2007 MITSUBISHI LECTURE2007 MITSUBISHI LECTURE
HIGHWALL, STOCKPILE AND DUMPS:SAFETY AND PRODUCTIVITY
Tim SullivanPells Sullivan Meynink
Pells Sullivan Meynink Pells
Sulli
van
Mey
n ink
MINING AND RISK ?MINING AND RISK ?
Pells
Sulli
van
Mey
n ink
SURFACE MININGSURFACE MINING
Traditionally two General Subdivisions:– Hard Rock and– Soft Rock.
But
“…….all geotechnical materials are part of one continuous spectrum”.
“…….one continuous science extending from soft soils to hard rocks. All geotechnical materials behave according to the same engineering principles…”
“…….differences a function of degree rather than fundamental nature” (Johnston 1991).
Pells
Sulli
van
Mey
n ink
OPEN CUT MINE SLOPE DESIGNOPEN CUT MINE SLOPE DESIGNApplication of scientific methods and engineering principles to the materials of the earth’s crust for the solution of engineering problems.
MINE SLOPE DESIGN:
• Soil mechanics,• Rock mechanics,• Hydrogeology and• Geology.
Geologically based science.
Fundamental corner stone of all mine slope design is geology.
Success with mine design depends on the ability to understand the geology.
In particular, the Patterns, Subtleties and Variations.
Pells
Sulli
van
Mey
n ink
ENGINEERING AND SCIENTIFIC ENGINEERING AND SCIENTIFIC DISCIPLINESDISCIPLINES
Pells
Sulli
van
Mey
n ink
GENERAL SLOPE DESIGN OBJECTIVESGENERAL SLOPE DESIGN OBJECTIVES
What are the general slope design rules?
“achieve an optimum design – a compromise between a slope which is steep enough to be economically acceptable and one which is flat enough to be safe” (Hoek and Bray, 1981).”
What is the practical reality to statements such as:
“steep enough to be economically acceptable”or
“flat enough to be safe”.
The other general definition of the optimum pit slope design is:
“The best design is the one which falls down the day that the last truck leaves the pit”.
2
Pells
Sulli
van
Mey
n ink
SIMPLE GEOLOGY SIMPLE GEOLOGY –– RISK?RISK?
Pells
Sulli
van
Mey
n ink
COMPLEX GEOLOGY – RISK?
Pells
Sulli
van
Mey
n ink
HOW EFFECTIVELY HOW EFFECTIVELY CAN WE CAN WE
UNDERSTAND THE UNDERSTAND THE GEOLOGY?GEOLOGY?
COMPARISON OF COMPARISON OF DRILLINGDRILLING
AND INTERPRETED AND INTERPRETED FAULTSFAULTS
Pells
Sulli
van
Mey
n ink
TECHNICAL COMPLEXITY AND RISK?TECHNICAL COMPLEXITY AND RISK?
Pells
Sulli
van
Mey
n ink
MINE GEOMETRY AND RISK?MINE GEOMETRY AND RISK?
Pells
Sulli
van
Mey
n ink
MINE GEOMETRY AND RISK?MINE GEOMETRY AND RISK?
3
Pells
Sulli
van
Mey
n ink
MINE GEOMETRY AND RISK?MINE GEOMETRY AND RISK?
EXCAVATING A SLOT NEXT TO AN UNSTABLE HIGHWALL
1
2007 MITSUBISHI LECTURE2007 MITSUBISHI LECTURE
PART 2CASE STUDIES
Pells Sullivan Meynink
CASE EXAMPLESCASE EXAMPLES“…slopes seldom fail without giving adequate warning” (Hoek
and Bray 1974)
Five Scales Of Problem:• Very Large Post Failure Deformations• Large Blocky Failures and
Collapses – Highwalls and dump• Bench Failure• Rockfall• Small Individual Blocks
Pells
Sulli
van
Mey
n ink
FREEPORT OVERALL VIEWFREEPORT OVERALL VIEW
Pells
Sulli
van
Mey
n ink
PRE FAILURE PRE FAILURE -- SOUTH WALLSOUTH WALL
Pells
Sulli
van
Mey
n ink
OVERALL OVERALL VIEW OF VIEW OF
FLOW PATHFLOW PATH
Pells
Sulli
van
Mey
n ink
FLOW PATH LOWER SLOPEFLOW PATH LOWER SLOPE
Pells
Sulli
van
Mey
n ink
MID HEIGHT BENCH 80m WIDE ? ENOUGH??
