2008 Annual Five Year Plan Update 2. 10/12/2007. Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai. Load Assumptions. Reliability Assessment – SSWG Forecast Economic Assessment – ERCOT Forecast. Generation Assumption. Existing generation - PowerPoint PPT Presentation
45
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai
Transcript
Page 1: 2008 Annual Five Year Plan Update 2

2008 Annual Five Year PlanUpdate 2

10/12/2007

Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai

Page 2: 2008 Annual Five Year Plan Update 2

Load Assumptions

• Reliability Assessment – SSWG Forecast

• Economic Assessment – ERCOT Forecast

Page 3: 2008 Annual Five Year Plan Update 2

Generation Assumption

• Existing generation• Mothballed units in-service if reserve margin falls

below 12.5%• Removed DFW-area non-SCR units• All future generation that have signed IA• $7/MMBTU average natural gas price for all

years

Page 4: 2008 Annual Five Year Plan Update 2

Wind Generation

• All generators that are in the SSWG 2007 DSB cases updated 08/30/2007 plus:– Hackberry Wind, 165 MW, Shackelford County– Wildhorse Mountain Wind, 120 MW, Howard County– Gulf Wind, 188 MW, Kenedy County– Penascal Wind, 201 MW, Kenedy County

• Total wind plant capacity are 6514, 6903 MW in 2008 and 2009 respectively

Page 5: 2008 Annual Five Year Plan Update 2

Generation Assumption

2008 2009 2010 2011 2012

SSWG Forecast Load

Reserve Margin (with no mothball units on) 12.4% 11.9% 9.3% 6.9% 5.7%

Reserve Margin (with all mothball units on) 14.6% 14.1% 11.5% 9.1% 7.8%

ERCOT Forecast Load

Reserve Margin (with no mothball units on) 15.5% 15.6% 13.4% 11.2% 10.6%

Reserve Margin (with all mothball units on) 17.9% 17.9% 15.7% 13.4% 12.8%

Page 6: 2008 Annual Five Year Plan Update 2

5-year Study Process

Existing 2012 SSWG Base case

Conditioned Case

Adding Reliability Projects

Reliability Analysis – TO and ERCOT

TPIT and RPG Analysis – TO and ERCOT

Remove Non-RPG approved projects

Base case for economic study

Update the topology and Switch to ERCOT forecast

Adding Economic Projects

RepeatProcessfor previous year

UPLAN Economic Analysis – TO and ERCOT

Final topology for the year

Page 7: 2008 Annual Five Year Plan Update 2

Reliability Projects

Page 8: 2008 Annual Five Year Plan Update 2

Definitions

• Reliability Projects – Transmission projects that are needed to meet NERC or ERCOT reliability criteria that could not otherwise be met by any dispatch of the existing generation in planning studies

• Economic Projects – Transmission projects that are needed to allow NERC and ERCOT reliability criteria to be met at a lower total cost than the continued dispatch of higher cost generation

This distinction is made only to describe what kind of analysis is performed for the project and does not indicate whether the project is required or optional.

Page 9: 2008 Annual Five Year Plan Update 2

Three Buses Example:

– Bus 1• Generator 1

– Capacity: 1800 MW– Cost of generation: $30/MWh

– Bus 2• Load: 1200 MW

– Bus 3• Load: 300 MW

– Three transmission lines with identical rating of 1000 MW and same characteristics (Impedances).

Figure one shows the network and assumptions

How does ERCOT Evaluating Reliability Projects

How does ERCOT Evaluating Reliability Projects

Page 10: 2008 Annual Five Year Plan Update 2

3 Bus Network Example3 Bus Network Example

G1: 1800 MW

Cost: $30/MWh

1200 MW Load

Bus 2

Bus 3 Bus 1

1000 MW

1000 MW 1000 MW

Figure 1300 MW

Load

Page 11: 2008 Annual Five Year Plan Update 2

Traditional Planning: Economic DispatchTraditional Planning: Economic Dispatch

G1: 1800 MW

Cost: $30/MWh

Dispatch 1500 MW

1200 MW Load

Bus 2

Bus 3 Bus 1

1000 MW

1000 MW 1000 MW

Figure 2

Pre Contingency

• G1 is dispatched at 1500 MW to serve load at Bus 2 and Bus 3

• No overload

300 MW Load

Page 12: 2008 Annual Five Year Plan Update 2

Traditional Reliability Project: Post Contingency OverloadingTraditional Reliability Project:

Post Contingency Overloading

G1: 1800 MW

Cost: $30/MWh

Dispatch 1500 MW

1200 MW Load

Bus 2

Bus 3 Bus 1

1000 MW

1000 MW 1000 MW

Figure 3

Post Contingency:

When contingency of line from bus1 to bus3 happens, line from bus 1 to 2 overloads 150%

300 MW Load

Page 13: 2008 Annual Five Year Plan Update 2

Current Planning: Unserved Energy

Current Planning: Unserved Energy

G1: 1800 MW

Cost: $30/MWh

Dispatch 1000 MW

1200 MW Load

Bus 2

Bus 3 Bus 1

1000 MW

1000 MW 1000 MW

Figure 4

• Security constraint dispatch: G1 at 1000 MW

• No Post Contingency Overload.

