1 / 17 PT. PERTADAYA GAS PT. WIJAYA KARYA (Persero) Tbk
Alamat : Jl. D.I. Panjaitan Kav. 9 Lt. 6 , Jakarta 13340 Indonesia, Phone : +62-21 -8192808, 8508640, 8508650, Fax : +62-21-8198040
NAMA PROYEK : FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL
PEMBERI KERJA : PT. PERTADAYA GAS
KONTRAKTOR : PT. WIJAYA KARYA
LOKASI : PESANGGARAN - MAKASAR
JUDUL DOKUMEN : DELIVERABLE LIST
REV DATE ISSUED FOR
WIKA PDGDATE
PREP'D CHK'D APPRV'D CHK'D APPRV'D 0 22 Jan 13 IFC FJR ARF AA
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 2 / 18
Rekaman Perubahan
Rev.No.
Paragraph No. Hal. Deskripsi Perubahan
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 3 / 18
DELIVERABLE LIST
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG
TRANSPORTATION AND RECEIVING TERMINAL (PESANGGRAHAN & MAKASAR)
No Document Number Description1 GENERAL PROCEDURES GENERAL1 - GEN - GEN - 001 Procedure for Numbering System2 - GEN - GEN - 002 Project Execution Plant3 - GEN - GEN - 003 Project Quality Plant
4 - GEN - GEN -004 Project Strategy - Philosophy 5 - GEN - GEN -005 Quality Level - Philosophy 6 - GEN - GEN -006 Key Technical Issue - Philosophy 7 - GEN - GEN -007 Equipment Design condition - Philosophy 8 - GEN - GEN -008 Emergency Shutdown - Philosophy 9 - GEN - GEN -009 Isolation Equipment & Zonal Relief - Philosophy 10 - GEN - GEN -0010 Relief System - Philosophy 11 - GEN - GEN -0011 Comminication - Philosophy 12 - GEN - GEN -0012 Plant layout - Philosophy 13 - GEN - GEN -0013 Fire & Gas Detection / Protection - Philosophy 14 - GEN - GEN -0014 Sparing - Philosophy 15 - GEN - GEN -0015 Maintenance - Philosophy 16 - GEN - GEN -0016 Loss Controll - Philosophy 17 - GEN - GEN -0017 Manning - Philosophy 18 - GEN - GEN -0018 Power Supply & Back Up Power Supply - Philosophy 19 - GEN - GEN -0019 Effluent Disposal - Flaring /Venting/Drainning -
Philosophy 20 - GEN - GEN -0020 Environmental Impact - Philosophy 21 - GEN - GEN -0021 Major cable Routing - Philosophy
22 - GEN - GEN - 022 Basic Engineering Desaign Data2 GEOPHYSISCS AND GEOTECHNICS STUDY1 - GT - RPT - 001 Topographic And Bathymetric Survey Result2 - GT - RPT - 002 Metocean Survey Result3 - GT - RPT - 003 Tidal Observation Result4 - GT - RPT - 004 Weather Observation Result5 - GT - RPT - 005 Geotechnical Survey Result6 - GT - RPT - 006 Summary of All Work Activities3 PROCESS GENERAL
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 4 / 18
1 - PRO - GEN - 001 Process Design Basis2 - PRO - GEN - 002 Process Control Phylosophy3 - PRO - GEN - 003 Material Selection Phylosophy4 - PRO - GEN - 004 Utility Desaign Basis5 - PRO - GEN - 005 Utility Design Philosophy6 - PRO - GEN - 006 Detailed Prcess Description7 - PRO - GEN - 007 Regasification Process Technology Selection8 - PRO - GEN - 008 Process Operating & Control Philosophy REPORT1 - PRO - RPT - 004 Process Simulation Report2 - PRO - RPT - 005 Blowdown Simulation Report3 - PRO - RPT - 006 Hydraulic Analysis CALCULATION1 - PRO - CAL - 001 Line Sizing2 - PRO - CAL - 002 Equipment Sizing
3 - PRO - CAL - 003
Power Supply Calculation (Compresor, Pump, Electricity
4 - PRO - CAL - 004 Instrument/Utility Calculation Note ????5 - PRO - CAL - 005 Utility Pump Sizing
6 - PRO - CAL - 006 Utility Line Sizing (sizing artinya sudah mencakup kalkulasi)
7 - PRO - CAL - 007 Flare System Sizing8 - PRO - CAL - 008 PSV Sizing
