Transcript

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

1. HSE Scorecard , IPC (Wells, Department) ,

Communication to staffx x x x x x x x

2. HSE Plan x x x x x x x x x x

3. MHSEV Lead by example, Verify action action plan,

effectivenessx x x x x

4. Rig/ Worksite Inspection Verify action action plan,effectiveness x x x x x x

5. Incident InvestigationPartcipation of management in incident

investigation

Participation of management in incident

investigationx x x x

6. HSEMS self-assessment (Wells Office HSE

Audit, Rig HSE Questionnaire)Championing HSE initiatives

Verify resources adequacy for HSE training

and promotionsx x x x x x x x x

7. KM1  Deep Dive Workshop x x x x x x x x

8. KM1 Causal Learning x x x x x x x x

9. SQM Audit, Meeting with Contractors, NCR Lead by example x x x x x

10. External HSE Meeting/ Conference/

Engagement

Sharing of meeting/ conference /

engagement salient points to othersx x x x x x x x

11. Hearts & Mind Training for WLT

& Middle Management

Verify process for identifying& changing of

behaviour is includedx

1.4 Manage HSE

Risks

Assets HSE Risk profiling and executive summary/key note

acknowledgement by the leaders

Leaders contribution in setting priority for risk mitigation

activities12. Wells HSE Champion 2014 - extract from

WLT packVerify action action plan,effectiveness x

13. Sharing of Lessons Learnt (worksite, dept

meeting)

Sharing and personnel message by

managementx x x x x x x x x

14. HSE Assurance Plan- Contractors

(Rig/ Technical, HSEMS) Resources for assurance x x x x x x

15. Wells HSE Committee Meeting

HSE matters high on meeting agenda, sharing

of incident lessons learnt; management

review process

x x

16. Wells LT Meeting

HSE matters high on meeting agenda, sharing

of incident lessons learnt, process for

resource identification, budget & manpower

for HSEMS implementation

x x

17. Wells International & Malaysia LT/ HSE

Committee Meeting MoM/ Pack

HSE matters high on meeting agenda, sharing

of inicdent lessons learntx x x

18. Wells Global Intervention & Services LT/

HSE Committee Meeting

HSE matters high on meeting agenda, sharing

of inicdent lessons learntx x

1.3 Informed

Involvement

1. Leaders set priority, develop and implement HSE

improvement plans to close the gaps.

2. Records on the appointment and directives to Element

Owner

1. Leaders are personally involved in the HSE MS Management

Review and assigned clear responsibilities and time frame for

the improvement efforts.

2. Leaders are championing HSE MS, elements and/or HSE

improvement initiatives.

3. Head of Region/Country appointment as MCF Champion and

record for their HSE leadership involvement.

1.1 Visibility

Evidence of Management involvement in HSE activities such as:

• Inspection / assurance.

• Site visits.

• Training / briefing / induction.

• Investigation.

• HSE self-assessment.

• HSE committee

• Attending HSE Meetings / conferences outside company.

• hampioning in HSE initiative

• Coverage and status of the KPI/ Score card/ Management

inspection

• Adequate and sufficient resources for HSE activities such as

training, promotional activities etc

• Evidence of lesson learnt being shared

1. HSE implementation and performance being actively

monitored at highest levels of organization e.g. Management

Committee

2. Leaders seek employee feedback on company’s commitment

to HSE through formal process such as survey.

3. Leaders champion in HSE benchmarking with international

recognized companies.

4. Adopt, share and promote industrial HSE best practices

1.2 Proactive in

target setting

1. Records on development on health, safety and environment

improvement objectives and targets for both leading and

lagging indicators.

2. Documented HSE target/commitment e.g. Letter of

Assurance.

1. HSE objectives and targets are cascaded to all staff through

individual performance contract / performance planning.