DEATHS OCCURRED HERE
2
FLOW PATH IN TOEFLOW PATH IN TOE
Pells
Sulli
van
Mey
n ink
FLOW PATH MID SLOPEFLOW PATH MID SLOPE
Pells
Sulli
van
Mey
n ink
CRESTCREST
Pells
Sulli
van
Mey
n ink
FINE GRAINED ALTERED ROCK
SECTION THROUGH SLIDESECTION THROUGH SLIDE
Pells
Sulli
van
Mey
n ink
DRILL, SHOVEL AND TRUCKSDRILL, SHOVEL AND TRUCKS
Pells
Sulli
van
Mey
n ink
DRILL,TRUCK AND SHOVELDRILL,TRUCK AND SHOVEL
Pells
Sulli
van
Mey
n ink
3
TRUCKTRUCK
Pells
Sulli
van
Mey
n ink
MONITORINGMONITORINGSYSTEMS?SYSTEMS?
Pells
Sulli
van
Mey
n ink
NCHANGANCHANGA
Pells
Sulli
van
Mey
n ink
UNBENCHED FOOTWALL – 220m HIGH
OVERALL VIEW OF FAILUREOVERALL VIEW OF FAILURE
Pells
Sulli
van
Mey
n ink
CRESTCREST
Pells
Sulli
van
Mey
n ink
SHOVEL DESTROYEDSHOVEL DESTROYED
Pells
Sulli
van
Mey
n ink
4
SECTION THROUGH FAILURESECTION THROUGH FAILURE
Pells
Sulli
van
Mey
n ink
27ºKINK BANDS
SUMMARY OF FAILURE INFORMATIONSUMMARY OF FAILURE INFORMATION
Pells
Sulli
van
Mey
n ink
NchangaPrevious failure20,000,000 tonnesJune 1985
NchangaPrevious failure20,000,000 tonnesJune 1985
HISTORY OF FAILURESANTAMINA PERUANTAMINA PERU
Pells
Sulli
van
Mey
n ink
OVERALL SETTINGOVERALL SETTING
Pells
Sulli
van
Mey
n ink
LAKE SEDIMENTS LEFT IN VALLEY
SHOVEL AND TRUCK SHOVED ACROSS PIT SHOVEL AND TRUCK SHOVED ACROSS PIT FLOORFLOOR
Pells
Sulli
van
Mey
n ink
5
BULLDOZER BURIEDBULLDOZER BURIED
Pells
Sulli
van
Mey
n ink
?
INTACT ROCK BUNDLAKE
SEDIMENTS
DRILLSDRILLS
Pells
Sulli
van
Mey
n ink
CLOSE UP OF DRILLCLOSE UP OF DRILL
Pells
Sulli
van
Mey
n ink
ABERFAN ABERFAN –– EXCAVATING THE TOEEXCAVATING THE TOE
Pells
Sulli
van
Mey
n ink
OVERALL VIEW OF ABERFANOVERALL VIEW OF ABERFAN
Pells
Sulli
van
Mey
n ink
PREVIOUS SLIDE
ABERFAN WASTE DUMPABERFAN WASTE DUMP
21ST October 1966.144 deaths, including 116 children.
Colliery waste had been dumped above the village for more than 20 years.
Two previous dump failures had occurred; 1944 and 1963. The 1963 failure was in the same location as the 1966 failure.
Because mine personnel were not injured and the downstream environment was not significantly damaged, the 1944 and 1963 slides were ignored.
Pells
Sulli
van
Mey
n ink
6
SUMMARY OF ISSUES AND FINDINGSSUMMARY OF ISSUES AND FINDINGS
GEOTECHNICAL FACTORS
Dump formed over springs, lead to softening of the toe.Dumped materials a mixture of rock, coal slurry and water.High moisture content of dump material lead to liquefaction.Failure took a few minutes.
CONCLUSIONS OF INQUIRY
“…the Aberfan Disaster is a terrifying tale of bungling ineptitude by many men charged with tasks for which they were totally unfitted, and of total lack of direction from above. Not villains but decent men, led astray by foolishness or by ignorance or by both in combination, are responsible for what happened at Aberfan.”
