POWER HOLDING COMPANY OF NIGERIA PLC NATIONAL CONTROL CENTRE OSOGBO GENERATION  AND TRANSMISSION GRID OPERATIONS 2009 (ANNUAL TECHNICAL REPORT)  ISSUED BY: GENERAL MANAGER (S/O) NATIONAL CONTROL CENTRE OSOGBO  
Transcript
  • 7/14/2019 2009 AnnualReport Final-13!05!10

    1/104

    POWER HOLDING COMPANY OF NIGERIA PLC

    NATIONAL CONTROL

    CENTRE

    OSOGBO

    GENERATION

    AND

    TRANSMISSION

    GRID OPERATIONS

    2009

    (ANNUAL TECHNICAL REPORT)

    ISSUED BY:

    GENERAL MANAGER (S/O)

    NATIONAL CONTROL CENTRE

    OSOGBO

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    2/104

    TABLE OF CONTENTS

    PAGES

    INTRODUCTION 1

    1.0 GRID OPERATIONS IN 2009 1

    1.1 Hydrology and Lake Operation. 2

    1.2 Thermal Generation 91.3 Generation Ordering and Load Dispatching 91.4 Frequency Control 91.5 Voltage Control 91.6 Outage Planning 211.7 Energy Production 25

    2.0 CONSTRAINTS TO GRID OPERATIONS 49

    2.1 Constraints to Grid vis-a-vis System Communication 492.2 Generation Constraints 522.3 Transmission Constraints 52

    3.0 REINFORCEMENT AND REHABILITATION OF

    NATIONAL GRID 63

    4.0 SYSTEM DISTURBANCES 65

    4.1 Transmission System faults 65

    4.2 Generation System faults 65

    5.0 ACCIDENTS AND MISHAPS 66

    6.0 CONCLUSIONS AND RECOMMENDATIONS 67

    7.0 APPENDICES 71

    (i)

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    3/104

    NO. LIST OF TABLES PAGE

    1A. HYDROLOGICAL SUMMARY 3

    1B COMPUTEDAVERAGE INFLOW AND TURBINE DISCHARGE 6

    2 AVERAGE MONTHLY MW AVAILABILITY 17

    3 SUMMARY OF GENERATION CAPABILITIES OF NIGERIAPOWER 18

    STATIONS AS OPERATED IN 2009

    4. NIGERIAPOWER SYSTEM FREQUENCY 22

    5A. 2009OUTAGES STATISTICAL SUMMARY 330KV LINE 23

    5B. 2008OUTAGES STATISTICAL SUMMARY 330KV LINE 23

    6A. 2009OUTAGES STATISTICAL SUMMARY 132KV LINE 24

    6B. 2008OUTAGES STATISTICAL SUMMARY 132KV LINE 24

    7A & 7B. ENERGY GENERATED/ SENT OUT(MWH) 31-32

    8. HYDRO & THERMAL ENERGY GENERATED(MWH) 33

    9. ENERGY GENERATION & POWER CONSUMPTION RECORDS 38

    10. MONTHLY ENERGY BALANCE SUMMARY 40

    11 ENERGY AVAILABLE FOR SALES PLUS DISTRIBUTION LOSSES

    IN EACH REGION (MW) 41

    12 QUANTITY OF GAS CONSUMED 42

    13 COST OF GAS (NAIRA) AGAINST ENERGY GENERATED 2009 43

    14 OPERATING FUEL COST (NAIRA/KWh) 44

    15 MONTHLY MAXIMUM DEMAND/GENERATION ANALYSIS (MWH) 73

    16 SYSTEM GENERATION PEAK LOAD (FORECAST & ACTUAL) 7417 SUMMARY OF OCCURRENCE OF MAXIMUM PEAK LOAD 75

    18 SUMMARY OF SYSTEM DISTUBANCES 93

    19A-C SUMMARY OF SYSTEM DISTUBANCES OF INTEGRATED GRID 94-96

    19D DAILY/MONTHLY ANALYSIS SUMMARY OF SYSTEM DISTURBANCE 97

    (ii)

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    4/104

    NO. CHARTS PAGE

    1. KAINJI AVERAGE MONTHLY TOTAL DISCHARGE AND INFLOW 4

    2. KAINJI HYDROGRAPH 4

    3. JEBBA AVERAGE MONTHLY TOTAL DISCHARGE AND INFLOW 7

    4. JEBBA HYDROGRAPH 7

    5. SHIRORO AVERAGE MONTHLY TOTAL DISCHARGE AND INFLOW 8

    6. SHIRORO HYDROGRAPH 8

    GENERATION AVAILABILITY IN 2009 10-15

    7. 2009 AVERAGE MONTHLY MW AVAILABILITY 16

    8. POWER STATIONS AVAILABILITY FACTOR 16

    9 POWER STATION AVERAGE MW AVAILABILITY 19

    10 POWER STATIONS INSTALLED CAPACITIES 19

    11 ANNUAL ENERGY GENERATED. 20

    12 SIMULTANEOUS NATIONAL PEAK DEMAND (MW 20

    13 330KV FORCED OUTAGES (2008 & 2009) 26

    14 132KV FORCED OUTAGES (2008 & 2009) 26

    15 COMBINED 2008 & 2009 330KV OUTAGES 27

    16 COMBINED 2008 & 2009 132KV OUTAGES 27

    17 330KV PLANNED, URGENT AND EMERGENCY OUTAGES 28

    18 132KV PLANNED,URGENT & EMERGENCY OUTAGES 28

    19 PERCENTAGE ENERGY USED IN POWER STATIONS 34

    20 HYDRO, THERMAL AND TOTAL ENERGY GENERATED 34

    21 ENERGY GENERATED IN HYDRO POWER STATIONS 37

    22 ENERGY GENERATED IN THERMAL POWER STATIONS 37

    23 AVAILABLE ENERGY FOR SALES 39

    24 TOTAL MONTHLY ENERGY AVAILABLE FOR SALE 39

    25 TRANSMISSION REGIONS: MONTHLY ENERGY AVAILABLE FOR SALE 45

    (iii)

