Snowmaker 1
Transfer of Snowmaker Construction Plans
WSL Institute for Snow and Avalanche Research SLF
Martin Schneebeli, Matthias Jaggi
Davos, 27th May 2014
Snowmaker 2
Old and new Snowmaker
Snowmaker 3
From prototype I to prototype II
Old and new Snowmaker
• Both prototypes use the same main principles to produce nature-identical snow• the ice crystals are brushed off the nylon cords instead of vibration motor• Some components were transferred from old to new Snowmaker
Higher reproducibility of the snow cristal size Higher amount of snow production High flexiblity because of modules on wheels (e.g. defrosting) Compacter device
Advantages
There is no CE certification for this machine
Snowmaker 4
Design (CAD, NX UGS)
• Single parts: construction number_PRT.prt• Assemblies: construction number_ASM.prt• Drawings: construction number_DWG.prt• For ordering: construction number_XXX.pdf
It is possible to export the files into other formats (iges, step, dxf)
Exploded view with numbered part list
Sketch (drawing)
Exploded view
5
Design (Assemblies)
1: Water evaporation basin («Wasserbecken»)
Water basin mady of aluminum with heating coil Fan and motor Electronics
2: Nucleation chamber («Nukleationskammer»)
Nylon wires Brush rack on linear guides Snow accumulation box Door
3: Condensation of residual humidity («Schneefänger»)
1
3
2
Snowmaker 6
Design main frame by item Schweiz
All parts which belong to the main frame of the Snowmaker are composed with the aluminum profile system from item Schweiz.
We made the construction (we defined the all dimensions) in CAD … BUT NOT how the single elements are connected. This was done by item company
Contact person [email protected], www.item24.ch
7Snowmaker
Frame of water basin, motor and fan
insulated top cover of water basin
wheel
motor
fan
fan fixation plate
motor fixation plate
thermal insulated water basin
humid air outlet
connector brackets to nucleations chamber
protective metal cover
water inlet
Snowmaker 8
Construction of thermal insulated water basin
insulation
waterproof thermometer
sacrificial anode (magnesium)against corrosion
heatingCoil framework
heating coil
cupperwaterproof connectors to the heating coil
heating coil framework
water level safety switch
water basin aluminum
Snowmaker 9
Divergent flow channel between water basin and nucleation chamber
magnet
joint flat face to water basin
Main frame connection holes
plates to build divergent flow channel
magnetic locking plate
threads
Snowmaker 10
Nucleation chamber
screws to tighten the wires
wires
linear guides
linear guides connection shaft
brush rack motor
brush rackwheel
divergent flow channel
snow accumulation box
tilted top cover of nucleation chamber
locking plates
door
Snowmaker 11
Construction for residual humidity
fixation plate for white cloth bag
opening to nucleation chamber
angle bracket (red)
frame of cloth bag can be removed upwards
Snowmaker 12
List of components
List is not complete
Snowmaker 13
Electronic components
fan speed control
water basin temperature control
brush rack control
Snowmaker 14
Possible (necessary) Improvements
• Heating coil in the divergent wind channel• mechanical support of the glasses where the wires are• new fan with integrated motor (24 VDC)• design• …
Snowmaker 15
Discussion / Questions