• Unserved Energy 200 MW at bus 2, 300 MW at bus 3

• Line1-2 showing as a limiting element

UNS: 200 MW

300 MW Load

UNS: 300 MW

Page 14: 2008 Annual Five Year Plan Update 2

Uplan Unserved Energy Report

Line 1-3-1.00Line 1-2300Bus 3

Line 1-3-1.00Line 1-2200Bus 2

CNT 1PTDF/OTDFLimiting Elements

UNS MWUNS Bus name

Page 15: 2008 Annual Five Year Plan Update 2

Reliability Projects5 Year Plan

Page 16: 2008 Annual Five Year Plan Update 2

Reliability Projects And Date Need--Preliminary

Project Name 2008 2009 2010 2011 2012

Rothwood 345/138 kV substation

2nd Forney Auto

Roanoke Switching Station #1 345/138 kV auto

Roanoke Switch - Southlake 138 kV line

Liggett 345/138 kV autotransformer

McCree-Shiloh Upgrade

Lake Creek - Robinson 138 kV line

Coppell Tap - McKamy Tap 138 kV line

McNeil to Summit new 2nd 138kV circuit

Cross Timbers-Roanoke Upgrade

2nd Lewisville Auto

Fairdale-Brand 138 kV line

Temple N to Temple Elm Creek circuit reconfig.

West Levee Series Reactor

Anderson to West Over Hills

Page 17: 2008 Annual Five Year Plan Update 2

Discussion of Selected Reliability Project

Page 18: 2008 Annual Five Year Plan Update 2

Rothwood 345/138 kV Station

Problem:

