+ All Categories
Home > Documents > 1976 - 2018 42 Years of Excellence - Readymix Abu …Etisalat In addition, we are also an approved...

1976 - 2018 42 Years of Excellence - Readymix Abu …Etisalat In addition, we are also an approved...

Date post: 23-Apr-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
79
Copyright This document is copyright and may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means without the prior written permission of Readymix Abu Dhabi Ltd. Management Representative. Readymix Abu Dhabi Ltd. Standard Pre-Qualification Document Abu Dhabi – United Arab Emirates 1976 - 2018 42 Years of Excellence
Transcript

Copyright This document is copyright and may not be copied, reproduced, stored in any form within a retrieval system or transmitted by any other means without the prior written permission of Readymix Abu Dhabi Ltd. Management Representative.

Readymix Abu Dhabi Ltd.

Standard Pre-Qualification Document

Abu Dhabi – United Arab Emirates

1976 - 2018 42 Years of Excellence

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 2

TABLEOFCONTENTS OVERVIEW................................................................................................................................................................................................3TheCompany.......................................................................................................................................................................................3OurMotto..............................................................................................................................................................................................3AnEfficientWorkplace....................................................................................................................................................................3MobilityStrength...............................................................................................................................................................................3MajorApprovals.................................................................................................................................................................................4

MANAGEMENT.......................................................................................................................................................................................4Profiles ................................................................................................................................................................................................5

APPROACH...............................................................................................................................................................................................7QUALITYPOLICY...................................................................................................................................................................................9QualityControl....................................................................................................................................................................................9QualityObjectives..............................................................................................................................................................................9

PLANTS....................................................................................................................................................................................................10PlantFacilities..................................................................................................................................................................................10Trucks&Pumps..............................................................................................................................................................................11

TECHNICAL............................................................................................................................................................................................12TechnicalCapabilities...................................................................................................................................................................12QA/QC .............................................................................................................................................................................................12Research&DevelopmentProjects..........................................................................................................................................13APPENDIX1................................................................................................................................................................................15SelectedProjectsList................................................................................................................................................................15APPENDIX2................................................................................................................................................................................55ListofPlant&Equipment......................................................................................................................................................55APPENDIX3................................................................................................................................................................................57ISO9001Certificate..................................................................................................................................................................57APPENDIX4................................................................................................................................................................................59OrganisationCharts..................................................................................................................................................................59APPENDIX5................................................................................................................................................................................62CompanyManpower................................................................................................................................................................62APPENDIX6................................................................................................................................................................................64CompanyLicenses.....................................................................................................................................................................64APPENDIX7................................................................................................................................................................................71CompanyPolicies.......................................................................................................................................................................71

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 3

OVERVIEW The Company Readymix Abu Dhabi (RMAD) was formed in 1976 by a group of highly qualified and forward thinking people, having extensive knowledge of various technical and managerial aspects of the concrete industry to cater for the Abu Dhabi construction market. We put our prime focus on meeting the requirements of our customer.

With decades of successful experience combined with the latest technological developments in the design, production and supply of various types of readymix concrete, we have earned the trust of our clients and have proudly associated our name with some of the most reputable projects across Abu Dhabi, Dubai and GCC countries.

We are the pioneers of high quality readymix concrete Readymix Abu Dhabi always aims to deliver concrete on time and to the satisfaction of our customers. We make your job much easier by saving you time, money and effort. We look to build partnerships with our customers and clients, by demonstrating an unrivalled level of dependability and trust.

Our Motto “Quality on time – Every time”

We don’t compromise on the quality of our concrete and ensure timely deliveries to our customers, every time.

An Efficient Workplace We believe our success relies on the success of our clients. Our professional attitude and teamwork towards an efficient workplace ensures that to our customers. All operational staff goes through various trainings and has developed an in-depth knowledge in their respective fields over the years.

Our plants are certified by NRMCA and calibrated by Bureau VERITAS. Our Quality and HSE policy statements are to the latest ISO standard.

Mobility Strength The company has deployed a truck fleet of more than 100 transit-mixers (9, 11 & 12 m³ capacity) supplemented by 30 concrete pumps (mobile & static) enabling it to ensure prompt, efficient and reliable delivery and placing of concrete in accordance with schedules laid down by the customer.

In addition to its stationary batching plants, Readymix Abu Dhabi has 5 mobile plants of production capacity ranging from 60m3/hr to 240m3/hr that can be placed on site for large scale and /or remote projects.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 4

Major Approvals Readymix Abu Dhabi is an approved supplier of concrete to the following government bodies:

Abu Dhabi and Al Ain Dubai Musanada Municipality Municipality, DOT Trakhees (Dubai World) Mubadala Tecom UAE Defence Forces ADNOC, GASCO & ADCO ADWEA & related companies Etisalat In addition, we are also an approved supplier to all major consultants and contractors.

Readymix Abu Dhabi has set a standard of quality, service and integrity that places us as the foremost supplier of high-grade concrete in the emirate of Abu Dhabi. MANAGEMENT We consider our staff and management as one family. Our staff are a group of hard working individuals building on our heritage of excellence by ensuring remarkable performance in their field and commitment to their service.

RMAD’s organizational body comprises of seven major departments: • Finance, Admin & HR • Technical & QA/QC • Sales & Marketing • Procurement • Production • Plant Maintenance • Workshop

These departments are led by our senior management team responsible for directing their respective departments with their advanced leadership qualities.

To get a detailed view of our organizational structure, please refer to the management section of our prequalification document.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 5

Profiles Robert Hogan – General Manager Robert Hogan started his career in the readymix industry in 1986, joining Redland Readymix (UK) as a Concrete Technician and progressing through the company in various roles including a Shipping Officer, Sales Executive, Sales Manager and Area Manager before moving on in 1999 to take up the role of area Sales Manager for a construction chemicals company in the South East of England.

After 14 successful years, he left in 2001 to pursue a career in the U.A.E. with Readymix Abu Dhabi. As Sales Manager, he was involved in securing a number of prestigious projects including the Emirates Palace Hotel, The New Corniche road, Central Market, The Atlantis Hotel Palm Jumeirah, Park Place Dubai; the first commercially produced self-compacting concrete in Abu Dhabi and many other notable projects.

When promoted to the position of Operations Manager in 2006, Robert grew the operations to reach a capacity of over 200,000 m³ per month at peak. During this period, the operations consisted of 12 batching plants, over 200 truck mixers, 40 concrete pumps and staffing levels of over 700 men. The company supplied some of Abu Dhabi’s most iconic projects including the pumping of 80 N/mm² concrete 370m vertically to Abu Dhabi’s tallest building, Central Market Tower 2.

In January 2012, Robert was promoted to the position of General Manager of RMAD and now looks to ensure the company achieves its vision of taking on and completing, the toughest concrete challenges and projects in the region.

Khaled Bseiso – Chief Financial Officer Khaled is responsible for managing RMAD’s Finance Department, through overseeing various processes including financial strategy, financial reporting and analysis, treasury operations and controllership. With over 18 years of experience within the accounting and audit professions. Khaled has supported the company’s drive for continued excellence through improving internal controls; establishing financial best-practices; and standardizing many financial processes.