2. Records on MCF gap assessment and ntervention

1.5 Drive HSE

Culture

Assets HSE Risk profiling and executive summary/key note

acknowledgement by the leaders

Leaders contribution in setting priority for risk mitigation

activities

ELEMENT 1 : LEADERSHIP & COMMITMENT

Review of process of setting HSE objectives &

target; reactive, Proactive indicators, HSE KPI

to Management

Leaders involvement in KPI setting, HSE

performance monitoring & frequency

Participation of management

Participation of management Verify action action plan,effectiveness

Participation of management

Verify action action plan,effectiveness

Verify action action plan

19. Wells Contractor HSE Forum / Meeting x

20. Wells Incident Review Committee (WIRP) x

21. Wells - Contractor Senior Engagement

Session with DGx x

22. Well Control Steering Committee (WCSC) x

23. Benchmarking with international

recognized companies e.g. OGP, PSCs, etc.

(Company level).

HSE performance survey/ benchmarking

agains Int. operatorsx x x x x x

24. Wells Feedback (for rig visit)Constructive feedback on Rig Management,

Communication, Welfarex x x x x x x x x

25. Wells Operational Excellence 2015 _

Strategy BookDemonstrating continual improvement x x x x x x x x x

26. Wells Online (PRTVC, DROID, Wells Portal,

Wells HSE Portal, Wells IC, ECM, Elevate, P2P)Resources for information dissemnination Verify effectiveness x x x x x x x x x x x

27. MCF Aplicability to WellsIdentification of HSEMS gaps, MCF Champion

identification ad involvement Verify MCF items implementation x

28. Risk Profillig x x x x x x x x x

29. Drilling readiness Strategy, PRA, BCM, Rig

Move Assessment, Well Control Risk

Prevention, Stuck Pipe Risk Prevention,

Schedule & Cost Risk Prevention

x x x x x x x x x x

29. Wells Review Committee, Rig Move

Review Committeex x x x x x x x

30. POCS Survey results Constructive feedback on POCS survey Verify rewards and action plans x x

31. Rig ScorecardBenchmarking on overall rig performance

including HSEx x x x

32. HSE Rewards and Recognition ProgrammeResources for HSEMS implementation,

continual improvementVerify effectiveness x x x x x x x

33. Consequence Management for Non

Performing ContractorsRecords of rules violations, non compliance

Verify the visibility of requirements through

signage, instruction, information, training

& supervision

x x x x x x x

Management assurance that risk is prioritized

and effectively managed

Verify action plan

1.5 Drive HSE

Culture

Assets HSE Risk profiling and executive summary/key note

acknowledgement by the leaders

Leaders contribution in setting priority for risk mitigation

activities

Participation of management Verify action action plan,effectiveness

Verify action action plan,effectiveness

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

2.1 Content1. Employee’s’ survey/ feedback on HSE policies & HSE

Management system

1. List of SHE document/ procedures

2. Records for HSE procedures implementation and compliance

e.g. transport safety guidelines Drug & Alcohol Test abuse test

records

1. HSEMS self-assessment

(Wells Office HSE Audit, Rig HSE

Questionnaire) - Tier 1

Assurance done every year Verify action plan, effectiveness x x x x x x x x x

2.2 Dissemintaion

1. Evaluation of contents of the HSE policies

2. Records for HSE policies review 1. Records for HSE policies dissemination 2. HSE Policies

Commitment to prevent impacts on PEAR,

relevant to current/ future nature and scale

of activity, approved/ signed, (latest version,

multi lingual, availability, accesibility).

Evidence of dissemination - Wells Online

(Portal, HSE Portal, display at strageic areas,

in project/ rig relevant documents) , include

in induction

Display at site content easily

understandable, translated in local language,

interview with personnel on how policy is

relevant to day to day work

x x x x x x x x x

3. HSE Plan (Wells, Rig, Project)

Availability of improvement targets, aligned

with business and strategic objectives,

contractor HSE management

Verify action plan, effectiveness, verify

project HSEplan vs MCF requirementsx x x x x x

4. Wells Operational Excellence 2015 _

Strategy Book

Direction to control employees exposure to

HSE risk, aligned with PETRONAS policy &

corporate HSE objectives, consider legal,

technolgy challenges, emerging issues , key

stakeholder concerns

Verify action plan, effectiveness x x x x x x x x x

5. MCF Aplicability Assessment for Wells,

Implementation Records

Identification of HSEMS gaps, MCF Champion

identification ad involvement Verify MCF items implementation x

6  HSE Performance Report (to Business

Planning HSE Ops/ TG/ Upstream)

