Date post: | 09-Jul-2016 |
Category: |
Documents |
Upload: | claudiomirors |
View: | 214 times |
Download: | 0 times |
EHP4 for SAP ERP 6.0
December 2010
English
Service with Time and Material Based Billing (198)
SAP AGDietmar-Hopp-Allee 1669190 Walldorf
Business Process Documentation
Germany
© SAP AG Page 2 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Copyright
© 2010 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
© SAP AG Page 3 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
External Process
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.
Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
© SAP AG Page 4 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Contents
1 Purpose........................................................................................................................................ 5
2 Prerequisites................................................................................................................................ 5
2.1 Master Data and Organizational Data...................................................................................5
2.2 Business Conditions..............................................................................................................6
2.3 Preliminary Steps.................................................................................................................. 7
2.4 Roles..................................................................................................................................... 8
3 Process Overview Table...............................................................................................................9
4 Process Steps............................................................................................................................ 10
4.1 Creating a Service Notification............................................................................................10
4.2 Changing the Service Notification (Optional).......................................................................12
4.3 Check the Task List.............................................................................................................13
4.4 Creating a Sales Order........................................................................................................15
4.5 Change the Sales Order......................................................................................................16
4.6 Changing the Service Order................................................................................................17
4.7 Time Recording (211)..........................................................................................................18
4.8 Confirming Time to the Service Order (Optional)................................................................20
4.9 Confirming the Materials Used............................................................................................21
4.10 Creating Resource-Related Billing Request.....................................................................21
4.11 Creating the Invoice for the Billing Memo Request..........................................................23
4.12 Closing the Service Order – Technical complete.............................................................24
5 Follow-Up Processes..................................................................................................................25
5.1 Period End Closing CO Orders (189)..................................................................................25
5.2 Accounts Receivable (157)..................................................................................................26
5.3 Closing Operations SD (203) (Optional)..............................................................................26
6 Appendix.................................................................................................................................... 26
6.1 Reversal of Process Steps..................................................................................................26
6.2 SAP ERP Reports...............................................................................................................29
6.3 Used Forms.........................................................................................................................29
© SAP AG Page 5 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Service with Time and Material Based Billing
1 Purpose
Documenting a customer request for quotation (RFQ) for services, a notification is created in the system to document and classify the required work. An optional activity lets the service responsible call the customer again to complete the information required to prepare the quotation.
The quotation is created in referring to the service portfolio offered by the service provider. This is represented through a range of service products. The prices being offered to the customer for the quoted services are based on time and material. The negotiation process leads to changes in the final price. The final informative quotation is sent to the customer for approval.
If the quotation is rejected, a reason for rejection is set in the sales document to proceed to its cancellation and the process concludes. In case the customer accepts the quotation, a sales order is created and automatically a service order. The service order will contain the resources, time and material, included in the quoted services.
The sales order is billed one or more times during the execution of the service. The amount billed is determined on a time and materials basis, the billing method used is resource-related billing. The actual revenue will be given in this case by the work actually performed and can be different to the quotation estimate.
In this scenario, settlement to Profitability Analysis takes place independently from the service order (actual costs) and from the sales order (actual revenues). Analysis for service profitability is carried out in CO-PA reporting.
This situation describes the case of small or quoted services (typically those that conform a service catalog) and that do not need to be individually analyzed in terms of profit and loss. Actual cost and revenues meet only in CO-PA, and the analysis takes place in bulk according to characteristics such as time period, customer, sales area, supplier cost center, service or service type provided, etc.
2 Prerequisites
2.1 Master Data and Organizational DataA range of indispensable master and organizational data was created in your ERP system in the implementation phase, such as the data that reflects the organizational structure of your company, as well as master data that suits its operational focus, for example, master data for materials, vendors, customers, and so on.
This master data usually consists of standardized SAP Best Practices default values and enables you to go through the process steps of this scenario.
Additional Master Data (Default Values)You can test the scenario with other SAP Best Practices default values that have the same characteristics.
Check your SAP ECC system to find out which other material master data exists.