From Bus To Bus From Bus To Bus From Bus To Bus

INTER___ 3,134.33 -0.7104 DRILCO__ N_BELT__ TOMBAL__ JEWETT_N KING____ KUYDAL74

DRILCO__ 1,584.02 -0.8149 DRILCO__ N_BELT__ TOMBAL__ JEWETT_N KING____ KUYDAL74

INTEQ___ 1,008.25 -0.7691 DRILCO__ N_BELT__ TOMBAL__ JEWETT_N KING____ KUYDAL74

TRSWIG__ 194.88 -0.452 HUMBLE__ TRSWIG__ TOMBAL__ JEWETT_N KING____ KUYDAL74

Contingency Line 2Bus Name

Unserved Energy

PTDF/OTDFOverload Element Contingency Line 1

Page 19: 2008 Annual Five Year Plan Update 2

Before Rothwood Station

TOMBAL__

KUYDAL74

KING____N_BELT__

TOMBAL66

TOMBAL__

RAYFRD66

TOMBAL81

LOUETA66

RAYFRD81

WESFLD__

LOUETA81

JESTER81

T_H_W___

BAMMEL__

JESTER67

GEARS67_

HIDDEN67

N_BELT__

T_H_W95_

GEARS95_

T_H_W81_

TRSWIG__

INTER___

INTEQ___

DRILCO__

45971

4090046100

45972

46511

46510

46261

46512

46051

46262

4657046052

45922

45510

45651

45921

4578146110

45512

45782

45511

46550

45910

45900

45740

VETRAN6746551

9%A

Amps

VETRAN8146552

45972

45971

CWESFLD_

74.2 Mvar

Unserved energy

Contingency

Overload Element

Page 20: 2008 Annual Five Year Plan Update 2

After Rothwood Station

TOMBAL__

KUYDAL74

KING____N_BELT__

TOMBAL66

TOMBAL__

RAYFRD66

TOMBAL81

LOUETA66

RAYFRD81

WESFLD__LOUETA81

JESTER81

T_H_W___

BAMMEL__

JESTER67

GEARS67_

HIDDEN67

N_BELT__

T_H_W95_

GEARS95_

HIDDEN95

T_H_W81_

TRSWIG__

INTER___

INTEQ___

DRILCO__

45971

4090046100

45972

46511

46510

46261

46512

46051

46262

4657046052

45922

45510

45651

45921

45781

45861

46110

45512

45782

45511

46550

45910

45900

45740

KUYDAL75

VETRAN6746551

9%A

Amps

VETRAN8146552

45972

45971

CN_BEL90

CWESFLD_

78.0 Mvar

T_H_W___ THW_GT1_

RW 345

46340

RW13846345

Page 21: 2008 Annual Five Year Plan Update 2

Forney 345/138 kV Auto

Problem

From Bus To Bus From Bus To Bus From Bus To Bus

SGVL1_8 2,178.77 -0.422 SGVLSW1_ SGVLSW1_ WATMLL_W TRINDAD1 WATMLL_E TRICRN1_

KLEBRG1_ 107.01 -0.3605 SGVLSW1_ SGVLSW1_ WATMLL_W TRINDAD1 WATMLL_E TRICRN1_

PTDF/OTDFOverload Element Contingency Line 1 Contingency Line 2

Bus NameUnserved

Energy

Page 22: 2008 Annual Five Year Plan Update 2

Before Forney Auto

FRNY1_5

SGVLSW1_

TRICRN1_

WATMLL_E

WATMLL_W

WATMLL_E

DESPLR1_

LNCST1_8 CRANDALL

SGVLSW1_SGVL1_8

LAWSON1_

KLEBRG1T

BCHSPG1T

KLEBRG1_

SSWWT2T_

SSWWT2_8

WILMER1_

BCHSPG1_

WATMLL_W

SSWWT1T_

SSWWT1_8HUTCH1_8

SMPST2T_

SMPST1_8

MURDCK2T

SCLFPMP1

SMPST2_8

BUNTIN2_

MURDCK2_

PLGRV1T_

CMPWSD2_

CCRST_1T

PLGRV1_8SUTHLD1_CCRST_E8

INDUST_1

INDUST_W

STAUG2T_

SUTHLD2_

PLGRV2T_

OAKLND1T

PLGRV2_8

MURDCK1T

MURDCK1_

STAUG2_8LKJN2_8

STAUG1_8LKJN1_8

FRNY1_8

MURPHY1_

WILMER1_

CCRST_9

CMPTON2_

BUNTIN1_

2432

2428

2437

2433

24352427

2429

3066 2727

24343076

2779

3077

2776

3078

3079

3080

3083

2777

2430

2965

29662964

2986

2988

2962

2989

2987

2985

2963

29602495

296129722494

2975

2974

2976

2951

2973

2952

2969

2953

2954

2955

29562957

29442945 2438

3084

2486

2982

2984

WATMLL_1

FPLEFR2A FPLEFR2B FPLEFR2C

SARGT1_5

SARGT_1T29472947

SARGT_S829482948

SARGT_N829492949

SARGT_2T2950

2997WATMLL_2

MARSHL68456845