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    5/104

    NO. CHARTS PAGE

    26 REGIONAL ENERGY AVAILABLE FOR SALE 45

    27 MAJOR THERMAL STATIONS FUEL COSTS 46

    28 MONTHLY UNIT PRODUCTION COST 47

    29 STATIONS AVERAGE PRODUCTION COSTS 48

    30 MONTHLY PEAK DEMAND FORECAST AND ACTUAL 76

    31 WEEKLY PEAK TOTAL MW GENERATION HISTOGRAM 76

    32 KAINJI G.S USABLE GEN.CAP.SPECTOGRAPH PLOT AVAILABLE 77

    33 JEBBA G.S. USABLE GEN. CAP. SPECTOGRAPH PLOT AVAILABLE 77

    34 SHIRORO P.S. USABLE GEN. CAP. SPECTOGRAPH 78

    35 EGBIN P.S. USABLE GEN. CAP. SPECTOGRAPH 78

    36 DELTA P.S. USABLE GEN. CAP. SPECTOGRAPH 79

    37 AFAM 1-V P.S. USABLE GEN. CAP. SPECTOGRAPH 79

    38 SAPELE P.S. USABLE GEN. CAP. SPECTOGRAPH 80

    39 AFAMVI / IBOM P.S. USABLE GEN. CAP. SPECTOGRAPH 80

    40 OLORUNSOGO P.S. USABLE GEN. CAP. SPECTOGRAP 81

    41 DAILY TOTAL GRID GEN. AVAILABILITY STATUS 81

    42 AES P.S. USABLE GEN. CAP. SPECTOGRAPH 82

    43 OKPAI P.S. USABLE GEN. CAP. SPECTOGRAPH 82

    44 GEREGU P.S. USABLE GEN. CAP. SPECTOGRAPH 83

    45 OMOTOSHO P.S. USABLE GEN. CAP. SPECTOGRAPH 83

    46 OMOKU P.S. USABLE GEN. CAP. SPECTOGRAPH 84

    47 AJAOKUTA P.S. USABLE GEN. CAP. SPECTOGRAPH 84

    48 AFAM VI P.S. USABLE GEN. CAP. SPECTOGRAPH 85

    49 IBOM P.S. USABLE GEN. CAP. SPECTOGRAPH 85

    50-51 GRAPHICAL REPRESENTATION OF SYSTEM COLLAPSE (MONTH) 98

    53 TOTAL LOSS DUE TO SYSTEM DISTURBANCE 99

    (iv)

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    6/104

    INTRODUCTION

    T

    his Technical Report is an annual publication of Power Holding Company Nigeria Plc

    (PHCN). It addressed the National Generation and Tranmission Grid Operations in 2009as collated from the electronic databank of theNational Control Centre (NCC), Osogbo.

    Significant headings covered are:

    1.0 Grid Operationsin 2009

    2.0 Constraints to Grid Operations in 2009

    3.0 Reinforcements to the National Grid in 2009

    4.0 System Disturbances 5.0 Accidents and Mishaps 6.0. Conclusions and Recommendations

    Grid Operations in 2009arecompared with the previous year 2008 through tables and

    graphs.

    Comprehensively analyzed are plant and equipment outages, energy generated,

    transmitted and available for sales to the distribution network.

    Supplementary charts, graphs and other important details enhancing assimilation of the

    report are displayed.

    1.0. GRID OPERATIONS IN 2009The plant average availability at Kainji Station in 2009 was 445.8MW. This was

    6.5MW higherthan 2008figure of 438.9MW.

    Jebba's plant availability ranged between 578.4MW and 376.2MW in 2009 with averageavailability of 458MW. This was lower than 2008 average availability of 529.4MW by

    71.4MW.

    At Shiroro Power Station, plant availability throughout the year was less than 2008,

    varying between 450MW and 300MW with an average of 404.6MW. This was 84.2

    MW less than 2008figure of 488.8MW.

    1

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    7/104

    1.1 HYDROLOGY AND LAKE OPERATIONS

    1.1.1. Kainji Lake

    The average computed inflow of the 2008/2009 black flood yield into the Kainji Lake was lowerthan the average forecast inflow by 18.34%.

    When the average black flood inflow was compared with the figures of immediate past five

    years, the 2008/2009 black flood was higher than the 2007/2008 by 13.274%, higher than

    2006/2007 by 21.23%, higher than 2005/2006 by 12.45%, lower than 2004/2005 by 6.4%.

    The good flood yield, brought the head water elevation to 140.94 meters corresponding to 11.05

    billion cubic metres by the beginning of the hydro year, January 1st 2009.

    The black flood inflow peaked on 2nd February 2009, with a value of 1834 cubic metres per

    second (m3/sec).

    This was (4.6%) higher than the peak daily computed inflow of 2007/2008.

    At the Joint Operations/Generation Planning meeting held at the National Control Centre, NCC,

    Osogbo between 11th and 13th March, 2009, the planned turbine releases and the expected

    inflow into the Kainji Lake from the months of March through August were as in the Table1B.

    The aim of the meeting was to agree on the draw down trajectory of the Lake in such a manner

    that will optimize the utilization of the stored water, till the next flood season, taking into

    consideration the safety of the dam structures.

    Kainji which started with elevation 140.94 metres (11.05 b.cu. metres) on 1st January, 2009,

    dropped to minimum elevation of 130.39 metres (1.6 b.cu. metres) in July 25th 2009. During the

    filling, an elevation of 141.39 metres (11.6 b.cu. metres) was attained in December 31st 2009.