System in place to utilize HSE data for

improvement plans, long term hse

improvement strategies development and

incorporated in overall business plan

x x

7. Records for HRA, CHRA, Health

Surveillance, Fatigue Management, hearing

conservation program

x x x

8. D&A Testing & Records - AMRO

Appointment, Substance Misue Committee

(SMC), Random Testing

x x

9. HSE Campaign/ Programmes x x x x x x

10. Health Surveillance, Fatigue Management,

hearing conservation program records,

compliance status

x x

11. HSE Legal Database/ Register x

12. HSE Legal Coompliance Assurance/

Status/ Letters to Authorities in managing any

non compliances

x

ELEMENT 2 : POLICY & STRATEGIC OBJECTIVES

HSE plan program meets MCF requirement,

each program monitired agains performance

indicatos,

2.4 HSE Plan &

2.5 HSE

programme and

Activities

1. HSE improvement plans incorporating resource

requirements, accountable parties, and target dates for

different departments / units are available.

2. The Departments / units’ HSE plans are aligned with the

overall company HSE Plan and Business Pan.

3. Evidence of communication of HSE objectives target and

plan.

4. Annual HSE Plan includes a comprehensive HSE related

fitness assessments e.g. FTW, D&A testing, Zeto Rule violations

1. L ong term HSE improvement strategies are incorporated

into the overall business plans.

2. Reporting and progress done by the Business Planning

department.

3. Company performance report.

4. Records for HRA, CHRA, Health Surveillance, Fatigue

Management, hearing conservation program

2.3 Strategic HSE

Objectives

1. HSE strategic objectives are part of business KPI and

consistent with PETRONAS where appropriate.

2. Regular Reviews conducted to monitor implementation plan.

1. Benchmarking and survey reports.

2. Records on development on health, safety and environment

improvement objectives and targets for both leading and

lagging indicators.

3. Records for MCF implementation strategy & supporting MOC

document in place where exceptions agreed upon any

mandatory requirement

Verify action plans, effectiveness

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

1. Wells/ Rig/ Project Organization Chart

(Manning level vs. approved position)R& R of employees clearly documented HSE R&R understood by personnel x x x x

2. Job Desrciption of Key Personnels- LT,

Critical Positions, HSE Positions, ARD, Non key

- any body by random

R& R of employees clearly documented ,

specific HSE roles

HSE R&R understood by personnel; interview

HSE critical position x x x x x x x x x x x

3. Wells HSE Management Rep (MR) Appointment of MR, HSEMS implementation

& maintained, recommends improvement, JDInterview MR x

4. Career Path / Capability Development for

Drilling staff, HSE; including Appriasal processLook for Symptoms of under-resourcing Review recruitment process x x