Pells
Sulli
van
Mey
n ink
THREDBO LANDSLIDE
1997
18 DEATHS
Pells
Sulli
van
Mey
n ink
LOCATION IN LOCATION IN THE VILLAGETHE VILLAGE
LANDSLIDE MASSLANDSLIDE MASSONLY 1300 mONLY 1300 m³³
Pells
Sulli
van
Mey
n ink
VIEW OF TOP OF SLIDEVIEW OF TOP OF SLIDE
Pells
Sulli
van
Mey
n ink
MUDFLOW THROUGH THE LODGESMUDFLOW THROUGH THE LODGES
Pells
Sulli
van
Mey
n ink
“LOST FORGOTTEN OR IGNORED”
Over 40 year history of similar but infrequent slides in the area.
Site originally classified as “unstable and unbuildable”
Loose dumped fill at 40° over an old landslide.
High pressure water pipeline – Asbestos cement with simple push couplings– Approved and constructed through the site.
Pells
Sulli
van
Mey
n ink
1
2007 MITSUBISHI LECTURE2007 MITSUBISHI LECTURE
Part 3 Large Blocky Failures
HighwallsAnd
Benches
Pells Sullivan Meynink Pells
Sulli
van
Mey
n ink
CARTENGA COAL MINE COLUMBIACARTENGA COAL MINE COLUMBIA
Pells
Sulli
van
Mey
n ink
DRAGLINE SPOIL DUMP
BRIDGE
Pells
Sulli
van
Mey
n ink
LOADERLOADER
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
?
Pells
Sulli
van
Mey
n ink
TOE OF FAILURETOE OF FAILURE
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
OVERALL VIEW OF HIGHWALL FAILUREOVERALL VIEW OF HIGHWALL FAILURE
Pells
Sulli
van
Mey
n ink
2
Pells
Sulli
van
Mey
n ink
GEOLOGICAL SETTING GEOLOGICAL SETTING UNDERCUTTING A DIP SLOPEUNDERCUTTING A DIP SLOPE
Pells
Sulli
van
Mey
n ink
10º
UNDERCUT HIGHWALL
Pells
Sulli
van
Mey
n ink
Mt. KEITH OVERALL SETTING Mt. KEITH OVERALL SETTING -- CUTBACKCUTBACK
Pells
Sulli
van
Mey
n ink
HAUL ROAD ON OUTSIDE OF CUTBACK
Pells
Sulli
van
Mey
n ink
TRUCK IN WATERTRUCK IN WATER
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
ROCK MASS FABRIC IN CUTBACKROCK MASS FABRIC IN CUTBACK
Pells
Sulli
van
Mey
n ink
DAYLIGHTING PLANES
SLOPE AT THE LIMIT WITH STRUCTURE PARALLEL OR DAYLIGHTING
CONTINUOUS ROCK STRUCTURE FABRIC
Pells
Sulli
van
Mey
n ink
CLOSE UP OF ROCK FABRICCLOSE UP OF ROCK FABRIC
Pells
Sulli
van
Mey
n ink
“SMOOTH” INFILLED JOINTS
Pells
Sulli
van
Mey
n ink
ROCK MASS FABRICROCK MASS FABRIC
Pells
Sulli
van
Mey
n ink
REAR RELEASEPLANES
3
Pells
Sulli
van
Mey
n ink
SHEAR ALONG JOINT PLANESSHEAR ALONG JOINT PLANES
Pells
Sulli
van
Mey
n ink
SHEAR AND DILATION ON MAJOR PLANES
Pells
Sulli
van
Mey
n ink
PREVIOUS FAILURE OF SAME TYPE IN THE PREVIOUS FAILURE OF SAME TYPE IN THE SAME SLOPE AT HIGHER ELEVATION ALSO SAME SLOPE AT HIGHER ELEVATION ALSO
AFFECTING HAUL ROADAFFECTING HAUL ROAD
Pells
Sulli
van
Mey
n ink
HAUL ROAD RE-ROUTED
PREVIOUS
NEW
Pells
Sulli
van
Mey
n ink
TRITRI--STAR COAL MINE STAR COAL MINE MARYLAND USAMARYLAND USA
1717THTH April 2007 April 2007 –– 2 killed2 killed
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
OVERALL OVERALL VIEW OF VIEW OF
HIGHWALL HIGHWALL COLLAPSECOLLAPSE
Pells
Sulli
van
Mey
n inkBULLDOZER AND
BACKHOE BURIED
Pells
Sulli
van
Mey
n ink
KIDSTON KIDSTON –– OVERALL VIEWOVERALL VIEW
Pells
Sulli
van
Mey
n ink
CABLE BOLTED FOOTWALL STEEPENED BELOW HAUL ROAD Pe
llsSu
lliva
nM
eyn i
nk
PREPRE--SPLIT DRILL RIG SPLIT DRILL RIG DRILLING SECOND LIFT OF TRIPLE BENCHDRILLING SECOND LIFT OF TRIPLE BENCH
Pells
Sulli
van
Mey
n ink
Failure plane and collapseDrill rig located here
4
Pells
Sulli
van
Mey
n ink
CHARACTER OF FAILURE PLANECHARACTER OF FAILURE PLANE
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