    Average inflow in 2009 was 9.7% higher than the average inflow of 2008. While average

    discharge in 2009 was 11.88% lower than 2008. There was water spillage throughout the year

    except in September and October 2009. Average spillage at Kainji in 2009 was 42.63% higher

    than 2008s. (table 1A). A comparison between forecast and actual inflows; forecast and actual

    discharges during the year was depicted in table 1B. The overall Kainji MW availability was

    lower (1.5%) than the previous year (see chart 1&2).

    1.1.2 Jebba Lake

    Jebba Lake, located downstream of the Kainji Lake, depended largely on Kainji Station turbine

    discharges especially during the dry months when the lateral inflows had ebbed out. At the

    beginning of the hydro year, 1st January 2009, the head water was at 101.0 metres,

    corresponding to 3.30 billion cubic metres of water. This volume was 1.7% lower than the

    storage balance of 3.82 billion cubic metres recorded at the beginning of the hydro year, 1st

    January 2009. During the year, the minimum head water recorded, was 99.04metres which

    occurred on July 31st, 2009. The lateral inflow peaked on September 3, with a value of 1225

    m3/sec. It was however 26.69% lower than the peak lateral inflow of 2008.

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    8/104

    AVE.TURB.DISCH.

    (CUB.M/SEC)

    (CUB.M/

    SEC)

    (CUB.M/SEC)

    RATE(CUB.M/SEC)

    (MWH)

    MONTH

    KAINJI

    JEBBA

    SHIRORO

    KAINJI

    JEBBA

    SHIRORO

    KAINJI

    JEBBA

    SH

    IRORO

    KAINJI

    JEBBA

    SHIRORO

    KAINJI

    JEBBA

    SHIRORO

    JAN.

    1199.42

    1258.40

    271.45

    157.19

    0.00

    0.00

    1356.60

    1258.40

    271.45

    1479.40

    1362.30

    40.65

    9671.97

    7238.35

    5988.10

    FEB.

    1101.89

    1343.36

    231.50

    208.00

    0.00

    0.00

    1309.89

    1343.36

    231.50

    1441.96

    1278.50

    34.36

    8872.43

    7748.50

    4963.71

    MAR.

    1102.52

    1465.94

    258.61

    297.84

    0.00

    0.00

    1400.35

    1465.94

    258.61

    652.03

    1379.74

    12.55

    8859.26

    8334.39

    5394.68

    APR.

    924.33

    1277.83

    219.47

    366.57

    0.00

    0.00

    1290.90

    1277.83

    219.47

    367.67

    1278.57

    17.97

    7072.00

    7026.77

    4429.30

    MAY.

    803.81

    1223.40

    256.26

    419.19

    0.00

    0.00

    1223.00

    1223.40

    256.26

    240.10

    1192.20

    62.23

    5623.87

    6738.74

    4803.10

    JUN.

    654.80

    1141.80

    145.87

    375.83

    0.00

    0.00

    1030.63

    1141.80

    145.87

    258.33

    1070.83

    120.23

    4455.03

    6144.77

    2567.63

    JAN-JUN

    TOTAL

    5786.77

    7710.73

    1383.16

    1824.62

    0.00

    0.00

    7611.37

    7710.73

    13

    83.16

    4439.49

    7562.14

    287.99

    44554.56

    43231.52

    28146.52

    JAN-JUN

    AVERAGE

    964.46

    1285.12

    258.87

    304.10

    0.00

    0.00

    1268.56

    1285.12

    230.53

    739.92

    1260.36

    48.00

    7425.76

    7205.25

    4691.09

    JUL.

    437.13

    895.65

    258.87

    336.39

    0.00

    0.00

    773.52

    895.65

    258.87

    607.97

    888.19

    278.94

    2884.84

    4801.74

    4564.40

    AUG.

    490.23

    1125.61

    464.10

    376.48

    0.00

    0.00

    866.71

    1125.60

    464.10

    1859.20

    1268.60

    1431.40

    3262.58

    5991.58

    9216.40

    SEP.

    956.80

    1576.40

    435.60

    0.00

    0.00

    0.00

    956.80

    1576.40

    435.60

    3062.87

    1803.63

    1130.00

    6880.33

    9200.00

    10030.20

    OCT.

    936.42

    1539.00

    362.03

    0.00

    0.00

    0.00

    936.42

    1539.00

    362.03

    1659.60

    1401.40

    500.39

    7296.52

    8948.26

    8461.10

    NOV.

    1071.23

    1368.40

    322.97

    181.50

    0.00

    7.80

    1252.73

    1368.40

    322.97

    1287.4

    1407.33

    147.79

    8443.60

    8245.43

    7352.33

    DEC.

    1131.23

    1341.81

    309.29

    66.52

    0.00

    0.00

    1197.70

    1341.80

    309.29

    1270.97

    1223.70

    61.61

    9244.10

    7679.94

    7132.10

    JUL-DEC

    TOTAL

    5023.04

    7846.87

    2152.86

    960.89

    0.00

    7.80

    5983.88

    7846.85

    21

    52.86

    9748.01

    7992.85

    3550.13

    38011.97

    44866.95

    46756.53

    JUL-DEC

    AVERAGE

    837.17

    1307.81

    358.81

    160.15

    0.00

    1.30

    997.31

    1307.81

    358.81

    1624.67

    1332.14

    591.69

    6335.33

    7477.83

    7792.76

    ANNUAL

    TOTAL

    10809.81

    15557.60

    3536.02

    2785.51

    0.00

    7.80

    13595.25

    15557.58

    35

    36.02

    14187.50

    15554.99

    3838.12

    82566.53

    88098.47

    74903.05

    AVERAGE

    ANNUAL

    900.82

    1296.47

    294.67

    232.13

    0.00

    0.65

    1132.94

    1296.47

    294.67

    1182.29

    1296.25

    319.84

    6880.54

    7341.54

    6241.92

    TABLE1A:H

    YDROLOGICAL

    SUMMARY.JANUA

    RY-DECEMBER2009

    AVE.SPIL

    LAGE

    STATIONAVE.TOT.DISCH

    COMP.AVE.INFLOW

    AVE.DAILYENERGY

    3

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    9/104

    0

    400

    800

    1200

    1600

    2000

    2400

    2800

    3200

    JAN. FEB. MAR. APR. MAY. JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    FLOWI