8 - PRO - CAL - 008 Process Calculation - PSV Sizing
LIST
1 - PRO - LIST - 001 Equipment List
2 - PRO - LIST - 002 Line List
PFD & UFD
1 - PRO - PFD - 001 PFD -LNG Receiving Facility
2 - PRO - PFD - 002 PFD-Pipe Line & Metering System
3 - PRO - PID - 003 UFD- Fuel System
4 - PRO - PID - 004 UFD -Instrument and Utility Air System
5 - PRO - PID - 005 UFD -Fire Water System
6 - PRO - PID - 006 UFD -Utility and Potable Water System
7 - PRO - PID - 007 UFD- Waste Water System
8 - PRO - PID - 008 UFD -Nitrogen System
HMB
1 EJGT - PRO - HMB - 008 Heat and Material Balance
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 5 / 18
P&ID
1 - PRO - PID - 001 P&ID-Drawing Index
2 - PRO - PID - 002 P&ID-Legend and Symbol
3 - PRO - PID - 003 P&ID-Loading Arm
4 - PRO - PID - 004 P&ID-LNG Tank
5 - PRO - PID - 005 P&ID-LNG Pump
6 - PRO - PID - 006 P&id-LNG Vaporizer
7 - PRO - PID - 007 P&ID-BOG Compressor
8 - PRO - PID - 008 P&ID-Gas PipeLine & LBCV
9 - PRO - PID - 009 P&ID-Gas Metering
10 - PRO - PID - 010 P&ID-Flare System
11 - PRO - PID - 011 P&ID-Fuel (Gas/Diesel) System
12 - PRO - PID - 012 P&ID-Instrument and Utility Air System
13 - PRO - PID - 013 P&ID-Fire Water System
14 - PRO - PID - 014 P&ID-Utility & Portable Water System
15 - PRO - PID - 015 P&ID-Waste Water System
16 - PRO - PID - 016 P&ID-Fire Water Ring Main
17 - PRO - PID - 017 P&ID-Closed Drain System
18 - PRO - PID - 018 P&ID-Nitrogen System
4 HSE
GENERAL
1 - HSE - GEN - 001 Health, Safety & Environment
2 - HSE - GEN - 002 Fire Fighting Supresion
3 - HSE - GEN - 003 Safety Loss Prevention
4 - HSE - GEN - 004 Hazid Study
5 - HSE - GEN - 005 Quantitative Risk Asessment Study
CALCULATION
1 - HSE - CAL - 001 Fire Extinguisher Calculation
2 - HSE - CAL - 002 Fire Water Supply Calculation
3 - HSE - CAL - 003 Fire Water Pump Sizing
4 - HSE - CAL - 004 Fire Supresion Calculation
SPECIFICATION
1 - HSE - SPC - 001 Specification for Personal Protection Equipment
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 6 / 18
2 - HSE - SPC - 002 Environmental Management and Monitoring System
3 - HSE - SPC - 003 Safety Specification for Fire Fighting Equipment
4 - HSE - SPC - 004 Safety Spesification for Fire & Gas Detector
5 - HSE - SPC - 005 Safety Spesification for Passive Fire Protection
6 - HSE - SPC - 006 Safety Spesification for Automatic Deluge Valves
7 - HSE - SPC - 007 Noise Level In Residential And Plant Area (Change to Spec Equipment Noise)
DATA SHEET
1 - HSE - DTS - 001 Delugas Valves Data Sheet
2 - HSE - DTS - 002 Hydrant Data Sheet
3 - HSE - DTS - 003 Fire Monitor Data Sheet
4 - HSE - DTS - 004 Eye Wash & Safety Shower Data Sheet
5 - HSE - DTS - 005 Fire Extinghuiser Data Sheet
LIST1 - HSE - LIST - 001 Safety Equipment List2 - HSE - LIST - 002 Hazardous Material List DRAWING1 - HSE - DWG - 001 Escape Ways Layout2 - HSE - DWG - 002 Fire and Gas Detector Layout3 - HSE - DWG - 003 Technical Building Fire and Gas Detection Layout4 - HSE - DWG - 004 Fire Fighting Equipment Layout5 - HSE - DWG - 005 Fire Water Layout5 MECHANICAL GENERAL - MEC - DB - 001 Mechanical Design Basis SPECIFICATION
1 - MEC - SPC - 001
Specification for Design and Fabrication of Pressure Vessels
2 - MEC - SPC - 002
Specification for Centrifugal Pump for Non Hydrocarbon Services
3 - MEC - SPC - 003
Spesification Centrifugal Pump Hydrocarbon Services
