Date post: | 01-Jan-2016 |
Category: |
Documents |
Upload: | randell-newman |
View: | 215 times |
Download: | 0 times |
2: PIRATA2: PIRATA(Pilot Research moored Array in the Tropical Atlantic)
(1997 - 200?)Tripartite Programme
as a contribution to CLIVAR, GCOS and GOOS :- FRANCE (IRD & Météo-France)
- BRAZIL (INPE & DHN)- USA (NOAA/PMEL & AOML)
* 1997-2001 : « Pilote » period* 2001-2006 : Consolidation period• 2006-2008 : continuation… PIRATA has actually been under review process (positive…) by CLIVAR and Ocean Observations Panel for Climate -OOPC- in 2006 • 2007: New Memorandum of Understanding Define the commitments of the partners for thenext years…
Photo: A.Kartavtseff
PIRATA evolution from 1997 until nowPIRATA evolution from 1997 until now
PIRATA ATLAS buoys network in October 2005
(Brazilian SW extension => 13 buoys)
PIRATA ATLAS buoys network from June 2006
US NorthEast extension along 23°W(carried out by NOAA, R/V Ron Brown in June 2006)
BCLME & South AfricaSouthEast extension at 6°S-8°E(carried out by IRD, R/V L’Atalante in June 2006)
=> 16 ATLAS buoys actually operationnal
First PIRATA ATLAS buoys network in 1997
(12 then 10 buoys)
PIRATA network status:
Maintained by Brazil: 8 Atlas buoys Maintained by France : 6 Atlas buoys+ At 23°W-Equator : surface ADCP mooring since 2001
Maintained by USA : 4 Atlas buoys : 2 deployed in 2006,at 4N & 11N/23W, 2 at 20N/23W & 38W will be deployed in 2007
Ocean Sites reference flux (swr, lwr, rh, air T, SLP).
PIRATA EXTENSIONSreal time data time series
8s 30w 14s 32w 19s 34w
12n 23w 4n 23w 6s 8w
Oceanic cruises in 2006(carried out in the framework of AMMA, PIRATA & CLIVAR…)
1) FRENCH ATALANTE / EGEE 3 cruise (East of the basin) : May 24 – July 6, 20062) GERMAN METEOR cruise (West and central basin) : May 23 – July 16, 20063) US RON BROWN cruise (North and central basin) : June 6 – July 9, 2006 4) BR ANTARES cruise (Western basin): November 16 – December 21, 2006
1
2 3 4
3
21
4
New 10 m Velocity DataU and V at 0°, 23°W Meridional Velocity along 23°W
0°
4°N
11.5°N
From: McPhaden (2006)
From: McPhaden (2006)
From: McPhaden (2006)
PIRATA Real-Time Data ReturnOct 2005-Sept 2006
Air T SST T(Z) Wind
% Data Return 72 78 73 91
RH Rain SWR Salinity
% Data Return 67 74 87 72
Currents
(6 sites)
LWR
(2 sites)
AirP
(2 sites)
All Sensors
% Data Return 73 74 99 75%
From: McPhaden (2006)
Increased GTS Hourly PIRATA Met Data
Argos Multi-sat
initiated Feb 2005
PIRATA Field Season begins May
2005
PIRATA Field Season begins May
2006
From: McPhaden (2006)