HOLES HALF FULL OF GROUT AND CABLES HOLES HALF FULL OF GROUT AND CABLES NOT GROUTEDNOT GROUTED
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
COAL MINECOAL MINE
Pells
Sulli
van
Mey
n ink
UNCONTROLLED PLACEMENT OF UNCONTROLLED PLACEMENT OF WET TERTIARY IN DUMPWET TERTIARY IN DUMP
Pells
Sulli
van
Mey
n ink
EQUIPMENT EQUIPMENT DAMAGEDAMAGE
Pells
Sulli
van
Mey
n ink
LOSS OF PRODUCTIONLOSS OF PRODUCTION
5
Pells
Sulli
van
Mey
n ink
LOSS OF DRAGLINE? LOSS OF DRAGLINE? AND PRODUCTION LOSSESAND PRODUCTION LOSSES
Pells
Sulli
van
Mey
n ink
LAWLERS GOLD MINELAWLERS GOLD MINE -- FAIRYLAND PITFAIRYLAND PIT
BATTER SCALE FAILURE -27th January 2003 – FATALITY
Catastrophic failure of a portion of the western wall of the Fairyland open pit occurred near an excavator that was digging and loading ore into haul trucks. An ore control technician directing the activities of the excavator was fatally injured when buried under the rockfall.
Immediate suspension of mining and mobilisation of the Mine Rescue Team. Notification of all relevant authorities. An investigation by the Western Australian Police commenced immediately and by the Department of Mineral and Petroleum Resources early the next day. Nature of the failure prevented immediate rescue attempts. Recovery of the body 41 hours after the event
Earlier inspection of the wall shortly before the event by a geotechnical consultant and other staff gave no indication that failure was imminent.
Cause; proximity to pit wall.
Pells
Sulli
van
Mey
n ink
Pells
Sulli
van
Mey
n ink
LOCATION OF FAILURELOCATION OF FAILURE
Pells
Sulli
van
Mey
n ink
1
2007 MITSUBISHI LECTURE2007 MITSUBISHI LECTURE
Part 4Rockfall Issues
AndConclusions
Pells Sullivan Meynink
MantosMantos
Pells
Sulli
van
Mey
n ink
Diagrama de sucesos
Accidente Fatal29 de octubre de 2003
Operaciones Mina Rajo AbiertoDivisión Mantos Blancos
Zona de probable Zona de probable desprendimiento de la desprendimiento de la
roca.roca.
Berma que delimita distanciaBerma que delimita distanciapara interactuar con elpara interactuar con el
talud del sector.talud del sector.
Talud 37Talud 37°° de pendiente.de pendiente.
Cargador Frontal 8703,Cargador Frontal 8703,operado por Jorge Campos,operado por Jorge Campos,a quien se le iba a entregara quien se le iba a entregar
el material de limpieza.el material de limpieza.
Imagen frontal del sector del suceso.
PosiciPosicióón final den final deCamioneta siniestradaCamioneta siniestrada
Imagen tomada desde el banco 780 hacia el banco 756.
Barra de perforaciBarra de perforacióón, con n, con 6 metros de avance 6 metros de avance aproximadamente.aproximadamente.
Berma que delimita el Berma que delimita el acecamientoacecamiento a la zona de a la zona de
riesgo identificado.riesgo identificado.
Imagen tomada desde el banco 756.
2
45 45 mtmt..25 25 mtmt..
Distancias de la camioneta hasta el talud y berma delimitadora de distancia.
Imagen tomada en el banco 684, sector del incidente.
Fragmentos de la roca.Fragmentos de la roca.
Fragmentos de la roca.Fragmentos de la roca.
Imagen tomada en el banco 684, sector del incidente.
Zona del impacto directo Zona del impacto directo de la roca en la camioneta.de la roca en la camioneta.
Imagen tomada en el banco 684, sector del incidente.
22°° zona de impacto de la zona de impacto de la roca (cabina)roca (cabina)
Zona de posiciZona de posicióón final de la n final de la roca.roca.
