Northamptonshire County Council and Kier Getting it ‘right first time ’ County Councils Network Annual Conference Annual Conference 19 th November, 2013. 19/11/2013. David Farquhar - NCC Greg Michael - Kier. Northamptonshire Highways Maintenance Initiative. Discussion today. - PowerPoint PPT Presentation
Popular Tags:
11
1 Date: Northamptonshire County Council and Kier Getting it ‘right first time’ County Councils Network Annual Conference Annual Conference 19 th November, 2013 19/11/2013 David Farquhar - NCC Greg Michael - Kier
Transcript
Page 1: 19/11/2013

1

Date:

Northamptonshire County Council and Kier

Getting it ‘right first time’County Councils Network Annual Conference

Annual Conference

19th November, 201319/11/2013

David Farquhar - NCC Greg Michael - Kier

Page 2: 19/11/2013

2

Northamptonshire Highways Maintenance Initiative

Page 3: 19/11/2013

3

Discussion today

• Setting the scene - the contract Greg Michael

• The catalysts- Why we did what we did David Farquhar

• The new approach• Year 1 results• Now • Future ideas• So what next?Discussion

Page 4: 19/11/2013

4

Setting the scene

• Contract started in March 2008• Challenged the past • Credibility from real transparency• Engagement equal from both sides and with market• Our approach to risk• Did what we said• Deliver the best possible solution• Trust and true partnership leads to innovation

Page 5: 19/11/2013

5

Kier in Northamptonshire

• Community and stakeholder engagement• Economic growth • Jobs• Apprenticeships

A snapshot of us in the county now• Building- The Innovation Cube building in Northampton.

New student accommodation in Northampton Remodelling of Criminal Justice Centre• Recycling in East Northamptonshire • Housing - The Homes and Communities Agency (HCA)

 

Page 6: 19/11/2013

6

The new approach

• Less reactive and more planned repairs• All permanent repairs except for emergencies• Focus on prevention • Understanding and communication

The Northamptonshire Highways Maintenance Initiative (NMHI)Launched April 2010

Getting it ‘right first time’

Page 7: 19/11/2013

7

The catalysts

• Reductions in budgets• Deteriorating condition of the network• Public dissatisfaction with roads and footpaths

And ultimatelyThe winters…. In fact, the weather!

Page 8: 19/11/2013

8

Year 1 results• Substantial increases in permanent/semi-permanent repairs - 90% of all repairs

carried out (10% previously)• Efficiency savings of £457k from effective patching minimising temporary

repairs.• 55% increase in preventative surface treatments.• Longer term savings of £2.5 million are anticipated from the preventative

approach.• Reduction in public reported defects of 23% for carriageway potholes. • Reduction in incident claims against the Council caused by poor road surfaces of

48%.• Nearly halved our CO2 emissions over a 2 year period through more effective

planning of work. • Less miles travelled resulted in a £22,000 reduction in fuel usage (current

figures).• Around approx. 3km of road repair patching completed. • Safer and better working practices.• Doing more whilst on site – achieved a 9% increase in defects repaired over and

above what was initially identified.• Positive feedback from the public increased.• Recognition and Reputation;

• National Highways and Transport (NHT) Public Opinion Survey • Northamptonshire County Council – You Choose Survey

Page 9: 19/11/2013

9

Future ideas

• Delay winter repairs until the weather improves to allow ‘right first time.’• Re-think the intervention levels and reclassifying some roads.• Offer an area package of repairs in partnership with the local community• (maintenance makeover).• Reclassify some roads/ introduce additional hierarchies to give more flexibility. • Reduce some rural carriageway widths and introducing passing places.• Reduce the asset with sign decluttering and sign rationalisation, including

limiting the use of information signs and other street furniture.• Explore options for self financed and maintained street furniture.• Explore the options to enable more self help in terms of carrying out

maintenance to the asset.• Make assets redundant e.g. close bridges, stop up roads and footways when it

makes sense to do so and suitable alternative exists.

Page 10: 19/11/2013

10

Managing the expectation

• Signs informing the public of intention• Speed limits on roads awaiting repair• Robust communication to our customers about our challenges

and solutions

Page 11: 19/11/2013

11

So what next?

Discussion