from various WTPs ........................................................................... 43 Table 6-3: Treated water supply from various WTPs ........................................................................... 43 Table 6-4: SLB indicators for Water supply sector of Nagpur ............................................................... 45 Table 6-5: JNNURM project implementation for water supply sector ................................................... 47 Table 6-6: Sewerage sector Service-Level Indicators .......................................................................... 49 Table 6-7: List of vehicles in use for solid waste transportation in Nagpur ........................................... 51 Table 6-8: Service-Level Benchmarks for solid waste management .................................................... 52 Table 6-9: Service-Level Benchmarks for storm water Drainage ......................................................... 53 Table 6-10: Status of road network ....................................................................................................... 54 Table 6-11: JNNURM project implementation for urban transport sector ............................................. 55 Table 6-12: Details of old projects under BSUP programme ................................................................ 56 Table 7-1: Zone-wise area planning and area under NMC ................................................................... 61 Table 7-2: Comparison of land use plan of Nagpur in 1984 and 2011 ................................................. 62 Table 7-3: Status of building plan approvals in last five years .............................................................. 63

    Table 7-4: Status of key reforms ........................................................................................................... 64 Table 8-1: Qualitative Information on Municipal Financial Management in Nagpur ............................. 71 Table 8-2: Qualitative Information on Urban service delivery in Nagpur .............................................. 81 Table 8-3: Qualitative information on Municipal Governance at Nagpur .............................................. 89 Table 8-4: Qualitative Information on urban planning in Nagpur .......................................................... 98 Table 8-5: ULB Key contacts .............................................................................................................. 102 Table 8-6: ULB Profile ......................................................................................................................... 102 Table 8-7: Workers details in ULB ...................................................................................................... 102 Table 8-8: Land use break-up ............................................................................................................. 103 Table 8-9: Financial Status ................................................................................................................. 104 Table 8-10: Financial Status ............................................................................................................... 104

    Table 8-11: Loan Statement................................................................................................................ 104 Table 8-12: Outstanding Debt Liability ................................................................................................ 105 Table 8-13: DCB Statement of Property Tax ...................................................................................... 105 Table 8-14: Sources of water supply .................................................................................................. 106 Table 8-15: Distribution ....................................................................................................................... 106 Table 8-16: Connection Details ........................................................................................................... 106 Table 8-17: Annual tariff for metered and unmetered connections..................................................... 106 Table 8-18: O&M Expenses ................................................................................................................ 108 Table 8-19: Demand Collection Balance Statement for Water Charges ............................................ 108 Table 8-20: Cost Recovery ................................................................................................................. 108 Table 8-21: Service level benchmarking ............................................................................................. 108 Table 8-22: Capacity Augmentation under JnNURM .......................................................................... 109 Table 8-23: Current system................................................................................................................. 109

  • 8/11/2019 18 Nagpur Draft Report

    9/129

    Ministry of Urban Development

    [ix]Rapid Baseline Assessment - Nagpur Draft Report

    Table 8-24: Capacity of STPs ............................................................................................................. 110 Table 8-25: Service Charges .............................................................................................................. 110 Table 8-26: O&M expenses ................................................................................................................ 110 Table 8-27: Demand and Collection Balance Statement .................................................................... 110 Table 8-28: Cost Recovery ................................................................................................................. 110 Table 8-29: Capacity Augmentation under JnNURM .......................................................................... 110 Table 8-30: Proposed Projects............................................................................................................ 111 Table 8-31: Service Level Benchmarking ........................................................................................... 111 Table 8-32: Current SWM service ....................................................................................................... 111 Table 8-33: Source-wise quantity of waste generation ....................................................................... 112 Table 8-34: Details of Disposal/landfill sites ....................................................................................... 112 Table 8-35: Tariff structure .................................................................................................................. 112 Table 8-36: Demand and collection Balance statement ..................................................................... 112 Table 8-37: Initiatives taken under JnNURM ...................................................................................... 112 Table 8-38: Proposed Projects............................................................................................................ 112

    Table 8-39: Service level benchmarking ............................................................................................. 112 Table 8-40: Present system ................................................................................................................ 113 Table 8-41: Initiatives taken under JnNURM ...................................................................................... 113 Table 8-42: Proposed Projects............................................................................................................ 113 Table 8-43: Details of Roads .............................................................................................................. 113 Table 8-44: Investment in projects including those under JnNURM ................................................... 114 Table 8-45: Proposed Projects............................................................................................................ 114 Table 8-46: Status of BSUP projects under JnNURM ........................................................................ 114 Table 8-47: Staffing Pattern ................................................................................................................ 114 Table 8-48: Training attended in the past one year ............................................................................ 115 Table 8-49: Training requirement ........................................................................................................ 115

    Table 8-50: Status of mandatory reforms under JNNURM ................................................................. 116 Table 8-51: Status of optional reforms under JNNURM ..................................................................... 116

  • 8/11/2019 18 Nagpur Draft Report

    10/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [1]

    1. Project Background

    With growing population in urban areas in India, tremendous pressure has been put on key urbanservices and service delivery mechanism at city/town level. In order to overcome these issues at ULBlevel, Government of India (GoI) had launched Jawaharlal Nehru National Urban Renewal Mission(JNNURM) to augment the capacity building of ULBs by implementing the projects and reformsacross the selected ULBs in India.While there has been good progress in implementation of reforms at policy level at state and centrallevel. However, Institutional strengthening and capacity buildings initiatives are yet to be initiated inmost of the ULBs. Further, the service levels are not up to the mark in most of the ULBs. The need ofthe hour is to focus on capacity building aspects at ULB level to improve the service deliverymechanism and enhance the revenue improvement measures to make the ULBs self-sustainable.

    1.1 CBUD Project

    In order to give an impetus to reforms under JNNURM, the MoUD and Ministry of Housing and UrbanPoverty Alleviation (MoHUPA) had launched a new project called Capacity Building of UrbanDevelopment (CBUD ). The project had been launched with support from The World Bank. Theproject has following three components:

    1. Capacity Building for Strengthened Urban Management . This component is aligned withthe infrastructure and governance sub-mission of JNNURM and will thus support technicalassistance across the several urban management topics.

    2. Capacities Building for Effective Urban Poverty Monitoring and Alleviation. Thesecapacity building initiatives are aligned with the basic services to the urban poor sub-mission.They reflect the need for building information systems, sharing experiences, and designingstrategies on urban poverty alleviation.

    3. Implementation Support. This component will support a national Project Management Unit(PMU) for providing overall technical and managerial support during the implementation of theProgramme. The PMU will have a critical role in promoting and support the project.

    Under the CBUD project, MoUD had initiated various studies such as preparation of CDPs, CSPs,training needs assessment, transport related studies, reduction of non-revenue water related studies,city and zonal support studies etc. In particular, the study on Rapid Baseline Assessment precedes allthese studies.