© SAP AG Page 6 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Using Your Own Master DataYou can also use customized values for any material or organizational data for which you have created master data. For more information on how to create master data, see the Master Data Procedures documentation.
Use the following master data in the process steps described in this document:Service
Service Plant
Master data Value Master / org. data details
Comments
Material/Service D103 T&M Billing
Material H100 Procurement-to-Stock (130)
Spare Part 1
Sold-to party 100100 Customer Services
Ship-to party 100100 Customer Services
Payer 100100 Customer Services
Plant 1000 Plant 1
Storage Location 1040 Shipping - (w/o
Company Code 1000 Company Code 1000
CO Area 1000 CO Area 1000
Purchasing Organization
1000 Purch.Org. 1000
Sales organization 1000 Inland
Distribution channel 10 Sales Direct
Division 10 Product Division 10
Task List 100000 / 3 Service T&M
Personnel Number 999201 Avila Tomas
Work Center SERV01 Services: Work Center Technical Serv.
2.2 Business Conditions The business process described in this Business Process Documentation is part of a bigger chain of integrated business processes or scenarios. As a consequence, you must have completed the following processes and fulfilled the following business conditions before you can start going through this scenario:
Business condition Scenario
In order to run through this scenario, the materials must be available in stock. If you use trading goods (HAWA) you can either:
Procurement w/o QM (130)
Do not install the Business Process
© SAP AG Page 7 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Business condition Scenario
run through the procurement w/o QM (130) process or
create stock using transaction MIGO (for details see chapter Preliminary Steps).
Procurement-to-Stock (130), but follow the steps described in the Business Process Documentation Procurement-to-Stock (130).
2.3 Preliminary StepsIn order to run through this scenario, the material H100 (Spare Part) must be available in stock.
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Materials Management Inventory Management Goods Movement Goods Movement (MIGO)
Transaction code MIGO
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Warehouse Clerk (SAP_NBPR_WAREHOUSECLERK-S)
Business role menu Warehouse Management Receiving Production Order Goods Movement
2. Make the following entries on the MIGO overview screen:
Field name User action and values Comment
Business Transaction A01 – Goods Receipt Select A01 – Goods Receipt from the 1st Drop-Down Menu
Business Transaction R10 – Other Select R10 – Other from the 2nd Drop-Down Menu
Movement Type 561 561 – Receipt per initial entry of stock balances into unrestricted use
3. Choose Enter.
4. On the Goods Receipt Other screen: Material tab page, make the following entry and choose Enter:
Field name User action and values Comment
Material <Material number> H100
5. On the Goods Receipt Other screen: Quantity tab page, make the following entry and choose Enter:
© SAP AG Page 8 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Field name User action and values
Qty in Unit of Entry 100
6. On the Goods Receipt Other screen: Where tab page, make the following entries and choose Enter:
Field name User action and values Comment
Plant 1000
Storage Location 1040 Shipping - (w/o
7. Choose Enter.
8. Save your entries.
ResultThe quantity of 100 has been posted.
Financial postings:
Material Debited Accounts Credited Accounts
Cost Element / CO Object
Trading Good (HAWA)
2011100000
Trading goods - cost
9800000003
Initial balance
none
2.4 Roles
UseThe following roles must have been installed to test this scenario in the SAP Netweaver Business Client (NWBC). The roles in this Business Process Documentation must be assigned to the user or users testing this scenario. You do not need these roles if you are not using the NWBC interface, but the standard SAP GUI.
PrerequisitesThe business roles have been assigned to the user who is testing this scenario.
Business role Technical name Process step Service Agent SAP_NBPR_SERVAGENT-S Creating a Service Notification,
Change Service Notification,
Check the Task List,
Creating a Sales Order
Sales Administration SAP_NBPR_SALESPERSON-S Change the Sales Order
Service Employee SAP_NBPR_SERVEMPLOYEE-S Changing the Service Order,
Confirming Time to the Service Order (Optional Step),
© SAP AG Page 9 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Business role Technical name Process step
Confirming the Materials Used,
Creating Resource-Related Billing Request,
Closing the Service Order – Technical complete
Sales Billing SAP_NBPR_BILLING-S Creating the Invoice for the Billing Memo Request,
Empleado (Uso General)
SAP_NBPR_EMPLOYEE-S La asignación de este rol es necesaria para las funciones básicas.
