Plot 179.250
Plot 279.000
Phase 2 Area for development(this application)
13330m²1.33 Hectares
Phase 1 Area (Previous application only)
8066m²0.81 Hectares
Plot 379.000
Plot 479.500
Plot 580.000
Plot 679.750
Plot 779.500
Plot 879.000
29 Bocam Park, Old Field Road, Pencoed, Bridgend CF35 5LJ.Phone: 01656 863794 Email: [email protected]
Project number
ALL DIMENSIONS TO BE CHECKED ON SITE: Contractor to check and verify all building and site dimensions. The
Contractor is to comply in all respects with the current Building Regulations whether specifically stated on this drawing or not. This drawing must be read and checked
against any other specialist drawings provided & manufacturer's recommendations. Tabled quantities are for
guidance only all specialist Consultants & Contractors to check and verify. Any discrepancies in all of the above must
be reported to the Design team prior to installation
CDM - If we are appointed as a Designer or Principal Designer, for the Pre-Construction Phase only, we can only carry out our duties for that phase. This means that we will give all relevant design information for consideration in the Construction Phase Plan / Health & Safety File to the Client
at the end of the Pre-Construction Phase. It will be the Client’s responsibility to pass that information on to the
Principal Contractor and any other Contractors or Designers, which the client subsequently appoints.
System Number
NOTES
drawn
status drg. no.
scale @ A0
date
Title
rev.
checked approved
Project
appr
vd.
rev.
draw
n
chkd
.
date description
Client
1. All dimensions are in millimetres unless noted otherwise.2. All levels are shown in millimetres unless noted otherwise.3. Do not scale from the drawing. Use figured dimensions only.4. Any discrepancies to be reported immediately to the
Designer/Engineer.5. This drawing to be read in conjunction with all relevant
Architects, engineers, subcontractors and specialistsdrawings and specifications.
1 : 500
Phase 2 Proposed Site Plan
9304
Llantrisant Business Park
Allied Welsh & Ty Carreg Group
March2018 ND MJ
124
On Land at Tal y FedwLlantrisant Business Park,
Llantrisant, CF72 8LF
ND/18-010-b/9304
plan
ning
1 : 500Site plan1
Isometric 1 - Phase 22
Isometric 2 - Phase 23
Isometric 3 - Phase 24
Marked Parking for 3 cars per unit (to include 1no disabled bays over the 5% required)
Areas: Operational - Green hatch at 973m2Non-Operational - Cyan hatch at 265m2
Unit 1 to drawing AW01
Boundary treatment in accordance to the current Planning
application submitted by Tom Pritchard
(16/1251)
Blue line indicates the site total outline
Red line indicates the outline site affected by this
application
Marked Parking for 3 cars per unit (to include 1no disabled bays over the 5% required)
Areas: Operational - Green hatch at 121m2Non-Operational - Cyan hatch at 76m2
Marked Parking for 3 cars per unit (to include 1no disabled bays over the 5% required)
Areas: Operational - Green hatch at 705m2Non-Operational - Cyan hatch at 337m2
Possible PROW diversion subject to approved application currently being
processed (green dashed line)
Line of existing PROW
One way system to vehicle tracking layouts
KEY
S1 - Metal frame bike shelter, paint/powder coating colour to match the building trims - Roof formed with clear poly carbonate sheets (holds up to 10 bikes)
S2 - Embankment regraded and seeded
S3 - New Indigenous hedgerow - in accordance with ecology report
S4 - New Indigenous Trees - in accordance with ecology report
S5 - 1.8m Feather edge board timber board fence and lockable gates for perimeter or bins and plant
S6 - Permeable tarmac to the footpaths, all access points to have a level thresholdS7 - Permeable tarmac to the vehicle hardstand to details provided
S8 - New flood lighting
S9 - Powder coated Wide Mesh anti climb fencing - by the owner of the Neighbouring site