    1.2 Rapid Baseline Assessment

    In order to provide a baseline for project implementation & broadly identify the capacity gaps andtraining needs, MoUD initiated the whole process with a Rapid Assessment of the status of the ULBsselected for participation in the CBUD project.The Rapid Baseline Assessment has majorly two-fold objectives,

    Firstly to set up a baseline of the 30 cities. This baseline would be helpful for MoUD tomonitor the progress in the city under the CBUD programme in mid and long term and

    Secondly to identify the capacity gaps in implementing the reforms and service deliverybenchmarks and identifying areas of intervention and the support to be provided to utilities.

    The study targeted to cut across the four major interrelated aspects mentioned below:

    1. Municipal Financial Management;2. Municipal Governance;

  • 8/11/2019 18 Nagpur Draft Report

    11/129

    Ministry of Urban Development

    [2] Rapid Baseline Assessment of Nagpur Draft Report

    3. Urban Planning and Land use; and4. Urban Service Delivery.

    To undertake this study, MoUD appointed CRISIL Risk & Infrastructure Solution Limited (CRIS) asconsultant to carry out rapid assessment for 30 selected ULBs across the county. As part of the study,

    CRIS followed the scope of work as defined in the ToR.

    1.3 Brief Approach and Methdology

    The progress of implementation of the reforms and poverty alleviation programmes were taken intoconsideration while studying each of the ULBs to gain an understanding on the quality and efficiencyof Urban Management mechanisms and to further propose interventions to enhance the ULBsperformance.The four Functional Areas are interrelated and have significant impact on each other. Each of theseFunctional Areas was dealt individually before they were integrated to realize the overall Goal of theProject. A Part -to-Whole approach was adopted to ensure clarity of tasks and activities proposed tostrengthen each of the Functional Areas. The flowchart below illustrates the overall frameworkadopted to achieve the goal of the assignment at hand.

    Figure 1-1: Rapid Baseline Study Process mapping

    1.4 Methodology

    The following in brief step by step actions were taken to prepare the Rapid Baseline Report at CityLevel

    Kick off meeting with MoUD Desk Research Questionnaire formulation (qualitative and quantitative) ULBs/ parastatals visit and detailed discussion and data collection Report preparation, expert review Submission of the draft report to MoUD and City

    Interventions leading to

    enhanced capacity ofurban management

    systems

    Assessment ofMunicipalFinancialSystem

    Assessment ofUrban planning

    and land use

    Assessment ofUrban servicesdelivery system

    Assessment ofMunicipal

    Governances stem

  • 8/11/2019 18 Nagpur Draft Report

    12/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [3]

    2. Executive Summary2.1 General information

    Sr. No. Particular Details1 Name of the City Nagpur

    2 Key Economic DriversOranges exports and other related

    industries

    3 Total Population (2011) 24,05,421 persons

    4 Floating population (if any, in case of tourist cities) NA

    5 Total Slum Population 8.50 lakhs (36% of total population)

    6 Decadal Growth Rate (2001-11) 15%

    7 Area of ULB 217.56 sq. km

    8 Density 11,304 persons per sq. km

    9 Literacy Rate 93.13%

    10 Sex Ratio 1040 females per 1000 males

    2.2 Municipal Governance

    General Information

    Sr.No.

    Particular Details

    1 Formation year of the ULB Municipal Association 1864

    Municipal Corporation 1951

    2 No. of wards 145

    3 Whether local body is in place Yes

    4 The city has following no. of citizen

    facilitation centres

    There are in all l 10 CFCs in Nagpur.

    5 The ULB has implemented the following

    acts:

    Right to Information (RTI)

    Right to Service (RTS)

    NMC is providing the information to citizens under

    the RTI act. The citizen s charter is in place to

    deliver the key service within the specified time

    period. The copy of citizen charter is provided in

    each CFC center in order to disseminate the

    information and provide transparency regarding the

    key services.

    6 The ULB discloses the following

    information to the public: Annual budget estimates Status of key project information and

    JNNURM-related information Contact details of the concerned officials for

  • 8/11/2019 18 Nagpur Draft Report

    13/129

    Ministry of Urban Development

    [4] Rapid Baseline Assessment of Nagpur Draft Report

    Sr.

    No.

    Particular Details

    key services

    7 Sanctioned Staff 125078 Actual Staff 9260

    9 Staff on contract NA

    Vacancy rate 26% (3247)

    10 The recruitment of staff is governed by NMC is responsible for carrying out recruitment of

    all class of employees.

    11 The recruitment rules are of the following

    year

    Rules and procedure of recruitment is carried out

    as per MMC Act (for old staff members it was as

    per CNC Act)

    12 The state has created Municipal Cadre Yes. Assistant Director for Town Planning post has

    been created. ADTP has been deployed at all the

    ULBs in Maharashtra State.

    13 The ULB has a training curriculum and

    budgets for training

    No. There is no HR policy and training cell at NMC.

    Transfer of funct io ns (as part of 74 th CAA)

    Sr.

    No.12th Schedule Functions

    Status of Transfer and the name of the

    agency/s responsible

    1 Urban planning including town planningPreparation of master plan NIT and NMC.Implementation NIT and NMC

    2Regulation of land-use and construction of

    buildingsNMC

    3Planning for economic and social

    developmentNMC and NIT

    4 Roads and bridges NMC and MSRDC

    5Water supply- domestic, industrial and

    commercial

    NMC

    6Public health, sanitation, conservancy and

    SWMNMC

    7 Fire services NMC

    8Urban forestry, protection of environment and

    ecologyNMC and state forest department

    9

    Safeguarding the interests of weaker

    sections of society including the handicapped

    and mentally retarded

    NMC

    10 Slum improvement and up-gradation NMC and Slum Rehabilitation Authority (SRA)

  • 8/11/2019 18 Nagpur Draft Report

    14/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [5]

    Sr.

    No.12th Schedule Functions

    Status of Transfer and the name of the

    agency/s responsible

    11 Urban poverty alleviation NMC and SRA

    12 Provision of urban amenities and facilities-parks, gardens and playgrounds

    NMC

    13Promotion of cultural, educational, and

    aesthetic aspectsNMC

    14Burials and burial grounds, cremations,

    cremation grounds and electric crematoriumsNMC

    15Cattle pounds, prevention of cruelty to

    animalsNMC

    16Vital statistics including registration of births

    and deathsNMC

    17

    Public amenities including street lighting,

    parking lots, bus stops and public

    conveniences

    NMC

    18 Regulation of slaughter houses and tanneries NMC

    Status of E-Governanc e Services

    Module Status Remarks

    Property tax Implemented Deployed the property tax module and also the payment

    gateway on NMC website.

    Accounting Implemented Tally based module is in place for double entry accountingsystem and the process of integrating it with budget codes,municipal receipts and expenditure has been carried outunder E-Governance project. Recently, NMC has preparedthe budget as per NMAM budget codes and NMC isplanning to integrate the same with the accounts codes.

    Water supply and

    other utilities

    Implemented Water supply module is in place. NMC has prepared the

    module but as per agreement a private operator iscollecting the water user charges. The private operator hasinformed NMC that they will have their ownmodule/application for water supply which is still pending.

    Birth and death

    registration

    Implemented A computerized system of birth and death is in place.

    Database for birth and death is digitized and availablesince 1897.