Encargado de Almacén
SAP_NBPR_WAREHOUSECLERK-S Contabilizar Entrada de Mercancías
3 Process Overview Table
Process step External process reference
Business condition
Business role
Trans-action code
Expected results
Creating a Service Notification
– – Service Agent IW51 Customer Request for Service
Changing the Service Notification
– – Service Agent IW52 Add Information to Customer Request
Check the Task List – – Service Agent OISD,
IA07
Check the Task List
Creating the Sales Order
– – Service Agent IW52 Create the Sales Order for resource-related billing
Changing the Sales Order
– – Sales Administration
VA02 Add partner to the sales order
Changing the Service Order
– – Service Employee
IW72 Add Spare Part to the Service Order
Time Recording 211: Time Recording
– See 211 scenario
See 211 scenario
See 211 scenario
Goods Movement – Service Employee
MB11 Confirm the Materials Used
Resource-Related Billing Request
– – Service Employee
DP90 Resource-Related Billing
© SAP AG Page 10 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Process step External process reference
Business condition
Business role
Trans-action code
Expected results
Creating the Invoice for the Billing Memo Request
– – Sales Billing VF04 The customer invoice has been created and transferred to the Accounting
Closing the Service Order
– – Service Employee
IW32 Set the status ‘Technically complete’.
Closing the Service Order
– – Service Employee
IW32 Set the status ‘Complete business’.
Settlement Service Orders
189: Period End Closing CO Orders
– See 189 scenario
See 189 scenario
See 189 scenario
Closing the Service Order – Business View
189: Period End Closing CO Orders
– See 189 scenario
See 189 scenario
See 189 scenario
4 Process Steps
4.1 Creating a Service Notification
UseIn this activity, a customer calls the customer service center in order to request a service. The operator carries out the following procedures to enter the information from the customer.
Procedure1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Notification Create (General)
Transaction code IW51
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Notifications Create Service Notification-General
© SAP AG Page 11 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
2. On the Create Service Notification screen, make the following entries:
Field name Description User action and values Comment
Notification Type
Notification Type Y2 Service Req. Order
Confirm with Enter.
3. On the Create Service Notification: Service Req.-Order screen choose the specifics tab page and sub tab page Cust. Address, make the following entries:
Field Name Description User Action and Values
Comment
Sold-to party Account Number of Customer
100100
Main Work Ctr. / (Plant)
Reference work center for quotation development
SERV01 / 1000
Plant - Logistic unit
Person Responsible
Responsible for the quotation development and service delivery
999201 Search can be done using the HR organizational structure
4. Confirm your entries with Enter.
5. Make the following entries in the Location data tab page:
Field Name Description User Action and Values Comment
MaintPlant Maintenance Plant 1000
Sales Organization Organizational unit 1000
Distribution Channel Field 2 10
Division Grouping of services
10
Company code Financial organization
1000 Is defaulted when selecting Sales Area
Business Area 0001 Services
CO Area Analytical organizational unit
1000 Can be defaulted when selecting Company Code
6. Make the following entries in the Additional Data 1 tab page:
Field Name Description User Action and Values Comment
Coding Code Group YBP100 Notification classification
Coding Code 6 Inquiry
© SAP AG Page 12 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Field Name Description User Action and Values Comment
Description Description Inquiry By default the notification type
Subject Long Text Description of the required services
The operator describes the required text and, if know, the number of the suggested service products
High level description of the service
7. Confirm your entries with Enter and save the problem notification, by choosing Save (ctrl. + S).
8. Make a note of the notification number.Notification number: _______________________________.
9. Choose Exit (shift + F3) to return to the SAP Easy Access menu.
ResultA Service Notification has been created.
4.2 Changing the Service Notification (Optional)
UseTo add more specific information that might be relevant for quoting complex services, the service provider calls the customer and adds information received in the call. Simultaneously the agent describes the customer’s expectation in more detail and creates a note regarding the customer call.