Prior to joining RMAD in early 2015, Khaled held a variety of finance and audit roles at major multinationals, including Ernst & Young, Emirates Future and Cham Holding.

Khaled holds a Bachelor Degree in Accountancy from the Hashemite University in Jordan. Additionally, he has attained the designations of Certified Public Account, Certified Financial Consultant and Certified Fraud Examiner from USA.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 6

Wassim Mansour – Commercial & Technical Manager Wassim Mansour holds a master’s degree in Concrete Technology from Reykjavik University in Iceland, diploma in Advanced Concrete Technology from the Institute of Concrete Technology in the UK, and a bachelor degree of Science in Civil Engineering from the Lebanese University. Wassim is in progress with a PhD program on EcoCrete and Concrete Rheology at Reykjavik University.

In 2001, Wassim started his career with Advanced Construction Technology Services (ACTS), which is one of the most reputed materials testing and consultancy firms in the Middle East. During his four years employment with ACTS as a Material Engineer and then Head of Geotechnical department, Wassim was involved in various large-scale construction and rehabilitation projects in Lebanon, Syria and Qatar. Wassim had a key role in establishing ACTS branch in Qatar.

In 2005, Wassim joined Readymix Abu Dhabi and currently holds the post of Commercial & Technical Manager. During his employment with RMAD, Wassim has been heavily involved in the supply process of over 15 million cubic meter of concrete supplied by RMAD and its subsidiary firms to a large number of projects in the UAE and Lebanon.

Wassim is a member of the Institute Concrete Technology in the UK, the American Concrete Institute and the Lebanese Order of Engineers. He has received many awards for his contribution to concrete industry. He has presented various innovative concrete related topics at numerous international conferences around the globe.

Malek Jammoul - Al Ain Area Manager

Malek Jammoul holds an Architecture Degree from the University of Naples "Federico II", Italy and pursued a specialization in Monuments Restoration at the same University. Following his graduation, he worked for T.A.U. (Territory, Architecture, Urbanism) in Italy.

Upon his return to Lebanon in 1994, he had a rich and diverse experience. He started as a site engineer at AKARIA, then as project manager at Bureau Abdel Wahed Chehab.

Following his site experience, he embarked on an extensive journey in the Readymix industry. From 1995 to 1998 he was a quality control manager at Betonval / SO.I.ME. From 1998 to 2002, he worked as a plant and production manager at Liban Beton in Lebanon. He was part of the initial team that setup the company's branch in Qatar as a plant manager. He then moved to Saudi Arabia where he took the position of Assistant General Manager for Jehan Holding Group in Jeddah.

In 2005, Malek joined Readymix Abu Dhabi and currently holds the post of Al Ain Area Manager. During his employment with RMAD, Malek was in-charge of various technical and production positions.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 7

APPROACH The manufacturing process is fully computerised (Simma – Austria). The batching operation is controlled by P.D.S microprocessors providing weighing and mixing controls as well as a database for mix designs making the process completely automatic with manual override facility in the event of malfunction.

Cement is fed from the external silos by means of screw conveyors into a weighing hopper where it is weighed to an accuracy of 1% (one per cent). The cement is held in the hopper until all concrete constituents are weighed.

Each plant has its own overhead aggregate bins. In addition to the overhead storage bins, bulk storage of aggregates is kept in separate sizes, within purpose made shaded storage bays located near the plant (storage volume is dependent on site conditions). The loading of aggregate into the plant is by means of loading shovels feeding the separate materials into a hopper from which it is conveyed by a chevron belt into the separate overhead storage bins. Aggregates are measured by weight from the overhead storage bins.

In general, all water for concrete is either from main water lines or transported by water tankers from recognised and approved sources. The water used in the production of concrete is potable and in accordance with the relevant standards. The water is chilled down to approximately 1°C and stored in purpose built (insulated and especially painted) water tanks before being added to the concrete. Water is then fed from the ice bank into a weighing hopper where it is weighed to an accuracy of 1% (one per cent).

Admixtures are supplied in liquid form and are delivered in bulk and stored in purpose made storage tanks. Admixtures will be dispensed through automatic dispensers and are measured to an accuracy of 3%. Admixture usage will be as per the manufacturer’s recommendations.

Once all the constituents of the mix are weighed to their satisfactory accuracy, they are discharged into the plant’s mixer according to a pre-set sequence. The mixer will ensure that the mix is homogeneous and consistent. Without exception, all concrete is wet batched throughout, twin shaft mixers ensure optimum consistency.

RMAD has a dedicated Plant Maintenance Team that carries out regular calibration checks in order to guarantee proper functioning of all plant and equipment. An independent professional body regularly verifies these calibrations.

The batching plant calibration is carried using set weights. Each set of “load cells” is independently calibrated in 25kg intervals over its certified range. The load cells sets are as follows:

• Cement weighing hopper • Aggregate weighing hopper

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 8

• Water weighing hopper (if & where applicable) • Admixture

All concrete when mixed to a satisfactory degree of uniformity will be delivered to the job site in the volume required using our fleet of transit mixers. Each and every load will have a barcoded delivery ticket containing the following details:

• Date • Transit mixer number • Time of loading • Driver’s name • Cubic meters ordered/delivered/this load • Miscellaneous description • Customer/contract/location • Time on/off site (to be filled by the client if required)

Readymix Abu Dhabi operates a fleet of over 100 transit mixers of different sizes and makes. RMAD can allocate a certain number of mixers and pumps to suit site requirements.

Furthermore, RMAD operates a large fleet of pumps to assist contractors in placing their concrete.

For plant-on-site projects, specific methodologies are put in place to suit any particular requirement the client may wish to implement.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 9

QUALITY POLICY Quality Control In its quest to achieve Total Quality Management, Readymix Abu Dhabi operates a computerised central dispatch system installed at Head Office. The Central Dispatch database stores the details of every project including a list of approved mixes, prices and agreed services (i.e. temperature control, pumping, admixtures…). By restricting the shippers’ access to pre-approved mixes and services, efficient and prompt control can be achieved by the Technical Department, insuring that each site gets only their approved mixes.

The Dispatch System is linked via internet/intranet to all plants where available and via a specially developed GPRS connectivity when not available. This provides on-line & live information from all linked plants to Head Office enabling Technical, Operations & Sales personnel to keep a close eye on the quality and service provided to customers.

Readymix Abu Dhabi operates a Quality Management System in accordance with ISO 9000:2008 requirements.

To supplement the automated manufacturing process, concrete technicians are available to regularly check & monitor the consistency and workability of concrete both on site and at the plant.

Quality Objectives The stated objectives of Readymix Abu Dhabi’s Quality Management System are:

1. To ensure satisfaction of our customers at all times by ensuring that our products and services consistently meet the agreed-upon requirements in time.

2. To ensure that: • Our products meet Nationally and Internationally accepted standards, laws and regulations. • Maintain and improve our Quality System. • Provide all necessary support from qualified workforce, best quality material and services. • Maximize our market share. • Generate higher revenues. • Reduce costs. • Offer our products at competitive prices. • Ensure participation of all employees in RMAD’s Quality System through close

cooperation with Top Management. 3. To assure our customers that adequate measures are being taken to ensure:

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 10

• Conformity to the contract/order requirements. • Conformity to specifications.