    Citizens

    grievance

    Implemented A dedicated cell for c itizens grievance monitoring is in

    place and all the departments are provided access to thePGR module. Once Ci tizens register their grievances

  • 8/11/2019 18 Nagpur Draft Report

    15/129

    Ministry of Urban Development

    [6] Rapid Baseline Assessment of Nagpur Draft Report

    Module Status Remarks

    monitoring online, it will be directed to the respective official ofrespective department. As per the timelines decidednecessary action has to be taken, else case gets escalated

    to the senior official.

    Personnel

    management

    system

    Implemented Module for personnel management system is in place;

    database for all the employees has been created.

    Procurement and

    monitoring of

    projects

    implemented Module for procurement and monitoring is under

    implementation.

    E-procurement Implemented Module is in place and under implementation.

    Project/ward

    works

    Implemented Module for projects is already under implementation.Projects status reports and measurement books areprepared and updated in the software itself.

    Building Plan

    approval

    Implemented A separate module (Auto DCR) is in place for building plan

    approval. All the approvals are given through this software.

    Health

    programmes

    Licenses Implemented A computerized licenses module is in operation.

    Solid Waste

    Management

    Implemented Module is in place and vehicle-tracking is done with the

    help of the GPS system.

    Particular Brief Details

    Status of

    Citizen Charter

    NMC has worked on improving its basic services provision to citizens and the same

    has been provided in the citizen s charter during 2012. Citizen charter for all the

    basic functions/services provided to citizens has been provided outside all the

    concern departments and offices of NMC. Details have been provided in form of

    posters and charts.

    Public

    Disclosure

    NMC is disclosing the information in terms of physical progress and financial

    progress related to the infrastructure/development works executed by its various

    departments through its website from time to time. Also, the progress reports related

    to JNNURM projects have been uploaded on the websites.

  • 8/11/2019 18 Nagpur Draft Report

    16/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [7]

    Particular Brief Details

    Grievance

    Redressal

    System

    NMC has developed a grievance redressal module under e-governance. NMC

    proposes to deliver citizen-centric integrated services through the NMC services

    portal. Access is either through online web portal or through manual registration at

    nearest citizen facilitation centre which have been set up across the city. Also, a

    new web portal of NMC offers many services online, which will save citizens time

    and efforts.

    2.3 Municipal Financial Management

    Exis t ing S ta tus Municipal Financial Management

    Sr.

    No.

    Particular Details

    1 The accounting system in the ULB is Double Entry Accounting System

    2 Balance Sheets are prepared uptill the year FY 2011-12 and yet to be audited

    3 Valuation of assets completed uptill the year List of assets has been prepared by various

    departments of NMC and provided to accounts

    department. Valuation of assets is still pending.

    4 The asset register is managed on a (real-

    time/ intermittent) basis

    Intermittent basis

    5 Double entry accounting system is practicedon (real-time/ intermittent) basis

    Real-time

    6 The ULB has adopted the municipal codes

    of (NMAM/ state accounting codes/ others if

    any)

    NMC has adopted NMAM and prepared the

    budget for the financial year 2013-14.

    7 Account codes are linked with budget codes

    (Yes/No)

    Linking is in process.

    8 Ledgers and other statements are

    maintained on (real-time/ intermittent) basis

    Real-time basis

    9 Budget planning is done based on (past

    years data/ based on actual requirements)

    It is a mix of both.

    For specific service delivery departments, actual

    requirements would be estimated. For non-

    technical departments, it would be based on a

    past years budget.

    10 Budget is prepared through a consultative

    process with various stakeholders

    No,

    a team of 4-5 officials in the accounts

    department looks after the preparation of the

    budget. CA&FO heads the team.

  • 8/11/2019 18 Nagpur Draft Report

    17/129

    Ministry of Urban Development

    [8] Rapid Baseline Assessment of Nagpur Draft Report

    Sr.

    No.

    Particular Details

    11 Trainings that are being provided to the staff

    for the new accounting system

    No trainings have been imparted to the staff in

    accounts departments.

    12 The ULB follows (post/ pre audit) Pre-audit. However, the a uditors role is very

    limited.

    14 The accounts have been audited till FY 2010-11

    15 The ULB has a separate budgeting system

    for

    No separate budget for water, sewerage and

    SWM.

    16 The ULB has Allocated - 10% of the total budget

    Utilized 10% of the total budget

    17 Does the ULB has exposure to debt Loans from various banks and financial

    institutions Municipal bonds

    18 The officials have undergone the following

    trainings

    No official has attended any training.

    Existing Status - Municipal Finance

    Sr.

    No.

    Particular Details

    1 The ULB s Municipal Credit Rating has been A by Fitch ratings.2 Over the past five years, the Revenue

    Account has been in (surplus/ deficit)

    Surplus

    3 The key source of revenue receipts for the

    ULB is

    Octroi and Property tax

    4 The key area of municipal expenditure is Establishment expenditure which includes

    salary to staff in SWM

    5 The ULB levies property tax based on (ARV/

    Unit Area method)

    ALV

    6 The following taxes were last revised in the

    year Property tax - 2008 Water charge under purview of private

    operator (OCWL). Sewerage charge along with property tax,

    as sewerage tax is sub component ofproperty tax as per system adopted by NMC.

    SWM charge No user charges levied byNMC

    7 User charges are determined on Ad hoc basis

  • 8/11/2019 18 Nagpur Draft Report

    18/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [9]

    Municipal F inancia l Indicators

    Sr.

    No. Indicators Value

    1. Own revenues as a proportion of total revenue receipts

    (Rs 70102.75 lakhs/ Rs 74577.4 lakhs) 94%

    2.Per capita own revenues

    (Rs 70102.75 lakhs/ 24.05 lakhs) Rs 2785

    3. Non-tax revenues as a proportion of own revenues

    (Rs 17152.80 Lakhs/ Rs 70102.75 Lakhs) 23%

    4.Per capita property tax demand

    (Rs 9595 lakhs/ 24.05 lakhs) Rs 399

    5. Coverage for property tax net

    (4.62 lakhs/ 5.32 lakhs) 87%

    6. Property tax collection performance

    (Rs 11214 lakhs/Rs 12890 lakhs) 87%

    7. Water charges collection performance (detail bifurcation not available)

    49%

    8. Operating ratio (revenue expenditure/ revenue receipts) (Rs 49943.6 lakhs/ Rs 74577.4 lakhs)

    0.63

    9. Per capita O&M expenditure

    (Rs 24050 lakhs/ 24.05 lakhs)

    Rs 1000

    10. Salary as percentage of Revenue Income (Rs 22273.3 Lakhs/ Rs 74577.4 lakhs)

    30%

    11. Salary as percentage of Revenue Expenditure (Rs 19977.4 Lakhs/ Rs 49943.6 lakhs)

    40%

    12. Staff per 1000 population (7910/24.05 lakhs)

    3.09

    13. Debt Servicing Coverage Ratio (

  • 8/11/2019 18 Nagpur Draft Report

    19/129

    Ministry of Urban Development

    [10] Rapid Baseline Assessment of Nagpur Draft Report

    Sr.

