Company Confidential 1 © Nokia Siemens Networks PS CCSR Situation
Transcript

Company Confidential

1 © Nokia Siemens Networks

PS CCSR Situation

Company Confidential

2 © Nokia Siemens Networks

PS CCSR

Company Confidential

3 © Nokia Siemens Networks

RNC 1 PS RAB ACT FAIL Due to

After RNC RAS5.1 upgraded, PS RAB Act fail

due to RNC improved a lot, and PS CCSR improved

from 99.2 to 99.6%

Company Confidential

4 © Nokia Siemens Networks

After RNC RAS5.1 upgraded, PS RAB Act fail

due to RNC improved a lot, and PS CCSR improved

from 99.2 to 99.6%

Company Confidential

5 © Nokia Siemens Networks

RNC 2 PS RAB ACT FAIL Due to

PS RAB Act fail due to RNC more serious then other reason, assume PS CCSR can improve

after RAS 5.1 upgrade

Company Confidential

6 © Nokia Siemens Networks

Company Confidential

7 © Nokia Siemens Networks

RNC 3 PS RAB ACT FAIL Due to

PS RAB Act fail due to RNC more serious then other reason, assume PS CCSR can improve

after RAS 5.1 upgrade

Company Confidential

8 © Nokia Siemens Networks

Company Confidential

9 © Nokia Siemens Networks

RNC 4 PS RAB ACT FAIL Due to

PS RAB Act fail due to IU more serious then other reason.

Company Confidential

10 © Nokia Siemens Networks

Company Confidential

11 © Nokia Siemens Networks

RNC 5 PS RAB ACT FAIL Due to

PS RAB Act fail due to RNC and IU more

serious then other reason, assume PS CCSR can improve

after RAS 5.1 upgrade

Company Confidential

12 © Nokia Siemens Networks

Company Confidential

13 © Nokia Siemens Networks

RNC 6 PS RAB ACT FAIL Due to

PS RAB Act fail due to IU more serious then other reason.

Company Confidential

14 © Nokia Siemens Networks

Company Confidential

15 © Nokia Siemens Networks

Low CCR in RNC SMATUPANG Parameter T315_base on Nov 22th

T315=180S

T315=30S

Smatupang is more setting to

30s, that is related to CCSR PS

Company Confidential

16 © Nokia Siemens Networks

Compare the T315 Vs HSDPA enabledbase on Nov 22th

T315=30S

HSDPAenabled=0

T315=30S

HSDPAenabled=1

T315=180S

HSDPAenabled=0

T315=180S

HSDPAenabled=1

Almost HSDPA enabled site the T315 setting to 30s, that is

maybe impact the HSDPA CCSR performance, and RNC 2 have

more hsdpa site that will impact HSDPA CSSR.

Company Confidential

17 © Nokia Siemens Networks

HSDPA enable site countbase on Nov 22th

HSDPAenabled=0 HSDPAenabled=1

Company Confidential

18 © Nokia Siemens Networks

Conclusion

• Observe from RNC RAJAWALI, After RNC RAS5.1 upgraded, PS RAB Act fail due to RNC improved a lot, and PS CCSR improved from 99.2 to 99.6%.

• RNC 2,3,4 and 5 : PS RAB Act fail due to RNC more serious then other reason, assume PS CCSR can improve after RAS 5.1 upgrade

• RAN 4,5 and 6: PS RAB Act fail due to IU more serious then other reason.

• Almost HSDPA enabled site the T315 setting to 30s, that is maybe impact the HSDPA CCSR performance, and RNC Smatupang have more HSDPA site that will impact HSDPA CSSR.

• Next Action

• RNC RAS 5.1 upgrade: it will improved a lot at PS CCSR

• Change T315 to 180s: change All RNC Smatupang site.


Recommended