4 - MEC - SPC - 004 Specification for Over head Crane5 - MEC - SPC - 005 Specification for Diesel Driven Fire Water Pump6 - MEC - SPC - 006 Specification Diesel Engine Generator7 - MEC - SPC - 007 Specification for Open Rack Vaporizer
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 7 / 18
8 - MEC - SPC - 008 Specification for Ambient Air Vaporizer9 - MEC - SPC - 009 Specification for BOG Return Boiler
10 - MEC - SPC - 010 Spesification for LNG Pump11 - MEC - SPC - 011 Specification of Heat Exchanger12 - MEC - SPC - 012 Spesification for Cyrogenic Loading Arm13 - MEC - SPC - 013 Spesification for Cyrogenic Loading Hose14 - MEC - SPC - 014 Spesification for Atmospheric LNG Tank15 - MEC - SPC - 015 Spesification for lso LNG Tank16 - MEC - SPC - 016 Spesification for General Weldding17 - MEC - SPC - 017 Spesification for Nitrogen System (Bottle Bank)
18 - MEC - SPC - 018
Mechanical-Specification Instrumen Air Compressor Package
19 - MEC - SPC - 019
Mechanical-Specification Nitrogen Generation Package
20 - MEC - SPC - 020 Specification for CO2 Fire Extinguishing System21 - MEC - SPC - 021 Specification Painting
DATA SHEET
1 - MEC - DTS - 001 Mechanical Data Sheet LNG Vaporizer
2 - MEC - DTS - 002 Mechanical Data Sheet LNG Loading Pump
3 - MEC - DTS - 003 Mechanical Data Sheet BOG Compressor
4 - MEC - DTS - 004 Mechanical Data Sheet LNG Storage Tank
5 - MEC - DTS - 005
Mechanical Data Sheet Diesel Fuel Distribution Pumps
6 - MEC - DTS - 006 Mechanical Data Sheet Diesel Fuel Storage Tank
7 - MEC - DTS - 007 Mechanical Data Sheet Engine Generator
8 - MEC - DTS - 008 Mechanical Data Sheet Pressure Vessel
9 - MEC - DTS - 009 Mechanical Data Sheet Heat Exchanger
10 - MEC - DTS - 010 Mechanical Data Sheet Cryogenic Loading Arm
11 - MEC - DTS - 011 Mechanical Data Sheet Cryogenic Loading Hose
12 - MEC - DTS - 012 Mechanical Data Sheet Cryogenic Tank
13 - MEC - DTS - 013
Instrument Air Compressor & Dryer Package Data Sheet
14 - MEC - DTS - 014 Instrument Air Receiver Data Sheet
15 - MEC - DTS - 015 Utility Air Receiver Data Sheet
16 - MEC - DTS - 016 Mechanical Data Sheet Deep Well Water Pumps
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 8 / 18
17 - MEC - DTS - 017 Mechanical Data Sheet Utility Water Pumps
18 - MEC - DTS - 018
Mechanical Data Sheet Potable Water Treatment Package
19 - MEC - DTS - 019 Mechanical Data Sheet Nitrogen (N2) Bottle Package
20 - MEC - DTS - 020 Mechanical Data Sheet Firewater Pumps
21 - MEC - DTS - 021 Mechanical Data Sheet Jockey Pumps
22 - MEC - DTS - 022 Mechanical Data Sheet Potable Water Tank
23 - MEC - DTS - 023 Mechanical Data Sheet Overhead Crane
24 - MEC - DTS - 024 Mechanical Data Sheet Pig Receiver
25 - MEC - DTS - 025 Mechanical Data Sheet Pig Launcher
26 - MEC - DTS - 026 Mechanical Data Sheet CO2 Snuffing Package
CALCULATION
1 - MEC - CAL - 001 Mechanical Calculation LNG Tank
MTO
1 - MEC - MTO - 001 Mechanical MTO - Material Take Off
6 CIVIL & STRUKTURAL
GENERAL
1 - CIV - GEN - 001 Civil and Structural - Design Basis Design Criteria
SPECIFICATION
1 - CIV - SPC - 001 Civil Specification for Design Load Structure
2 - CIV - SPC - 002
Civil Specification for Structural Steel Design and Material
3 - CIV - SPC - 003 Civil Specification for Concrete Design and Material
4 - CIV - SPC - 004 Civil Specification for Building Design and Material