    No.

    Key Infrastructure

    Services

    Planning and

    design

    Construction/

    Implementation

    O&M

    3 Storm Water Drains NMC NMC NMC

    4 Solid Waste Management NMC NMC NMC

    5 Urban Transport City

    Bus Service

    NMC NMC/Private operator NMC/Private

    operator

    6 Street Lighting NMC NMC NMC

    7 Preparation of Master

    Plan/ Development Plan

    NIT NIT/NMC NIT/NMC

    8 Housing for Urban Poor NMC/SRA NMC/SRA NMC/SRA

    Other Informat ion

    Sr.

    No. Particular Details

    1A The ULB has preparedinfrastructure master plan for

    NMC has prepared the following documents

    Master plans for basic service sectors

    DPRs for service sectors

    1B The ULB has prepared a CDP and

    in which year it was prepared CDP document has been prepared in April 2006.

    2A DPR prepared for following

    infrastructure services CSP document has been prepared by NMC in April2012.

    2B The ULB is looking forward tosupport the preparation of the DPRfor

    Water Supply- The DPR is in place Sewerage - The DPR and master plan is in place Solid Waste Management DPR is yet to prepared Road DPR is in place and master plan is yet to

    be prepared Housing DPR is in place with SRA

    3 The ULB is looking forward to

    support in preparing the MP/DPRfor the following projects

    NMC is looking for support in preparation of DPR on

    sewerage and solid waste management project.

    4A The ULB is aware and has put in

    place

    Water supply, sewerage department and public health

    department are departments that are familiar with SLB

    framework and manage SLB information of NMC and

    update it on a regular basis.

    Information System Improvement Plan (ISIP) - not yet

    prepared

    Performance Improvement Plan (PIP) - not yet

    prepared

  • 8/11/2019 18 Nagpur Draft Report

    20/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [11]

    Sr.

    No. Particular Details

    4B The ULB has taken the initiative for

    improving service delivery and

    monitoring the performance of SLB

    indicators

    NMC has taken up 11 water supply projects under

    JnNURM, under which; they have targeted toimprove key indicators like NRW, per capita watersupply, continuity of water supply, and water usercharges.

    But till now, a performance report has not beenprepared to monitor the benefits of projects asagainst targeted Indicators.

    NMC has not taken initiatives to improve theperformance of SLB indicators in any other servicesector.

    5 Following are the safeguards

    (social and environmental)

    measures the ULB takes while

    planning for developmental

    projects

    While preparing the DPRs for any projects, NMCwould emphasize on the social and environmental

    aspects and safeguard the same while implementing

    the projects.

    6A The ULB has an internal legal

    department to deal with contractual

    issues (yes/ no)

    Yes

    6B The ULB has an Engineering

    Department to deal with projectplanning and project

    implementation

    NMC has the technical strength to deal with project

    implementation. Engineers are there in each of thetechnical departments, i.e., water works, city

    development dept., sewerage dept., Market Dept.,

    Estate Dept., PWD, Lighting Dept., Work charge

    Dept., Transport Dept..

    But NMCs engineers and technical staff lack

    technical skills in project management and

    planning.

    7 The ULB is planning or has

    experience of undertaking the

    following on the PPP framework

    It is implementing the water supply system on PPP

    basis

    Reuse and recycling of waste-water project through

    the PPP mode is under implementation.

    Provision of city bus services is under

    implementation on PPP basis.

    8 The service delivery departments

    have attended following trainings/

    workshops

    No trainings

  • 8/11/2019 18 Nagpur Draft Report

    21/129

    Ministry of Urban Development

    [12] Rapid Baseline Assessment of Nagpur Draft Report

    Service Delivery Indicators

    Sr.

    No. Indicator Value MoUD

    Benchmark

    Water Supply Services

    1 Coverage of water supply connections

    (218146 HH water connections/266031 total HH in city) 82% 100%

    2 Per capita supply of water

    (235 MLD supply / 24.05 lakh population)

    100 -110

    lpcd135 lpcd

    3 Extent of metering of water connections

    (74488 metered connection/ 266031 total connections) 28% 100%

    4Extent of Non-Revenue Water

    (231 MLD (clear water)- 98 MLD (Billed Water))/ 129 MLD (Clearwater))

    56% 20%

    5 Continuity of water supply

    (on daily basis for around 6 hrs) 6 Hour 24 hours

    6Quality of water supplied

    (all the samples taken passed) 100% 100%

    7 Efficiency in redressal of customer complaints

    (NA) 95% 80%

    8 Cost recovery in water supply services

    (NA-under PPP)

    117% 100%

    9 Efficiency in collection of water supply related charges

    (NA) 74% 90%

    Sewerage and Sanitation

    1Coverage of toilets

    (5.09 lakhs properties are connected with sewerage network/5.31lakhs properties)

    90% 100%

    2Coverage of sewage network services

    (5.09 lakhs properties are connected with sewerage network/5.31lakhs properties)

    96% 100%

    3Collection efficiency of sewage network

    (85 MLD STP capacity/ 290 MLD sewerage generation) 29% 100%

    4 Adequacy of sewage treatment capacity

    (63 MLD Capacity/ 290 MLD sewerage generation) 22% 100%

    5 Quality of sewage treatment

    (it is tertiary treatment) 100% 100%

    6 Extent of reuse and recycling of sewage 0% 20%

    7 Efficiency in redressal of customer complaints

    (NA) NA 80%

    8 Extent of cost recovery in sewage management

    (collected as part of property tax)

    100% 100%

  • 8/11/2019 18 Nagpur Draft Report

    22/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [13]

    Sr.

    No. Indicator Value

    MoUD

    Benchmark

    9 Efficiency in collection of sewerage/sewage charges

    (collected as part of property tax) 100% 90%

    Solid Waste Management

    1Household-level coverage of SWM services

    (5.4 lakhs properties covered with door to door collection/ 5.31lakhs total properties)

    95% 100%

    2Efficiency of collection of municipal solid waste

    (720 MT waste collected in a month/750 MT waste generated ina month)

    95% 100%

    3 Extent of segregation of municipal solid waste 28% 100%

    4Extent of municipal solid waste recovered

    (6750 MT waste recovered in a month/ total waste generated 750MT)

    9% 80%

    5 Extent of scientific disposal of municipal solid waste 0% 100%

    6 Efficiency in redressal of complaints

    (NA) 97% 80%

    7Extent of cost recovery in SWM services

    (No use charges in place, recovered from only commercial andindustrial establishment)

    75% 100%

    8Efficiency in collection of SWM charges

    (No user charges levied by NMC) - 90%

    Storm Water Drainage

    1 Coverage of Storm water drainage network

    (917 km pucca drains/ 2620 km total road network) 35% 100%

    2 Incidence of water logging / flooding

    (Average during the monsoon period)

    Maximum of

    450

    Roads and Transportation

    1 Road area per capita 0.4 -

    2 Proportion of surfaced roads

    (1336 Km surface roads/ 1970 kms total road network) 58% -

    3O&M cost per kilometer of road (Rs per km)

