20-Nov-06 FALC - KEK Global Design Effort 1
GDE Report
Barry Barish
Caltech / GDE
20-Nov-06RDR Design Freeze
20-Nov-06 FALC - KEK Global Design Effort 2
Outline
• Agenda Items– Progress towards the RDR– Provisional cost estimates– Discussion on the review process of the RDR– Site aspects of RDR
• Additional Items– GDE Coordination of Global R&D Program– Common Fund – Request for FY07
20-Nov-06 FALC - KEK Global Design Effort 4
Baseline to a RDR
Jan July Dec 2006
Freeze ConfigurationOrganize for RDR
Bangalore
Review Design/Cost Methodology
Review InitialDesign / Cost Review Final
Design / CostRDR Document
Design and Costing PreliminaryRDR
Released
Frascati Vancouver Valencia
20-Nov-06 FALC - KEK Global Design Effort 5
System July 18, 2006 - Cost Estimates received for Regionaldescription common e- e+ DR RTML ML BDS Exp Am Asia Eure- Source √e+ Source √DR √RTML √Main LinacBDS √Com, Op, ReliabControl System √ √ √ √ √ √ √Cryogenics √ √ √ * √ √ √ *Convent. Facilities √ √ √ √ √ √ √ * √ √ √ √Installation √ √ √ √ √ √ √Instrumentation √ √ √ √ √ √ √Cavities √ √ √Cryomodules √ √ √ √ √ √ √RF √ √ √ √ √ √ √ √ √Magnets & PS √ * √ *Dumps & Collim √ √ √ √ √Vacuum √ √ √ √ √ √Accel Phys
√ = complete, √ * = almost complete, missing something minor
Vancouver Cost Data
20-Nov-06 FALC - KEK Global Design Effort 6
ILC Estimate by Area Systems -17july06
Main Linac DRs Beam Deliv RTML e+ Source Exp. Halls e- Source General
Costs by Area System
20-Nov-06 FALC - KEK Global Design Effort 7
ILC Estimate by Technical & Global Systems - 22july06
Conventional Facilities
Dumps & Collimators
CM & Cavities
Instrumentation
RF
Vacuum
Installation
Magnets
Cryogenics
Controls
Costs by Technical & Global System
20-Nov-06 FALC - KEK Global Design Effort 8
Optimizing Cost to Performance
RDR MB CCB
214mr IRs supported central injectors supported Removal of service tunnel rejected
conventional e+ source rejected
RF unit modifications (24 26 cav/klys) supported submitted
reduced RF in DR (6 9mm z) supported in prep
DR race-track lattice (CFS) supported in prep
reduced static cryo overhead supported in prep
removal linac RF overhead supported in prep
single-stage bunch compressor rejected
e- source: common pre-accelerator supported in prep
20-Nov-06 FALC - KEK Global Design Effort 9
Vancouver Costs for BDS
• Cost drivers– CF&S– Magnet
system– Vacuum
system– Installation– Dumps &
Collimators
Total Cost
Additional costs for IR20 and IR2
20-Nov-06 FALC - KEK Global Design Effort 10
2/20 mrad 14/14 mrad
• Motivation – Reduce costs
• 2 mrad beam line expensive, risky, especially extraction line• Common collider hall
– Advantages• Improved radiation conditions in the extraction lines• Better performance of downstream diagnostics• Easier design and operation of extraction optics and magnets• Reduced back scattering from extraction line elements
– Disadvantages• Impact on physics (appears minor at present). • Simpler incoming beam optics
• R&D on small crossing angles will continue as alternative
20-Nov-06 FALC - KEK Global Design Effort 11
On-surface Detector Assembly• Vancouver WBS considered the underground halls
sized at 32m (W) x 72m (L) each to allow underground assembly of the largest considered detector.
• Conventional Facilities Schedule gives detector hall is ready for detector assembly 5 yrs from project start– If so, cannot fit our goal of “7years until first beam” and
“8years until physics run”
• Surface assembly allows to save 2-2.5 years and allows to fit into this goal– The collider hall size may be smaller (~40-50%) in this
case – A building on surface is needed, but savings may be
still substantial
• Optimization needs to be done
20-Nov-06 FALC - KEK Global Design Effort 12
CMS assembly approach• Assembled on the surface in parallel with underground work• Allows pre-commissioning before lowering• Lowering using dedicated heavy lifting equipment• Potential for big time saving• Reduce size of underground hall required
On-surface assembly
20-Nov-06 FALC - KEK Global Design Effort 13
Cost details of new 14/14 baseline
Total cost
1.000
0.3680.316 0.316
0
0.2
0.4
0.6
0.8
1
1.2
Total Common add for IR A add for IR B
a.u.