MARSHLL_27322732

FORNEY_W2712

2946

SARGT_3T29402940

SARGT_4T29412941

7%A

Amps

DWUSSWW

WITTRD1_

SSWWT_P9230

3081

160 MW 120 Mvar

158 MW 120 Mvar 120 Mvar

LUCAS1_82778

80%A

Amps

Unserved energy

Contingency

Overload Element

Page 23: 2008 Annual Five Year Plan Update 2

Forney Vs. Seagoville

FRNY1_5

SGVLSW1_

TRICRN1_

WATMLL_E

WLEVEE1_

WATMLL_W

DESSW1_8

WATMLL_E

DESHPR1_DESPLR1_

LNCST1_8 CRANDALL

SGVLSW1_SGVL1_8

LAWSON1_

KLEBRG1T

BCHSPG1T

KLEBRG1_

SSWWT2T_

SSWWT2_8

WILMER1_

BCHSPG1_

MSQT1_8

TERRL RC

WATMLL_W

SSWWT1T_

SSWWT1_8

HUTCH1_8

SMPST2T_

SMPST1_8

MURDCK2T

SCLFPMP1

SMPST2_8

BUNTIN2_

MURDCK2_

PLGRV1T_

CMPWSD2_

CCRST_1T

PLGRV1_8SUTHLD1_

STHTN1_8

CCRST_W8 CCRST_E8

INDUST_1

STHTN2_8

INDUST_W

INDUST_E

SOKCF2_8

SOKCF1_8

STAUG2T_

CMPTON1_

SUTHLD2_

WNET3_8

WNET2_8

WALLST1_

POLK2T_8

POLK1T_8

DEALEY1_

PLGRV2T_

PARKDB2_

OAKLND1T

ELEVEE_E

POLK2_8

HMPTN2_8

POLK1_8

HMPTN1_8

WLEVEE_W

PLGRV2_8

MURDCK1T

OAKLND1_

DAVST2_8

MURDCK1_

STAUG2_8LKJN2_8

WMRLD2_8

ENET1_8

SCYENE1T

HSKEL2_8

HSKEL1T_NNET1T_8

SCYENE1_

PRCK2_8

PARKDB1_

HSKEL1_8

NNET1_8

PRCKSW1_

PRCK1_8

OAKLND2_

PARKDB3_

ENET3_8

STAUG1T_

STAUG1_8LKJN1_8

MSQTFR1_

MSQTWE1_SCYENE2T DUCKCK1T

MSQTW1_8SCYENE2_

JMLLER1_

MSQTE1_8

THRNE2_8

FRNY1_8

DUCKCK1_

LKHBPMP_

MSQTTE1_

ESIDE1T_ESIDE2T_

ESIDE1_8

ESIDE2_8 FORNY RC

NNET3_8

NNET2_8

DRAGON2_

DRAGON1_

WLEVEE_E

MURPHY1_

ELEVEE_W

WNET1_8

ENET2_8

BRYNST2_

DAVST1_8MSQT RC

WILMER1_

PARKD1_9

CCRST_9

WMRLD1_8

CMPTON2_

BUNTIN1_

WALLST2_

WLEVEE_1

WLEVEE_2

2432

2428

2437

2433

2398

24352427

24242429

30593060

3066 2727

24343076

2779

3077

2776

3078

3079

3080

3083

2777

2775

6898

2430

2965

29662964

2986

2988

2962

2989

2987

2985

2963

2960

2990

2495

29612972

2992

2493 2494

2975

2993

2974

2976

3024

3023

2951

2981

2973

2876

2875

2977

3019

3018

2842

2952

2445

2969

2482

3021

3020

2400

2953

2954

2970

2955

29562957

3004

2903

27432440

2914

2900

28982906

27452762

2442

2899

2861

2441

2763

2971

2443

2905

2939

29442945

2752

27592744 2934

2747

27542746

2748

2756

2751

2438

2935

2936

2765

27692771

2770

2772 6866

2863

2862

2857

2858

2399

2481

2874

2904

2908

6910

3084

2444

2486

3042

2982

2984

2983

2479

2480

PARKD_1T

WATMLL_1

800NET_D2806

900NET_D2807

8009001_2808

8009002_2809

8009003_2810

FLYNN_S82860

ENET_D

NNET_D

WNET_D

FPLEFRB112410

FPLEFRB212420

FPLEFR2A FPLEFR2B FPLEFR2C FPLEFR2S

FPLEFR1A FPLEFR1B

SARGT1_5

SARGT_1T29472947

SARGT_S829482948

SARGT_N829492949

SARGT_2T2950

6911MSQTV RC

2997WATMLL_2

TALTY RC6902

COMBINRC6904

CHILTPL430583058

MARSHL68456845

MARSHLL_27322732

FORNEY_W2712

FRNYW RC6865

FORNYERC6867

2946

SARGT_3T29402940

SARGT_4T29412941

8%A

Amps 8%

A

Amps

CHCLRKRD

DESSW1_5 7%A

Amps

DWUSSWW

WITTRD1_

SSWWT_P9230

3081

160 MW 120 Mvar

158 MW 120 Mvar

156 MW 120 Mvar

401 MW 175 Mvar

162 MW 120 Mvar

164 MW 120 Mvar

LUCAS1_82778

SNYVLE1_2764

WNET400_2872

DESPKV2_12425

MSQTTE1T2767

81%A

Amps

80%A

Amps

Page 24: 2008 Annual Five Year Plan Update 2