5 - CIV - SPC - 005 Civil Specification for Foundation
6 - CIV - SPC - 006 Civil Specification for Fencing and Gates Materials
7 - CIV - SPC - 007
Civil Specification for Roads, Parking, and Grading Areas
8 - CIV - SPC - 008 Civil Specification for Masonry Construction
9 - CIV - SPC - 009 Civil Specification for Grouting Design and Material
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 9 / 18
10 - CIV - SPC - 010 Civil Specification for Interior Plumbing and Material
11 - CIV - SPC - 011 Civil Specification for Sewer and Drainage System
12 - CIV - SPC - 012 Civil Specification for Water Pond
13 - CIV - SPC - 013 Civil Specification for Site Prepaation
14 - CIV - SPC - 014 Civil Specification for Earthworks & Soil Mix Desaign
15 - CIV - SPC - 015 Civil Specification for Piles and Sheet Pile
16 - CIV - SPC - 016 Civil Specification for Landscape
17 - CIV - SPC - 017 Civil Specification for Topography
18 - CIV - SPC - 018 Civil Specification for Civil Investigation
CALCULATION
1 - CIV - SPC - 001
Civil Calculation Sheet - Telecom, Battery, MCC & Control Room
2 - CIV - SPC - 002
Civil Calculation Sheet - Office/Administration Building
3 - CIV - SPC - 003
Civil Calculation Sheet - Werehouse and Workshop Building
4 - CIV - SPC - 004 Civil Calculation Sheet - Security / Guard Post5 - CIV - SPC - 005 Civil Calculation Sheet - Gen-set Shelter
6 - CIV - SPC - 006
Civil Calculation Sheet - Instrument Air / Landfall-Shelter
7 - CIV - SPC - 007 Civil Calculation Sheet - Fire Water Pond8 - CIV - SPC - 008 Civil Calculation Sheet - Water Jockey Pump Shelter9 - CIV - SPC - 009 Civil Calculation Sheet - Vent Stack
10 - CIV - SPC - 010
Civil Calculation Sheet - Piperack Steel Framing & Foundation
11 - CIV - SPC - 011 Civil Calculation Sheet - Vent Stack Foundation12 - CIV - SPC - 012 Civil Calculation Sheet - Piling Capacity Design13 - CIV - SPC - 013 Civil Calculation Sheet - Pipe Sleeper Foundation
14 - CIV - SPC - 014
Civil Calculation Sheet - Diesel Fuel Storage Tank Support Foundation
15 - CIV - SPC - 015
Civil Calculation Sheet - Tie In Gas Metering Foundation
16 - CIV - SPC - 016
Civil Calculation Sheet - Utility & Instrument Air Receiver Foundation
17 - CIV - SPC - 017 Civil Calculation Sheet - Slab On Grades Plan
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 10 / 18
18 - CIV - SPC - 018
Civil Calculation Sheet - Portable Water Storage Tank Tower Foundaton
19 - CIV - SPC - 019 Civil Calculation Sheet - Gas Manifold Foundation
20 - CIV - SPC - 020
Civil Calculation Sheet - Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slabe on Grade)
21 - CIV - SPC - 021
Civil Calculation Sheet - Flexible Road Pavement (Asphalt)
22 - CIV - SPC - 022
Civil Calculation Sheet - Rigid Road Pavement (Concrete)
23 - CIV - SPC - 023 Civil Calculation Sheet - Culvet & U-Ditch
DRAWING
1 - CIV - DRW- 001
General Note, Abrreviation & Symbol for Civil, Structures & Architecture
2 - CIV - DRW- 002 Pilling Plan3 - CIV - DRW- 003 Foundation Plan4 - CIV - DRW- 004 Fence and Gate Plan
5 - CIV - DRW- 005
Telecom, Battery, MCC & Control Room-Plans, View and Section
6 - CIV - DRW- 006
Telecom, Battery, MCC & Control Room-Roofing, Floor Plan, Columm & Beam Schedule and Detail
7 - CIV - DRW- 007
Office Administration, Building-Plans, View and Sections
8 - CIV - DRW- 008
Office Administration, Building-Roofing, Floor Slab, Columm & Beam Schedule and Detail