This step is optional and aimed to show the documentation of calls within service notifications.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Notification Change
Transaction code IW52
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Notifications General Change Service Notification
2. On the Change Service Notifications: Initial Screen, enter the following Notification number from the previous section. Confirm your entry with Enter:
© SAP AG Page 13 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
3. Choose Log telephone call from the action box on the right.
4. In the Subject of conversation area, enter a text of any length.
5. Confirm the data you have entered for the outgoing telephone call by choosing Continue (Enter).
6. On the Change Service Notification: choose the Notification details tab page.
7. Text entered for the telephone conversation, choose Text in the Activity area.
8. To return to the Notification choose Back (F3). Confirm the message with yes.
9. To save the changes choose Save (ctrl. + S).
10. Choose Back (F3) to return to the SAP Easy Access menu.
ResultThe Service Notification has been updated with the information of the call.
4.3 Check the Task List
UseThe purpose of this activity is to check the activities and resources associated to the service product accepted by the customer.
The service product can be configurable. In this case, the characteristics valuation screen does not appear during the quotation creation from the transaction IW51, and the service order is not created at that moment.
The service order will be created automatically when the sales order is created based on the accepted quotation and saved. In order to generate the service order, a task list is assigned to the service product.
Procedure1. Access the service product using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Agreements Environment Sales and Distribution Service Products
Transaction code OISD
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Notifications Others Service Activities Generation of PM Orders from SD
2. Choose Position, the button at the bottom of the table, and make the following entries in the pop-up screen:
© SAP AG Page 14 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Field name Description User action and values Comment
Planning Plant Plant 1000
Service Object Service product number D103
3. Accept by choosing Continue (Enter). The cursor is positioned in the appropriate row.
4. In the column Gen TL is contained the key of the Task List Group, this entry along with the one at the column G (Group Counter) identifies uniquely the assigned task list.
Check the values for the assigned task list:
Task List Group:___________________________________.
Group Counter:___________________________________.
5. Choose Back to return to the SAP Easy Access menu.
6. Access the task list using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP MenuLogistics Customer Service Service Agreements Maintenance Task Lists Task Lists General Maintenance Task Lists Display
Transaction code IA07
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Preventive Maintenance Task List Display General Task List
7. On the Display General Task List: Initial Screen, make the following entries
Field name
Description User action and values Comment
Group Task list grouping code
Enter the task list group copied in the previous step
8. Select Task List.
9. In the table General Task List Overview, select the row corresponding to the counter copied in the previous step.
10. Choose Operation to access to the Display General Task List: Operation Overview, that contains the operations that are be included in the service order when this is generated in base to this task list.
11. Select the push button to select all the operations and then, the button Components at the bottom of the operations table. You are prompted to the General maintenance task list Display: Components Overview. (if assigned)
© SAP AG Page 15 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
12. Navigate through the selected operations using to check the spare parts needed to deliver the service. (if assigned)
The planned resources in the Task List will be the origin of the actual costs of the service delivery. If the price has been changed manually in the quotation due the negotiation process with the customer, this price will be transferred to the sales order and to the billing document, regardless the actual costs incurred.
This is the main characteristic of this process, in which the quotation is binding.
13. Choose Back to return to the SAP Easy Access menu.
ResultThe Task List has been checked.
4.4 Creating a Sales Order
UseThe purpose of this activity is to define and process the customer’s requirements for service. It will be the basis for billing.
The sales order is created with reference to the service notification.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Notification Change
Transaction code IW52
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Notifications General Change Service Notification
2. On the Change Service Notification: Service Req. Order screen choose Sales Order.
3. Choose Back.
4. Save the Service Notification.
Sales order number: _______________________________. (See the line at the bottom)
ResultThe Sales Order has been created.
© SAP AG Page 16 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
4.5 Change the Sales Order
UseIn this activity enter the service material with quantity in the sales order.
Procedure
1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Sales and Distribution Sales Order Change
Transaction code VA02
2. Enter the sales order number created in the previous step. Confirm with Enter.
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Sales Administration (SAP_NBPR_SALESPERSON-S)
Business role menu Sales Sales Orders Sales Order Processing Change Sales Order
In the list beside choose the All Sales Orders tab page, mark the line with the sales order number created in the previous step and choose Change.
