Point Cloud Park Concorso Internazionale di Progettazione del Cavalcavia Bussa Diagrams and Blueprints LA5EC6EU 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Framework (Phase 1) Grassland and structural planting ‐1 1 Point cloud structure 1 1 Infrastructure 1 1 Access structures 1 1 1 Expo pavilions 0 1 1 Testing sites 1 1 1 Evolution (Phases 2‐ x) Landscape establishment Base landscape maintenance 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Landscape evolution (capital investment) 1 1 1 1 1 1 1 1 1 1 1 1 1 Sports events / facilities (neutral / capital return) 0 2 1 2 0 2 0 1 2 1 0 2 0 Arts and Culture (capital investment) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Seasonal commercial events (capital return) 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 Local events (capital subsidy) 1 1 1 1 1 1 1 1 1 1 Regular commercial facilities (capital return) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 Quarterly outlay 3 5 2 0 1 1 0 2 2 3 2 4 0 1 0 3 2 1 3 2 2 0 1 3 1 2 1 3 0 3 1 3 1 2 1 5 0 0 0 2 2 1 0 2 Cumulative sustainability 3 8 10 10 9 8 8 6 8 5 7 3 3 4 4 1 1 2 1 1 3 3 4 7 6 8 7 10 10 13 12 15 14 16 15 20 20 20 20 22 24 25 25 27 2024 2025 2015 2016 2017 2018 2019 2020 2021 2022 2023 Year 7 Year 8 Year 9 Year 10 Year 11 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 2. Framework The “framework” will create an inial landscape of grass surfaces, drainage infrastructure and preliminary planng configuraon. Crical improvements to pedestrian and cycle access will be established at the outset of the project. A “point-cloud” structure of grid and the definion of component plots for future growth will be established. This structure will enable the subsequent delivery of an evolving and flexible programme of the occupaon of components and the parcipave engagement with the development of the park. Early intervenons within this structure will be tested as a preliminary phase of the “point-cloud” park as acve engagement. South access 1. Timber deck with lightweight steel structural support resng on the contours of the terraced landscape; 2. Liſt core to Cavalcavia Bussa level; 3. Gateway signage; 4. Integrated slide within terracing. Street improvements 1. Street planng; 2. Phased evoluon of vehicular movement transformaon. Cavalcavia Bussa components 1. 195 grid components; 2. Inial “framework” grassland condion with fixing points for progressive evoluon of park environment. Slope plan 1. Terraced landscapes to create play space, informal seang and shallower access routes; 2. Cycle route marked with vehicle access maintained for servicing park; 3. Gabion walls formed using recycled material from park construcon process. Slope plan 1. Terraced landscapes to create play space, informal seang and shallower access routes; 2. Cycle route marked with vehicle access maintained for servicing park; 3. Gabion walls formed using recycled material from park construcon process. North access 1. Timber steps built off ground and exisng structures; 2. Liſt core to Cavalcavia Bussa level; 3. Gateway signage. East access 1. Timber deck 1:20 ramp between Metro rooflights for cycle access to Cavalcavia Bussa level; 2. Cycle storage tower with stacked cycle storage, internal ramp within mesh enclosure and direct access off cycle ramp and Bussa slab; 3. Modular field of cycle storage; 4. Pedestrian liſt core to Bussa level; 5. Gateway signage. New Access Points Redesigned Slopes Flat Space Exisng Steps Acid/Inferle Calcareous/Inferle Stony Ferle Loam Meadow/Perennial Planng Woodland Edge Rocky Slope Rain Gardens New Water Source Rain Gardens Overflow Storage Natural Irrigaon South access Timber deck with lightweight steel structural support resng on the contours of the terraced landscape. North access Timber steps built off ground and exisng structures. East access Timber deck 1:20 ramp between Metro rooflights for cycle access to Cavalcavia Bussa level and modular cycle storage structures within mesh enclosures.
Transcript
Page 1: 2. Framework - Concorrimi · progressive evolution of park environment. Slope plan 1. Terraced landscapes to create play space, informal seating and shallower access routes; 2. Cycle