Forney Vs. Seagoville

FRNY1_5

SGVLSW1_

TRICRN1_

WATMLL_E

WLEVEE1_

WATMLL_W

DESSW1_8WATMLL_E

DESPLR1_

LNCST1_8 CRANDALL

SGVLSW1_SGVL1_8

LAWSON1_

KLEBRG1T

BCHSPG1T

KLEBRG1_

SSWWT2T_

SSWWT2_8

WILMER1_

BCHSPG1_

MSQT1_8

TERRL RC

WATMLL_W

SSWWT1T_

SSWWT1_8HUTCH1_8

SMPST2T_

SMPST1_8

MURDCK2T

SCLFPMP1

SMPST2_8

BUNTIN2_

MURDCK2_

PLGRV1T_

CMPWSD2_

CCRST_1T

PLGRV1_8SUTHLD1_

CCRST_W8 CCRST_E8

INDUST_1

INDUST_W

INDUST_E

SOKCF2_8

SOKCF1_8

STAUG2T_

CMPTON1_

SUTHLD2_

WNET3_8

WNET2_8

WALLST1_

POLK1T_8

DEALEY1_

PLGRV2T_

OAKLND1T

PLGRV2_8

MURDCK1T

OAKLND1_

MURDCK1_

STAUG2_8LKJN2_8

PARKDB1_

OAKLND2_

STAUG1_8LKJN1_8

FRNY1_8

ESIDE1T_ESIDE2T_

ESIDE1_8

ESIDE2_8 FORNY RC

WNET1_8 MSQT RC

WILMER1_

PARKD1_9

CCRST_9

CMPTON2_

BUNTIN1_

WALLST2_

2432

2428

2437

2433

2398

24352427

24242429

3060

3066 2727

24343076

2779

3077

2776

3078

3079

3080

3083

2777

2775

6898

2430

2965

29662964

2986

2988

2962

2989

2987

2985

2963

2960

2990

2495

296129722493 2494

2975

2974

2976

3024

3023

2951

2981

2973

2876

2875

2977

2842

2952

2969

2953

2954

2970

2955

29562957

2442

2971

2939

29442945

2756

2438

27692771

2770

2772 6866

28746910

3084

2444

2486

2982

2984

2983

WATMLL_1

800NET_D2806

900NET_D2807

8009001_2808

8009002_2809

8009003_2810

WNET_D

FPLEFRB212420

FPLEFR2A FPLEFR2B FPLEFR2C FPLEFR2S

SARGT1_5

SARGT_1T29472947

SARGT_S829482948

SARGT_N829492949

SARGT_2T2950

6911MSQTV RC

2997WATMLL_2

TALTY RC6902

COMBINRC6904

CHILTPL4

MARSHL68456845

MARSHLL_27322732

FORNEY_W2712

FRNYW RC6865

FORNYERC6867

2946

SARGT_3T29402940

SARGT_4T29412941

8%A

Amps

DWUSSWW

WITTRD1_

SSWWT_P9230

3081

160 MW 120 Mvar

158 MW 120 Mvar

156 MW 120 Mvar

401 MW 175 Mvar

162 MW 120 Mvar

164 MW 120 Mvar

LUCAS1_82778

WNET400_2872

MSQTTE1T

2767

82%A

Amps

80%A

Amps

Contingency

No Overload

Second Auto

Page 25: 2008 Annual Five Year Plan Update 2

Roanoke1 345/138 kV Auto

Problem

From Bus To Bus From Bus To Bus From Bus To Bus

ROANOKE1 1,697.42 -0.4183 ROANOKE1 ROANOKE1 ROANOKE2 ROANOKE2

MCPHERSO 229.75 -0.4074 ROANOKE1 ROANOKE1 ROANOKE2 ROANOKE2

ELIZCRK1 23.92 -0.4152 ROANOKE1 ROANOKE1 ROANOKE2 ROANOKE2

Bus NameUnserved

EnergyPTDF/OTDF

Overload Element Contingency Line 1 Contingency Line 2

Page 26: 2008 Annual Five Year Plan Update 2

Before Roanoke1 Auto

ROANOKE2

ALLIANCEIBM

ROANOKE1

KELLER

WROANOKE

MCPHERSN

1853

1855

18542018

640

18571855

CROSTIMB661

ROANOKE3

ROANOKE1

ROANOKE1ROANOKE2

ROANOKE1

ROANOKE2

ROANOKE2

HERITAGEKELLER2_

1852

1850

1851 1849

1845

1847

1848

JETER627

Unserved energy

Overload Element

Contingency

Page 27: 2008 Annual Five Year Plan Update 2

McNeil to Summit Second Circuit

Problem

From Bus To Bus From Bus To Bus From Bus To Bus

HAMILMB2 58.03 -0.5426 MCNEILN SUMMITN MCNEILS MAGPLANT MCNEILN SUMMITN

SUMMITN 2,089.68 -0.6174 MCNEILN SUMMITN MCNEILS MAGPLANT MCNEILN SUMMITN

SUMMITS 213.12 -0.6143 MCNEILN SUMMITN MCNEILS MAGPLANT MCNEILN SUMMITN

Contingency Line 1 Contingency Line 2Bus Name

Unserved Energy

PTDF/OTDFOverload Element