5. HSE Training Records ( HSE Personnel) -

Onboaring, LNI/LNAx

6. HSE Training Records (Drilling) - HSE

onboarding for L1, L2, ARDx

7. Wells HSE Training Matrix

Availability, Training validity, mandatory

competency, Postions are filled with

competent staff

x x

8. Wells HSE Competency Assurance for

critical position, List of HSE critical position

Review/ approved; have appropriate

experience, Postions are filled with

competent staff

Sample ofHSE critical positions, verify

effectiveness, interview HSE critical positionx x

9. Rig Crew Competency Assessment Look for Symptoms of under-resourcing Review recruitment, selection and placement

provessx x x x x

10. RACI - Driling Governance structire for HSE accountabilities Verify governance , effectiveness x x x x x x x x x x

11. HSE Advsiors (HSE Department)

HSE Org. Chat,availabiity of internal HSE

Advisors, Sample report of HSE advices,

verify carrying out of HSE advisor roles

(incident investigation, risk assesment) , clear

reporting line, adequacy of HSE staff

Interview with HSE Advisors x

12. HSE Performance Data Analysis Report

Solution options orovided through HSE

analysis from incident, assurance, KPI,

benchmaring. Promote and sharing of best

practices

Observation for continual improvement x x x

13. HSE CaseAll HSE critical system functions as per design

intent and objectives

No by pass of HSE critical systems, approved

overidingx x x x x

14. HSE Trainng Induction modules -

OnboardingHSE R& R included

Employee aware of their HSER&R , interview

random personnelx x x x x x x x x x x

15. Sample og Contractor PO, PR

HSE performance of contractors, Check HSE

requirement in PR/ PO, adequate SHE

technical info.

Equipment/ goods delivered meets HSE

tsandards, technical information in HSE

critical quipment (e.g. BOP, lifting gears)

x x x x x x

16. HSE Requirements in Contract x

1. Legal register and PETRONAS Technical Standard.

2. Assessment of the compliance.

3. Record of managing new and/or changes to legal

requirement.

4. Legal compliance audit and action plans to ensure

compliance.

1. Register of other requirement beyond Legal and PETRONAS

Technical Standard.

2. Records for annual review of legal register.

3.8 Legal,

Standards and

Other requirement

1. All positions are filled with competent staff.

2. Verification conducted to the incumbents against the

competency matrix; e.g. skill group matrix, POSS, CBA, HSE

training matrix.

3.Record of OMOC.

4. Leave schedule/rotas.

3.4 Resources

1. Record of resources assessment.

2. Resources succession planning.

3. Training matrix - supervisor training includes training on

stress management, motivation, etc.

4. Records on MCF element-wise resources requirement &

assignment of action parties.

1. Record of communication such as briefing and meeting with

public and authorities conducted.

2. External communication with external agencies in the event

of emergency is established and effectively implemented

3.7

Communication

Evidence of external communication and involvement in

committee etc.

ELEMENT 3 : ORGANIZATION, RESPONSIBILITIES, RESOURCES, STANDARDS & DOCUMENTS

Verify plan vs actual

Verify plan vs actual

3.1 Roles &

Responsibilities

1. Verification on understanding of HSE roles and

responsibilities.

2. Verification of HSE KPIs, standards, and competency

requirements are addressed.

1. Verification on understanding of Job Description for specific

HSE roles and responsibilities.

2. Records for appointment of AME, medical review officer

(MRO), Drug & Alcohol Testing Technician DATT), OHD, IH Staff

as applicable

1. Management of Contractor HSE procedure (in accordance to

PTS 18.0303) is implemented.

2. Contractor HSE plan is implemented and tracked

3. HSE non-compliance is defined in the contract and remedial

action plan/consequence management is included.

4. Evidence of Contractor HSE performance objectives and

targets are achieved

1. Management of Contractor HSE procedure (in accordance to

PTS 18.0303) is being reviewed and improved.

2. Contractor HSE MS is subject to Contractor Management

Review.

3. Evidence of engagement with contractor and the outcome

used for improvement of overall contractor management.

4. Work Completion Certificate includes Final evaluation and

Close-Out Report

3.6 Contractor &

Supplier

1. Tracking report and record of training program being

implemented.

2. Record of competencies assessment tracked and kept.

3. Relevant personnel been trained on all operating procedures

or instructions involving their activities/tasks.

4. Adequate budget allocation is made for training and

development.

3.5 CompetenceEvidence of compilation, analysis, and solution options on

competency gaps are for continual improvement.

1. HSE responsibilities are carried out by the line, e.g.

participation / leading JHAs, PHA, PASR, PSSR, CHRA, HAZOPs,

EIA, ESHIA, gas testing, HSE training conducted by line staff, etc.

2. Specialist role of HSE Advisor(s) has been carried out e.g.

facilitating incident investigations, CHRA, HAZOPS etc.

3. Verification of services from customers (line) on response

from HSE Advisors.

1. Compilation, analysis, and solution options are provided

based on incident investigation reports, assurance activities,

lessons learnt, HSE KPIs, benchmarking, etc.