PLANTS The company currently operates plants in Abu Dhabi, KIZAD, Al Ain and western region areas.

RMAD’s production facilities are equipped with the following: • State of the art, fully automated concrete batching plants with wet mix

technology. • Eco-friendly power lean water chilling and ice production systems. • Soundproofed generators equipped with power saving, synchronizing &

paralleling systems. • European Community environmentally approved concrete reclaiming and

water recycling system. • Fully shaded aggregate storage bays. • Advanced shipping control and truck navigation and traffic control system.

Our concrete Batching Plants are fitted with heavy duty, robust twin paddle mixers and pan mixers. These plants use latest and fastest conveying systems with extremely accurate weighing systems (to the third decimal point), all hooded under a fully automated process. This is backed up by state of the art, sophisticated & computerized control system offered by SIMMA, an Internationally recognised plant automation solutions provider.

This ensures that all concrete production supervised by shrewd engineers as well as highly skilled and experienced personnel is of the highest quality and complies with local regulations as well as BSI and ASTM codes & standards. Our capabilities and versatility has enabled us to be the leader in a demanding market. We meet all concrete requirements in terms of on design, durability and quality. Moreover, new ideas and designs are proposed.

Our investment and advances in both of our assets, personnel and equipment, has given us a competitive advantage in the market.

Customers seeking a complete concrete solution always approach Readymix Abu Dhabi. Therefore, we are well known in mobilising plant and equipment for numerous prestigious contracts & turn-key projects.

Plant Facilities Our plant staff ensures that QA/QC and safety rules are strictly followed by all personnel. Under the supervision of the Plant Manager, proper maintenance programs are adopted to ensure optimum performance of our equipment and machinery and the safety of our operating teams.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 11

Maintenance programs are a blend of manufacturer recommendations as well as well-known maintenance codes and standards. This has lead to one of the best maintenance procedures in the field monitored and scheduled through a state of the art CMMS system that facilitates work and prolongs equipment life. This is achieved through deep analysis applied on different types of maintenance whether it is TBM, CBM, RBM or RTF.

The plant department deploys a range of Key Performance Indicators to ensure: • Plant and equipment are always at their best performing condition. • Maintenance work is always effective. • Staff is productive. • Product is of finest quality and according to specifications.

We strictly follow our safety policy and closely monitor staff to adhere to it during maintenance throughout our plant. Hence, plant staff follows a lockout – tag out safety procedure while carrying out maintenance works.

Trucks & Pumps Readymix Abu Dhabi operates one of the youngest fleets of high capacity truck mixers from European makers: Renault and MAN. The truck mixers capacities vary from 9 to 12 m3. They are maintained in good working order by our in-house workshop. The workshop is equipped with the latest technologies for diagnostic, troubleshooting and repair of faults. Trucks are also equipped with sensors to give feedback on consumption and other performance indicators.

The truck fleet is supplemented by over 20 mobile (with boom sizes of up to 52m) and static pumps that are owned and operated by Readymix Abu Dhabi. Also available are a number of hydraulic placing booms up to a reach of 32m.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 12

TECHNICAL

Technical Capabilities We maintain our concrete quality and standards by focusing our technical capabilities in order to meet the most challenging requirements of our customers. This is achieved by:

• Internal commitments Readymix Abu Dhabi hires only the best, most suitable and qualified technical personnel at all levels. Highly knowledgeable and experienced engineers head our technical team. They keep up to date with new and advanced concrete technologies through participation in international forums and seminars.

• Commitment to high standards Our technical team strives to exceed the customers’ expectations by meeting their projects’ requirements and professionally attending to any concrete related issues arising onsite.

• Commitment to meet project specifications No matter how big or small a project is, Readymix Abu Dhabi abides by the specifications and offer value-engineered alternatives wherever possible.

• Commitment to concrete sustainability Readymix Abu Dhabi always follows sustainable approaches when designing concrete mixes. These mixes are usually proposed as an alternative to the specified ones.

• Commitment to the development of new concrete technologies We operate a research and development facility dedicated to developing new technologies and enhancing existing concrete mixes. We organise/sponsor local and international concrete conferences and participate in the dissemination of technical knowledge.

QA / QC RMAD operates under a stringent QA/QC plan and testing regime. Our quality assurance and quality control policies are strictly followed throughout; from carefully selecting our raw material suppliers to the manufacturing of readymix concrete according to customer’s requirements and relevant codes.

• Our laboratory is equipped with the most advanced instruments that are calibrated internally and verified on a yearly basis by third party. The internal

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 13

calibration is done on a fixed schedule and carried out off-schedule in case it is required.

• A state-of-the-art concrete Rheometer (Contec Rheometer 4SCC) is used to accurately design, control and assess the rheology of flowable and self-consolidating concrete. It is also used to estimate the compatibility of admixtures and cements in terms of fresh concrete performance.

• Our technical department has access to other instruments through cooperation agreements with external laboratories and universities.

Research & Development Projects The most recent advanced concrete products that Readymix Abu Dhabi has researched /developed are:

Geopolymer (2009-2010) Over 2 years of extensive research works, Readymix Abu Dhabi successfully developed a concrete mix with total replacement of Portland cement by GGBS. Various mock-ups were cast using this concrete mix.

Performance of the concrete mock-ups against various exposures over time is still being monitored. Data related to this research has not been published by Readymix Abu Dhabi yet.

This type of concrete is eco-friendly, highly durable and could be used for structural elements. However, particular placing and curing regimes require special expertise and practices that are not common in the UAE construction market.

EcoCrete & EcoCrete-Xtreme (2010-present) Ecocrete and Ecocrete-Xtreme are a breakthrough in recent concrete technology. They are the result of a collaborative research work between Readymix Abu Dhabi and Innovation Center Iceland.

EcoCrete & EcoCrete Xtreme have the following characteristics:

• Easy to place Self-consolidating concrete (SCC) made with extremely low cement content (less than 80 Kg of cement and 260 Kg of total binder content per cubic meter of concrete).

• Highly durable concrete offering extended service life even in very harsh environments (more than 150 years of service life according to Life-365).

• Substantially improve concrete sustainability. • Substantial carbon footprint reduction (more than 70% reduction in CO2e

when compared to conventional concrete of the same grade).

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 14

A life size demonstration of EcoCrete and EcoCrete-Xtreme was carried out at our plant in the presence of the Icelandic president, H.E. Ólafur Ragnar Grímmson, as well as other key people involved in the UAE construction field. During the demonstration, using a 3.8 x 1.5m transparent acrylic form of the shape of the “U A E” letters connected only at the bottom, EcoCrete-Xtreme was cast from the top of the “U” letter and successfully flowed throughout the whole form to reach the top end of letter “E” just in 2 minutes and 10 seconds.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 15

APPENDIX 1

Selected Projects List

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 16

Project Name: Conference Palace Hotel Project Description Development & construction of a Conference Palace and a

Five star hotel on the Abu Dhabi Corniche Road. The project was on a Fast Track program.

