  • 8/2/2019 2 Fluid Catalytic Cracking

    1/6

  • 8/2/2019 2 Fluid Catalytic Cracking

    2/6

    Tu rbom ach ine ry fo r FC C P lan tsM ain A ir B low er

    The grow ing dem and fo r ligh t hydrocarbons such as benz ine or p ropy lene isd riven by the inc reas ing leve l o f m oto riza tion worldw ide on the one hand and thegrow ing need fo r p las tic o r syn the tic fib res on the o ther. W ith the he lp o f the F lu idC ata ly tic C rack ing (FC C) process , a key convers ion process w here various heavyhyd rocarbons are converted to ligh te r, m ore va luab le p roducts v ia h igh -tem -pera tu re ca ta ly tic c rack ing , th is g row ing dem and can be covered . Turbom ach inerytra ins are a t the heart o f these p lan ts and as such exert a s ign ifican t in fluenceon p la n t p ro fita b ility .

    2 FluidCatalytic Cracking

  • 8/2/2019 2 Fluid Catalytic Cracking

    3/6

    0 ; - 1 ~ 100o_N c,

    2 S 80-cw

    ~ 60w

    D ::

    160

    * Design point

    140Typicalperformancemap

    120

    40

    20

    o40 50 60 70 80 90 100 110 120

    Intake volume flow V/v' [% [

    Des ign f e at u res Axial or radial inlet Cast iron casing, horizontally split Double casing design (inner/outer casing) Radial end stage/rotating diffuser Reaction-type blading Solid forged shaft/rotor (single piece)

    The air compressor takes atmospheric air and deliv-ers it to the regenerator at pressure ratios of approx.4-5 for the subsequent combustion process.MAN Diesel & Turbo is the leading supplier of air com-pressor trains including steam turbine drivers in FCCplants with flows up to 1,000,000 m3/h and has gainedsignificant references for this application worldwideincluding the Main Air Blower for the world's largestFCC plant. Advan tages

    Robust designThe challenging operating conditions with varying flow High flexibility and reliabilityrates and temperatures can be covered by the wide- Ease of maintenanceranging performance map with its inherent speed High efficiencyand/or stator blade control capability and the well High cost efficiencyproven design with radial end stage.

    Fluid Catalytic Cracking 3

  • 8/2/2019 2 Fluid Catalytic Cracking

    4/6

    Wet G as C om pressor Train

    The vapours or wet gases from the reactor are com-pressed by the Wet Gas Compressor (WGC) beforebeing transferred to the high-pressure condenser.Typically, the Wet Gas Compressor isa two-stage inter-cooled centrifugal compressor driven by an industrialsteam turbine.

    MAN Diesel & Turbo supplies the Wet Gas Compres-sor, an optimized machine for specific process con-ditions and fully compliant with NACE requirements,as well as the respective steam turbine driver. Bothmachines are designed according to the specificcustomer and process requirements, fully tested andassembled in the factory.

    Des ign f ea tu r es Dry Gas Seals (DGS) in double ortandem arrangement

    Closed impeller in 20 or 3D design, optimizedfor specific flow requirements of each stage

    Horizontally split casing for easy maintenance Water/wash oil injection for long meantime between maintenance activities

    Back-to-back arrangement

    Advan tages Robust design High flexibili ty and reliabil ity Ease of maintenance High efficiency High cost efficiency

    Fluid Catalytic Cracking 4

  • 8/2/2019 2 Fluid Catalytic Cracking

    5/6

    Competenc ies

    Additionally, the entire supply chain is continuouslydeveloped further for an optimum flow of materialsand reduced lead times.

    In 2004, a sophisticated assembly and test centrefor large machine trains was commissioned includingoverhead cranes, cooling towers, steam supply linesand substantial electrical power supply system. Thisenables MAN Diesel & Turbo to work on several ma-chine trains with modules up to 600 tons of weight atthe same time by using an area of more than 4,500 m2.

    Exper ience More than 100 years of experience All FCC processes covered

    W orkshop s and tes ting fac ilities Approved by all oil and gas majors worldwideTo meet today's needs for high-quality, economic pro- Some 200 turbomachines supplied for FCCduction and short delivery periods, advanced work- References for all types of rotating equipmentshops are mandatory. The state-of-the-art production including Main Air Blower, Wet Gas Compressor,and service shops as well as assembly and testing Heat Pump Compressor, Expander as well as thefacilities of MAN Diesel & Turbo's turbomachinery respective steam turbine drivers for various cus-sector fulfil these requirements in every respect. tomers and operators

    Selected references

    Installationrder year Customer/operator MAN Diesel & Turbo equipment

    GSEC/Takreer Main Air Blower, Steam Turbine-----------------------NOCl/NOCl Main Air Blower, Wet Gas

    Compressor, Steam TurbinesSK Corp'/SK Corp. Main Air Blower, Steam TurbineDragados/Pemex Main Air Blower, Wet Gas

    Compressor, Steam Turbines

    2010 Ruwais, UAE2009 Cuddalore, India

    2006 Ulsan, South Korea2006 Minatitlan, Mexico

    2006 Jamnagar, India Bechtel/Reliance

    2006 Dung Quat, Vietnam2005 Rabigh, Saudi Arabia2005 Point-a-Pierre,

    Trinidad & Tobago

    Main Air Blower, Wet GasCompressor, Steam Turbines

    JGC/PetroVietnam Main Air Blower, Steam TurbineJGC/Rabigh Joint Venture Main Air Blower, Steam Turbine

    Petrotrin/Petrotrin Main Air Blower, Wet GasCompressor, Steam Turbines

    Fluid Catalytic Cracking 5

  • 8/2/2019 2 Fluid Catalytic Cracking

    6/6