Page 28: 2008 Annual Five Year Plan Update 2

Before McNeil to Summit

L_MCNEIL

MCNEILN

MCNEILW

MCNEILS

HAMILMB2

HAMILMB1

SUMMITN

SUMMITSMCNEIL

7334

9079

9076

9077

9203

9279

92809080

MAGPLANT9238

9283UTBALC

L_MCNEIL

Contingency

Unserved energy

Overload Element

Page 29: 2008 Annual Five Year Plan Update 2

Fairdale to Brand Upgrade

Problem

From Bus To Bus From Bus To Bus From Bus To Bus

FAIRDALE 1,624.78 -0.3574 FAIRDALE BRAND SHILOH MCCREE8 MCCREE9 MCCREE8

SHILOH 250.49 -0.3561 FAIRDALE BRAND SHILOH MCCREE8 MCCREE9 MCCREE8

PLASTIPA 117.68 -0.3568 FAIRDALE BRAND SHILOH MCCREE8 MCCREE9 MCCREE8

KRAFT 81.58 -0.3566 FAIRDALE BRAND SHILOH MCCREE8 MCCREE9 MCCREE8

Contingency Line 1 Contingency Line 2Bus Name

Unserved Energy

PTDF/OTDFOverload Element

Page 30: 2008 Annual Five Year Plan Update 2

BENDAVIS

PLRD1_8

PLRD2_8

LKHLS2T_

FORSTV2TGARL1_8

GARLW1_8

FORSTV1_

WALNT2T_WALNT2_8

RICH_WH_

APOLLO

MCCREE8

WYNNJOYC

SHILOH

KRAFT

FAIRDALE

BRAND

WALNT1T_

AIRLIQD1

WALNT1_8

AIRLIQD1

MCCREE9

RAYTHEON

JUPITER

OAKLAND

NEWMAN9

LAWLER

WALNUT

MILLER

NAAMAN

CASTLE_D

970

2921

2922

2924

2929

2701

2700

2699

26092610

2698

802

834

813

830

827

832

804

809

814

823

824

825

826

NEWMAN_G

993BENDAVIS

MARQUIS9852

MARQUIS848

CRIST

BENDAVIS

MCCREE1_

MCCREE_5

13%A

Amps

KRAFTTAP

LAWLERT

0 MW 0 Mvar

973

974

994

NEWMAN8849

805

815

806

820

801

836 PLASTIPA808

STAR BUS99971

Before Fairdale to Brand Upgrade

Contingency

Unserved energy

Overload Element

Page 31: 2008 Annual Five Year Plan Update 2

After Fairdale to Brand Upgrade

BENDAVIS

PLRD1_8

PLRD2_8

LKHLS2T_

FORSTV2TGARL1_8

GARLW1_8

FORSTV1_

WALNT2T_WALNT2_8

RICH_WH_

APOLLO

MCCREE8

WYNNJOYC

SHILOH

KRAFT

FAIRDALE

BRAND

WALNT1T_

AIRLIQD1

WALNT1_8

AIRLIQD1

MCCREE9

RAYTHEON

JUPITER

OAKLAND

NEWMAN9

LAWLER

WALNUT

MILLER

NAAMAN

CASTLE_D

970

2921

2922

2924

2929

2701

2700

2699

26092610

2698

802

834

813

830

827

832

804

809

814

823

824

825

826

NEWMAN_G

993BENDAVIS

MARQUIS9852

MARQUIS848

CRIST

BENDAVIS

MCCREE1_

MCCREE_5

13%A

Amps

KRAFTTAP

LAWLERT

0 MW 0 Mvar

973

974

994

NEWMAN8849

805

815

806

820

801

836 PLASTIPA808

STAR BUS99971

No Overload

Page 32: 2008 Annual Five Year Plan Update 2

Problem

McCree - Shiloh Upgrade

From Bus To Bus From Bus To Bus From Bus To Bus

FAIRDALE 1,624.78 -0.3574 FAIRDALE BRAND SHILOH MCCREE8

Bus NameUnserved

EnergyPTDF/OTDF

Overload Element Contingency Line 1 Contingency Line 2

Page 33: 2008 Annual Five Year Plan Update 2

BENDAVIS

OATESGARLDPL2

PLRD1_8

PLRD2_8

LKHLS2T_

LKHLS2_8

FORSTV2T

FORSTV2_GARL1_8

GARLW1_8

FORSTV1_

BENDAVIS

WALNT2T_WALNT2_8

RICH_WH_

RICH_E_8

APOLLO

RICH1_8

RICH_SV_

MCCREE8

WYNNJOYC

SHILOH

KRAFT

FAIRDALE

BRAND

WALNT1T_

AIRLIQD1

WALNT1_8

AIRLIQD1

MCCREE9

RAYTHEON

JUPITER

PRAXAIR

OAKLAND

NEWMAN9

LAWLER

WALNUT

MILLER

NAAMAN

CASTLE_D

970

2920

2921

2922

2924

2926

2929

29302701

2700

2699

968

26092610

2698

2690

802

26862683

2684

834

813

830

827

2607

2595

2608

2606

832

804

807

809

814

823

824

825

826

NEWMAN_G