3. On the Change SP: SD- Order XX: Overview screen, make the following entries:
Field name Value Description
PO Number e.g.: CI-8888 Enter the PO number given by the customer or your internal PO number for the customer.
Material D103 T&M Billing
Order Quantity 1
If the Service Product used to create the quotation is configurable, at this moment the system will prompt you to the Characteristics Valuation screen.
In this case, the service product material is not configurable.
4. Choose Enter.
5. Choose All in the pop up window Operation selection using work center / replace work center.
6. Choose All in the next pop up window Operation select.
7. The message Cost determination appears and you can select the item 10 choose Go to (Menu line) Item Conditions and have a look at the calculated costs EK02.
© SAP AG Page 17 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
8. Choose Back.
9. To assign a sales employee to the sales order, choose Goto Header Partner.
10. On the Create SP: SD-Order: Header Data screen, make the following entries:
Field name Description User action and values
Comment
Partner Function
Type of partner Select ‘VE - SALES EMPLOYEE’
Click on drop-down arrow in open field
Partner Alphanumeric key identifying the partner
999201 Tomas Ávila
The assignment of a sales employee to the sales order facilitates reporting of sales data by the responsible sales person.
11. Choose Back.
12. Choose Back again.
13. Confirm the message with Yes and save the sales order.
ResultThe system issues the message SP: SD-Order XXXX has been saved.
14. Choose (Document flow), mark the previous changed sales order and choose service documents.
Write down the service order number: _______________________________.
Choose Back to return to the SAP Easy Access menu.
4.6 Changing the Service Order
UseIn this activity you assign the required spare part in the service order. For stock materials, a reservation is created and for non-stock material a purchase requisition is created. It is also possible to plan third-party services.
In this example we will plan stock material.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Order
© SAP AG Page 18 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Service Order Service Order List Change
Transaction code IW72
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Service Order Change Order - List Form
2. On the Change Service Orders: Selection of Orders screen, in the Order Selection area, make the following entries:
Field name Description User action and values Comment
Main work center SERV01
Plant for Work Center 1000
3. Choose Execute.
4. Double-click the service order number to change the service order.
5. Select the Operation tab page.
6. On the Change Service Order <…>: Operation Overview screen, select operation 0010 and choose General.
7. Add the following data for the spare parts required to perform the repairs: Item 10
Field name Description User action and values Comment
Component H100
Reqmnt qty 1
IC (item category) Stock item L
SLoc Storage Location 1040
Plant 1000
8. Confirm with Enter. Choose Back.
9. Choose Release. If the dialog box appears for checking the credit limit of the customer, choose Enter.
10. Save your entries.
ResultA Component was added to the Service Order.
4.7 Time Recording (211)
External Process
© SAP AG Page 19 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
UseThe Cross-Application Time Sheet (CATS) is the tool used for recording time worked by an employee on a certain assignment. In this scenario the service order is the focal point of the process as it collects labor.
PrerequisitesThe service order is already created. The service order collects all time and cost for internal review.
ProcedureComplete all activities described in the Business Process Documentation of the scenario: Time Recording (211)To accomplish activities of the scenario, carry out the process steps in the relevant Business Process Documentation using the master data from the following table:
Field name Description User action and values
Comment
Data Entry Profile
Customized time sheet profile
YB_CS SP Service Order
Key Date Date that determines the date range available in the time sheet
Accept default of today’s date
The first time a time sheet is called up, the key date is not visible on the initial screen.
Personnel Number
Numeric key identifying a personnel record
999201 Tomas Ávila
Field name Description User action and values
Comment
ActTyp Activity type Leave empty The value will be set automatically after all necessary fields are filled in and are confirmed with Enter
Rec. CCtr Receiver Cost Center
Leave empty
RecSaleOrd Receiving order that will collect time and cost
Leave empty
RecItm Item number in receiver sales order
Leave empty
Rec.Order Receiver Order Type in the service order number from step 4.5
Act. Activity Number Type in the
© SAP AG Page 20 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Activity Number 0010
Hours Time worked on the receiving object
Any scenario hours
Example: 8
4.8 Confirming Time to the Service Order (Optional)
UseAs an alternative to CATS, time can be reported using the Services time confirmation transaction. Unlike CATS, you do not need to identify a personnel number to report the working time now.