    NCUBICMETRES/SEC

    MONTHS

    KAINJI AVE.MONTHLY TOT. DISCHARGE & INFLOWJANUARY-DECEMBER 2009CHART 1 (SEE TABLE 1)

    DISCHARGE INFLOW

    129.5

    131.5

    133.5

    135.5

    137.5

    139.5

    141.5

    143.5

    JAN. FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    HEADWATERELEVATIONINMETRES

    MONTHS

    KAINJI HYDROGRAPH1994-2009 CHART 2

    2009ACTUAL 2008ACTUAL 2007ACTUAL 2006ACTUAL 2005ACTUAL 2004ACTUAL 2003ACTUAL 2002ACTUAL

    2001ACTUAL 2000ACTUAL 1999ACTUAL 1998ACTUAL 1997ACTUAL 1996ACTUAL 1995 ACTUAL 1994 ACTUAL

    4

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    10/104

    Despite threat of spillage at Jebba in the year when the head water elevation attained 103.10 metres, this

    was averted due to cooperation between the stake holders including NCC, Kainji and Jebba Managements..

    By December 31st2009, the head water elevation in Jebba was 100.82 metres corresponding to 3.25 billion

    cubic metres. This was 0.1% lower than the head water elevation of the Lake at the same period in 2008.

    1.1.3 Shiroro Lake

    At the beginning of the hydro year, January 1st 2009, the reservoir elevation was 374.20 metrescorresponding to storage balance of 3.8225 billion cubic metres. This volume was higher (2.7%) than the

    storage balance at the same time 2008.

    During the period, it was difficult to actualize the draw down plan because of the grid demand. Each timethere was System disturbance, Shiroro was always islanded to feed the Federal Capital Territory pending

    System restoration.

    Unstable gas supply to thermal stations often necessitated running additional units than planned in order to

    maintain grid integrity and stability.

    In the year, Shiroro lake was drawn down to 54.8 metresby June 7th, 2009 -the lowest ever- due toavailability of only two of the Shiroro generating units. That was to create enough space for white flood

    and consequently avert spillage as much as possible.

    Lake filling commenced on July 31st, 2009 when the average computed inflow was 562 m3/sec.

    The maximum head water elevation in Shiroro Lake was 382.37 metres which occurred on 1 stNovember

    2009, corresponding to 5.80 billion cubic metres. Draw down of the lake to the minimum level ever paidoff as prolonged spillage was averted..

    Overall ,Shiroro MW availability throughout 2009 dropped by 20.81% when compared with 2008 figure.

    By December 31st2009, the head water elevation in Shiroro stood at 378.24 meters, corresponding to a

    storage balance of 4.69 billion cubic metres.

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    11/104

    MON

    TH

    PLANINF.

    ACTUAL

    INF.

    PLAN

    DISC.

    ACTUAL

    DISC.

    PLAN

    INF.

    ACTUAL

    INF.

    PLAN

    DISC.

    AVER.

    LATERAL

    INF

    ACTUAL

    DISC.

    PLAN

    INF.

    ACTUAL

    INF.

    PLAN

    DISC.

    ACTUAL

    DISC.

    JAN.

    2100.00

    1479.40

    1300.00

    1199.42

    1299.00

    1362.30

    1300.00

    0.76

    1258.40

    30.00

    40.65

    200.00

    271.45

    FEB.

    1300.00

    1441.96

    1200.00

    1101.89

    1204.00

    1278.50

    1179.00

    26.46

    1343.36

    25.00

    40.08

    200.00

    231.50

    MAR.

    573.00

    652.03

    1200.00

    1102.52

    1127.00

    1379.74

    1450.00

    21.90

    1465.94

    32.00

    12.55

    250.00

    258.61

    APR.

    210.00

    367.67

    1200.00

    924.33

    1380.00

    1278.57

    1350.00

    16.10

    1277.93

    40.00

    19.25

    250.00

    219.47

    MAY.

    125.00

    240.10

    1000.00

    803.81

    1203.00

    1192.20

    1180.00

    26.45

    1223.40

    62.00

    62.23

    200.00

    256.26

    JUN.

    237.00

    258.33

    600.00

    654.80

    720.00

    1070.83

    700.00

    25.10

    1141.80

    210.00

    120.23

    250.00

    145.87

    JUL.

    830.00

    607.97

    900.00

    437.13

    1105.00

    888.19

    1090.00

    102.00

    895.65

    360.00

    278.94

    250.00

    258.87

    AUG.

    1900.00

    1859.20

    840.00

    490.23

    1256.00

    1268.60

    1250.00

    393.55

    1125.60

    900.00

    1431.40

    400.00

    464.10

    SEP.

    2400.00

    3062.87

    750.00

    956.80

    1400.00

    1803.63

    1300.00

    862.34

    1576.40

    1500.00

    1130.00

    450.00

    435.60

    OCT.

    1900.00

    1659.60

    900.00

    936.42

    1300.00

    1401.40

    1300.00

    465.28

    1539.00

    500.00

    500.39

    450.00

    362.03

    NOV.