2. Evidence of best practices shared, promoted, cascade and

implemented upon advice from HSE Advisors.

3.2 Management

Rep. &

3.3 HSE Advisors

17. ITB, Contracts Document, Contractor HSE

plan, HSE Interface/ Bridging documents

Adequate HSE Deliverables & controls to are

in place, HSE plan monitoring

Work execution as per contract/ HSE plan/

bridging documentx x x x x x x

18. Contractor Performance (CPE), Lesson

learnt, Well After Action Review

Sharing of lessons learnt wrt to contractor

performance

Lessons learnt implementation for future

wells/ rigsx x x x x x

19. HSE Communication- Bulletin, HSE Alerts,

Portal etc

Availaibilty of communication process

(internal)

- Records of external communications with

public and authority e.g. CIMAH, engagement

sessions with authority - DOSH,DOE,Marine

Dept,APMM etc.

- Evidence of an established and effective

communication with authority during

emergency e.g. notification to authority by

ECC, Availability of updated authority contact

no. for emergency

Verify effectiveness x x x x x x x x x x x

20. Legal Register , Legal compliance Auidt

Report

Availability of register, maintains the register

(new requirements)x x x x x x

21. Register of other requirrements Eg. IADC, IPIECA, ; register to be updated x x x x x x

22. List of HSE Standards, Procedure, Work

Instruction, HSEMS Manual

Availability, Document control procedure in

placeVerify accesibility and availability x x

3.9 Documentation

and Control -

HSEMS

1. Record of changes in HSE MS documentation.

2. HSEMS Manual and procedures are completed,

implemented, updated, and continually improved..

1. A system exists to review HSE MS Manual(s) and is updated

as required.

2. Evidence of continual improvement of document control

system such as online documentation.

Verify records of communication to required

parties (project, contractors), last update

status

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

1. Standard for Hazard Identifcation, HER,

Training Records

Availability Health - CHRa, HRA, Safety -

BOWTIES, JHA, QRA, HAZOP, Environment -

EIA , HER, EHSIA, Process safety risk

identifcation tools

x x x x x x x x

2. Risk Profillig Availability of updated risk profile x x x x x x x x x

3. List of risk assessment studies/ report Availability of reports, Linkages to MOC to

capture changes in placeVerify MOC findings updated to ER x x x

4. Risk Assessment Procedure x x

5. Risk Review Plan x

6. Risk Matrix x

7. List of Safe Operating Procedure - Wells

Mandatory Control Framework

Responsble parties assigned for control

measuered for identified risk Verify effectiveness x

8. Critical Activities Catalogue

KPI for maintenance of the controls defined.

Controls assigned to responsible parties,

reviewd and updated

Verify that the effectiveness of control

measures are monitored.x x x

4.3 Control

measures

1. KPIs for the maintenance of the controls are defined in

critical activities catalogue.

2. All controls assigned to responsible parties are described in

critical activities catalogue.

3. Monitoring report of the control measures.

Evidence on changes /review of the control measures.

4.4 Recovery

Measures

1. There exist a comprehensive hazards and effects register for

covering Health, Environment, Safety (Occupational & Process).

2. The hazard and effects register is a controlled document and

is accessible to all relevant parties for their use.

3. Risk assessment related studies / reports are available.

4. Team members’ participation are adequate and leaders are

skilled in the risk assessment technique.

1. Evidence of updating the hazard register as result of changes

on the process, services, products, facilities and incidences.

2. Linkages to MOC to capture hazard due to changes on the

process, services, products, facilities and incidences.

4.5 Statutory HSE

Risk Assessment

Requirement

Action items from the statutory report and the status of

compliance.

Evidence on revision of the HSE Case / CIMAH report / EIA/

CHRA.

1. There is a formal well documented change management

procedure for plant, process, organizational, and procedural

change.

2. There is a provision for updating the hazard and effects

register in the event of change.