Location Corniche Road, Abu Dhabi - U.A.E Start Date December 2001 End Date April 2004 Status Completed Client Conference Palace Hotel Executive Committee Project Management Co. Turner Construction International LLC

Consultant Wimberly, Allison, Tong & Goo Contractors Bauer International Piling

Six Construct Conference Palace Arabtec External Works Interbeton/ACC Hotels (South Wing & East Wing) Various Contractors Miscellaneous Packages

Concrete Volume 340,000 cubic meters Concrete Value 78,000,000 AED RMAD Role Supply of concrete from Plant-On-Site (240 m³/hour setup)

Concrete Details 17.50 N/mm² - Blinding 28.00 N/mm² - Sub-Structure 28.00 N/mm² - Super-Structure 35.00 N/mm² - Piling 35.00 N/mm² - Sub-Structure 45.00 N/mm² - Sub-Structure 45.00 N/mm² - Super-Structure Other Grades Total Volume

10,400 m³ 20,000 m³

120,000 m³ 46,700 m³ 44,500 m³ 13,600 m³ 45,400 m³ 36,000 m³

314,900 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 17

Project Name: Thumrait Air-Base Project Description Supply of 85,000 m³ of Paving Quality concrete for Thumrait

Air Base within a period not exceeding 90 Days. Location Thumrait - Sultanate of Oman Start Date February 2003 End Date April 2003 Status Completed Client U.S. Air Force Project Management Co. Readiness Management Services (RMS)

Consultant U.S. Air Force Contractors U.S. Air Force Concrete Volume 85,000 cubic meters (Paving Quality Concrete) Concrete Value 34,000,000 AED RMAD Role Supply of concrete from Plant-On-Site (240 m³/hour setup)

Major Equipment Employed: Concrete Batching Plant 240 m³/hour (rated) Ice-Water Plant 180 M³/Day Generators 2 x 550 kVA Laboratory Fully Equipped

Concrete Details Grade 45 MPa (Cyl) PQ Concrete Total Volume

85,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 18

Project Name: National Bank of Abu Dhabi New Headquarters Project Description Construction of High Rise Office Tower Location Hamdan Street, Abu Dhabi - U.A.E Start Date November 1999 End Date January 2003 Status Completed Client National Bank of Abu Dhabi Project Management Co. N/a

Consultant Architecture & Planning Group Contractors Al Habtoor – Murray & Roberts JV Concrete Volume 42,000 cubic meters Concrete Value 10,000,000 AED RMAD Role Supply of concrete from existing facility at Mussaffah. Concrete Details 25 N/mm² SRC

30 N/mm² OPC 60 N/mm² SRC 60 N/mm² OPC 75 N/mm² OPC 85 N/mm² OPC Total Volume

1,200 m³ 3,600 m³ 6,800 m³

18,800 m³ 10,000 m³

1,700 m³

42,100 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 19

Project Name: Borouge Polyethylene Expansion Project

Project Description Development & Construction of a Polyethylene Facility at Ruwais

Location Ruwais Refinery, Abu Dhabi - U.A.E Start Date February 2000 End Date July 2001 Status Completed Client Abu Dhabi National Oil Company Project Management Co. Technimont / Borouge

Consultant Technimont / ADNOC Contractors Al Habtoor - Murray & Roberts JV Concrete Volume 64,000 cubic meters Concrete Value 17,800,000 AED RMAD Role Supply of concrete from existing facility at Ruwais.

Major Equipment Employed: Concrete Batching Plant 180 m³/hour (rated) Flaked Ice Plants 84 T/Day Ice-Water Plants 360 M³/Day Generators 3 x 550 kVA Transit Mixers Minimum 5 at any one time Pumps Minimum 2 at any one time

Concrete Details 20.00 N/mm² - Structural 30.00 N/mm² - Structural 40.00 N/mm² - Structural Total Volume

8,700 m³ 47,700 m³

7,600 m³

64,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 20

Project Name: Abu Dhabi Trade Centre - Phase I

Project Description Raft Foundations at the Abu Dhabi Trade Centre (Abu Dhabi Mall)

Location Tourist Club Area, Abu Dhabi - U.A.E Start Date June 2000 End Date September 2003 Status Completed Client Sheikh Suroor Al Dhaheri Project Management Co. Cansult

Consultant Cansult Contractors Six Construct - Campenon Bernard Concrete Volume 70,000 cubic meters Concrete Value Undisclosed

RMAD Role Co-Supply with Readymix Beton for the supply of concrete from existing facilities at Mussaffah to the Raft Foundations of the project (70,000 m³ in 4 months).

Concrete Details Total Volume (By RMAD)

35,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 21

Project Name: Abu Dhabi Trade Centre - Phase II

Project Description Construction of 5 Towers & Grand lobby for Rotana Beach Hotel

Location Tourist Club Area, Abu Dhabi - U.A.E Start Date June 2000 End Date September 2003 Status Completed Client Sheikh Suroor Al Dhaheri Project Management Co. Cansult

Consultant Cansult Contractors Arabian Construction Co. Concrete Volume 75,000 cubic meters Concrete Value 16,200,000 AED RMAD Role Supply of concrete from existing facility at Mussaffah Concrete Details 25 N/mm² SRC - Screed

45 N/mm² OPC - Structural 55 N/mm² OPC - Structural 65 N/mm² OPC - Structural Other Grades Total Volume

92, 000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 22

Project Name: Contract 2015A - Comp. of New Corniche Rd East Stage 1

& Contract 2016 - New Corniche Road East Stage 2

Project Description Fast Track Infrastructure & Beautification works on the new

Corniche Road (Abu Dhabi) - Including Tunnel, Pedestrian Underpasses, Small Bridges, Water Reservoirs & Miscellaneous Works.

Location Abu Dhabi - U.A.E Start Date June 2003 End Date July 2004 Status Completed Client Abu Dhabi Municipality Project Management Co. N/a

Consultant De Lew Cather International Contractors Al Muhairy General Contracting Est. Concrete Volume 300,000 cubic meters Concrete Value 60,000,000 AED RMAD Role Supply of concrete from existing facility at Mussaffah. Concrete Details K 140 SRC – 140 kg/cm²

K 250 SRC – 250 kg/cm² K 335 SRC – 335 kg/cm² K 415 SRC – 415 kg/cm² Total Volume

40,000 m³ 55,000 m³

125,000 m³ 75,000 m³

295,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 23

Project Name: ADSS 509/1 - Sea Outlets at Shahama, Rahba &

Samha Project Description Installation of Major Storm-Water outlet pipelines to the sea.

Injection of special concrete grouts for soil stabilization. Location Shahama, Rahba & Samha, Abu Dhabi - U.A.E Start Date December 2001 End Date November 2003 Status Completed Client Abu Dhabi Municipality - Sewerage Projects Committee Project Management Co. N/a

Consultant Parsons Engineering Science Contractors Pact General Contracting Concrete Volume 45, 000 cubic meters Concrete Value 8,000,000 AED

RMAD Role Daily supply of concrete from existing facilities at Samha & Mussaffah

Concrete Details C 20 - Pipebase C 50 - Triple Blend C 40 - GGBS Blend Underwater Grout Total Volume

35,000 m³ 2,000 m³ 3,000 m³ 5,000 m³

41,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 24

Project Name: 15 Pedestrian Underpasses - Abu Dhabi

City Project Description The casting of tunnels under the streets of Abu Dhabi city for

pedestrian crossings. Conventional concrete & casting was not suitable for this type of project. A proposal of Self compacting – Quick Strike concrete was accepted by the client & consultants as the optimum solution.

