2 FDWP Meeting (FATA) Page(99-103)

Date post: 09-Apr-2018
Category:
Upload: farhat-abbas-durrani
View: 214 times
Download: 0 times
Share this document with a friend

of 168

Transcript
  • 8/8/2019 2 FDWP Meeting (FATA) Page(99-103)

    1/168

    t:,

    ^

    ADP.NO.Total Cost. 952 (2007-08)111 .070 million.*l.t

  • 8/8/2019 2 FDWP Meeting (FATA) Page(99-103)

    2/168

    PC-7_EXTENS f ON / .SrreveLo?vwewt progrAvw

    (.sp>p)Noverruber, zooT

    Extension i strengthening of sustainabre plains DevelopmentProgramme.(SPDP) : ADP No g52 (2002-08)Two main components of the project "Extension of spDp andStrengthening of SPDP" are. a) Extension of SpDp andb) Strengthening of SPDp.

    a) Extension of SPDPPresently the activities of spDp are being carried out intr4ohmand and Khyber*f\genci.* Under the said project itextended to North Waziri will beadditionto Kurram and Mo_hm-and,..Agenciegd In these agencies/Fr communitvi"d, rvtrtrJfarms are established on vast prains of *"st"l"ndr thejefor. tl" Feasible sites are identified thrcughfeasibility studies for the identification of locations for cornmunity farms.

    ,/\r/Nmu of Project:

    2. Location VI\

    KurramIIIt

    tII

  • 8/8/2019 2 FDWP Meeting (FATA) Page(99-103)

    3/168

    , 2b) Strenothenino of SPDPA head office will be established at Peshawar under the comPonent.Regional offices will be establishedKhyber and Mohmand.

    at each agency excePt Kurram,

    y''Sponsoring: Planning & Development Department.(FATA) Governor's Secretariat Peshawar

    Sustainable Plains Development Programme(SPDP) FATA Planning & Development Governor'sSecretariat, Peshawar

    SPDP and communities during the project execution andcommunity alone after plan period of the project'

    2

    Map of FATA

    Operation & Maintenance

  • 8/8/2019 2 FDWP Meeting (FATA) Page(99-103)

    4/168

    + 4. Plan Provision4,. lt the project is

    included in the FiveYear Plan, specifyactual allocations?

    4ti. lf not included in thecurrent plan, how is it nowproposed to be accommodate

    The project has not been included specifically in theMedium Term /Five Year Plan.

    Reference page154, para 6 of the Eighth Five yearPlan.Agriculture production system is a complexenterprise requiring interaction of large number oforganization, institution and specialized agencies atfederal, provincial and grass root levels. Poorinteraction between the agencies directly involved inagricultural development is the single mostimportant factor responsible for the low efficiency ofthe agriculture sector.

    As per the Plan, the primary sectoral goal is theachievement of a growth rate higher than thepopulation growth, in order to ensure food security,self sufficiency and large exportable surpluses. ThePlan laid emphasizes on the following;a) lntegrated Management of agriculture, irrigation

    and drainageb) Etficient land managementc) Efficient water managementlJinh nrinrifrr rrrac nirron fn nntimizo nrnrlr rntirrifrr frnm.Ilrr| rrrv.rr, ..uv ..., .''...available land and water resources through efficientuse of other inputs while conserving the resourcebase.

    5

  • 8/8/2019 2 FDWP Meeting (FATA) Page(99-103)

    5/168

    4The strateov of SPDP is in line with the quidelines of the Five Year Plan. The integratedapproach is practice in true sense in SPDP. Theviews of all relevant departments, agencies arediscussed with communities and appropriatecoerces of action are selected and are executedthrough a joint team of project staff andcommunities.

    Further more SPDP is primarily based oncommunity farming which is the best tool forincreasing productivity and exportable surpluses.Wasteland is developed for optimum production onthe basis of Land / Water Use Planning. Drylandaqriculture is promoted on wastelands due to the-r-__-


Recommended