In this activity, the technician responsible report back the time used for this maintenance order.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Confirmation Entry Individual Confirmation (Time)
Transaction code IW41
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Confirmation Enter PM Order Confirmation
2. Enter the number of the service order and confirm your entry with Enter.
3. The screen Create PM Order Confirmation: Operation Overview is shown. Select the operations
0010 and 0020 and then choose .
4. On the Create PM Order Confirmation: Actual Data screen enter the actual time worked in the field Actual work (e.g. 4 hours).
5. Choose Next Operation (Shift + F11) to confirm time in the activity 0020 the same way.
6. To save the confirmation, choose Save (ctrl. + S).
7. Choose Back to return to the SAP Easy Access menu.
ResultThe system status of the service order been updated with the actual work made for this order.
4.9 Confirming the Materials Used
© SAP AG Page 21 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
UseSpare parts have been planned from stock for the service. You now have to confirm the consumption of the spare part materials.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Confirmation Goods Movement Goods Movement
Transaction code MB11
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Employee SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Other Service Activities Goods Movement
2. On the Enter Goods Movement: Initial Screen, choose To Order and make the following entries:
Field name Description User action and values Comment
Order Number Your service order
3. Confirm your entries with Enter. On the Enter Goods Movement: Select screen, select the relevant items, choose Adopt + Details and check the entries.
4. Save the goods issue document.
5. Choose Back to return to the SAP Easy Access menu.
ResultThe material consumption has been posted and the stock level is reduced in the system.
4.10 Creating Resource-Related Billing Request
UseBilling takes place in two steps. In the first one is created a billing memo request (Billing Request), in the second the actual billing document is created, based on the billing request.
In this activity a billing request is being created out of the actual time and materials used in the service order.
The invoice will be posted to the Sales Order item in which the Service Order is assigned.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
© SAP AG Page 22 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
SAP Menu Logistics Customer Service Service Processing Completion Billing Request Process Individually
Transaction code DP90
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Billing CS: Resource-Related Billing Doc.
2. On the Resource-Related Billing Request: initial Screen, make the following entries:
Field Name Description User Action and Values Comment
Sales Document
Billable sales document
Sales Order created in previous step RRB with reference to the Service Order
Sales Document Item
Billable sales document
Positions of the sales order to be billed RRB with reference to the Service Order
3. To start creating the Billing request choose Create billing Request (enter)
4. On the Billing request for resource-related billing document <new>: Expenses screen save the billing request by choosing Save Billing Request (Shift + F7)
5. A warning: Do you really want to create the billing request? Choose Yes.
6. On the Sales tab page, in the Order reason field, choose No warranty.
7. On the Change Debit Memo Requ. 70000xxx: Overview screen, delete the billing block, by leaving the field blank.
8. Select all items and Goto Item Conditions and make the following entries:
Field Name Description User Action and Values Comment
CnTy Condition Type Select condition type YBS1 SP: Surcharge to the costs
Amount Type in a percentage you want to add to the costs and charge to the customer
Go to the button to go to the next item and repeat step 8.
For the service material items the status on condition type VPRS – Internal Price (field CnTy in the item conditions) is red. This is not an error. The service materials do not have a material price in the master data. The condition type VPRS collects the material price from the material master and shows it in the pricing conditions of the billing document. In the case of the service materials there is no price, therefore VPRS is ‘0,00’ and in ‘red light’.
9. Choose Back
10. To save the Debit Memo Request choose Save (ctrl. + S).
© SAP AG Page 23 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Make a note of the billing request number.Billing Request: _______________________________.
11. Choose Back (F3) to return to the SAP Easy Access menu.
If you don’t get a billing request number go to the service order (transaction: IW32). Enter your service order number and choose enter. Follow path Extras Documents for order document flow. Here you can see the Debit Memo Requ. with status Open.