9 - CIV - DRW- 009
Ware House & Workshop Building - Plan, View and Sections
10 - CIV - DRW- 010
Ware House & Workshop Building - Floor, Roofing Plan Columm & Bean Schedule and Detail
11 - CIV - DRW- 011
Power Feeder Station (PLN House) - Plan, Views and Section
12 - CIV - DRW- 012
Power Feeder Station (PLN House) - Roofing Plan, Collum and Beam Schedule and Details
13 - CIV - DRW- 013 Security / Guard Post Plan, View and Section
14 - CIV - DRW- 014
Security / Guard Post Roofing Plan, Columm and Beam Schedule and Details
SHELTERS
15 - CIV - DRW- 015
Genset Shelter - Structure Plans, Foundation Plan, Views Section and Details
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 11 / 18
16 - CIV - DRW- 016 Genset Shelter - Roofing Plan
17 - CIV - DRW- 017
Instrument Air Shelter - Structure Plans, Foundation Plan, View Section and Details
18 - CIV - DRW- 018 Instrument Air Shelter - Roofing Plan
19 - CIV - DRW- 019
Landfall Sheller - Structure Plans, Foundation Plans, Views Section and Details
20 - CIV - DRW- 020 Landfall Sheller - Roofing Plan21 - CIV - DRW- 021 Pond Fire Water Jockey Pumps Sheller - Roofing Plan
22 - CIV - DRW- 022
Pond Fire Water Jockey Pumps Sheller - Structure Plans, Foundation Plan, Views Section and Details
UTILITIES23 - CIV - DRW- 023 Typical Vessel Support Plan, Section and Table
24 - CIV - DRW- 024
Vent Stack Support Structure - Plan, Section and Details
25 - CIV - DRW- 025 Vent Structure Foundation - Plan and Section Details
26 - CIV - DRW- 026
Piperack - Plan, Elevation and Steel Member Shcedule (1/2)
27 - CIV - DRW- 027
Piperack - Plan, Elevation and Steel Member Shcedule (2/2)
28 - CIV - DRW- 028 Piperack - Pilling and Foundation Plan
29 - CIV - DRW- 029
Typical Pipe Support and Pipe Sleeper Plan Elevation and Section
30 - CIV - DRW- 030
Instrument Air Shelter - Piling, Foundation and Roofing Plan
31 - CIV - DRW- 031
Typical Pipe Support and Pipe Sleeper Plan Elevation and Section
32 - CIV - DRW- 032
Potable Water Storage Tank Tower - Plan, Elevation and Stell Member Schedule
33 - CIV - DRW- 033
Potable Water Storage Tank Tower - Piling & Foundation Details
34 - CIV - DRW- 034
Diesel Fuel Storage Tank Support Plan, Section and Details
35 - CIV - DRW- 035 Slab on Grades Plan, Section and Table
36 - CIV - DRW- 036
Tie In Gas Metering Foundation - Plan and Section Details
37 - CIV - DRW- 037
Utility & Instrument Air Receiver Foundation - Plan and Section Details
38 - CIV - DRW- 038
Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slab on Grade)
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 12 / 18
39 - CIV - DRW- 039
Condensate Drum and Pump Foundation - Plan and Section Details
40 - CIV - DRW- 040 Road and Pavement - Plan, Section and Details41 - CIV - DRW- 041 Culvert / Bridge - Plan, Section and Details42 - CIV - DRW- 042 Fence and Gate Plan43 - CIV - DRW- 043 Fences - Sections and Details44 - CIV - DRW- 044 Gates - Section and Details45 - CIV - DRW- 045 Sewer & Drainege System - Plan, Section & Details LIST1 - CIV - LIST- 001 Drawing List Civil, Structure and Architecture
MTO1 - CIV - MTO- 001 MTO Civil and Structures7 PIPING GENERAL1 EJGT - PIP - DB - 001 Piping Design Basis SPECIFICATION1 - PIP - SPC - 001 Piping - Spesification Piping Design
2 - PIP - SPC - 002
Piping - Specification Piping Material Class (Include All Piping Accessories)