    (Rs 1244 lakhs/1670 kms of road network) 74491 -

    Source: NMC

    Project s envisaged in CDP and Sanct ioned Pro ject s

    Sr. No. Projects envisaged under CDP

    Financial Details (amount in Rs. crores)

    Investment

    Envisaged in CDP

    Sanctioned Cost

    under JNNURM

    1 Water supply 590 1249 2 Sewerage 515

  • 8/11/2019 18 Nagpur Draft Report

    23/129

    Ministry of Urban Development

    [14] Rapid Baseline Assessment of Nagpur Draft Report

    Sr. No. Projects envisaged under CDP Financial Details (amount in Rs. crores)

    3 Storm Water Drains 246

    4 Solid Waste Management 50

    5 Slum development 1592

    6 Water Recycling and Reuse 250 130 7 Roads 1086

    8 MRTS and Traffic Management 1550 188 9 Social Amenities 15

    10 IT/ E-Governance 0 14 Total 5894 1581

    Status of Projects u nder J NNURM/ UIDSSMT/ BSUP/ IHSDP

    Sr.

    No. Project

    Approved

    Cost (Rs

    in crores)

    Status of projects (till May 13)

    PhysicalExpenditure

    (Rs. in crores)

    1 Water Supply 1294

    6 project Completed

    5 are in progress 2 projects having

    progress >80%, 2 projects having

    progress >50% and 80%, 1

    project having progress >50% and

  • 8/11/2019 18 Nagpur Draft Report

    24/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [15]

    Sr.

    No.Particular Details

    the issues and implement programmes for Urban Poor

    2The CBOs/ NGOs are active in participative planning

    for urban poorNo

    3 Mapping of slums It is in progress

    4 Status of Slum-Free Action Plan under RAY In process

    5 Broad initiatives for urban poverty alleviationBSUP and RAY are under

    implementation

    6The following projects are taken up in collaboration

    with NGOs/ CBOs

    So far, no projects have been taken

    up with NGOs/ CBOs

    2.5 Urban Planning

    Sr. No. Particular Details

    1 Agency responsible for preparing

    master planNIT

    2

    Has the master plan of the city been

    p r epared? If yes, till what planning

    period?

    Yes. Till year 2031

    3 Is DPC or MPC in place?

    Yes. MPC formed under Maharashtra

    Metropolitan Committee Act 1999. Election for

    DPCs was held in 2008.

    4The following studies have been

    carried out by the utility.

    City Development Plan (year 2006) City Sanitation Plan (year 2010) Slum-Free Action Plan under RAY (in process)

    5

    Any form of support envisaged by the

    ULB to prepare or monitor such

    studies discussed above

    Yes. The support is required in preparation of

    DPR for sewerage, SWM and preparation of plan

    for making Nagpur a Slum free city.

    6The status of key urban planning -

    related reforms

    Streamlining building plan approval process The building bye-laws are in place and NMChas implemented the Auto DCR to streamlinethe approval process

    Rainwater harvesting The building bye-lawsare prepared and have successfully beenimplemented.

    Approval for bye-laws for recycle and reuse ofwaste water is pending with state govt.

    Earmarking of the land for EWS and LIG - Asper Government of Maharashtra GR; for the

  • 8/11/2019 18 Nagpur Draft Report

    25/129

    Ministry of Urban Development

    [16] Rapid Baseline Assessment of Nagpur Draft Report

    Sr. No. Particular Details

    sub-division of the land admeasuring 2000sq.mts. And more, minimum 20% area shallbe provided in the form of 30 to 50 sq. mt.Developed plots for EWS/LIG (affordableplots).

    2.6 Key issues

    2.6.1 Municipal Governance

    Around 30% of the sanctioned posts are vacant, thus the existing staff members are given

    multiple charges. This is affecting the service delivery.

    As NMC has a transfer policy, under which transfer are taken place within the department on

    regular basis. However, there is no handholding support and training to the staff on the new

    role and responsibilities. This is resulting into poor performance of the staff.

    There is no review and appraisal process and discussion with the employee on their

    performance, which is one of major area of concern.

    There is no job card defined. Hence, there is lack of clarity on roles and responsibilities at the

    key positions; leading to accountability issues.

    There is no monitoring system to track the status of the key services as against the timelines

    mentioned in the citizens charter.

    There is no proper monitoring system to track the status of complaints. Hence, the complaintsare not attended to within the prescribed time;

    There is no adequate IT infrastructure and trainings to the staff and hence most of the staff

    lacks basic computer skills.

    It is also understood that the majority of the staff do not have exposure to the relevant acts,

    policies, guidelines for administrative works.

    NMC has not carried out training needs assessment; there is no training curriculum and

    budget for trainings. Also, there are no initiatives for the skill development of the staff. Thus,

    the teams are updated about new technologies; best practices implemented elsewhere.

    2.6.2 Municipal Financial Management

    The data entries are not carried out properly in the DEAS system . Thus, the balance sheets

    are not reflecting the actual financial status of NMC.

    The data entry operators are not skilled. Thus, data entries in the DEAS system irregular and

    inaccurate and the staff or contract employees are not trained on DEAS.

    Valuations of assets is still pending as a result, finalization of the final balance sheet has been

    delayed.

  • 8/11/2019 18 Nagpur Draft Report

    26/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [17]

    There is no proper coordination between the accounts and estate department for valuation of

    assets. Hence, the process has been delayed, which is affecting the overall progress of the

    balance sheet preparation.

    There is a shortage of manpower and lack of computer skills among the staff in the accounts

    department. Thus, there is inefficiency in the account department to implement new

    accounting system.

    There were multiple property taxation systems (base rate and ARV) in place. This has

    affected the overall collection efficiency of property tax.

    Non-technical staff are deputed to assess the properties as a result, there are number of

    errors in assessment and valuation of the tax.

    On an average, 4,000 properties are being handled by one revenue inspector/tax collector.

    Its an over load due to which they are not able to cover all properties in time.

    Property tax department is not in a position to complete the revaluation of all the properties.So far, only 1.30 lakhs (around 26%) properties were revalued.

    As recovery is given priority over assessment its being getting delayed.

    Though the department has a centralized computer section, which generates demand notices

    for all the zones. It takes almost three months to generate and deliver the same to the

    respective zones.

    Most of the postal addresses of the properties are not updated in the system and hence the

    deliver is by hand to most of house.

    NMC has replaced the Octroi with Local Body Tax (LBT); Octroi used to contribute around

    60%-70% to the own source of revenues, while currently revenues from LBT is very nominal.

    Which if not increased, NMC may face financial crunch. In addition there is strong agitation

    against the implementation of LBT from local commercial vendors and traders.

    2.6.3 Urban Service Delivery

    Water supply

    NMC is implementing the water supply projects under JNNURM. However, the project outcomes

    are yet to be achieved due to delay in implementation of the projects. Following are the current

    service levels in.

    LPCD is 101

    Metering of water connections - 28%.

    NRW is 47.8% due transmission and distribution losses

    24 x 7 water supply project implementation has been delayed on account of coordination

    between NMC and the private operator, noncompliance of terms and conditions of the

    agreement

    Sewerage

    There is no dedicated staff/department for sewerage at NMC.