3. Evidence exists where this has been practiced

Verify effectiveness, action plan

Guideline for selection of approriate

technique for risk profiling,particpation of

adequate skilled staff in risk identification

exercuise

Availability, correct application of risk

ranking, assurance on risk assessment

methods

ELEMENT 4 : HAZARDS & EFFECTS MANAGEMENT PROCESS

10. HSE Case Guideline, HSE Case report, Rig

Acceptance Framework

HSE case & Rig acceptance criteria

availability, system in place to review and

update the renmedial action plans, repotys

endorsed by management, competenct

personenl and accepted by authority,

equipment & people related certification

requirement included, peridioc review to

inlcude changes as per regulatory

requirement

Verify the availability/ update, verify

acceptance recrords, verify implementationx x x x x x x

1. There exist a comprehensive hazards and effects register for

covering Health, Environment, Safety (Occupational & Process).

2. The hazard and effects register is a controlled document and

is accessible to all relevant parties for their use.

3. Risk assessment related studies / reports are available.

4. Team members’ participation are adequate and leaders are

skilled in the risk assessment technique.

1. Evidence of updating the hazard register as result of changes

on the process, services, products, facilities and incidences.

2. Linkages to MOC to capture hazard due to changes on the

process, services, products, facilities and incidences

4.1 Identification

of Hazards and

Effects

1. Assessment ranking report.

2. Evidence of external assurance of the risk assessment

technique.

3. Evidence of benchmarking against other similar operations.

4. Evidence of cross checking with other studies, e.g. Safety

Case, QRA’s, etc.

5. Risk review conducted throughout the lifecycle of projects

e.g. conceptual (QRA, Facility Siting), design (HAZOP, HAZID,

QRA, LOPA, SIL), construction (PIR, HAZID, JSA), commissioning

(PSSR), operation (PHR, HAZOP), maintenance (FMEA) and

decommissioning (HAZID).

6. HAZOP study reviewed periodically, minimum every 5 years

interval, for all process facilities.

4.2 Assessment

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

5.1 Asset Integrity

1. Equipment file available to capture history e.g. maintenance

records, repair, change of service etc.

2. Specific Equipment Reliability Plan (SERP) available and

implemented.

3. Action plans arising from risk-based assessment (e.g. RBI,

IPF, ECA, Electrical equipment risk assessment) are being

implemented and tracked.

4. Use of appropriate tools (e.g. FMEA, What-if etc.) for failure

analysis and deficiency management (bad actor management).

5. List of MCF elements related procedures and plans, and

records for their effectiveness review status.

1. Actively seeking applying and improving best practices

through benchmarking with other similar industries.

2. Evidence of site being benchmarked on Asset Integrity

Management System.

Well Integrity and Rig Integrity Documents Verify completeness, implemenattionVerify implemention, action plan (from

assurance) x x x x

2. List of Procedures rand Work Instruction,

including Approved work instruction for

drilling Equipment.

Availability

3. Bridging Document

4. SISO

5.3 Management

Of Change

1. Compliance audit conducted on MOC process and findings

are addressed.

2. Action items arising from MOC process are tracked and

properly closed

- Risk Assessment conducted for all changes under MOC

(equipment, procedure, organization& people) are adequate

and action items incorporated in finalizing the changes.

- Pre-startup safety review carried out prior to system or

equipment start-up arising from change.

3. Change log/master register established and updated.

1. Interview of personnel at different level and department to

gauge understanding on application of MOC.

2. Evidence of revision on MOC procedure to include

benchmarking result and industry best practices. (e.g. online

system to facilitate MOC procedure and implementation).

5. MOC - Approved MOC procedures , MOC

related docs ( MOC forms, Risk Assessment ,

Tracking of MOC , Minutes of meeting ,

Training Records.,

MOC Procedure - Scope covers equipment,

org, people, procedure, changes are logged in

master register, deviations approved by

relevant TA

Verify MOC records x x x

5.4 Contingency

and Emergency

Planning

1. Competencies are defined and assured through appropriate

training and skill development, comprehensive tiered

emergency response planning in-line with PETRONAS

standards.

2. Drills include testing the coordination between sites are

carried out.

3. Training records to relevant personnel are available such as

Emergency Response Team (ERT), Emergency management

team (EMT) and Country Support Team (CST).

