Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | georgiana-marshall |
View: | 217 times |
Download: | 3 times |
2
3
WMA Technical Working Group WMA Technical Working Group (WMA TWG)(WMA TWG)
Formed in 2005Formed in 2005Purpose:Purpose:
Promote Technology TransferPromote Technology TransferFacilitate Product Approval Facilitate Product Approval MethodsMethodsEncourage ResearchEncourage ResearchDevelop Quality and Environmental Testing Develop Quality and Environmental Testing ProtocolsProtocolsProvide Guidelines for Mix Design and Provide Guidelines for Mix Design and ConstructionConstructionIdentify Other Benefits of WMAIdentify Other Benefits of WMA
4
WMA Technical Working Group WMA Technical Working Group (WMA TWG)(WMA TWG)
2 - 3 meetings annually2 - 3 meetings annuallyMay 6, 2008May 6, 2008
WMA Guide Specification for Highway Const.WMA Guide Specification for Highway Const.
December 11-12, 2007December 11-12, 2007Current Technology Overview and UpdatesCurrent Technology Overview and UpdatesPlant Setup, Operations, and EfficiencyPlant Setup, Operations, and EfficiencyResearch ActivitiesResearch ActivitiesSelect Project ExperiencesSelect Project ExperiencesWMA European Scan TourWMA European Scan Tour
5
www.warmmixasphalt.comwww.warmmixasphalt.comMaterial Testing FrameworkMaterial Testing FrameworkEmission Testing FrameworkEmission Testing FrameworkWMA Best Practices DocumentWMA Best Practices DocumentResearch Needs IdentifiedResearch Needs Identified
Developed three (3) research statementsDeveloped three (3) research statementsSubmitted through AASHTO to NCHRPSubmitted through AASHTO to NCHRP• All projects highly ranked by SCORAll projects highly ranked by SCOR• Total $1.4 millionTotal $1.4 million
WMA TWG AccomplishmentsWMA TWG Accomplishments
6
NCHRP Research ProjectsNCHRP Research Projects
NCHRP Project 09-43NCHRP Project 09-43““Mix Design Practices for Warm Mix Asphalt”Mix Design Practices for Warm Mix Asphalt”
$500,000.$500,000.0000
Principal Investigator:Principal Investigator:
Dr. Ramon Bonaquist, Dr. Ramon Bonaquist, Advanced Asphalt Technologies, LLCAdvanced Asphalt Technologies, LLC
Completion Date: Completion Date:
March 2010March 2010http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=977http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=977
7
NCHRP Research ProjectsNCHRP Research Projects
NCHRP Project 09-47NCHRP Project 09-47““Engineering Properties, Emissions, and Field Engineering Properties, Emissions, and Field Performance”Performance”$900,000.$900,000.0000
Principal Investigator: TBDPrincipal Investigator: TBDCompletion Date: Completion Date: not to exceed 42 monthsnot to exceed 42 monthshttp://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1625http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1625
8
9
Binder ETG Research ProjectsBinder ETG Research Projects
Laboratory Evaluation: Wax Additives in Laboratory Evaluation: Wax Additives in Warm-Mix Asphalt BinderWarm-Mix Asphalt BinderEvaluate the effect of wax additives on Evaluate the effect of wax additives on physical properties and characteristics of physical properties and characteristics of asphalt binders and their subsequent asphalt binders and their subsequent performance in mixtures.performance in mixtures.