  • 8/11/2019 18 Nagpur Draft Report

    27/129

    Ministry of Urban Development

    [18] Rapid Baseline Assessment of Nagpur Draft Report

    NMC does not have adequate sewerage treatment facilities in the city for treatment and

    disposal of the sewage generated in the city.

    Solid waste is dumped into the open channels in the city leading to blockage of open

    channels.

    Solid waste management

    There is no segregation of waste at source.

    There is no awareness among the citizens regarding segregation of waste.

    There are no transfer stations within the city. Hence, the waste is transferred in multiple

    vehicles. Further, this is leading to higher O&M expenditure on transportation of the waste.

    There are no user charges on SWM services. Hence, there is no cost recovery on SWM

    services.

    Storm water drainage and roads

    Only 50-60% of the roads are covered with storm-water drains. There are number of water logging areas in the city.

    Urban poor

    Lack of complete database on various aspects of urban poor including number of slums, slum

    population, access to services like water and sanitation, livelihood, etc. This is further

    affecting the identification of the projects for the urban poor.

    There is no adequate budget provision for creation of infrastructure in urban poor areas.

    2.6.4 Urban Planning

    There is no coordination between the authorities regarding implementation of the master plan.

    Urban planning function is carried out by NIT without any consultation with NMC.

    DCR rules are prepared without any consultations with NMC.

    2.7 Capacity Building

    2.7.1 Municipal Governance

    Support is required in the following areas:

    Procurement of computers/hardware for effective implementation of e-governance modules

    across all the departments. Conduct the trainings/workshops to the staff on various e-

    governance modules on regular basis. Also, Assist NMC in computerization/digitization of

    historical data for all the departments for effective implementation e-governance.

    Business process reengineering should be carried out for key departments in order to

    improve the governance and service delivery.

    Provide support for preparation of HR policy, defining of roles and responsibilities, along with

    incentives and reward programmes.

    Support should be extended for identification of training institutions, training modules,

    preparing study materials, and preparation of training calendar.

  • 8/11/2019 18 Nagpur Draft Report

    28/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [19]

    Impart trainings to staff on applicable laws, rules, and note sheet preparation and tasks in

    day-to-day activities. Also, impart the training on basic knowledge about computer operations.

    Handholding support is required in:

    Set up a legal cell and provide training to the team on various legal aspects related to

    municipal governance and management. .

    2.7.2 Municipal Financial Management

    Support is required in the following areas:

    Day to day handholding support required in DEAS system. The support would be in the areas

    of data entry of the vouchers and preparation of balance sheets as and when required.

    Support is required in listing of the assets and further valuation of the same. Also, provide

    guidance note for valuation of assets.

    Preparation of separate budget for water and sewerage as per the applicable municipal acts. Assist NMC in effective implementation of local body tax; prepare the actions plans for short

    and long term. Also, monitor the overall performance of LBT on monthly basis.

    Provide the guidelines for expenditure management and curtail the regular capital

    expenditure.

    Review the existing user charges for water and provide the new tariff structure on real-time

    basis.

    Propose new user charges structure for sewerage and solid waste management in order to

    achieve the full recovery. Assist the departments in getting the approval from the general

    body. Further, support sewerage/health departments in effective implementation of new

    charges

    Handholding support is required if NMC would like to shift to capital value based property tax

    system

    Support required in restructuring of property tax department with new verticals and special

    committees and smooth transition into the new structure

    Support is required in monitoring the survey of properties to be carried out with the

    department. Support is required in implementation of tax calendar.

    Trainings to staff of DEAS and data entry operator.

    The trainings to be imparted to both technical non-technical staff on budget preparation.

    Trainings to be imparted to the staff on GIS and other software platforms.

    Studies to be carried

    Detailed study to be carried out on the water sector and property tax, to identify the grey

    areas and further improve the coverage and collection efficiency.

    Detailed study to review and assess the financial impact due to implementation of Local Body

    Taxes and perspective of local trade and commerce association.

  • 8/11/2019 18 Nagpur Draft Report

    29/129

    Ministry of Urban Development

    [20] Rapid Baseline Assessment of Nagpur Draft Report

    2.7.3 Urban Service Delivery

    Planning

    Support is required in preparation of DPRs for SWM and sewerage sectors. Also, assist NMC

    in getting the approval from GoI and GoM. Support is required in imparting the trainings to the technical staff on bid process

    management, preparation of bid document, tenders, and bid evaluation.

    Support required in preparation and review of the legal documents for PPP projects.

    Carry out feasibility study for construction of transfer stations across the city to reduce the

    cost on transportation of solid waste.

    Prepare the framework for implementation of SLB, ISIP and PIP for key services.

    Support is required in land acquisition for the projects and conduct stakeholder meetings.

    Support is required in accessing the financial support from various banks and financial

    institutions for the projects to be taken on loans.

    Implementation

    Carry out regular meetings with parastatals agencies for smooth implementation of ongoing

    projects.

    Support JNNURM team at NMC in getting the various permissions from railways, pollution

    control boards and other agencies concerned.

    Support required in completion of ongoing JNNURM projects. The support would be; carrying

    out of site visits, quality checking, material quality and certifications, review of PERT and CPM

    on real time basis, development of MIS on project milestones and monitoring the progress ofthe milestones.

    Prepare the monthly and quarterly progress report for JNNURM projects and submit the same

    to state and central governments. Also, assist NMC in getting the installments on timely basis.

    Prepare the status report on the key projects and submit the same to commissioner to resolve

    the issues and expedite the progress.

    Impart the trainings on monitoring of the works, quality checking measures, penalty impose

    methods, review of the project progress and cycle, critical assessment of project and closure

    of the projects.

    Support required in preparation of measurement books preparation for the projects.

    Provide case studies and organize study tours to tackle the project implementation issues.

    Support should be provided in implementation of CSP for improving SWM, sewerage and

    sanitation services to all.

    Operation and Maintenance

    Post implementation of JNNURM projects; assist NMC in carrying out of regular O&M related

    observations. Further, prepare the status note on the same.

    Carry out the feasibility studies for O&M of water/sewerage/SWM through PPP/outscored

    options and provide the project structure, feasibility and risk matrix.

  • 8/11/2019 18 Nagpur Draft Report

    30/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [21]

    Prepare the O&M manual for all the key sectors. Also, assist the department in estimation of

    the O&M cost for newly created assets.

    Support in preparing the budget estimation for O&M cost of newly created assets and also, for

    existing assets.

    Create awareness among the citizens through Information and Education campaigns (IEC) for

    all the key services. Also, support in preparation of O&M manual for all the key sectors.

    Develop database management for all key services, specifically those aimed at the urban

    poor.

    Establishing a community based organizations for effective implementation of projects

    targeted for urban poor

    Organize ward-wise and zone-wise camps on regular basis to create awareness amongst

    urban poor for government schemes and their participation.

    Prepare a training calendar and organising trainings in the areas of water supply, sewerage,asset management, new techniques in operation & maintenance of WTP/STPs, energy from

    waste, etc.

