Saudi Aramco Safety InstrumentationTechnology Development Strategy
FF General AssemblyPatrick Flanders, P.E.
Engineering Consultant
Saudi Aramco
Copyright 2011, Saudi Aramco. All rights reserved.
8/11/2019 2 FF for SIF Patrick Flanders
2/12
2011 General AssemblyMumbai, India
Business Driver Deploy newtechnology to capture benefits
within Saudi Aramco operations
Leverage Cooperative TechnologyDevelopment Efforts
Win-Win Technology Deployment
Opportunity
2
Saudi Aramco Safety Instrumentation Technology
Development Strategy
8/11/2019 2 FF for SIF Patrick Flanders
3/12
2011 General AssemblyMumbai, India
Introduce new technologies to address deficiencies
within existing solutions.
Provide on-line functional testing methods.
Capability to trip on demand only via continuous communicationsand diagnostics
Real-time fault detection, recording and tracking.
3Success stories demonstrate the benefit of long-termsupplier/end-user partnership to tackle real-world problems.
Common objective to improve safe operations
through the deployment of new technology
within Safety Instrumentation.
8/11/2019 2 FF for SIF Patrick Flanders
4/12
8/11/2019 2 FF for SIF Patrick Flanders
5/12
2011 General AssemblyMumbai, India5
Conventional
Wellhead HIPS
PS
Hydraulic WellheadS/D system
ZV 1HH
LL
8 API3000SpecBreakValve
ASMEClass600
8 x 0.5 inW.T. Pipe
API-5L
Safety Critical Final Elements
Self-contained Fail-Safe Spring
Return Hydraulic Actuators
SSV
SSSV
Separate Process
Connections
ZV 3ZV 2
Utilized existing technology to protect downstream flowlines from over
pressure. Required manual functional testing and performanceverification.
8/11/2019 2 FF for SIF Patrick Flanders
6/12
2011 General AssemblyMumbai, India6
Wellhead HIPS with automated ZV testing
PS
Hydraulic WellheadS/D system
ZV 1HH
LL
PtA
PtB
PtC
With Local Control PanelSafety Logic Solver
8 API3000SpecBreakValve
ASMEClass600
8 x 0.5 inW.T. Pipe
API-5L
PtD
Safety Critical
Outputs to ZV 1 & 2Fail-Safe Electric Actuator
Pressure Transmitter (D) and
drain isolation valve (ZV 3)
required for TSO verification.
SSV
SSSV
Safety Critical Inputs
Pressure Transmitters A,
B, and C voted 2oo3
ZV 2
ZV 3
Leveraged technology developed in 1990s to introduce a newsolution with improved functional testing and diagnostics in 2010.
8/11/2019 2 FF for SIF Patrick Flanders
7/12
2011 General AssemblyMumbai, India
Smart ZV
Local Control Panel
FF-SIF
7
Leverage Cooperative Technology Development
Example 2.
Saudi Aramco Emerson Metso joint product development.
8/11/2019 2 FF for SIF Patrick Flanders
8/12
2011 General AssemblyMumbai, India8
Conventional ZV Local Control and Testing
1970s technology to provide local control of automated EIVs.Power operated EIVs are called ZVs within Saudi Aramco.
High Cost
Limited Functionality
Complex Design
8/11/2019 2 FF for SIF Patrick Flanders
9/12
2011 General AssemblyMumbai, India9
Smart ZV
Introduced technology in the 2000s to allow PST and local controlof automated EIVs called Smart ZVs within Saudi Aramco.
On-Line Testing
Improved Safety
Lower Cost
8/11/2019 2 FF for SIF Patrick Flanders
10/12
2011 General AssemblyMumbai, India10
FF-SIF
FF and FF-SIFon common H1
Hybrid of
conventional and FF
I/O.
Valve PST and
diagnosticfeedback in real-
time.
Field deployment at Juaymah Gas Plant in 2011Invensys Safety Logic Solver
8/11/2019 2 FF for SIF Patrick Flanders
11/12
2011 General AssemblyMumbai, India
Win Win Deployment Opportunity
11
Update Standards
and specifications
Explore options
Internally andExternally
Describe IP and
Pursue Prototype
Identify Business
Need Area
for Improvement
Field EvaluationDevelopmentDevelopment
ProcessProcess
Project
Deployment
Update
Design
8/11/2019 2 FF for SIF Patrick Flanders
12/12
2011 General AssemblyMumbai, India12
Saudi Aramco Safety Instrumentation
Technology Development Strategy
Responds to a real business need.
Introduces new solutions to old problems.
Provides a win-win collaboration opportunity.