Location Abu Dhabi Start Date December 2001 End Date November 2003 Status Completed Client Abu Dhabi Municipality - Trip Section Project Management Co. N/a

Consultant De Lew Cather International Contractors Al Muhairy General Contracting Est. Concrete Volume 4,000 cubic meters Concrete Value 1,000,000 AED

RMAD Role

While traditional concrete was being supplied by another supplier, Readymix Abu Dhabi were approached by the contractor to find a solution for allowing the casting of the underground tunnels where limited space was available and a high level of finish & quick strike time was required for the project. Readymix Abu Dhabi remained the only company in Abu Dhabi to have approval for the supply of Self-Compacting Concrete on Municipality Projects for a long while.

Concrete Details K 415 - SELF COMPACTING CONCRETE (Strength @ 07 Days = 58 N/mm²) (Strength @ 28 Days = 69 N/mm²) Total Volume

4,000 m³

4,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 25

Project Name: Concrete Paving - CBM for ADPC – KPIZ Project Description Supplying cement bound material (CBM). Location Khalifa Port, Abu Dhabi - U.A.E Start Date March 2016 End Date June 2016 Status Completed Client Abu Dhabi Ports Company Project Management Co. ---

Consultant --- Contractors Saif Bin Darwish Concrete Volume 38,000 cubic meters Concrete Value 8,000,000 AED RMAD Role Supply of concrete from dedicated plant on site at KIZAD (Summary of Mixes) CBM 3 – SRC

Total Volume

38,000 m³

39,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 26

Project Name: Library Project - Phase 1 Project Description Package 1 consists of constructing a diaphragm wall and piling

works in readiness for a special library complex in a military area.

Location Confidential, Abu Dhabi - U.A.E Start Date November 2004 End Date May 2005 Status Completed Client U.A.E Armed Forces - General Head Quarters Project Management Co. U.A.E Armed Forces

Consultant U.A.E Armed Forces Contractors Bauer International Concrete Volume 20,000 cubic meters Concrete Value 5,000,000 AED RMAD Role Supply of concrete from existing facility. Concrete Details 40 N/mm² OPC - Piling

40 N/mm² OPC - Diaphragm Wall 20 N/mm² OPC Total Volume

2,000 m³ 17,000 m³

1,000 m³

20,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 27

Project Name: JAP006/C94: Village Centre Quay Walls Golden

Mile Enabling & Piling Works Project Description Both Projects are Fast Track Projects and consist of

constructing Diaphragm Walls to create a water channel on the Palm Island.

Location Jumeirah Palm Island, Dubai - U.A.E Start Date September 2005 End Date February 2006 Status Completed Client Palm Island Developers - Nakheel Project Management Co. N/a

Consultant A.C.E Contractors Parsons - De Lew Cather International Concrete Volume 100,000 cubic meters Concrete Value 25,000,000 AED RMAD Role Supply of concrete from Palm Island Plant, Dubai. Concrete Details 40 N/mm² MSRC/GGBS - Piling

40 N/mm² MSRC/GGBS - Dia. Walls Total Volume

20,000 m³ 80,000 m³

100,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 28

Project Name: Park Place - Dubai Project Description Park Plaza is situated at Sheikh Zayed Road, the main artery

of Dubai. The project comprises the construction of a residential tower of 61 floors (69,000 m2), of which the lower eighteen floors are reserved for offices. The building, designed by Cox Architecture Planning Design of Australia, will be fitted with a special climate façade to limit the costs of energy for cooling the building. The project also includes the construction of a multi-storey car park (24,000 m2), which will be connected with the tower by a 46-meter steel structure bridge.

Location Sheikh Zayed Road, - Dubai U.A.E Start Date December 2004 End Date December 2005 Status Completed Client Asteco Project Management Co. Clifton Coney Stevens

Consultant C.C.D Australia Contractors Higgs & Hill - ACC JV Concrete Volume 61,450 cubic meters Concrete Value 20,000,000 AED RMAD Role Supply of concrete from existing facility. Concrete Details 17.5 N/mm² - Blinding

32.0 N/mm² OPC/GGBS 32.0 N/mm² OPC 47.0 N/mm² OPC/Microsilica 47.0 N/mm² OPC/GGBS/Microsilica 80.0 N/mm² OPC 70.0 N/mm² OPC 60.0 N/mm² OPC 50.0 N/mm² OPC Total Volume

400 m³ 3,000 m³ 6,200 m³

21,500 m³ 7,100 m³ 1,250 m³ 4,800 m³ 7,700 m³ 9,500 m³

61,450 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 29

Project Name: Al Udeid Air Base - Qatar Project Description Supply of 100,000 m³ of Paving Quality concrete for Al Udeid

Air Base within a period not exceeding 90 Days. Location Al Udeid Military Cantonment - Qatar Start Date January 2004 End Date February / March 2005 Status Completed Client U.S Air Force & Qatari Air Force Project Management Co. Rizzani De Eccher Q.A.C.C JV

Consultant CH2M Hill Contractors Q.A.C.C / Rizzani De Eccher JV Concrete Volume 100,000 cubic meters (Paving Quality Concrete) Concrete Value 30,000,000 AED RMAD Role Supply of concrete from Plant-on-Site (240 m³/hour setup)

Major Equipment Employed: Concrete Batching Plant 240 m³/hour (rated) Ice-Water Plant 180 M³/Day Generators 3 x 550 kVA Laboratory Fully Equipped

Concrete Details Grade 45 MPa PQ Concrete. (Flexural strength of 5.5 MPa) Total Volume

100,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 30

Project Name: International City (Dubai) - Packages 9 & 12 Project Description Supply of 70,000 m³ of Structural concrete to a number of

residential & commercial buildings in Dubai International City. Location Dubai International City Start Date March 2005 End Date July 2006 Status Completed Client NAKHEEL Project Management Co. Drees & Sommer Gulf FZ LLC

Consultant Associated Consulting Engineering International Contractors Nurol General Contracting Concrete Volume +70,000 cubic meters Concrete Value Undisclosed RMAD Role Supply of concrete Concrete Details 40 N/mm² OPC/GGBS

40 N/mm² OPC 20 N/mm² SRC Various Screeds Total Volume

70,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 31

Project Name: Atlantis - The Palm Project Description Supply of 270,000 m³ of Structural concrete to the Atlantis

hotel and resort on the Crescent of Palm Island Jumeirah. Location Palm Island, Jumeirah – Dubai Start Date May 2006 End Date September 2008 Status Completed Client Al Naboodah Laing O’Rourke & other contractors Project Management Co. Kerzner International

Consultant Norr Contractors Al Naboodah Laing O’Rourke Concrete Volume +270,000 cubic meters Concrete Value Undisclosed RMAD Role Supply of concrete via a plant on site Concrete Details Various Structural Mixes

Various Screeds Coloured Concrete Total Volume

270,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 32

Project Name: Khalidiyah Palace Hotel Project Description Supply of 110,000 m³ of Structural concrete to the hotel tower

and various surrounding compounds. Location Khalidiyah, Abu Dhabi - U.A.E Start Date October 2006 End Date October 2008 Status Completed Client Undisclosed Project Management Co. E.C. Harris