10
Binder ETG Research ProjectsBinder ETG Research Projects
Asphalt – One (1)Asphalt – One (1)Lion Oil PG64-22 Eldorado, AR RefineryLion Oil PG64-22 Eldorado, AR Refinery
Wax Additives – Nine (9)Wax Additives – Nine (9)Non-Paraffin Wax AdditivesNon-Paraffin Wax Additives
AggregatesAggregatesVulcan Barin Quarry Granite, Columbus, GAVulcan Barin Quarry Granite, Columbus, GA
Mix DesignMix Design12.5mm Dense Graded SuperPave Gyratory 12.5mm Dense Graded SuperPave Gyratory • ~5.5% Binder~5.5% Binder• ~7.0% Air Voids~7.0% Air Voids
11
Binder ETG Research ProjectsBinder ETG Research Projects
Fourier Transform Infra-Red Spectroscopy Fourier Transform Infra-Red Spectroscopy Gel Permeation ChromatographyGel Permeation ChromatographyGlass Transition (Tg)Glass Transition (Tg)BranchingBranchingPhysical Hardening (32 days saturation at Physical Hardening (32 days saturation at -12°C) Bending Beam Rheometry-12°C) Bending Beam RheometryTesting at 1,2,4,8,16 and 32 DaysTesting at 1,2,4,8,16 and 32 DaysMulti-Step Creep Recovery (MSCR)Multi-Step Creep Recovery (MSCR)Binder Stress Sweep FatigueBinder Stress Sweep FatigueAdditional testing … etc.Additional testing … etc.
12
International WMA ConferenceInternational WMA Conference
FHWA, AASHTO, NAPA sponsoredFHWA, AASHTO, NAPA sponsored
November 11-13, 2008 in Nashville, TNNovember 11-13, 2008 in Nashville, TN
Features:Features:ProcessesProcesses
Mix Production & PlacementMix Production & Placement
Energy consumptionEnergy consumption
Mix DesignMix Design
Material PropertiesMaterial Properties
Environmental PerformanceEnvironmental Performance
EngineeringEngineering
State of the PracticeState of the Practice
Future DirectionFuture Direction
13
Warm Mix Asphalt: Best PracticesWarm Mix Asphalt: Best Practices
Quality Improvement Series Quality Improvement Series (QIP) 125(QIP) 125
Stockpile Moisture Stockpile Moisture ManagementManagement
Burner Adjustments and Burner Adjustments and EfficiencyEfficiency
Aggregate Drying and Aggregate Drying and Baghouse TemperaturesBaghouse Temperatures
Drum Slope and FlightingDrum Slope and Flighting
Combustion AirCombustion Air
RAP usageRAP usage
Placement ChangesPlacement Changes
14
WMA European Scan TourWMA European Scan Tour
Joint Program w/ Joint Program w/ FHWA, AASHTO,FHWA, AASHTO,NCHRP and IndustryNCHRP and IndustryPublicationPublicationFHWA-PL-08-007FHWA-PL-08-007Scan Final ReportScan Final Report
Electronic copyElectronic copy.pdf available at.pdf available at
15
WMA European Scan ConclusionsWMA European Scan Conclusions
There is a consensus among the WMA There is a consensus among the WMA SCAN Team that WMA is a viable SCAN Team that WMA is a viable technology. U.S. Agencies and the HMA technology. U.S. Agencies and the HMA Industry need to cooperatively pursue this Industry need to cooperatively pursue this path.path.
The U.S. has already made great strides The U.S. has already made great strides in evaluating WMA, thanks in part to in evaluating WMA, thanks in part to Public-Private Partnerships like the WMA Public-Private Partnerships like the WMA TWG and the WMA SCAN Tour.TWG and the WMA SCAN Tour.
16
17
18
FHWA working in partnership with FHWA working in partnership with AASHTO and Industry to established AASHTO and Industry to established clear targets for implementationclear targets for implementationWMA Technical Working Group (TWG)WMA Technical Working Group (TWG)FHWA Expert Task GroupsFHWA Expert Task Groups
Binder, Mixture, and ModelsBinder, Mixture, and Models
Regional User-Producer GroupsRegional User-Producer GroupsShare data and informationShare data and information
Move out of demonstration phaseMove out of demonstration phaseTraining and EducationTraining and Education
WMA Investigation and WMA Investigation and ImplementationImplementation
19