Classification: Internal Status: Draft
INT LNG, Melkya17. January 2008
Snhvit LNG a true adventureArctic gas to new markets
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
2/34
2
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
3/34
3
SnhvitThe first gas development project in the Barents Sea
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
4/34
4
Snhvit factsThe first gas development project in the Barents Sea
Discovered: 1981 84Water depth: 250 340 m
Distance to shore: 140 kmGas in place ( GIIP): 317 GSm 3 /11.2 TCF (terra cubic feet)
Condensate: 34 MSm 3
Owners:
3.26%Amerada Hess Norge AS
2.81%RWE Dea Norge AS
12.00%Gaz de France Norge AS
18.40%Total E&P Norge AS
30.00%Petoro AS
33.53%Statoil ASA (Operator)
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
5/34
5
SnhvitThe first gas development project in the Barents Sea
The first export facility for LNG inNorway and Europe
The first offshore project in the BarentsSea
The largest-ever industrial developmentin northern Norway
New technology/
new markets
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
6/34
6
Modultransport
Snhvit- consists of ..
Field developments offshore
Pipeline to shore
LNG plant on land for processingand liquefaction
LNG carriers
Gas to new markets
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
7/34
7
Full subsea field/remote operationRecord-distance multiphase flowCO 2 sequestration and storagePath breaking LNG technology
Zero surface solutions from subsea to the beach
Snhvit technology for the ArcticA benchmark project for offshore and LNG technology
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
8/34
8
Field developments offshore
Remotely controlled subsea development
No installations on the surface
Overtrawlable subsea templates
No toxic discharges to the sea
Re-injection of carbon dioxides (CO 2)
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
9/34
9
SnhvitLNG-plant at Melkya
Separates the various wellstream phases
Separates CO 2 for re-injection
Separates MEG for re-use
Cools down gas to liquid form
(LNG) at -163O
C
Refrigeration processdeveloped by Statoil/Linde
Energy-efficient plant, self-sufficient in electricity
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
10/34
10
Statoil/Linde, MFC
GG
Pre-coolingCycle
Lique-
factionCycle
Sub-coolingCycle
S CCExp. /Gener.
LNG Expander/Generator
Plate FinHea tExchangers
Spiral Wou ndHea tExchangersGenerator
N G
L N G
M
M
M
SCC C ompresso r
PCC C ompresso r
LCC C ompresso r
ElectricPowerGener.
5 x GE LM 6000 GTwith waste hea t recovery
G
G
G
G
G
Process heatconsumers
Fuel gasA ir
H oto ilcycle
Electric Powerfrom the Grid
Se awatercooling
Cold box
Un it 25
Cycle compression andseawater cooling
Un it 25
Electric power gene rationwaste heat recovery,ho t oil cycleUnit 81 and 50
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
11/34
11
SnhvitTesting of compressors
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
12/34
12
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
13/34
13
SnhvitCO2-injection
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
14/34
14
SnhvitMelkya before start-up
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
15/34
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
16/34
16
Prefabrication a necessityHarsh weather conditionsand limited infrastructuremake prefabrication a
necessity
Compact layout
Method that can enable
projects in other remoteareas
Valuable lessons learnt:Technology/
organisation/contracts
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
17/34
17
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
18/34
18
Slug catcher
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
19/34
19
MEG-tanks
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
20/34
20
Kuldeboks Cold box
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
21/34
21
Cold box
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
22/34
22
SnhvitBlue Marlin and process barge in Cadiz
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
23/34
23
SnhvitIn-docking of process-barge
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
24/34
24
4 new carriersL: 290 m, W: 49 m , H: 53 m145 000 cbmMade in JapanDelivery November 2005 - April 2006.
LNG: 70 cargoes a year
LPG: 20 000 tonn
Condensate: 40 000 tonn
LPG/Condensate:
15-20 cargoes a year
LNG-carriers
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
25/34
25
Melkya - Cove Point: 20 days returnMelkya Bilbao: 12 days return
SnhvitShipping and new markets
Cove Point
annually 2.4billion cubic
metres
Iberdrola S.A.
annually 1.6billion cubic
metres
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
26/34
26
Continued high activity parallel processes
Final constructionactivities
Commissioning andtesting
Start up andoperations
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
27/34
27
SnhvitCompletion of all details
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
28/34
28
SnhvitMilestone 21. August
Opening of wells offshoreand flow intothe pipeline
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
29/34
29
SnhvitFakling i oppstartsfasen
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
30/34
30
Hammerfest LNG
Veske-fanger
MottakMling
CO2fjerning
Vannfjerning Kvikkslvfjerning
Flytendegjring
av Natur Gass
LPGTank
KondensatTank
MEGgjenvinning
Kondensatbehandling
CO2 trkingog
rekompresjonNitrogenfjerning
Fraksjonering
Fyr gasssystem LNG
Tank
LNGTank
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
31/34
31
SnhvitFirst cargo left Hammerfest 20. October 2007
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
32/34
32
Lekkasje i sjvannsvarmeveksler
8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]
33/34
33
Annual running costs:
NOK 800 million250 million possibleregional spin-offs
400500 jobs in total
Operations organisation- 200 jobs
Suppliers and contractors
- 100-200 jobs
Regional impact- another 150 jobs
Snhvit- 25 to 30 year production period