Consultant Khatib & Alami Contractors Nurol General Contracting Concrete Volume +110,000 cubic meters Concrete Value Undisclosed RMAD Role Supply of concrete / Plant-on-Site Concrete Details 40 N/mm² OPC/GGBS

40 N/mm² OPCI 20 N/mm² SRC Various Screeds Total Volume

110,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 33

Project Name: Al Raha Beach Development Project Project Description Please visit www.aldar.com Location Raha Beach Phase I, Abu Dhabi - U.A.E Start Date October 2006 End Date - Status Completed Client ALDAR Properties Project Management Co. ALDAR Laing O’Rourke

Consultant Various Consultants Contractors Various Contractors Concrete Volume 2,000,000 cubic meters to date Concrete Value Undisclosed RMAD Role Install & operate a fully equipped concrete operation to ensure

continuous and uninterrupted high quality concrete supplies to all the contractors working on the project. Work with the Client & various contractors to formulate a list of Site-Wide Pre-Approved mixes to be used by all contractors. The purpose is to provide cost effective use of all the resources at hand as well as provide the Client with value engineering in order to reduce costs while enhancing the quality of the end product.

Concrete Details Various High Performances Concrete Mixes Total Volume

2,000,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 34

Project Name: Central Market Redevelopment Project Project Description Please visit www.aldar.com Location Old Abu Dhabi Souk, Abu Dhabi - U.A.E Start Date June 2006 End Date June 2012 Status Completed Client ALDAR Properties Project Management Co. E.C. Harris

Consultant Halvorson & Partners

Contractors Mushrif Nat. Contracting: Piling, Shoring, Raft Foundations & Car Park Arabian Construction Co.: Market (Souk) & Towers

Concrete Volume Over 500,000 cubic meters to date Concrete Value To be determined

RMAD Role

Supply concrete and assist in value engineering to enhance quality of concrete while minimising costs. Pumping Concrete using single stage pumping method up to heights of 88 floors over and above the podium.

Concrete Details Various High Performance Concrete Mixes including 80 & 70 N/mm² concrete. Total Volume

+500,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 35

Project Name: Sulphur Granulation Plant Project Description The Habshan Project involves shipping of liquid sulphur via

pipeline, storage of liquid sulphur, blocking, granulation, railcar loading and storage of elemental granular

Location Habshan, Abu Dhabi - U.A.E Start Date September 2011 End Date 2014 Status Completed Client Abu Dhabi Gas Industries Ltd. (GASCO) Project Management Co. N/a

Consultant N/a Contractors Dodsal PTE Ltd. Concrete Volume 135,000 cubic meters Concrete Value 49,607,127.50 AED RMAD Role Supply of concrete from existing facility at Habshan Concrete Details Various concrete grades

Total Volume

135,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 36

Project Name: Abu Dhabi Financial City Project Description The project involves construction of 4 commercial towers.

Tower 1 & 2 comprises of 2 retail floors, 1 podium level and 31 additional floors whereas tower 3 & 4 comprises of 2 retail floors, 1 podium level and 37 additional floors. The project will also include construction of a stock exchange building as well as 2 car park building, each comprising of a ground floor and 4 additional floors.

Location Al Sowah Island, Abu Dhabi - U.A.E Start Date April 2009 End Date December 2012 Status Completed Client Mubadala Development Company Project Management Co. N/a

Consultant Fluor Daniel Contractors Oger Abu Dhabi L.L.C Concrete Volume 287,000 cubic meters Concrete Value 108,156,876.50 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

287,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 37

Project Name: Al Sowwah Islands - Roads, Bridges & Infrastructure Works Project Description The project involves the design and building of 4 bridges with 6

km of elevated carriageway. In addition, creating a complete utility network to handle requirements for sewerage, storms, fire, irrigation, telecom, potable water, high voltage/low voltage power, service level roads, utility tunnels, 3 km of quay wall and a pump station. In total, 50,000 m³ of reinforced concrete work was in place by completion of this work, including substantial post-tensioning of pre-cast and in-situ elements of the structures.

Location Al Sowwah Island Start Date June 2009 End Date Status Completed Client Mubadala Development Company Project Management Co. N/a

Consultant WS Atkins & Partners Overseas and KEO Contractors Al Naboodah Contracting Co. Concrete Volume 292,000 cubic meters Concrete Value 103,122,840.70 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

292,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 38

Project Name: Habshan - 5 Oil & Gas Project Project Description An integrated gas development Habshan - 5 process plant

project for Abu Dhabi Gas Industries (GASCO) in Habshan. Location Habshan Start Date June 2010 End Date January 2013 Status Completed Client Abu Dhabi Gas Industries Ltd. (GASCO) Project Management Co. N/a

Consultant N/a Contractors Kharafi National Concrete Volume 261,616.50 cubic meters Concrete Value 105,875,557.50 AED RMAD Role Supply of concrete from plant on site Concrete Details Various concrete grades

Total Volume

262,000. m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 39

Project Name: Al Mafraq Hospital Project Description A 745 bed, General Hospital consisting of outpatient clinical

unit (2 basement + ground + 2 levels) and 2 Inpatient towers (2 basement + ground + 9 levels) and (2 basements + ground + 11 levels). The hospital’s services include internal medicine, obstetrics, paediatrics as well as surgical and critical care services that supports trauma program.

Location Al Mafraq, Abu Dhabi - U.A.E Start Date April 2011 End Date December 2015 Status Completed Client SEHA - Abu Dhabi Health Service Authority Project Management Co. Allen and Shariff

Consultant Burt Hill Contractors Al Habtoor Leighton / Murray & Roberts JV Concrete Volume 168,000 cubic meters Concrete Value 48,867,918.50 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

168,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 40

Project Name: Cleveland Clinic Project Description A 360-bed facility (expandable to 490), modelled after

Cleveland Clinic in the U.S. The hospital’s services include treating a range of complex medical requirements in the areas of heart, vascular and neurological medicine, as well as digestive diseases, eye, respiratory and critical care. Other service lines will include emergency medicine, surgical and medical subspecialties, pathology and laboratory medicine, radiology, anaesthesiology and quality and patient safety.

Location Al Sowwah Island Start Date April 2010 End Date Status Completed Client ALDAR Properties Project Management Co. N/a

Consultant AECOM Contractors SIXCO / Samsung JV Concrete Volume 242,000 cubic Meters Concrete Value 72,161,497.50 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

242,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 41

Project Name: ADAC Gravity Utility System & Micro

Tunnelling Project Description The sewage and storm water deep utilities network project is

required to facilitate the new airport terminal and future planned facilities including additional cargo terminals and various support buildings for the new terminals. As part of the network, various structures are also required such as storm water outfalls, culverts and flow dissipation structures.

Location Abu Dhabi International Airport Start Date October 2012 End Date Status Completed Client ADAC Project Management Co. N/a

Consultant N/a Contractors Al Naboodah National Contracting Concrete Volume 81,000 cubic meters Concrete Value TBD RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

81,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 42

Project Name: Underground Car Park at ADNOC HQ Project Description The project is located beneath the public park site adjacent to

the existing ADNOC Headquarter building located at the intersection of the Corniche & Bainunah street. The project comprises of a 3-storey basement car park structure. The project covers a footprint area of approximately 22,741 m2. and provides a built-up area of 65,340 m2, approx. 1,575 car parking spaces.