3 - PIP - SPC - 003 Piping - Specification Piping Plan Layot4 - PIP - SPC - 004 Piping - Specification Stress Design Basis DATA SHEET1 - PIP - DTS - 001 Specially Item Data Sheet2 DRAWING 3 - PIP - DRW - 001 General Plot Plan4 - PIP - DRW - 002 Equipment Layout5 - PIP - DRW - 003 Key Plan ORF6 - PIP - DRW - 004 Piping GA - Overall System ORF7 - PIP - DRW - 005 Piping GA - Slug Catcher ORF8 - PIP - DRW - 006 Fire Water System and Utility Water Pump CALCULATION1 - PIP - CAL - 001 Wall Thickness Calculation MTO1 - PIP - MTO - 001 Material Take Off Piping8 ELECTRICAL GENERAL1 - ELE - DB - 001 Electrical Design Basis2 - ELE - DB - 002 Electrical Power Distribution System3 - ELE - DB - 003 Hazardous Area Classification Design4 - ELE - DB - 004 Electrical Control System
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 13 / 18
5 - ELE - DB - 005 Electrical Power System REPORT1 - ELE - RPT - 006 Electrical Report - ETAP Power Study Report SPECIFICATION
1 - ELE - SPC - 001
Specification of General Electrical Instalation (Code and Standard Electrical)
2 - ELE - SPC - 002 Electrical Instalation Specification
3 - ELE - SPC - 003
Electrical Specification - Electrical Requirements For Package Unit
4 - ELE - SPC - 004 Electrical - Specification Power Generator5 - ELE - SPC - 005 Electrical - Specification Induction Motor
6 - ELE - SPC - 006
Specification of Low Voltage Switchgear & Motor Control Center
7 - ELE - SPC - 007
Electrical Specification - Electrical and Instrument Cable
8 - ELE - SPC - 008
Electrical Specification - Electrical and Instrument Cable Trays
9 - ELE - SPC - 009 Electrical Specification - DC Battery System
10 - ELE - SPC - 010
Electrical Specification - Uninterruptable Power System (UPS)
11 - ELE - SPC - 011 Electrical Specification - Lighting and Accessories
12 - ELE - SPC - 012
Electrical Specification - Grounding / Bounding System
13 - ELE - SPC - 013
Electrical Specification - Grounding System / EMC Base
14 - ELE - SPC - 014 Electrical Specification - Lighting Protection System
15 - ELE - SPC - 015
Electrical Specification - Oil Immerse Power Transformer
16 - ELE - SPC - 016 Electrical Specification - Catodic Protection CALCULATION1 - ELE - CAL - 001 Electrical Calculation - Cable Sizing2 - ELE - CAL - 002 Electrical Calculation - Voltage Drop3 - ELE - CAL - 003 Electrical Calculation - Short Circuit4 - ELE - CAL - 004 Electrical Calculation - Load Flow5 - ELE - CAL - 005 Electrical Calculation - Lighting6 - ELE - CAL - 006 Electrical Calculation - UPS7 - ELE - CAL - 007 Electrical Calculation - Battery Charger 24 VDC8 - ELE - CAL - 008 Generator Capacity Calculation9 - ELE - CAL - 009 Electrical Calculation - Power Consumption
10 - ELE - CAL - 010 Short Circuit Calculation
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 14 / 18
11 - ELE - CAL - 011 Grounding Calculation DATA SHEET1 - ELE - DTS - 001 Data Sheet Gas Engine Driven Generator2 - ELE - DTS - 002 Data Sheet Diesel Engine Generator3 - ELE - DTS - 003 Electrical Data Sheet LV Switchgear4 - ELE - DTS - 004 Data Sheet MCC5 - ELE - DTS - 005 Data Sheet Power & Distribution Transformer
6 - ELE - DTS - 006
Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System
7 - ELE - DTS - 007 Data Sheet 24 VDC Baterry Charger8 - ELE - DTS - 008 Data Sheet Earthing and Lighting Protection System9 - ELE - DTS - 009 Data Sheet Panel Distribution Board