3
SMALL RAVELLING FAILURESMALL RAVELLING FAILUREEVEN SMALL ROCKS CAN BE A PROBLEMEVEN SMALL ROCKS CAN BE A PROBLEM
Pells
Sulli
van
Mey
n ink
RESULTANT VEHICLE DAMAGERESULTANT VEHICLE DAMAGE
Pells
Sulli
van
Mey
n ink
PLACEMENT OF PLACEMENT OF SUMPS AND PUMPS SUMPS AND PUMPS
CONTROL OF CONTROL OF PERSONNEL PERSONNEL
ACCESSACCESS
Pells
Sulli
van
Mey
n ink
PROCEDURES AND CONTROLS FOR LIGHT PROCEDURES AND CONTROLS FOR LIGHT VEHICLE ACCESSVEHICLE ACCESS
Pells
Sulli
van
Mey
n ink
LARGE EXCAVATING EQUIPMENTLARGE EXCAVATING EQUIPMENTUSUALLY A PRODUCTION ISSUEUSUALLY A PRODUCTION ISSUE
Pells
Sulli
van
Mey
n ink
LARGE EXCAVATING EQUIPMENTLARGE EXCAVATING EQUIPMENTUSUALLY A PRODUCTION ISSUEUSUALLY A PRODUCTION ISSUE
BUT IT DEPENDS ON CIRCUMSTANCESBUT IT DEPENDS ON CIRCUMSTANCES
Pells
Sulli
van
Mey
n ink
4
FIXED INFRASTRUCTUREFIXED INFRASTRUCTURE
Pells
Sulli
van
Mey
n ink
OPERATOR ESCAPED UNINJUREDOPERATOR ESCAPED UNINJURED
Pells
Sulli
van
Mey
n ink
ROCKFALLROCKFALL-- WHO IS AT RISK?WHO IS AT RISK?
Pells
Sulli
van
Mey
n ink
ANCILLARY EQUIPMENT ?ANCILLARY EQUIPMENT ?
Pells
Sulli
van
Mey
n ink
LOCATION OF SUMPS AND ANCILLARY LOCATION OF SUMPS AND ANCILLARY EQUIPMENT, ACCESS ON FOOT? EQUIPMENT, ACCESS ON FOOT?
Pells
Sulli
van
Mey
n ink
Sump & pump location? Character of highwall ?
OPERATORS AND LIGHT VEHICLES ?OPERATORS AND LIGHT VEHICLES ?
Pells
Sulli
van
Mey
n ink
5
SLOPE FORM EXACERBATES ROCK FALL SLOPE FORM EXACERBATES ROCK FALL PROBLEMS PROBLEMS –– NO EFFECTIVE BENCHESNO EFFECTIVE BENCHES
Pells
Sulli
van
Mey
n ink
STEEP BENCH SLOPESSTEEP BENCH SLOPESPOTENTIAL FOR SUDDEN FAILUREPOTENTIAL FOR SUDDEN FAILURE
Pells
Sulli
van
Mey
n ink
ROCK FALL FENCESROCK FALL FENCESFALSE SECURITY ?FALSE SECURITY ?
Pells
Sulli
van
Mey
n ink
ACCESS CONTROLS ACCESS CONTROLS
Pells
Sulli
van
Mey
n ink
IMPORTANCE OF PROCEDURES AND IMPORTANCE OF PROCEDURES AND CONTROLSCONTROLS
Pells
Sulli
van
Mey
n ink
LARGER SCALE WALL FAILURES CONTRIBUTING FACTORSFATALITIES AND SERIOUS INJURY INCIDENTS
•••Slope failure onto mine personnel
?•••Large pit wall failure 1
?••Highwall failure onto equipment
•••••Failure leads to mudflow
•••••Failure undercuts equipment 1
••Loss of equipment over pit edge
••••Large pit wall failure
••Failure onto pre-split drilling rig
Inadequate Control of
Access
Inadequate Control of
Excavation
Poor Understanding of Significance of Monitoring
Failure to Appreciate
Post Failure Deformation
Failure to Appreciate
Role of Water
Risky Geological / Geotechnical
Setting Or Design Too
Steep
Inadequate Implementation of
Design
Poor Pit Design
Element
FAILURE TO HEED
EXPLICIT WARNINGS
CONTROL OF INPIT ACCESS AND EXCAVATION
GEOTECHNICAL ISSUESPIT DESIGN ISSUES
INCIDENT
Note 1 Failure to appreciate significance of previous incident (history)
• Principal Factor or Concern• Minor Factor or Concern
6
LARGER SCALE FAILURESLARGER SCALE FAILURES
Pells
Sulli
van
Mey
n ink
The contributing factors in order of decreasing frequency:– Geotechnical Issues – 14 cases.– Access, Procedures and Controls – 3 cases.– Warnings Ignored – 2 cases.– Open Cut Design Issues,
including implementation of design – 2 cases.