Location Intersection of Corniche and Bainunah Street Start Date September 2011 End Date Status Completed Client ADNOC Project Management Co. N/a

Consultant H.O.K Contractors Arab Technical Construction Concrete Volume 74,000 cubic meters Concrete Value 21,913,959 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

74,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 43

Project Name: Bab Al Qasr Hotel & Serviced Apartments Project Description The project is located in Abu Dhabi and consists of 32 floor

hotel & service apartment floors, 5 podium floors with swimming pools & hotel facilities, 4 basement floors and will have a total closed area of 155,000 m². The project includes a 375-room luxury hotel and a 234-unit serviced apartment with food & beverage establishments, Moroccan-themed spa, health club and other facilities.

Location Plot No. 6A, Sector W32 Start Date January 2010 End Date Status Completed Client EMROC Project Management Co. JACOBS

Consultant Surbana Consultants PTE Ltd. Contractors Nurol General Contracting Concrete Volume 135,000 cubic meters Concrete Value 47,600,038 AED RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

135,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 44

Project Name: Hazzaa bin Zayed Stadium - Al Ain Project Description The Sand Stadium (or The Rock Stadium) is built in the Al Ain

desert. The stadium, which will facilitate 40,000 spectators, is to be built at a cost of Dh. 3.5 million ($953 million)

Location Al Ain Start Date June 2012 End Date August 2013 Status Completed Client N/a Project Management Co. N/a

Consultant N/a Contractors BAM International Concrete Volume 49,500 cubic meters Concrete Value 13,568,913.50 AED RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

49,500 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 45

Project Name: Upgrading of Northern Ring Road - Al Ain Project Description Supply of 90,000 m3 for structural concrete for the Upgrading of

Northern Ring Road Location Al Ain Start Date January 2009 End Date November 2013 Status Completed Client Municipality Project Management Co. Ihab & Faik

Consultant Hill International Contractors Saif Bin Darwish Concrete Volume 90,000 cubic meters Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

90,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 46

Project Name: Widening & Upgrading of Al Ain-Dubai Road Project Description Supply of 95,000 m3 for structural concrete for the Widening &

Upgrading of Al Ain Dubai Road Location Al Ain Start Date August 2008 End Date September 2013 Status Completed Client Municipality Project Management Co. N/a

Consultant WS Atkins Contractors Mohammed Abdul Mohsin al Kharafi & Sons Concrete Volume 95,000 cubic meters Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

95,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 47

Project Name: UAE University New Campus Development -

Al Ain Project Description Supply of concrete to a 280,000 square meter campus with

consist of state of the art educational facilities, as well as sport and residences accommodations

Location Al Ain Start Date February 2008 End Date November 2010 Status Completed Client UAE University Project Management Co. N/a

Consultant GHD Contractors Oger Abu Dhabi LLC Concrete Volume 150,000 cubic meters Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

150,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 48

Project Name: Wahat Hili Mall - Al Ain Project Description Wahat Hili Mall is a first-rate boutique mall that brings together

discerning shoppers with upscale retail brands. Rising 3 stories high and encompassing 150 retail outlets, Wahat Hili Mall entail all components one would expect to find in a modern-day shopping destination.

Location Al Ain Start Date August 2008 End Date February 2011 Status Completed Client N/a Project Management Co. N/a

Consultant N/a Contractors Ekinciler – Mazroui JV Concrete Volume 66,000 cubic meters Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

66,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 49

Project Name: Hazzaa bin Zayed Stadium Mixed Use

Development, Phase II - Al Ain Project Description The new development covers an area of 500,000 square

meters which, in addition to the main stadium, includes a community with 700 residential units in a complex of apartments and green spaces, two office buildings of 20,000 square meters, and a chain of 50 restaurants and retail outlets plus a 172 room international hotel.

Location Al Ain Start Date June 2014 End Date Status Completed Client N/a Project Management Co. N/a

Consultant Hill International Contractors BAM International Concrete Volume Ongoing Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details

Total Volume

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 50

Project Name: Al Ain Hospital - Al Ain Project Description The Al Ain Hospital is a 358,000 sq. meter, 713 Bed Hospital,

and will have underground parking facility for 1500 cars. Location Al Ain Start Date May 2014 End Date December 2016 Status Completed Client N/a Project Management Co. N/a

Consultant N/a Contractors Arabtec – San Jose JV Concrete Volume 150,000 m3 Concrete Value RMAD Role Supply of concrete from our Al Ain plant Concrete Details Various concrete grades

Total Volume

150,000m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 51

Project Name: Saadiyat Island Museum District Infrastructure

- Service Tunnel. Project Description The project includes the construction of a 1.8 kilometer long

tunnel which is 11 meters wide with a 6.5 meters vertical clearance. The tunnel will be linked to the museums with 7 branches.

Location Museum District on Saadiyat Island Start Date May 2014 End Date January 2016 Status Completed Client TDIC Project Management Co. N/a

Consultant Parsons International Contractors Nurol General Contracting Concrete Volume 75,000 cubic meters Concrete Value TBD RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

75,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 52

Project Name: Abu Dhabi Marina City Development. Project Description The project includes the construction of 67 high-end luxury

villas and 4 townhouses in Marina Island, Abu Dhabi having 120,000 m2 construction area.

Location Marina Island Start Date April 2014 End Date To be determined Status Ongoing Client National Investment Corporation Project Management Co. N/a

Consultant N/a Contractors Nurol General Contracting Concrete Volume 100,000 cubic meters Concrete Value TBD RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

100,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 53

Project Name: Utility Plant & Distribution and East Midfield

Roads. Project Description The project includes:

- Utility Plant site and buildings - Central Utility Plants (CUPs) 1 and 2

- Utility networks (pipework, cabling, chambers) - Perimeter roads - Administration buildings - Utility diversions and connections

Location Abu Dhabi International Airport Start Date December 2013 End Date To be determined Status Ongoing Client ADAC Project Management Co. N/a

Consultant N/a Contractors Al Habtoor Leighton Concrete Volume 155,000 cubic meters Concrete Value TBD RMAD Role Supply of concrete Concrete Details Various concrete grades

Total Volume

155,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 54

Project Name: National Food Products Company – Mega Plant

at Kizad Project Description The project includes:

- Built area over 750,000 square meter - State-of-the-art post-tensioning system fir the roof and

slab on grade - Fair faced concrete to receive special-hygiene grade

epoxy Location KIZAD Start Date August 2016 End Date To be determined Status Ongoing Client NFPC Project Management Co. N/a

Consultant NEB Contractors CES – Al Rakha Concrete Volume 125,000 cubic meters Concrete Value 33,000,000 RMAD Role Supply of concrete from plant on site Concrete Details Various concrete grades

Total Volume

125,000 m³

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 55

APPENDIX 2

List of Plant & Equipment

Quality On Time – Every Time 56

Readymix Abu Dhabi Ltd. - Concrete Batching Plants Area Location Make / Model Rated Output Mixer Type Mixer Size Dry Wet Computer System