    1300.00

    1287.40

    1110.00

    1071.23

    1176.00

    1407.33

    1159.00

    160.86

    1368.40

    90.00

    147.79

    300.00

    315.17

    DEC.

    1397.00

    1271.00

    1110.00

    1131.20

    1128.00

    1223.70

    1265.00

    21.24

    1341.81

    65.00

    61.61

    450.00

    309.29

    TABLE

    1B:PLAN/ACTUALCOMP.AVE.INFLOWAND

    AVE.TURB.DISCH.(CUB.M/SEC).JANUARY

    -DECEMBER2009.

    KAINJI

    JEBBA

    SHIROR

    6

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    12/104

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    JAN. FEB. MAR. APR. MAY. JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    FLOWI

    NCUBICMETRES/SEC

    MONTHS

    JEBBA AVE. MONTHLY TOTAL DISCHARGE & INFLOWJANUARY-DECEMBER 2009 CHART 3 (SEE TABLE 1)

    DISCHARGE INFLOW

    99

    99.5

    100

    100.5

    101

    101.5

    102

    102.5

    103

    103.5

    104

    JAN. FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    HEADWATERELEVATIONINMETRES

    MONTHS

    JEBBA HYDROGRAPH1994-2009 CHART 4

    2009ACTUAL 2008ACTUAL 2007ACTUAL 2006ACTUAL 2005ACTUAL 2004ACTUAL 2003ACTUAL 2002ACTUAL

    2001ACTUAL 2000ACTUAL 1999ACTUAL 1998ACTUAL 1997ACTUAL 1996ACTUAL 1995 ACTUAL 1994 ACTUAL

    7

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    13/104

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    1100

    1200

    1300

    1400

    1500

    JAN. FEB. MAR. APR. MAY. JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    FLOWIN

    CUBICMETRES/SEC

    MONTHS

    SHIRORO AV. MONTHLY TOT. DISCHARGE & INFLOWJANUARY - DECEMBER 2009 CHART 5 (SEE TABLE 1 )

    DISCHARGE INFLOW

    350

    355

    360

    365

    370

    375

    380

    385

    JAN. FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    HEADWATERELEVATIONINMETRES

    MONTHS

    SHIRORO HYDROGRAPH1994-2009, CHART 6

    2009ACTUAL 2008ACTUAL 2007ACTUAL 2006 ACTUAL 2005 ACTUAL 2004 ACTUAL

    2003ACTUAL 2002ACTUAL 2001ACTUAL 2000ACTUAL 1999ACTUAL 1998ACTUAL

    1997ACTUAL 1996ACTUAL 1995ACTUAL 1994ACTUAL

    8

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    14/104

    1.2. THERMAL GENERATION

    1.2.0. GENERATION AVAILABILITY

    The plants average MW availability for year 2009 is contained in table 2. Monthly average MWavailability was computed by averaging the daily actual generation output in the month.

    Thermal plants average availability was 3194.3MW in 2009. Of this,1104.3MW was from

    A.E.S, Okpai, Afam VI, Ibom and Omoku (Independent Power Producers) while 2090MW was

    from PHCN. The thermal availability was 70.95.12% of the total hydro and thermal availability

    of 4502.3MW in the year. It was 7.78% higher than 2008 average thermal and hydro availability

    of 4177.0MW. (section 1.2.1. to 1.2.12).

    1.3. GENERATION ORDERING AND LOAD DISPATCH

    An integrated grid was operated in 2009, pooling generation from Kainji, Jebba and Shiroro

    Hydro Power Stations and Egbin, Delta, Afam(1-V), Afam V1, Sapele, AES, Okpai, Omotosho,

    Ajaokuta, Omoku, Geregu, Olorunsogo and IBOM thermal Stations. Inadequate gas supply from

    the Nigerian Gas Company (NGC) and incessant low gas pressure militated against full thermal

    capacity generation into the grid. Among the affected Stations were: Egbin and AES which,

    although capable of an average generation of 1217.3MW, was frequently confined between 200

    and 800 MW. Geregu, Omotosho and Olorunsogo plants were idle for several months in 2009

    due to lack of gas. Since generation availability was grossly inadequate to meet the ever

    increasing load demand, load shedding continued through out the year in order to maintainpower balance.

    1.4 FREQUENCY CONTROL

    Due to generation shortage, the grid was operated outside the frequency control policy of 50Hz

    + 0.40% i.e. 49.80Hz to 50.20Hz, resulting in frequency excursions outside the operational

    limits. Most of the gas turbines on the grid were operated on temperature control mode. Hence

    they were often insensitive to vagaries of system frequency. The automatic voltage regulator

    (AVRs) and governor system of KainjiKaplan units (variable blades) were not functional. All

    the other machines in the system were considered base load, except Jebba units that regulate

    occasionally. It is however noteworthy that the underfrequency relays installed in some stations

    obviated system collapses on several occasions.

    1.5. VOLTAGE CONTROL

    In 2008, the voltage control policy of 330kV + 5% and 15% on the 330kV buses and 132kV

    +10% and -15% for the 132kV buses was frequently maintained. The Area Control Centres

    efforts in this regard were commendable. Diverse Engineering techniques of voltage control

    were applied in the year. Among them were reactive power generation/absorption by generators

    in the proximity of the controlled bus; use of reactive compensators and as a last resort ,switching

    of 330kVcircuits.

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    15/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    16/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    17/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    18/104

    JAN

    FEB

    MAR

    APR

    MAY

    JUN

    JUL

    AUG

    SEP

    OCT

    NOV

    DEC

    GT1

    GT2

    GT3

    GT4

    GT5

    GT6

    GT7

    GT8

    KEY:

    Units

    Available

    GT1

    -

    wasav

    ailablefromJanuarytofebruary,3rdMay2009.