12. In case you could not delete the billing block in the previous step, access the Billing Request following the navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP MenuLogistics Customer Service Service Processing Environment Sales and Distribution Sales Order Change
Transaction code VA02
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Sales Administration (SAP_NBPR_SALESPERSON-S)
Business role menu Sales Sales Orders Sales Order Processing Change Sales Order
13. On the Change Sales Order: initial Screen, make the following entries:
Field Name Description User Action and Values Comment
Order Billing request created before
14. Choose (enter), and then select Goto Header Billing. Leave the field Billing Block blank and then choose Save (Ctrl. + S).
ResultThe Resource-Related Billing Request has been created.
4.11 Creating the Invoice for the Billing Memo Request
UseIn this activity the invoice is generated out of the billing memo request.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Completion Billing Document Process Billing Due List
Transaction code VF04
© SAP AG Page 24 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
2. On the Create Billing Document initial screen, make the following entries:
Field Name Description User Action and Values Comment
SD Document Billing Request from the previous step
Order-related X
3. To display the billing list choose Display Bill List.
4. On the Maintain Billing Due List screen, save the proposed debit memo by choosing Save (ctrl. + S).. This generates the billing document.
5. To display the invoice number mark the line and choose the button Documents. Then mark the line with the invoice number and choose the button Disp. Doc. Now the invoice is displayed.
6. Choose Back (F3) four times to return to the SAP Easy Access menu.
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Sales Billing (SAP_NBPR_BILLING-S)
Business role menu Sales Billing
1. In the list shown beside choose All Sales Documents Due for Billing tab page.
If the document is not shown in the list choose Search criteria and enter the sales document number manually.
2. Mark the line with the sales order document created earlier.
3. Choose Individual Billing. This generates the billing document. To display the invoice document in the same step choose Individual Billing and Show as PDF.
Press Home to return to the NetWeaver Business Client main menu.
ResultThe invoice has been created and assigned to the accounting.
4.12 Closing the Service Order – Technical complete
UseIn this activity, the service order status is set to “technically complete”.
Procedure1. Access the transaction using one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP Menu Logistics Customer Service Service Processing Order Service Order Change
© SAP AG Page 25 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Transaction code IW32
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Service Order Change Order
2. Enter the service order number and choose Enter.
3. On the Change Service Order 4XXXXX: Central Header screen choose Complete (technically) (Ctrl+F12) to continue.
4. A screen window appears where additional information regarding the completion can be updated, to continue choose Enter.
5. Choose Back to return to the SAP Easy Access menu.
ResultThe Service Order is completed technically.
5 Follow-Up ProcessesYou have finished all activities that are part of the business process described in this document.
To accomplish subsequent activities of this business process, carry out the process steps described in one or more of the following scenarios, using the master data from this document.
5.1 Period End Closing CO Orders (189)
External Process
UseAdditional activities must be carried out in this project. These are executed collectively as a part of month-end closing. For more information on the month-end closing procedure, see the Business Process Documentation for period end closing CO Orders.
Note that month-end closing can only be executed once a month.
To accomplish activities of the scenario, carry out the process steps Settlement Service Orders and Close Completed Service Orders (Business View).
© SAP AG Page 26 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
5.2 Accounts Receivable (157)
External Process
UseIn this activity you post the incoming payment.
ProcedureComplete all activities described in the Business Process Documentation of the scenario: Accounts Receivable (157) (Chapters “Post Payments using Automatic Payments Program”, “Post Incoming Payment from Customer Manually”, “Automatic Clearing of open items in customer accounts”, “Manual Clearing of Open items in customer accounts”) using the master data from this document.
5.3 Closing Operations SD (203) (Optional)
External Process
UseThis scenario describes the collection of periodic activities such as day ending activities or legal requirements like Intrastat and Extrastat reporting.
ProcedureComplete all activities described in the Business Process Documentation of the scenario: Closing Operations SD (203) (Chapters “Review Sales Documents blocked for billing”, “Review Billing Due List”, “Review Log of collective invoice creation” and “Review List Blocked (for accounting) Billing Documents”) using the master data from this document.
