    2011 General AssemblyMumbai, India1

    Saudi Aramco Safety InstrumentationTechnology Development Strategy

    FF General AssemblyPatrick Flanders, P.E.

    Engineering Consultant

    Saudi Aramco

    Copyright 2011, Saudi Aramco. All rights reserved.

  • 8/11/2019 2 FF for SIF Patrick Flanders

    2/12

    2011 General AssemblyMumbai, India

    Business Driver Deploy newtechnology to capture benefits

    within Saudi Aramco operations

    Leverage Cooperative TechnologyDevelopment Efforts

    Win-Win Technology Deployment

    Opportunity

    2

    Saudi Aramco Safety Instrumentation Technology

    Development Strategy

  • 8/11/2019 2 FF for SIF Patrick Flanders

    3/12

    2011 General AssemblyMumbai, India

    Introduce new technologies to address deficiencies

    within existing solutions.

    Provide on-line functional testing methods.

    Capability to trip on demand only via continuous communicationsand diagnostics

    Real-time fault detection, recording and tracking.

    3Success stories demonstrate the benefit of long-termsupplier/end-user partnership to tackle real-world problems.

    Common objective to improve safe operations

    through the deployment of new technology

    within Safety Instrumentation.

  • 8/11/2019 2 FF for SIF Patrick Flanders

    4/12

  • 8/11/2019 2 FF for SIF Patrick Flanders

    5/12

    2011 General AssemblyMumbai, India5

    Conventional

    Wellhead HIPS

    PS

    Hydraulic WellheadS/D system

    ZV 1HH

    LL

    8 API3000SpecBreakValve

    ASMEClass600

    8 x 0.5 inW.T. Pipe

    API-5L

    Safety Critical Final Elements

    Self-contained Fail-Safe Spring

    Return Hydraulic Actuators

    SSV

    SSSV

    Separate Process

    Connections

    ZV 3ZV 2

    Utilized existing technology to protect downstream flowlines from over

    pressure. Required manual functional testing and performanceverification.

  • 8/11/2019 2 FF for SIF Patrick Flanders

    6/12

    2011 General AssemblyMumbai, India6

    Wellhead HIPS with automated ZV testing

    PS

    Hydraulic WellheadS/D system

    ZV 1HH

    LL

    PtA

    PtB

    PtC

    With Local Control PanelSafety Logic Solver

    8 API3000SpecBreakValve

    ASMEClass600

    8 x 0.5 inW.T. Pipe

    API-5L

    PtD

    Safety Critical

    Outputs to ZV 1 & 2Fail-Safe Electric Actuator

    Pressure Transmitter (D) and

    drain isolation valve (ZV 3)

    required for TSO verification.

    SSV

    SSSV

    Safety Critical Inputs

    Pressure Transmitters A,

    B, and C voted 2oo3

    ZV 2

    ZV 3

    Leveraged technology developed in 1990s to introduce a newsolution with improved functional testing and diagnostics in 2010.

  • 8/11/2019 2 FF for SIF Patrick Flanders

    7/12

    2011 General AssemblyMumbai, India

    Smart ZV

    Local Control Panel

    FF-SIF

    7

    Leverage Cooperative Technology Development

    Example 2.

    Saudi Aramco Emerson Metso joint product development.

  • 8/11/2019 2 FF for SIF Patrick Flanders

    8/12

    2011 General AssemblyMumbai, India8

    Conventional ZV Local Control and Testing

    1970s technology to provide local control of automated EIVs.Power operated EIVs are called ZVs within Saudi Aramco.

    High Cost

    Limited Functionality

    Complex Design

  • 8/11/2019 2 FF for SIF Patrick Flanders

    9/12

    2011 General AssemblyMumbai, India9

    Smart ZV

    Introduced technology in the 2000s to allow PST and local controlof automated EIVs called Smart ZVs within Saudi Aramco.

    On-Line Testing

    Improved Safety

    Lower Cost

  • 8/11/2019 2 FF for SIF Patrick Flanders

    10/12

    2011 General AssemblyMumbai, India10

    FF-SIF

    FF and FF-SIFon common H1

    Hybrid of

    conventional and FF

    I/O.

    Valve PST and

    diagnosticfeedback in real-

    time.

    Field deployment at Juaymah Gas Plant in 2011Invensys Safety Logic Solver

  • 8/11/2019 2 FF for SIF Patrick Flanders

    11/12

    2011 General AssemblyMumbai, India

    Win Win Deployment Opportunity

    11

    Update Standards

    and specifications

    Explore options

    Internally andExternally

    Describe IP and

    Pursue Prototype

    Identify Business

    Need Area

    for Improvement

    Field EvaluationDevelopmentDevelopment

    ProcessProcess

    Project

    Deployment

    Update

    Design

  • 8/11/2019 2 FF for SIF Patrick Flanders

    12/12

    2011 General AssemblyMumbai, India12

    Saudi Aramco Safety Instrumentation

    Technology Development Strategy

    Responds to a real business need.

    Introduces new solutions to old problems.

    Provides a win-win collaboration opportunity.