    GT2

    -

    wasav

    ailablefromJanuarytofebruaryand22ndNovember2009.

    GT3

    -

    wasav

    ailablepartofJanuary,throughoutFebruary;partofApril2009.

    GT4

    -

    wasav

    ailablefrom

    Januarytofeb;29thto30thApril2009.

    GT5

    -

    wasav

    ailablefromJanuarytoFebruary2009.

    GT6

    -

    wasavailablefromJanuarytoFebruary;18thto26thApril;4thto7thMay2009.

    GT7

    -

    wasav

    ailablefrom1stto14january;Feb;19to20thMarch200

    9.

    GT8

    -

    wasav

    ailablefromJanuarytoFebruary;19to21stmarch;23rd

    to27thApril;3rdmay2009.

    GT1,2,3,6&8

    wereon

    outageasindicatedonthechartabove

    UNITS

    JANUARY

    F

    EBRUARY

    MARCH

    APRIL

    MAY

    JUNE

    JULY

    AUGUST

    SEPTEMBER

    OCTOBER

    NOVEMBER

    DECEMBER

    GT11

    GT12

    GT13

    KEY:

    Units

    Available

    GT11

    -

    wasavaila

    blepartofJanuary,MarchtoMay;throughoutFebruary

    ,SeptembertoNovember2009.

    GT12

    -

    wasavaila

    blethroughoutJanuary;partofSeptembertoDecembe

    r2009

    GT13

    -

    wasavai

    lablefromJanuaryto16thMay2009.

    GT11,12&ST1

    wereonout

    ageasindicatedonthechartabove.

    ()

    1.2.8

    GENERATIONAVAILABILITY-

    GEREGUPOWERSTAT

    ION(2009)

    LowgasPressure

    3

    LowgasPressure

    LowgasPressure

    LowgasPressure

    22

    DCground

    fault

    8

    LowgasPressure

    LowgasPressure

    29

    22

    18

    30

    Low

    gas

    Press

    LowgasPressure

    29

    LowgasPressure

    Lowg

    asPressure

    LowgasPressure

    18

    Lowgas

    Pressure

    26

    4

    LowgasPressure

    7

    Speedpanel

    problem

    14

    Awaiting

    spareparts

    LowgasPressure

    Lowgas

    Pressure

    19

    20

    Lowgas

    Pressure

    LowgasPressure

    3

    LowgasPressure

    21

    19

    Lowgas

    Pressure

    27

    23

    Shutdown

    4

    On

    stand

    b

    4

    LGP

    SHUTDOWN

    LG

    P

    Vibrati

    ontest

    parts

    16

    Outongen

    winding

    19

    16

    24

    1

    6

    LGP

    25

    22

    20

    23

    LGP

    19

    LG

    13

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    19/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    20/104

    UNITS

    JANUARY

    FEBRU

    ARY

    MARCH

    APRIL

    MAY

    JUNE

    JULY

    AUGUST

    SEPTEMBER

    OCTOBER

    NOVEMBER

    DECEMBER

    ST1

    ST2

    KEY:

    UnitsAvailable

    ST1

    -

    wasnotavailablethroughouttheyear.

    ST2

    -

    wasnotavailablethroughouttheyear.

    ST1&2-

    wereonoutageasindicatedonthechartabove.

    UNITS

    JANUARY

    FEBRU

    ARY

    MARCH

    APRIL

    MAY

    JUNE

    JULY

    AUGUST

    SEPTEMBER

    OCTOBER

    NOVEMBER

    DECEMBER

    GT11

    GT12

    GT13

    KEY:

    UnitsAvailable

    GT11

    -

    wasavailablep

    artofJanuarytoJuly,SeptembertoNovember;throughoutAugustandDecember.

    GT12

    -

    wasavailablep

    artofJanuarytoFebruary,Apriltonovember;throughoutDecember.

    GT13

    -

    wasavailablep

    artofMarchtoApril,July,SeptembertoNovember;throughoutDecember.

    GT11,12&13-

    wereonoutageasindicatedonthechartabove.

    UNITS

    JANUARY

    FEBRUARY

    MARCH

    APRIL

    MAY

    JUNE

    JULY

    AUGUST

    SEPTEMBER

    OCTOBER

    NOVEMBER

    DECEMBER

    GT1

    KEY:

    UnitsAvailable

    GT1

    Wasavailablefrom

    16thto

    17th,thenfrom18thto27thDecember2009

    1.2.13

    GENE

    RATIONAVAILABILITY

    -IBOMPOWERSTATIO

    N(2009)

    1.2.12

    GENERATIONAVAILAB

    ILITY-AFAMVIPOWERSTATION(2009)

    1.2.11

    GENERATIONAVAILABILITY-ASCOP

    OWERSTATIONPOWERSTATION(2009)