Abu Dhabi

Mussaffah

BPL Econocrete C100 100 Pan Mixer 3.00 m3 Yes Yes Simma Electronics

Simem Eagle 120 Pan Mixer 3.00 m3 Yes Yes Simma Electronics

Lintec CC 3000D v2 240 Twin Shaft 2 x 3.00 m3 Yes Yes Simma Electronics

Total Mussaffah 460 m3/hr

KIZAD Lambert Mob 60 60 Pan Mixer 1.25 m3 Yes Yes Simma Electronics

Nisbau - Euromix 120 120 Twin Shaft 3 m3 Yes Yes Simma Electronics

Lintec CC 3000D v2 240 Twin Shaft 2 x 3.00 m3 Yes Yes Simma Electronics

Total KIZAD 420 m3/hr Madinat Zayed BPL Econobatch C90 120 Pan Mixer 2.00 m3 Yes Yes Simma Electronics

Total Madinat Zayed 120 m3/hr

Al Ain Sanaiya - Al Ain

MEKA 120 Twin Shaft 2.00 m3 Yes Yes Simma

Reich RSG 4 TM 80 Twin Shaft 2.00 m3 Yes Yes Alkon - Spectrum v 6.18

Pataud SM 50 60 Pan Mixer 1.25 m3 Yes Yes Alkon - Spectrum v 6.18

Total Sanaiya 260 m3/hr

Spare Spare

Lambert Mob 60 60 Pan Mixer 1.25 m3 Yes Yes Simma Electronics

Lintec CC 3000D v2 240 Twin Shaft 2 x 3.00 m3 Yes Yes Simma Electronics

Lintec CC 3000D v2 240 Twin Shaft 2 x 3.00 m3 Yes Yes Simma Electronics

Total Spare Plants 540 m3/hr

Total Production Capacity (Concrete) 1,800 m3/hr Trucks & Pumps

Readymix Abu Dhabi operates one of the youngest fleets of high capacity truck mixers from European makers: Renault and MAN. The truck mixers capacities vary from 9 to 12 m3. They are maintained in good working order by our in-house workshop. The workshop is equipped with the latest technologies for diagnostic, troubleshooting and repair of faults. Trucks are also equipped with sensors to give feedback on consumption and other performance indicators.

The truck fleet is supplemented by 30 mobile (with boom sizes of up to 52m) and static pumps that are owned and operated by Readymix Abu Dhabi. Also available are a number of hydraulic placing booms up to a reach of 32m.

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 57

APPENDIX 3

ISO 9001 Certificate

NRMCA CertifificateOSHAD Certifificate

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 59

APPENDIX 4

Organisation Charts

GeneralManager

Procurement & WorkshopManager

Operations Manager

Al Ain Area Manager

Commercial &

Technical Manager

Technical Engineer

LaboratoryTechnicians

Asst. Technical

Manager

Site / PlantTechnicians

SalesCoordinator

SeniorAccountant(Abu Dhabi)

Senior

Accountant(Al Ain)

Debt Collector

MaterialLogistics / Stores

Area Production

Managers

CentralShipping Office

QHSEAuditors

WorkshopSupervisor

Deputy GMFinance & Admin. /

MR

Accountants

SalesAdministrator

Sr. Storeman

StoresClerks

Production Yards

Chief FinancialOfficer

Secretary &

Admin Assistant

Readymix Abu Dhabi

Organisation Chart RMAD-OC-01 r10 – Oct 2017

- Reporting

- Coordination

- Team

Chief Accountant

QA / System Supervisor

IT / Communication

Sales Executive

Safety Officers

CentralShipping Office

PRO / Admin /

Store

Plant

Maintenance

Mechanical Supervisor

Mechanics

Electricians

Chief Electrician

Lab Supervisor

Yard Foreman

Plant OperatorsShovel

Operators

TM DriversPump CrewsPlant Maint.

TeamMaterial

ReceiversVehicle Maint.

Team

Sr. TechnicianTechniciansLaboratory Technicians

Yard Foreman

Plant Operators

Shovel Operators

TM Drivers

Pump Crews

Material Receivers

Coordinator

Foreman

Electricians

Mechanics

Fabricators

Welders

Tyremen

Painters

PRO

HR / AdminOfficer

Asst. ManagerProduction

Asst. Manager

Technical / Sales

Mr. Robert HoganGeneral Manager

Malek JammoulArea Manager

SanaiyaYard

PumpingDivision

Yard Foreman

Plant Operators

Shovel Operators

TM Drivers

Ice Men

Plant Maint. Team

Material Receivers

Vehicle Maint. Team

Supervisor

Site Coordinators

Pump Operators

Pump Helpers

Site Technicians

Laboratory Technicians

Blasters

Internal Auditors

Readymix Abu DhabiOrganisation Chart RMAD-OC-02 r4 – 06 Apr 2016

- Reporting

- Coordination

- Team

Production Department Technical Department Plant & Maintenance Department

AL AIN PLANTORGANISATIONAL CHART

Painters

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 62

APPENDIX 5

Company Manpower

Quality On Time – Every Time 63

Head Office & Al Ain Total

General Manager 1 Dy. General Manager 1 Chief Technical Officer 1 Commercial & Technical Manager 1

Chief Financial Officer 1 Area Manager 1 Sales Executive 2 Sales Clerck 1 HSEQ Administrator 1 PRO 3 Senior Accountant 1 Accountant 4 Debt Collector 1 Secretary / Receptionist 1 Helpers 1 TOTAL 21

Location AUH Al Ain Total

Production Manager 1 0 1 Production Supervisor 2 1 3 Workshop Manager 1 0 1 Workshop Coordinator 1 0 1 Plant & Maint. Manager 1 0 1 Maintenance Coordinator 1 0 1 Maintenance Foreman 1 0 1 Procurement Manager 1 0 1 Stores Foreman 1 0 1 Stores Assistant 1 0 1 Storekeeper 1 1 2 Shipper 2 1 3 Shipper Assistant 1 2 3 Batcher Foreman 3 0 3 Plant Operator 8 3 11 Shovel Operator 5 3 8 Administrative Assistant 1 0 1 Material Coordinator 1 0 1 Material Receiver 3 0 3 Camp Boss 1 1 2 Light Duty Driver 0 1 1 Watchman 0 1 1 Heavy Duty Driver 54 31 85

Pump Operator 19 7 26 Static Pump Operator 0 1 1 Pump Helper 2 3 5 Pipeline Foreman 1 1 2 Pipeline Helper 0 6 6 Senior Mechanic 0 2 2 Mechanic 5 4 9 Chief Electrician 1 0 1 Electrician 3 2 5 Tyreman 2 0 2 Welder 2 2 4 Body Work & Painter 3 1 4 Fitter 7 1 8 Helpers 13 9 22 QA/QC Supervisor 1 1 2 Senior Technician 3 2 5 Concrete Technician 7 9 16 TOTAL 160 96 256

Location AUH Al Ain Total

Head Office & Al Ain 21 Plants 256 Company Total 277

Quality On Time – Every Time 64

APPENDIX 6

Company Licenses

Location:

Abu Dhabi – U.A.E. Document Name:

Standard Pre-Qualification Contract:

Readymix Abu Dhabi Ltd.

Revision (Date):

01-01-2018

Document Title:

Standard Pre-Qualification Document

Quality On Time – Every Time 71

APPENDIX 7

Company Policies


Recommended