6 Appendix
6.1 Reversal of Process StepsIn the following section, you can find the most common reversal steps, which you can take to reverse some of the activities described in this document,
© SAP AG Page 27 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Creating a Service NotificationTransaction code ( SAP GUI) IW51
Reversal: Change a Service Notification
Transaction code ( SAP GUI) IW52
Business role Service Agent (SAP_NBPR_SERVAGENT-S)
Business role menu Service Processing Notifications Change Service Notification
Comment Set the system status NOCO (Notification completed) and set system status DLFL (Deletion Flag).
Change the Service OrderTransaction code ( SAP GUI) IW32
Reversal: Change the Service Order
Transaction code ( SAP GUI) IW32
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Change Order
Comment If the order is not released: set the system status NCMP (Not completed) with the function Do Not Execute. After that set the system status DLFL (Deletion Flag).
If the order is released: set the system status CLSD (Closed) with the function Complete (Business). After that set the system status DLFL (Deletion Flag).
Confirming Time to Service Order (Optional Step)Transaction code ( SAP GUI) IW41
Reversal: Cancel PM Order Confirmation
Transaction code ( SAP GUI) IW45
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Confirmation Cancel PM Order Confirmation
Comment It is only possible to cancel the whole confirmation.
© SAP AG Page 28 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Confirming the Materials UsedTransaction code ( SAP GUI) MB11
Reversal: Goods Movement - Cancel with Reference to Order
Transaction code ( SAP GUI) MB11
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Goods Movement
Comment The Goods Movement with Reference to the Order is cancelled.
Closing the Service Order - TechnicallyTransaction code ( SAP GUI) IW32
Reversal: Cancel the Technical Completion
Transaction code ( SAP GUI) IW32
Business role Service Employee (SAP_NBPR_SERVEMPLOYEE-S)
Business role menu Customer Service Service Processing Change Order
Comment Use Order - Functions – Complete – Cancel technical completion
Create Sales OrderTransaction code ( SAP GUI) VA01
Reversal: Change Sales Order
Transaction code ( SAP GUI) VA02
Business role Sales Administration (SAP_NBPR_SALESPERSON-S)
Business role menu Customer Service Service Processing Change Order
Comment You change the sales order before invoicing.
Maintain Billing Due List / Create Billing Document Transaction code ( SAP GUI) VF04 / VF01
Reversal: Cancel Billing Document
Transaction code ( SAP GUI) VF02
Business role Sales Billing (SAP_NBPR_SALESPERSON-S)
Business role menu Sales Billing Change Billing Document
Comment You cancel the customer invoice and the posting to the accounting.
© SAP AG Page 29 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
6.2 SAP ERP Reports
UseThe table below lists the most frequently used reports that help you to obtain additional information on this business process.
You can find detailed descriptions of the individual reports in the following BPD documents, which provide a comprehensive compilation of all important reports:
Financial Accounting: SAP ERP Reports for Accounting (221)
Logistics Processes: SAP ERP Reports for Logistics (222)
Note that the descriptions of some reports that are an indispensable part of the process flow may be located directly in the section where they belong.
ReportsReport title Transaction code Comment
Service Notifications IW59 A list of service notifications.
Service and Maintenance orders IW39 A printed list of orders.
Cost Analysis MCI8 A list of order types contains information about the numbers of unplanned and complete orders.
Orders: Actual/Plan Variance S_ALR_87012993 An Overview of the actual and plan data on internal orders.
List: Orders S_ALR_87012995 A List of Orders by Controlling Area for a Plan/Actual Comparison
Actual Line Items KOB1 A Report for Actual Line Items for Orders.
Execute Report KE30 A Report concerning Plan/Actual Activities.
6.3 Used Forms
UseIn some of the activities of this business process, forms were used. The table below provides details on these forms.
Common form name
Form type Used in process step Output type
Technical name
PM_COMMON SapScript After Release of the Service Shop
© SAP AG Page 30 of 31
SAP Best Practices Service with Time and Material Based Billing (198): BPD
Order Paper
© SAP AG Page 31 of 31