+ All Categories
Home > Documents > 1928 Temporary Church

1928 Temporary Church

Date post: 24-Feb-2016
Category:
Upload: terri
View: 24 times
Download: 0 times
Share this document with a friend
Description:
1928 Temporary Church. 1937 New church. Mass in Latin, back to the people Preaching from pulpit F ont in the baptistry P icture stations on side walls L antern lights 10 confessionals Wooden altar rails Brick walled sanctuary. Changes in the 1950s. New marble sanctuary – 1951-2 - PowerPoint PPT Presentation
Popular Tags:
7
1928 Temporary Church 1
Transcript
Page 1: 1928 Temporary Church

1928 Temporary Church

1

Page 2: 1928 Temporary Church

1937 New church• Mass in Latin, back to the

people • Preaching from pulpit• Font in the baptistry • Picture stations on side walls • Lantern lights • 10 confessionals • Wooden altar rails• Brick walled sanctuary

2

Page 3: 1928 Temporary Church

Changes in the 1950s• New marble sanctuary – 1951-2• East facing altar• Pulpit • Crucifix• Stained glass

windows1956

• Carved Stations of the Cross1958

• Strip lights1958

3

Page 4: 1928 Temporary Church

Changes after Vatican II (1962-1965)

• 1967 - temporary forward altar

• 1970 –- font relocated• later - altar permanently moved forward, pulpit

removed, lectern plinths built, some benches removed, floodlights fitted as uplighters then turned over, reconciliation room created.

• This picture taken in 1983

4

Page 5: 1928 Temporary Church

Why change again now?

• Health and safety issues• Access and facilities for people with disability• Preservation and maintenance• Comfort and welcome• Architectural considerations• Liturgical reasons• Restoring and renewing

5

Page 6: 1928 Temporary Church

Full, active and conscious participation

• Gathering round the altar• Baptism is our entry into the church• Restoring the Way of the Cross

6

Page 7: 1928 Temporary Church

Recent improvements

• 2012: rewiring, re-lighting, temporary re-ordering (forward altar, rearrange benches), font relocated, confessionals converted to store rooms, stations moved into side aisles, pointing, repair to big window, disabled toilet.

• 2013: marble altar brought forward, altar rails moved back, new marble lectern, new flooring, redecoration.

7


Recommended