993BENDAVIS

MARQUIS9852

MARQUIS848

CRIST

BENDAVIS

MCCREE1_

MCCREE_5

17%A

Amps

KRAFTTAP

LAWLERT

0 MW 0 Mvar

973

974

994

828

NEWMAN8849

805

815

806

820

801

836 PLASTIPA808

STAR BUS99971

STAR BUS99972

STAR BUS99973

Contingency

Unserved energy

Overload Element

Before McCree-Shiloh Upgrade

Page 34: 2008 Annual Five Year Plan Update 2

After McCree-Shiloh Upgrade

BENDAVIS

GARLDPL2

PLRD1_8

PLRD2_8

LKHLS2T_

LKHLS2_8

FORSTV2T

FORSTV2_GARL1_8

GARLW1_8

FORSTV1_

BENDAVIS

WALNT2T_WALNT2_8

RICH_WH_

RICH_E_8

APOLLO

RICH1_8

RICH_SV_

MCCREE8

WYNNJOYC

SHILOH

KRAFT

FAIRDALE

BRAND

WALNT1T_

AIRLIQD1

WALNT1_8

AIRLIQD1

MCCREE9

RAYTHEON

JUPITER

PRAXAIR

OAKLAND

NEWMAN9

LAWLER

WALNUT

MILLER

NAAMAN

CASTLE_D

970

2921

2922

2924

2926

2929

2701

2700

2699

968

26092610

2698

2690

8022684

834

813

830

827

2607

2595

2608

2606

832

804

807

809

814

823

824

825

826

NEWMAN_G

993BENDAVIS

MARQUIS9852

MARQUIS848

CRIST

BENDAVIS

MCCREE1_

MCCREE_5

17%A

Amps

KRAFTTAP

LAWLERT

0 MW 0 Mvar

973

974

994

NEWMAN8849

805

815

806

820

801

836 PLASTIPA808

STAR BUS99971

STAR BUS99972

STAR BUS99973

Contingency

No Overload

Page 35: 2008 Annual Five Year Plan Update 2

Problem

Cross Timbers to Roanoke Upgrade

From Bus To Bus From Bus To Bus From Bus To Bus

CROSTIMB 795.29 -0.7545 CROSTIMB ROANOKE2 LEWISVLS LEWISVIL

Contingency Line 1 Contingency Line 2Bus Name

Unserved Energy

PTDF/OTDFOverload Element

Page 36: 2008 Annual Five Year Plan Update 2

ROANOKE2

ALLIANCE

CRLTN_NW

MCKAMYRD

COPPELL_

MCKAMY

COPPELL

GRAPEVIN

MOUND

IBM

LEWISVIL

ROANOKE1

LEWISVLS

KELLER

STHLAKE1

WROANOKE

KLR_MAG2

ROANOKE

LEW_JNS_

TNLWVLST

TNLWVLTITNLAKEPN

TNLWVLWE

FLWRMND_TNJONES_CHISOLM

MCPHERSN

MCPHERSO

1853

1855

2024

2015

658

648

555

656

556

660

1854

645

565

2020

2018

2034

640

1972

37100

37080

37010

37060

2030

37030

1970

1857

679

1855

CROSTIMB661

TNBIOENR37011

50%A

Amps

63%A

MVA

FLWRMNDS20312031

ROANOKE3

ROANOKE1

ROANOKE1ROANOKE2

ROANOKE1

ROANOKE2

ROANOKE2

18%A

Amps

22%A

Amps

HERITAGEHRTAG1_T HRTAG2_T

KELLER1T

KELLER2_

ELIZCRK11866

ELIZCRK21867

1852

1850

1851 1849

1845

1847

1848

PONDER

SNDYLAK12012

ELZBTHCR624

JETER627

Contingency

Unserved energy

Overload Element

Before Cross Timbers to Roanoke Upgrade

Page 37: 2008 Annual Five Year Plan Update 2

After Cross Timbers to Roanoke Upgrade

EAGLEMNT

ROANOKE2

ALLIANCE

CRLTN_NWMCKAMY_T

MCKAMYRD

COPPELL_

MCKAMY

COPPELL

GRAPEVIN

MOUND

IBM

LEWISVIL

ROANOKE1

LEWISVLS

KELLER

STHLAKE1

WROANOKE

EMCS1_8

KLR_MAG2

ROANOKE

LEW_JNS_

TNLWVLST

TNLWVLTITNLAKEPN

TNLWVLWE

FLWRMND_TNJONES_CHISOLM

RHOME_8

MCPHERSN

MCPHERSO

1853

1855

2025

2024

2015

658

648

555

656

556

660

1854

645

565

2020

2018

2065

2034

640

1972

37100

3708037010

37060

2030

37030585

1970

1857

679

1855

CROSTIMB661

TNBIOENR37011

50%A

Amps

63%A

MVA

FLWRMNDS20312031

KIMBALRO

ROANOKE3

ROANOKE1

ROANOKE1ROANOKE2

ROANOKE1

ROANOKE2

ROANOKE2

18%A

Amps

22%A

Amps

HERITAGEHRTAG1_T HRTAG2_T

KEL_MAG2

KELLER1T

KELLER2_