Updates from CF&SMagnets to be included
Should we go to a single IR and push
pull system and save 30% of BCD costs?
20-Nov-06 FALC - KEK Global Design Effort 14
Push-Pull Evaluation
• Initiated by GDE & WWS at the end of September• Detailed list of questions to be studied developed:
• Large group of accelerator and detector colleagues, from ILC and other projects, is participating in design and discussion of these question
• The task force of detector experts was formed to contribute to detailed evaluation of the whole set of technical issues
http://www-project.slac.stanford.edu/ilc/acceldev/beamdelivery/rdr/docs/push-pull/
20-Nov-06 FALC - KEK Global Design Effort 15
Cost Reductions Logged
Our efforts at Valencia identified another 4.91%!
05
10
152025
initia
l
BDS
14/1
4 + m
uon
1 e+ r
ing
ML RF
DR 9m
m +
e+ so
urce
RTML
CF&S
Sha
fts+
Centrariz
ed D
R
BDS
1IR
Cooli
ng+M
isc
Energy
?
Lumino
sity?
%
Accumulated Cost Savings Each Cost Savings
20-Nov-06 FALC - KEK Global Design Effort 16
ILC Documents
• Several reports for different audiences
• Brochure – non-technical audiences, ready now• “Quantum Universe” level booklet ~30 pages
• Executive Summary ~ 30 pages • Physics motivation, accelerator and detectors
• RDR Report ~ 300 pages• high level description of the accelerator
• DCR Report ~ 250 pages• physics and detectors
•
20-Nov-06 FALC - KEK Global Design Effort 17
RDR Report
• RDR is a high level description of the accelerator, CFS, sites and costs
• A snapshot of what we propose to build– not a history of R&D, design evolution, and
alternatives
• Editors: – Nan Phinney (SLAC), Nobu Toge (KEK), Nick Walker
(DESY)
• Original schedule was complete draft now, but has been pushed back because of cost iterations
20-Nov-06 FALC - KEK Global Design Effort 19
Plans until Beijing (Feb. '07)
November December January February
Valencia
Further cost consolidationCCR preparation & submission
Cost & Design Freeze 30/11
Prepare for Full Cost Review
SLAC Cost Review 14-16/12
MAC 10-12/01/07
Final cost corrections and documentation
Agency cost briefings
Beijing: RDR draft published
RDR final editing
RDR prepare 1st drafts
2006 2007
20-Nov-06 FALC - KEK Global Design Effort 20
Charge for MAC Review
• On Wednesday 10, Thursday 11 and Friday 12 (until noon) January 2007, there will be an ILC MAC meeting at the Cockcroft Institute, Daresbury, UK. The major item for the meeting is the ILC cost and overall design, with specific MAC tasks:
– Review the soundness of the overall RDR concept, identify any areas of concern, note what R&D is still needed, and comment on whether the performance parameters can be met.
– Review the cost methodology and identify any areas of concern.
• This will be the first occasion at which costs will be presented outside of the GDE.
20-Nov-06 FALC - KEK Global Design Effort 21
What Happens after Beijing?
• Public Release of Draft RDR and Preliminary Costing at Beijing– Cost Reviews, etc– Finalize RDR by Summer 2007?
• Enter into Engineering Design Phase– Planning underway internally– Design will evolve through value engineering
and R&D program– General Goal is to have Construction Proposal
ready by 2010
20-Nov-06 FALC - KEK Global Design Effort 23
Presentation Strategy• The GDE is purposefully constituted as a tri-regional
design team whose goal is to produce by 2009 a Technical Design Report (TDR) which will contain a detailed, engineering-based design and cost for the ILC.