10 - ELE - DTS - 010 Data Sheet Cable
LIST1 - ELE - LIST - 001 List - Electrical Equipment2 - ELE - LIST - 002 Electrical List - Load List Equipment
DRAWINGS1 - ELE - DWG - 001 Layot Hazardous Area ORF Grati2 - ELE - DWG - 002 Electrical Legend and Symbol3 - ELE - DWG - 003 Electrical Overall One Line Diagram4 - ELE - DWG - 004 Electrical Lighting Protection Layout5 - ELE - DWG - 005 Outdoor Lighting Layout ORF Grati6 - ELE - DWG - 006 Electrical Cable Ladder and Cable Routing Layout7 - ELE - DWG - 007 Building for E/t Telecom Layout
8 - ELE - DWG - 008
Electrical Typical Installation Detail Power and Control Works (35 Sheets)
9 - ELE - DWG - 009
Electrical MCC Arrangement Layout in Control Room at Building
MTO 1 - ELE - MTO - 001 MTO - Material Take Off Electrical
9 INSTRUMENT GENERAL
1 - INS - DB - 001
Instrument Design Basis - Instrument & Control Design Basis
SPECIFICATION
1 - INS - SPC - 001
Instrument Spesification - Instrument Mounted on Packages
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 15 / 18
2 - INS - SPC - 002
Instrument Spesification - Instrument Design & Instalation
3 - INS - SPC - 003 Instrument Spesification - Process Control System4 - INS - SPC - 004 Instrument Spesification - ESD Specification
5 - INS - SPC - 005
Instrument Spesification - Instrument Inspection & Testing Spesification
6 - INS - SPC - 006
Instrument Spesification - Gas Metering Specifcation
7 - INS - SPC - 007 Instrument Spesification - Gas Analyzer8 - INS - SPC - 008 CCTV, Paging and Alarm System Specification9 - INS - SPC - 009 Personal Announcement
10 - INS - SPC - 010 Jetty Emergency Shutdown System11 - INS - SPC - 011 Surge Arrester Specification
DATA SHEET
1 - INS - DTS - 001
Instrument Data Sheet - Orifice Plate and Restriction Orifice
2 - INS - DTS - 002 Instrument Data Sheet - DP Flow Transmitter
3 - INS - DTS - 003 Instrument Data Sheet - Level Transmitter
4 - INS - DTS - 004 Instrument Data Sheet - Temperature Gauge
5 - INS - DTS - 005 Instrument Data Sheet - Temperature Transmitter
6 - INS - DTS - 006
Instrument Data Sheet - Pressure Differential Gauge
7 - INS - DTS - 007 Instrument Data Sheet - Pressure Transmitter
8 - INS - DTS - 008 Instrument Data Sheet - Pessure Indicator
9 - INS - DTS - 009
Instrument Data Sheet - Shutdown and Blowdown Valves
10 - INS - DTS - 010 Instrument Data Sheet - Gas Cromatography
11 - INS - DTS - 011 Instrument Data Sheet - Gas Detector
12 - INS - DTS - 012 Instrument Data Sheet - Flame Detector
13 - INS - DTS - 013 Instrument Data Sheet - Manual Alarm Call Point
14 - INS - DTS - 014 Instrument Data Sheet - Heat Detector
15 - INS - DTS - 015 Instrument Data Sheet - Smoke Detector
16 - INS - DTS - 016 Instrument Data Sheet - Fire Alarm Panel
17 - INS - DTS - 017 Instrument Data Sheet - Control Valve
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 16 / 18
18 - INS - DTS - 018 Instrument Data Sheet - Junction Box
19 - INS - DTS - 019 Instrument Data Sheet - Gas Metering
20 - INS - DTS - 020 Instrument Data Sheet - Alarm Bell
21 - INS - DTS - 021 Instrument Cable Schedule
22 - INS - DTS - 022 Instrument Data Sheet - Pressure Safety Valve
23 - INS - DTS - 023 Instrument Data Sheet - Pressure Switch
24 - INS - DTS - 024 Instrument Data Sheet - Level Glass
25 - INS - DTS - 025
Instrument Data Sheet - Differential Pressure Level Transmitter