4. Tier 2 post mortem reports / status of action item.

1. Drills are conducted within the OPU and external agencies in

accordance to plan.

2. Post mortem of drills are carried with improvements

incorporated and checked.

3. Tier 3 post mortem reports / status of action item

6. Emergency Reponse / Crisis Management

related records - Drills, Exercise, Inicdent

Management Framework

Incident Command structure Verify plan, exercise effectiveness x x x x x x

ELEMENT 5 : PLANNING & PROCEDURES

Availability, consultation with TA/ SME

Verify implementation and effectiveness5.2 Procedure and

Work Instruction

1. System and arrangement for managing Procedures and

working instructions consistently implemented

2. Central Register of Procedures and working instructions is

available.

3. Validation process consistently applied in developing and

reviewing Procedures and working instructions.

4. Procedures and working instructions need assessment

revisited based on defined criteria e.g. fixed interval or based

1. Evidence of incorporation and enhancement of procedures

and work instructions through benchmarking.

2. Evidence of sharing and adoption of procedure and work

instruction by others.

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

ject

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

ing

HR

1.  HSE Performance Report & Incident

Analysis

No of KPIs, Reactive & Proactive KPI, regularly

reviewed, linkage of analysis with

intervention programme

Verify measurement standards used x

2. HSE Plan HSE plan monitoring & frequency HSE plan monitoring & frequency x x x

3. HSE Records Maintained regularly Accessibility,availability x

4. Register of non conformance. Corrective

action status (HSERAI)Tracking system in place, peridocical review Verify effectiveness, records x x x x x x x

6.3 Non

Compliance and

Corrective/

Preventive Actions

1. Report of non-compliances

2. Record monitoring and tracking of action items resulting

from non-compliance.

Evidence of employees adequately assessing the other

alternatives whenever there is a potential need to deviate from

standards and procedures through interview and review of

reports.

5. Incident Reports & Register, HSE Alerts

(including Incident Management Framework)Findings shared, tracking system in place,

Verify incident reports, action plan , following

process flow / frameworkx x x x x x

6.4 Incident

Reporting and

Follow-Up

1. Incident report.

2. Investigation team training record.

3. Evidence of lesson learnt dissemination e.g. through

meetings, e-mail, and newsletters.

4. Tracking and monitoring record of action items.

1. Report on analysis of incidences and its link to intervention

programs.

2. Lessons learnt from external parties.

3. Review statistic to verify no recurrence of similar incidents

HSEMS LEVEL 3 LEVEL 4 Relevent Evidences for Wells (2014, 2015) Doc Evaluation expectation Interview/ Site Visit expectation Rig

Pro

jec

t

HSE

WM

WIN

T

WIS

TES

RIS

K

WC

MA

Pla

nn

i

ng

HR

7.1 Assurance

1. Assurance plan.

2. External assurance reports.

3. Status of action items.

1. All MCF related documents & assurances per list next page

2. Assurance plan.

3. Assurance reports.

4. Status of action items.

5. Benchmarking report.

1. Wells Asurance Plan/ Schedule Availability Verify implementation, action plan x x x

2. Assurance Reports Availability Verify implementation, action plan x x x x x x

3. Auditor Training Records, Competency

RegisterNA NA

7.3 Contractor

Assurance

1. Contractors HSE assurance integrated with OPUs assurance

activities. Recommendations are documented and tracked to

closure.

2. Contractors’ assurance activities involved line personnel and

independent parties e.g. OPUs, certification bodies, regulatory

bodies and customers.

1. Contractor assurance findings are reviewed, analysed and

tabled at contract review forum and at Management Review.

2. Results of assurance activities are reflected in contractors’

performance.

3. Lesson learnt from contractors’ assurance activities

incorporated in future contract.

ELEMENT 6 : IMPLEMENTATION & MONITORING

ELEMENT 7 : ASSURANCE

7.2 Assessor

Competency

1. There is an assessor refresher training and competency

development plan.

2. Assessors continue to participate in internal assurances.

3. Assessors’ performance is being assured as part of system

assurance.