• The initial step towards the TDR was to establish a Reference Design Report (RDR) which will define a self-consistent set of ILC design parameters and associated implementation scope. The RDR also contains an initial estimate of cost at the 20% level which is mostly parametric in nature. This initial cost estimate is at sufficient detail to permit a) trend analysis for cost reduction/optimization and b) give guidance for the R&D and industrialization that must accompany the engineering design process of the TDR.
20-Nov-06 FALC - KEK Global Design Effort 24
Cost Review Guideline• An international team should be convened prior to completion of
the RDR to review those aspects of the RDR cost estimate that strongly influence the TDR. Given the intermediate nature of the RDR estimate as discussed above, it would seem premature to review in detail every aspect of an ILC cost estimate. Rather this review team should:– review cost trends and relative costs of sub-systems as
they relate to potential scope changes to be incorporated in the TDR
– review cost trends and relative costs of sub-systems and comment on their relevance to the R&D program needed to complete the TDR
– review the methodology used in the estimate to ensure that it is appropriate for establishing an accurate TDR cost assessment. Evaluate that the method and format of estimation can serve the needs of regional authorities as they develop plans for potential involvement as partners in the ILC
20-Nov-06 FALC - KEK Global Design Effort 26
Site Aspects of RDR
• Three Samples Sites– ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic
Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group
– Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited
– Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total.
20-Nov-06 FALC - KEK Global Design Effort 27
ILC Estimate by Technical & Global Systems - 22july06
Conventional Facilities
Dumps & Collimators
CM & Cavities
Instrumentation
RF
Vacuum
Installation
Magnets
Cryogenics
Controls
Costs by Technical & Global System
20-Nov-06 FALC - KEK Global Design Effort 28
Site Aspects of RDR
• Three Samples Sites– ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic
Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group
– Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited
– Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total.
• Costing Regional – Best estimates in “own” system of costing. They are close to equal, meaning the RDR siting chapter can concentrate on requirements, technical features, cost drivers, safety issues, other issues etc.
• Need “true” candidate sites within ~ 1-2 years for realistic engineering design. How do we solicit candidate sites
20-Nov-06 FALC - KEK Global Design Effort 30
The ‘S’ R&D Task Forces
S0High-Gradient Cavities
S1High-Gradient Cryomodule
S2Test Linac
S3Damping Ring
S4Beam Delivery
S5…Sn
To address priority R&D items, RDB has convened several ‘task forces’.
S0-S3 will report on Friday AM GDE plenary
20-Nov-06 FALC - KEK Global Design Effort 31
The ‘S’ R&D Task Forces
• Addresses current ‘poor’ yield for EP cavities
• Primary goal: establish parameters for routinely producing 35 MV/m EP’d cavities– required 80% yield
S0High-Gradient Cavities
S1High-Gradient Cryomodule
S2Test Linac
S3Damping Ring
S4Beam Delivery
S5…SnH. Hayano, T. Higo, L. Lilje, J. Mammosser, H. Padamsee, M. Ross, K. Saito
20-Nov-06 FALC - KEK Global Design Effort 35
FY06 FY07 FY08
Max, Mora, M&S, Travel, Web $377 $377 $377
Costing Support - 3 FTE $150 $300
EDMS Support - 3 FTE $150 $300
Meeting Support $50 $50
Unsupported Travel (MAC, etc) $50 $50
Project Manager $100 $200
Communications $100 $100
Detector Review (new – extra) $50 $50
TOTAL Central Support Needed $377 $1,027 $1,427
Can reduce by any offset support from labs
DESY EDMS 2FTE ($100) ($200)
TOTAL - Common Fund $377 $927 $1,250
Projected Budgets
20-Nov-06 FALC - KEK Global Design Effort 36
Summary
• Status of Costing– First costing available at Vancouver (July)– Cost to performance optimization
• Status & Plans for design modifications– Several proposals accepted and some rejected– Changes having physics impact (Valencia)– Complete RDR by Beijing Meetings
• Global planning for critical R&D beginning– Formation of ‘S’ task forces
20-Nov-06 FALC - KEK Global Design Effort 37
Final Discussion Points
• Discussion Items – The MAC Review in January? Preview of RDR
and Costs or list of items?– Informing ILCSC (Feb 4?) – Informing FALC ?– Strategy for Release – ICFA Feb– International Cost Review (FALC Sponsored?)
• How are we going to approach getting candidate sites? Who solicits?
• Common Fund Request