    Organize the study tours to the staff and elected representative for effective implementation of

    reforms for full O&M recovery.

    2.7.4 Urban Planning

    Support is required in the following areas: Support is required in preparation of investment

    plan for implementation of master plan and identification of projects required for development

    of city.

    Support required in phasing out the intervention required and for implementation of identified

    projects.

    Support required in developing of a framework for monitoring of the implementation of town

    planning reforms/schemes and related projects.

    Support required in revising building bye laws and fees.

    State government should take action in the following areas to support NMC:

    State government should extend funding support to NMC and NIT for effective

    implementation of the various urban master plan and projects.

    Organize investor meets in Nagpur to support industrial development in the region.

  • 8/11/2019 18 Nagpur Draft Report

    31/129

  • 8/11/2019 18 Nagpur Draft Report

    32/129

    Ministry of Urban Development

    [22] Rapid Baseline Assessment - Nagpur Draft Report

    3. Brief City Profile

    Nagpur is located at the geographical centre of

    India; in fact, the Zero Milestone of India (aheritage monument) is in this city. The city is 837

    km east of Mumbai, 1,094 km south of Delhi,

    1,092 km north of Chennai and 1,140 km west of

    Kolkata). All the major highways, NH-7 (Varanasi

    - Kanyakumari) and NH-6 (Mumbai - Sambalpur -

    Kolkata) and major railway trunk routes (Mumbai,

    Chennai, Howrah and Delhi) pass through the

    city.

    Nagpur is one of the fastest growing cities of Maharashtra. Nagpur is also called as the Orange City .

    Nagpur is also said to be the second greenest city in India and the 10 th largest in India in terms of

    population. The city is the winter capital of the state of Maharashtra. The climate of Nagpur follows a

    typical seasonal monsoon weather pattern. The average annual rainfall is 45 inches, with more rain in

    the east than in the west.

    The city administration is vested with the NMC. The organizational setup of the NMC comprises a

    political wing and an executive wing. The political wing consists of elected candidates from 145

    different wards in the city and is headed by the mayor.

    The executive wing comprises of various administrative wings, which is headed by a MunicipalCommissioner; who manages and monitors all day-to-day functioning of the Corporation.

    NMC undertakes various obligatory and discretionary functions as per the provisions of the

    Maharashtra Municipal Corporation Act, 2012. The corporation is responsible for providing basic

    services to citizens which are mandatory as per MMC Act, 2012. NMC also provides other services

    like running city bus services, primary and secondary education, and health services in the city.

    Construction, operation and maintenance of urban infrastructure are the prime responsibilities of

    NMC.

    3.1 Population Trends

    As per the Census of India (2011), Nagpurs

    population is about 24.05 lakhs. The population

    trends of the city show a declining growth rate

    over the decades. Considering its decadal

    growth rate of 22.2%, Nagpurs population is

    expected to be 34.2 lakhs in 2021. The

    population distribution in the city is

    characterised by high densities and

    26%29%

    25%21%

    15%

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    35%

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    1971 1981 1991 2001 2011

    i n T

    h o u s a n

    d s

    Population trends of Nagpur

    Figure 3-1 : Population trends of Nagpur city

  • 8/11/2019 18 Nagpur Draft Report

    33/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [23]

    concentration in the inner city area and a relatively sparse distribution in the outer areas.

    Looking to the population numbers and growth rate, the main reason for increase in the population is

    natural growth. Even though Nagpur being base for various economic activities, home to much-

    planned MIHAN projects and having potential for the development of IT parks; its population trend is

    on declining side since the last four decades.

    Nagpur city has spatial spread over an area of 217.56 sq. km with a population density of 11,304

    persons/sq km. This has increased in 2011 by 16% (density was 9,400 persons/sq km during 2001).

    The presence of slums in Nagpur is prominent; around 8,50,000 people reside in slums in 336 slum

    pockets in the city.

    Table 3-1: Population trend of Nagpur city

    Census Year Population Decadal change Growth rate

    1971 8,66,000 - 26%1981 12,17,000 3,51,000 29%1991 16,22,818 4,05,818 25%2001 20,50,000 4,27,182 21%

    Source: census of India

    3.2 Indicators

    Table 3-2: Demographic Indicators of Nagpur city

    S. No. Indicator Input dataDemographic

    1 Population density 11,304 persons/ sq.km.

    2 Decadal Population Growth Rate 15% (2001-2011)

    3 Literacy Rate 93.13% (96.16%-Males & 89.99%-females, 2011)

    4 Sex Ratio 961

    5 Workforce participation rates Main workers 33.8

    Marginal workers -15.7

    Non-workers 51.50

    6 Vulnerable population (SC / ST)1. SC population 6,32,515

    2. ST population 2,62,145

    7 Household information 1. No. of households- 546687

    2. Size of household- 4.4

  • 8/11/2019 18 Nagpur Draft Report

    34/129

    Ministry of Urban Development

    [24] Rapid Baseline Assessment - Nagpur Draft Report

    4. Urban Governance

    This chapter would briefly elaborate on the urban governance status in NMC, the role of NMC and

    parastatals in service delivery, the status of human resources along with trainings and requirements,

    and further, key issues concerning urban governance at NMC. Based on the assessment of current

    situation of urban governance in Nagpur, key issues and recommendations have been provided at the

    end of the chapter to bring accountability in the system and improve the service delivery mechanism.

    The ULBs have been performing their roles and responsibilities, as laid down by the state

    governments through their respective Acts. In the case of the ULBs in Maharashtra, these are the

    Maharashtra Municipality Act 2012, Maharashtra Municipal Corporation Act 2012 and BPMC Act

    1948.

    4.1 Existing status

    The city administration is vested with NMC. The total area within the Municipal Corporations limit is

    217.56 sq km. The organizational setup of the NMC comprises a political wing and an executive wing.

    The political wing consists of elected candidates from 145 different wards in the city and is headed by

    the mayor. The executive wing comprises various administrative wings, headed by a Municipal

    Commissioner, who acts upon the decisions of the General Body and manages the day-to-day

    functioning of the Corporation.

    NMC is solely responsible for providing the basic services within its jurisdictions. NMC is governed by

    the Maharashtra Municipal Corporation Act 2012. As per the provisions of the Act, NMC is providing

    the various services to the citizens along with other key functions. Along with NMC, a few parastatals

    agencies are also involved in the provision of the key services within NMCs jurisdiction. The details

    regarding the parastatals agencies have been discussed in the following sub-sections.

    Nagpur is divided into 10 zones and each zone, has zonal offices with zonal structure headed by

    Assistant Commissioner. Main responsibilities of zonal officials is to collect taxes, user charges,

    property tax and resolve grievances related to services provided by NMC. Thus, the zonal offices

    work as execution agencies in their administrative areas and revenue is collected and deposited

    under different account heads for revenues.