4. Development plan in place for new assessors.

5. MCF related assurance mapping and records for

implementation

1. Assessors competency recognized by other OPUs/bodies.

2. Assessors are recognized as critical function in the

organization and include in overall company training matrix.

1. Report on detailed analysis of HSE performance and

evidence of presentation to management are consistently

conducted.

2. HSE performance is being used as one of the criteria for

decision making e.g. intervention plans, contractor selection.

1. KPIs for implementation of HSE MS elements and procedures

are being used and included in employee appraisals.

2. Benchmarking report on HSE performance and targets are

regularly reviewed.

3. KPIs and targets are regularly reviewed and revised to

become more stringent for both leading and lagging.

6.1 Performance

Monitoring

1. HSE records are identified and retention periods determined.

2. HSE records are maintained, are traceable, and made

available as per procedure.

3. Verification of accessibility through interviews and

demonstration.

1. HSE records are maintained and available at all sites and

accessibility by all parties.

2. Verification of accessibility through interviews and

demonstration.

3. Records for MCF related procedures, implementation and

gap assessment as per document listed in Section 7.1

6.2 Records

1.  Wells HSE Committee Meeting x x x

2.  Wells LT Meeting x x x

ELEMENT 8 : MANAGEMENT REVIEW

8.1 Management

Review

1. Review have taken place and there are documented

record/evidence of Management Review carried out in

accordance to approved agenda and planned schedule.

2. Changes in risk exposure, stakeholders, the business

environment, and performance are included in the agenda of

the review, are analyzed and presented in Management review.

3. HSE Performance is trended and analyzed and present to

Management Review.

4. Action item from Management Review being tracked and

effectively closed.

5. Result of Management Review are being communicated.

6. Records for management review & intervention plan.

1. Evidence of integrated HSE objective and plan with company

business strategy.

2. Evidence of benchmarking result with other company use as

criteria in decision making.

3. Records for management review & intervention plan.

Reactive performance used as input to

modify HSEMS, HSE performance trend,

analysis, action tracking and effective closure

Verify implementation, effectiveness and

results communicated to stakeholders, action

plan

3

4

26

.

Hazard Top Event P E A R OR MAH

Hydrocarbons in formation Uncontrolled Release to

Surface B5 B3 B4 B5 H*B5

Yes

Personnel at Height >2m Fall from HeightC4 B1 C1 B4 H*

C4

No

Objects Overhead Loss of ControlB5 C2 B2 B3 H*

B5

Yes

Objects under Tension Loss of ControlC4 B3 C3 C3 H*

C4

No

Objects under Compression Loss of StabilityB5 B1 B5 D2 H*

B5

Yes

Equipment with Moving or

Rotating Parts

Caught byC4 C1 C1 B1 H*

C4

No

Using Hand Tools Loss of ControlD3 C1 C1 B1 H*

D3

No

Weather Conditions Loss of stabilityC4 B1 C2 B1 H

C4

No

Voltage > 50 V to 440 V in

cables

Loss of electrical insulationC4 B1 B3 B1 H*

C4

No

Voltage > 440 V Electrical ShockC4 B1 B3 B1 H*

C4

No

Manual material handling Loss of ControlD3 D1 D1 B3 H

D3

No

27

Safe System of Work (e.g. PTW, PPE program, Working on Roofs) 3 4

Legal/Regulatory Requirements (e.g. OSHA, FMA, AELA, etc.) 2 2

Activity / Task Risk Assessment 2 2

Incident Investigation 3 4

Compliance Auditing 2 3

Safety Critical Equipment 2 3

Management of Change 3 4

Management of Contractors & Suppliers 2 2

Emergency Planning & Response 2 2

Chemical Management 2 2

Behavioural Safety 2 2

Drilling Operation Pre-activity Safety Review e.g. Drill on Paper

Review, Drilling Readiness Assessment, etc.2 3

Managing Major Hazards 2 3

11

12

13

6

7

8

9

10

1

2

3

4

5

DSDESCRIPTOR DSV

28

29

30

31

32

33

34


Recommended