    OUTDUETOFIREOUTBREAKON

    THEGENERATOR

    SIDE

    OUTDUETOHYDROGEN

    PROBLEM

    undergoi

    ng

    check

    15

    system

    collapse

    14

    15

    outon

    wash

    No

    gas

    Gas

    maint

    enan

    low

    Gas

    pres

    5

    7

    19

    20

    9

    8

    13

    27

    low

    Gas

    pres

    7

    mtc

    e

    3

    low

    Gas

    pres

    syst

    e sy

    ste

    m

    shut

    do

    no

    gas

    17

    8

    65

    ins

    pe

    cti

    loa

    dlimi

    7

    13

    25

    23

    devi

    ce

    prot

    2

    3

    lgp

    7

    shut

    do

    26

    22

    low

    Gas

    pres

    mtc

    e

    low

    Gas

    pres

    shutdownchecks

    shutdow

    nfortes

    t

    4

    4

    15

    18

    shutdownchecks

    29

    2

    3

    Atypeof

    inspection

    5

    lo

    w

    G

    as

    5

    low

    Gas

    load

    limitatio

    n

    21

    25

    29

    4

    loadlim

    13

    lowga

    lowga

    lowga

    7

    161

    8

    202

    1

    Che

    cks

    20

    16

    shut

    dow

    n

    nog

    Trip

    ped

    s

    5

    8

    27

    26

    20

    820

    lowGaspressure

    OutforfurtherCheck

    lowG

    26

    30

    loadlim

    loadlim

    4

    7

    14

    16

    sh

    utd

    ow

    26

    lowga

    7

    7

    Atypeof

    inspection

    insp

    ecti

    on

    low

    Gas

    9

    22

    21

    16

    Tripped

    17

    27No

    genera

    tion

    15

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    21/104

    0

    500

    1000

    1500

    2000

    2500

    J F M A M J J A S O N D

    MONTHLYAVAILABILITY

    MONTHS

    2009 AVE. MONTHLY MW AVAILABILITYJANUARY-DECEMBER 2009 CHART 7(SEE TABLE2)

    KAINJI JEBBA SHIRORO SAP.TOT AFAM EGBIN

    DELTA IJORA CALABAR AES OKPAI AJAOKU

    THMAL PHCN THMAL IPP #REF! #REF! OMOKU

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    AVAILABILITY

    FACTOR

    POWER STATIONS

    POWER STATIONS AVAILABILITY FACTORJANUARY-DECEMBER 2009, CHART 8(SEE TABLE 3)

    16

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    22/104

    MONTHS

    KAINJI

    MW

    JEBBA

    MW

    S

    HIRORO

    MW

    EGBIN

    MW

    ASCO

    MW

    A.E.S

    MW

    SAPELE

    MW

    OKPAI

    MW

    AFAM(I-V)

    MW

    AFAMIV

    MW

    DELTA

    MW

    GEREGU

    MW

    OMOKU

    MW

    OMOTOSHO

    MW

    PAPALANTO

    MW

    IBOMMW

    THERMAL

    TOTAL

    (PHCN)MW

    THERMAL

    TO

    TAL(IPP)

    MW

    THERMAL

    TOTALMW

    HYDRO

    TOTAL

    MW

    GRAND

    TOTAL

    MW

    JAN.

    545.8

    578.4

    440.3

    1000.6

    0.0

    225.5

    120.0

    469.7

    30.6

    115.0

    254.1

    300.0

    75.0

    287.5

    282.7

    0.0

    2275.5

    770.2

    3045.7

    1564.5

    4610.2

    FEB.

    527.3

    590.4

    425.0

    1100.0

    0.0

    257.3

    122.3

    478.9

    82.5

    250.4

    316.5

    300.0

    92.6

    317.8

    290.2

    0.0

    2529.3

    828.7

    3358.0

    1542.8

    4900.8

    MAR.

    522.2

    575.3

    425.8

    1071.6

    0.0

    254.9

    189.7

    414.0

    91.2

    281.7

    272.6

    300.0

    98.3

    294.0

    330.1

    0.0

    2549.2

    767.1

    3316.3

    1523.3

    4839.6

    APR.

    437.7

    478.6

    450.0

    1004.7

    0.0

    272.7

    240.0

    438.6

    61.8

    280.4

    269.3

    300.0

    120.7

    255.9

    285.2

    0.0

    2416.8

    832.0

    3248.8

    1366.3

    4615.1

    MAY.

    351.0

    376.2

    333.9

    851.6

    0.0

    221.9

    240.0

    464.6

    73.4

    316.0

    281.1

    300.0

    125.0

    288.0

    291.0

    0.0

    2325.1

    811.5

    3136.6

    1061.0

    4197.6

    JUN.

    380.0

    379.2

    300.0

    938.7

    0.0

    284.7

    240.0

    377.1

    75.0

    300.3

    283.4

    300.0

    110.7

    291.9

    301.5

    0.0

    2430.5

    772.6

    3203.1

    1059.2

    4262.3

    JAN-JUN

    TOTAL

    2764.0

    2978.1

    2375.0

    5967.2

    0.0

    1516.9

    1152.0

    2642.9

    414.4

    1543.8

    1677.0

    1800.0

    622.3

    1735.0

    1780.7

    0.0

    14526.4

    4782.0

    19308.4

    8117.1

    27425.5

    JAN-JUN

    AVERAGE

    460.7

    496.4

    395.8

    994.5

    0.0

    252.8

    192.0

    440.5

    69.1

    257.3

    279.5

    300.0

    103.7

    289.2

    296.8

    0.0

    2421.1

    797.0

    3218.1

    1352.8

    4570.9

    JUL.

    372.3

    385.6

    391.9

    1078.7

    0.0

    251.9

    240.0

    377.1

    57.5

    222.6

    229.2

    300.0

    100.0

    288.0

    336.0

    0.0

    2529.4

    729.1

    3258.5

    1149.8

    4408.3

    AUG.

    283.2

    441.6

    450.0

    908.4

    0.0

    258.3

    240.0

    478.0

    72.5

    450.0

    200.7

    300.0

    100.0

    308.2

    335.7

    0.0

    2365.5

    836.3

    3201.9

    1174.8

    4376.7

    SEP.

    420.7

    443.4

    450.1

    1026.7

    0.0

    231.5

    240.0

    480.0

    26.7

    415.0

    172.0

    300.0

    99.2

    335.0

    335.0

    0.0

    2435.3

    810.6

    3246.0

    1314.2

    4560.1

    OCT.

    452.7

    435.4

    387.1

    880.0

    0.0

    210.0

    127.7

    480.0

    17.5

    411.3

    230.3

    300.0

    90.3

    326.9

    335.0

    0.0

    2217.5

    780.3

    2997.8

    1275.3

    4273.1

    NOV.