    4.1.1 Empowering ULBs Status of 74th CAA

    In order to strengthen the third tier of local self-government; Government of India (GoI) has amended

    the Constitution in 1992 to make the ULBs self-sustainable and bring local participation in the

    planning and development of their respective cities. Thus, the 74 th Constitutional Amendment Act (74 th

    CAA) has come into force in India since 1992. It clearly provides rights to ULBs to act as third tier of

    Government taking charge of all the functions and services to be provided to the citizens in their

    respective city.

    The 74 th CAA has been implemented in Nagpur by the state government. Under JNNURM, most of

    the functions and powers are delegated to NMC. Key important services provided by NMC to citizensunder the functions delegated to it, are as follows.

  • 8/11/2019 18 Nagpur Draft Report

    35/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [25]

    Table 4-1: Status of transfer of functions as per 74th CAA

    Functions transferred to NMC 1. Regulation of land use and construction of buildings

    2. Roads and bridges 3. Sanitation and SWM

    4. Public health - Sewerage, water supply

    5. Safeguarding the interests of weaker sections

    6. Slum improvement/up-gradation

    7. Urban poverty alleviation

    8. Provision of urban amenities such as parks and playgrounds

    9. Promotion of cultural, educational, and aesthetic aspects

    10. Burial grounds and crematoria

    11. Cattle pounds

    12. Registration of births and deaths

    13. Public conveniences including street lighting, parking lots, etc.

    14. Regulation of slaughter houses

    15. Fire services

    16. Urban forestry

    17. Urban planning

    18. Socio-economic planning

    4.1.2 Functions, roles and responsibilities of NMC and parastatals

    All the functions related to urban governance and city administration, along with the responsibilities of

    providing mandatory and obligatory services in the city of Nagpur are mainly carried out by NMC.

    Other agencies like NIT, SRA and MSRDC also play a role in providing services in Nagpur. The

    following sections provide a snapshot of the institutional responsibilities, including the roles played by

    the private sector, for various urban infrastructure services.

    NMC is responsible for the planning, implementing, construction and O&M of the following

    sectors and provides the following services:

    Provides all key services such as water supply, sewerage, sanitation, solid waste management,

    storm water drainage, roads, street lighting, housing for poor, health and education, birth and

    death registrations, parking facilities and basic services to the urban poor people within NMC s

    limits

    Planning, designing, construction, operation and maintenance of key services

    Enforcement of various plans and regulating development activities as per the state byelaws as

    applicable.

    Levying and collecting various taxes, charges and fees as per the applicable municipal

    corporation Act Framing polices and plans for sustainable development in the region

  • 8/11/2019 18 Nagpur Draft Report

    36/129

    Ministry of Urban Development

    [26] Rapid Baseline Assessment - Nagpur Draft Report

    Disclosing the status of the services and various activities as per the applicable public disclosure

    law

    Public transport services

    Fire-fighting service

    NIT is responsible for:

    Preparing plans such as master plans and land use plans for the region Development of the area in accordance with proposals approved by state government and as

    per the provisions of applicable Act Acquiring, holding, managing and disposing of land and other property to carry out building and

    other operationsSRA is responsible for:

    Surveying and reviewing the existing position regarding slum areas in Nagpur city

    Formulating schemes for the rehabilitation of slum areas

    Getting the slum rehabilitation scheme implemented

    4.1.3 NMC- Status of Municipal Administration

    1. Status of human resource

    The establishment section of the General Administration Department (GAD) of NMC is responsible

    for human resource (HR)-related activities in the corporation. The department is headed by the

    additional commissioner and further he would be assisted by the department staff in various HR

    related activities. Bill clerks in each department/section are made responsible for updating the

    service books (SB) of the employees, recording leaves, attendances, and promotions etc. of their

    departments. By the end of every month, the bill clerk would prepare and send the salary requests tothe accounts department for payment of salaries through e-governance modules. The same process

    would continue throughout the year.

    2. Staffing pattern

    There are in all, 28 departments in NMC. Some of the key departments are GAD, Water Works,

    Sewerage, Social Welfare, Market, Fire-fighting, Accounts, Health, Property tax, Education, and the

    Town Planning department. There are in all, 12,532 regular sanctioned posts in NMC, of which 7,910

    posts are filled and 3,874 posts are vacant. The department-wise and class-wise staff details have

    been provided in the table below.

    Table 4-2: Department-wise staff strength

    Sr. No. Department Name Sanctioned Post Working staff Vacant Post

    1 General Admin Dept. 62 42 20

    2 Standing Committee 33 33 0

    3 Library Dept. 141 69 72

    4 Fire Fighting Dept. 411 273 138

    5 Central Auditing Dept. 68 48 20

    6 Octroi Dept. 495 343 152

  • 8/11/2019 18 Nagpur Draft Report

    37/129

    Ministry of Urban Development

    Rapid Baseline Assessment - Nagpur Draft Report [27]

    Sr. No. Department Name Sanctioned Post Working staff Vacant Post

    7 tax department 233 196 37

    8 Assessment tax Dept. 259 154 105

    9 Market Dept. 83 56 2710 Enforcement dept. 51 29 22

    11 Cattle pound Dept. 34 16 18

    12 Estate Dept. 29 22 7

    13 PWD 336 205 131

    14 Slum Dept. 63 55 8

    15 Social welfare Dept. 18 15 3

    16 lighting Dept. 316 142 174

    17 Garden Dept. 273 152 12118 City Development Dept. 69 54 15

    19 Hot Mix Plant 41 23 18

    20 Work Charge department 6 5 1

    21 Transport Dept. 53 13 40

    22 Town Planning Dept. 39 35 4

    23 Workshop dept. 68 38 30

    24 Education 3,001 1925 1076

    25 Water works dept. 74826 Sewerage dept./STP 50 22 28

    27 Health dept. 5,499 3912 1587

    28 Sewerage dept./Underground drains 53 33 20

    Total 12,532 7,910 3,874

    Source: Establishment Department, NMC, Nagpur

    3. Recruitment, promotion and transfer policy

    NMC can recruit officials of any grade/class or post with prior approval from the commissioner and the

    standing committee. For the recruitment of lower-level staff, demand has to be sent by the respective

    department to the commissioner. Once the commissioner approves demand note/proposal, it is

    forwarded to the standing committee for its approval. Recruitment of senior level officials and

    technical staff is being carried out by State government on deputation. Most of the staff in NMC is on

    deputation from PWD, GoM.

    Promotions would take place based on the years of service and availability of posts. These

    promotions would be applicable only to NMC staff. Promotions of the technical and senior-level staff

    would be taken care of by the parent department in the case of deputation.

    4. Assessment of trainings and trainings programmes

  • 8/11/2019 18 Nagpur Draft Report

    38/129

    Ministry of Urban Development

    [28] Rapid Baseline Assessment - Nagpur Draft Report

    NMC has staff strength of 9,269 employees, of which 2% is constituted by Class I and Class II

    employees. The rest 98% comes under Class III (42%) and Class IV employees (56%). At present,

    NMC does not have any training programme framework for imparting training to its employees.

    As per the administrative reforms under JNNURM, NMC was supposed to carry out capacity-building

    and training programmes, which are still in the planning stage. Current capacity-building and

    knowledge sharing is taking place through participation in t