ELIZCRK11866

ELIZCRK21867

1852

1850

1851 1849

1845

1847

1848

PONDER669

SNDYLAK12012

ELZBTHCR624

JETER627

Contingency

No Overload

Page 38: 2008 Annual Five Year Plan Update 2

Problem

Liggett Auto Upgrade

From Bus To Bus From Bus To Bus From Bus To Bus

SHDYGRV1 1,942.77 -0.1685 LIGGETTA LIGGETT_ LIGGETT_ LIGGETTA

INT_AIR1 547.85 -0.1663 LIGGETTA LIGGETT_ LIGGETT_ LIGGETTA

Bus NameUnserved

EnergyPTDF/OTDF

Overload Element Contingency Line 1 Contingency Line 2

Page 39: 2008 Annual Five Year Plan Update 2

Before Liggett Auto Upgrade

LIGGETTALIGGETTA

LIGGETTA LIGGETTA1925

1922

1921

1925LIGGETT_ LIGGETT_19261927

Page 40: 2008 Annual Five Year Plan Update 2

Unserved-Limiting Elements-Contigency

From Bus To Bus From Bus To Bus From Bus To Bus

Roanoke Switch - Southlake 138 kV line

WROANOKE 441.89 -0.7544 ROANOKE2 WROANOKE ROANOKE2 KELLER2_ ROANOKE1 MCPHERSN

Coppell Tap - McKamy Tap 138 kV line

LEWISVIL 14.60 -0.7046 COPPELTP MCKAMY_T LEWISVLS LEWISVIL

Lake Creek - Robinson 138 kV line

ROBINSON 2,062.20 -0.6447 LAKE_CRK ROBINSON LAKE_CRK WACOLASA

2nd Lewisville Auto

JMCRSTL1 1,032.12 -0.0939 TNLAKEPN CRLTN_NW LEWISVLS LEWISVIL

Contingency Line 2Bus NameUnserved

EnergyPTDF/OTDF Overload Element Contingency Line 1

Page 41: 2008 Annual Five Year Plan Update 2

From Bus To Bus From Bus To Bus From Bus To Bus

West Levee Series Reactor

800NET_D 265.30 -0.2575 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

DRAGON2_ 220.62 -0.2609 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

DRAGON1_ 174.96 -0.26 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

900NET_D 160.31 -0.2575 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

REAGAN2_ 36.80 -0.2563 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

LMOALT2_ 6.57 -0.2563 WLEVEE1_ WLEVEE_2 WLEVEE1_ WLEVEE_1

Temple N to Temple Elm Creek circuit reconfig.

TEMP_SE1 375.98 -0.7333 TEMP_SS_ TEMP_SE1 TEMPLE_N TEMPELMC TEMPLE_N TEMPELMC

SCOTWHIT 102.53 -0.7251 TEMP_SS_ TEMP_SE1 TEMPLE_N TEMPELMC TEMPLE_N TEMPELMC

TEMPLE_S 92.02 -0.7136 TEMP_SS_ TEMP_SE1 TEMPLE_N TEMPELMC TEMPLE_N TEMPELMC

Bus NameUnserved

EnergyPTDF/OTDF Overload Element Contingency Line 1 Contingency Line 2

Unserved-Limiting Elements-Contigency

Continued

Page 42: 2008 Annual Five Year Plan Update 2

Economic Projects

Page 43: 2008 Annual Five Year Plan Update 2

2012 Economic Project

• Performed preliminary economic project analysis

• Creating list and send to TOs for review:– Technical feasibility of the proposed

projects

– Cost estimates of the projects

– Alternative proposals and cost

Page 44: 2008 Annual Five Year Plan Update 2

Economic Projects

• Use the list of projects in 2012 as a manual to do other year economic analysis– If there is congestion, see if the project from the

2012 list can economically solve the issue

– If there is congestion that can not be solved by any of the projects in 2012 economic project list:

• Determine if there is a project that can generate enough revenue in the first few years to cover the capital cost

• Any other temporary solutions

Page 45: 2008 Annual Five Year Plan Update 2

Questions?