Important conclusions are:
1. The overriding influence of geotechnical issues in these serious larger scale failures.
2. The concern that specific warnings apparently went unheeded in two of the cases.
ROCKFALL CONTRIBUTING FACTORS TO FATALITIES AND SERIOUS NEAR MISSES
••Rockfall onto drill
••Rockfall onto truck and excavator
•Rockfall hits light vehicle
•••Ravelling rockfall on light vehicle
••Rockfall through Windscreen
•Bench failure and rockfall
•••••Rockfall below Cutback
•Rockfall below Cutback
•Rockfall below Cutback
Inadequate Separation
between Unstable Area
and Access
Location of Sumps,
Pumps and Ancillary Services
Inadequate Awareness and Access
Controls
Poor Control of Cutback
Excavation
Berm Loss
Poor Blasting Practices
Inadequate Support of Poor Rock Mass Zone
Slope too Steep for
Geotechnical Conditions
Inadequate Catch Fence
Design
ACCESS PROCEDURES AND CONTROLSEXCAVATION PRACTICESDESIGN ISSUES
INCIDENT
SMALLER ROCK FALLSSMALLER ROCK FALLS
Pells
Sulli
van
Mey
n ink
The main issues from the rockfall examples are:
1. Not possible to stop rockfall in mining environment.
1. 2. Identification of rockfall areas is essential.
2. 3. Education and awareness throughout the workforce is essential.
3. 4. Protocols required for what to do in the event of rockfall.
4. 5. Control of access by personnel and smaller ancillary equipment into risk areas is essential.
5. 6. The placement of ancillary items of infrastructure such as sumps, pumps, etc. requires careful consideration.
6. 7. Adequate separation between areas actively generating potential instability, such as cutbacks, and areas of general access is mandatory.
SLOPE DESIGN ELEMENTSSLOPE DESIGN ELEMENTS
Pells
Sulli
van
Mey
n ink
DEEP OPEN CUT MINE SLOPE DESIGN ELEMENTS AND RISK AREAS
•1•Height
•1••Angle
OVERALL
•1•Height
•1••Angle
INTER-RAMP
•••••Berm Width
•••••Height
•••••Angle
BENCHGEOMETRY
EconomicsSafetyEnvironmental FactorsMining SystemsGeotechnical
Issues
RISK AREAMAIN CONTROLLING ORINFLUENCING FACTOR
COMPONENTSLOPE DESIGN ELEMENT
• Principal factor or main concern• Minor factor or concernNotes: 1 Assumes a sound Pit Slope Management Procedure is in place.
Pells
Sulli
van
Mey
n ink
SLOPE DESIGN ELEMENTSSLOPE DESIGN ELEMENTS
Pells
Sulli
van
Mey
n ink
7
SHALLOW OPEN CUT DRAGLINE MINESLOPE DESIGN ELEMENTS AND RISK AREAS
•••Angle(mid light berm)
•••Height
SPOIL DUMP
•••Angle 1LOW WALL
••••Height
••••Angle
HIGHWALL
EconomicsSafetyMining EquipmentalSystemsGeotechnical Issues
RISK AREACONTROLLING ORINFLUENCING FACTOR
COMPONENTSLOPE DESIGN ELEMENT
1 It is assumed the location and hence height are defined by the LOX line and hence this element is fixed
Pells
Sulli
van
Mey
n ink
LESSONS LARGE FAILURESLESSONS LARGE FAILURES
Pells
Sulli
van
Mey
n ink
Role of HISTORY.
Importance of overall GEOLOGICAL SETTING.
Experience with MOVING SLOPES.
Critical role of pore pressure responses.
Understanding POST FAILURE BEHAVIOUR ANDDEFORMATIONS.
Experience base used to predict future performance, is it adequate or appropriate?
MONITORING must be right.
If the environment is different will the performance be the same; climate, stress, blasting?
LESSONS FROM SMALLER LESSONS FROM SMALLER FAILURESFAILURES
Potential risks at all scales.
Not feasible to completely remove the risk.
Those most at risk are people on foot, ancillary equipment and light vehicles.
Importance of:
AWARENESS, PROCEDURES and CONTROLS.