Point Cloud Park

Concorso Internazionale di Progettazione del Cavalcavia BussaDiagrams and Blueprints

LA5EC6EU

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4Framework (Phase 1)Grassland and structural planting ‐1 ‐1Point cloud structure ‐1 ‐1Infrastructure ‐1 ‐1Access structures ‐1 ‐1 ‐1Expo pavilions 0 1 1Testing sites ‐1 ‐1 1Evolution (Phases 2‐ x)Landscape establishmentBase landscape maintenance ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1Landscape evolution (capital investment) ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1Sports events / facilities (neutral / capital return) 0 2 1 2 0 2 0 1 2 1 0 2 0Arts and Culture (capital investment) ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1Seasonal commercial events (capital return) 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3Local events (capital subsidy) ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1 ‐1Regular commercial facilities (capital return) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1Quarterly outlay ‐3 ‐5 ‐2 0 1 1 0 2 ‐2 3 ‐2 4 0 ‐1 0 3 2 1 ‐3 2 2 0 1 3 ‐1 2 ‐1 3 0 3 ‐1 3 ‐1 2 ‐1 5 0 0 0 2 2 1 0 2Cumulative sustainability ‐3 ‐8 ‐10 ‐10 ‐9 ‐8 ‐8 ‐6 ‐8 ‐5 ‐7 ‐3 ‐3 ‐4 ‐4 ‐1 1 2 ‐1 1 3 3 4 7 6 8 7 10 10 13 12 15 14 16 15 20 20 20 20 22 24 25 25 27

2024 20252015 2016 2017 2018 2019 2020 2021 2022 2023

Year 7 Year 8 Year 9 Year 10 Year 11Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2. Framework

• The “framework” will create an initial landscape of grass surfaces, drainage infrastructure and preliminary planting configuration.

• Critical improvements to pedestrian and cycle access will be established at the outset of the project.• A “point-cloud” structure of grid and the definition of component plots for future growth will be established.• This structure will enable the subsequent delivery of an evolving and flexible programme of the occupation of

components and the participative engagement with the development of the park.• Early interventions within this structure will be tested as a preliminary phase of the “point-cloud” park as active

engagement.

South access

1. Timber deck with lightweight steel structural support resting on the contours of the terraced landscape;

2. Lift core to Cavalcavia Bussa level;3. Gateway signage;4. Integrated slide within terracing.

Street improvements

1. Street planting;2. Phased evolution of vehicular movement transformation.

Cavalcavia Bussa components

1. 195 grid components;2. Initial “framework” grassland

condition with fixing points for progressive evolution of park environment.

Slope plan

1. Terraced landscapes to create play space, informal seating and shallower access routes;

2. Cycle route marked with vehicle access maintained for servicing park;

3. Gabion walls formed using recycled material from park construction process.

Slope plan

1. Terraced landscapes to create play space, informal seating and shallower access routes;

2. Cycle route marked with vehicle access maintained for servicing park;

3. Gabion walls formed using recycled material from park construction process.

North access

1. Timber steps built off ground and existing structures;

2. Lift core to Cavalcavia Bussa level;3. Gateway signage.

East access

1. Timber deck 1:20 ramp between Metro rooflights for cycle access to Cavalcavia Bussa level;

2. Cycle storage tower with stacked cycle storage, internal ramp within mesh enclosure and direct access off cycle ramp and Bussa slab;

3. Modular field of cycle storage;4. Pedestrian lift core to Bussa level;5. Gateway signage.

New Access PointsRedesigned SlopesFlat SpaceExisting Steps

Acid/InfertileCalcareous/InfertileStonyFertile Loam

Meadow/Perennial PlantingWoodland EdgeRocky SlopeRain Gardens

New Water SourceRain GardensOverflow StorageNatural Irrigation

South access

Timber deck with lightweight steel structural support resting on the contours of the terraced landscape.

North access

Timber steps built off ground and existing structures.

East access

Timber deck 1:20 ramp between Metro rooflights for cycle access to Cavalcavia Bussa level and modular cycle storage structures within mesh enclosures.