DRAWING1 - INS - DWG - 001 Instrument - Instrument Index ORF Grati
2 - INS - DWG - 002
Hook up Pressure Lead Tubing and Instrument Air Tubing (Typical) Shutdown Valve
3 - INS - DWG - 003
Instrument Layout of Fire and Gas Detection Cable Routing
4 - INS - DWG - 004
Instrument Main Cable Way & Main Cable Routing & Junction Box ORF Grati
5 - INS - DWG - 005 Layout Field Instrument Location & Cable Routing
6 - INS - DWG - 006
Instrument Hook Up (Typical) Temperature Transmitter
7 - INS - DWG - 007 Instrument Block Diagram8 - INS - DWG - 008 Instrument Hierarchy9 - INS - DWG - 009 Instrument Battery Limit DIAGRAM - INS - DWG - 009 Instrument Diagram - Cause and Effect Diagram
10 TELECOMMUNICATION GENERAL1 - INS - GEN - 001 Design Basis Supervisory Control and Data Acquisition 2 - INS - GEN - 002 Gas Management System3 - INS - GEN - 003 Coastal Radio SPECIFICATION
1 - INS - SPC - 001
Gas Management System Specification Radio Data and Voice Specification
2 - INS - SPC - 002 Network System Specification3 - INS - SPC - 003 IPBX Specification CALCULATIONS DRAWING1 - INS - DRW - 001 Overall System Configuration
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 17 / 18
2 - INS - DRW - 002 RTU Configuration3 - INS - DRW - 003 INSTRUMENT & TELECOM - SYSTEM CONFIGURATION4 - INS - DRW - 004 RTU -TYPICAL BLOCK DIAGRAM METERING5 - INS - DRW - 005 SCADA ARCHITECTURE
11 PIPELINE SPESIFIKASI1 - PL - SPC - 001 Spesification Pipeline Onshore2 - PL - SPC - 002 Spesification External Pipe Coating3 - PL - SPC - 003 Spesification Field Joint Coating Offshore4 - PL - SPC - 004 Spesification Hot Induction Bend
5 - PL - SPC - 005 Spesification Pipeline Offshore Construction
6 - PL - SPC - 006 Spesification for Internal Coating Epoxy Paint
7 - PL - SPC - 007 Spesification Wrapping
8 - PL - SPC - 008 Spesification For Concrete Coating
9 - PL - SPC - 009 Spesification For Insulating Joint
10 - PL - SPC - 010 Spesification Pipeline Welding
11 - PL - SPC - 011 Spesification Pre-Commissioning
12 - PL - SPC - 012 Spesification Painting Pipeline Onshore
CALCULATION
1 - PL - CAL - 001 Perhitungan Ketebalan Pipeline
2 - PL - CAL - 002 Perhitungan Field Bending
3 - PL - CAL - 003
Perhitungan Buckling, Collapse Pipeline Analysis Pipeline
4 - PL - CAL - 004 Perhitungan Pipeline Stability dan Bouyancy
5 - PL - CAL - 005 Perhitungan Freespan Pipeline Offshore
6 - PL - CAL - 006 Perhitungan On Bottom Stability Analysis Offshore
7 - PL - CAL - 007 Perhitungan Bending Stress Offshore
DATA SHEET
1 - PL - DTS - 001 Data Sheet for Pipeline Valve
2 - PL - DTS - 002 Data Sheet for Pipeline Special Item
DRAWINGS
1 - PL - DRW - 001 Key Plan Pipeline Route
2 - PL - DRW - 002
Pipeline Alignment Sheet 1 : 2000 Horizontal, 1 : 5000 Vertical
3 - PL - DRW - 003 Typical Anode Drawing
4 - PL - DRW - 004 Typical Pipeline Freespan Correction
DOC.NO : FEED-GEN-GEN-024
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN &
MAKASAR)
DELIVERABLE LISTREVISI : 0
HALAMAN : 18 / 18
5 - PL - DRW - 005 Typical Road Crossing
12 MATERIAL TAKE OFF
1 - PL - MTO - 001 MTO for Pipeline
13 SCHEDULE & COST
1 - SCH - - 001 Project Schedule 2 - SCH - - 002 List of Longlead Items & Construction services 3 - SCH - - 003 Delivery Periode for All Major Items of Equipment 4 - SCH - - 004 Vendor List
5 - EC - - 002 Engineering Cost Estimate