    519.0

    388.8

    370.0

    902.0

    0.0

    179.1

    180.0

    472.1

    64.8

    375.8

    254.7

    300.0

    57.5

    302.6

    335.0

    0.0

    2339.2

    708.7

    3047.9

    1277.8

    4325.7

    DEC.

    533.5

    422.9

    430.6

    1007.7

    0.0

    189.5

    209.0

    424.8

    108.8

    455.4

    300.0

    300.0

    83.3

    282.0

    331.6

    34.8

    2539.2

    732.5

    3271.6

    1387.1

    4658.7

    JUL-DEC

    TOTAL

    2581.4

    2517.8

    2479.8

    5803.5

    0.0

    1320.3

    1236.8

    2712.1

    347.8

    2330.1

    1386.9

    1800.0

    530.3

    1842.7

    2008.3

    34.8

    14426.1

    4597.6

    19023.6

    7579.0

    26602.6

    JUL-DEC

    AVERAGE

    430.2

    419.6

    413.3

    967.3

    0.0

    220.1

    206.1

    452.0

    58.0

    388.3

    231.2

    300.0

    88.4

    307.1

    334.7

    5.8

    2404.3

    766.3

    3170.6

    1263.2

    4433.8

    ANNUAL

    STN.

    AVERAGE

    445.4

    458.0

    404.6

    980.9

    0.0

    236.4

    199.1

    446.2

    63.5

    322.8

    255.3

    300.0

    96.0

    298.1

    315.7

    2.9

    2412.7

    781.6

    3194.3

    1308.0

    4502.3

    TABLE

    2

    AVERAGEMONTHLYMWAVAILABILITYJAN.TODEC.2009

    17

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    23/104

    POWER STATIONAVAILABILITY

    FACTOR (MW)

    AVERAGE

    AVAILABILITY

    (MW)

    INSTALLED CAPACITY

    (MW)

    KAINJI HYDRO 0.59 445.45 760.00

    JEBBA HYDRO 0.79 457.99 578.40

    SHIRORO 0.67 404.56 600.00

    EGBIN STEAM 0.74 980.89 1320.00

    AJAOKUTA 0.00 0.00 110.00

    A.E.S (GAS) 0.78 236.44 302.00

    SAPELE ST 0.20 199.07 1020.00

    OKPAI GAS/ 0.93 446.25 480.00

    AFAM (1-V) (GAS) 0.07 63.52 931.60

    AFAM IV (GAS) 0.65 322.82 497.25DELTA (GAS) 0.29 255.33 882.00

    GEREGU (GAS) 0.72 300.00 414.00

    OMOKU GT 0.96 96.05 100.00

    OMOTOSHO 0.89 298.15 335.00

    IBOM 0.08 2.90 37.00

    OLORUNSOGO 0.94 315.75 335.00

    TOTAL 0.55 4825.17 8702.25

    DEFINITIONS:-

    1. AVAILABILITY FACTOR = AVERAGE MW. AVAILABILITY

    PI

    2. PI = The sum of current site rating of

    commissioned units installed in the

    station for the year.

    3. AVERAGE MW. AVAILABILITY = This is a measure of average

    usable MW capacity of each stationputting gas pressure constraints

    and other external factors into

    consideration.

    TABLE 3. SUMMARY OF GENERATION CAPABILITIES OF PHCN POWER

    STATIONS AS OPERATED IN THE YEAR 2009( JANUARY - DECEMBER )

    18

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    24/104

    POWER STATIONS AVERAGE MW AVAILABILITY

    JANUARY-DECEMBER 2009, CHART 9 (SEE TABLE 3)

    0

    200

    400

    600

    800

    1000

    1200

    KAINJI JEBBA SHIRORO EGBIN AJAO A.E.S SAPELE OKPAI AFAM V1 AFAM IV DELTA GEREGU OMOKU OMOT IBOM OLORUN

    POWER STATIONS

    AVERAGEMWA

    VAILABILITY(MW

    POWER STATIONS INTALLED CAPACITIESJANUARY-DECEMBER 2009, CHART 10 (SEE TABLE3)

    0

    200

    400

    600

    800

    1000

    1200

    1400

    KAINJI JEBBA SHIRORO EGBIN AJAO A.E.S SAPELE OKPAI AFAM V1 AFAM IV DELTA GEREGU OMOKU OMOT IBOM OLORUN

    POWER STATIONS

    INSTALLEDCAPACITIES(MW)

    19

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    25/104

    2,4932,780

    3,3223,750

    4,1954,359

    5,1515,724

    6,7667,102

    8,4568,927

    10,15510,665

    11,14111,471

    12,70013,364

    14,21215,066

    14,61714,557

    15,79315,971

    15,41616,25316,291

    15,22717,637

    21,54422,612

    24,13224,077

    23,30023,187

    21,30920,838

    0 5000 10000 15000 20000 25000 30000

    737475767778798081828384858687888990919293949596979899000102

    03040506070809

    ENERGY GENERATED (GWH)

    YEAR

    73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09

    ENERGY(GWH) 24 27 33 37 41 43 51 57 67 71 84 89 10 10 11 11 12 13 14 15 14 14 15 15 15 16 16 15 17 21 22 24 24 23 23 21 20

    ANNUAL ENERGY GENERATED (GWH)1973-2009 CHART 11

    385457

    579708

    767887

    1,0951,181

    1,3231,448

    1,4341,532

    1,7201,730

    1,8551,952

    2,0082,219

    2,2462,382

    2,3302,4462,4522,470

    2,4572,4482,458

    2,4992,934.49

    3,223.4 3,479.3

    3,427.53,774.1

    3,6823,6003,596

    3,710

    0 500 1000 1500 2000 2500 3000 3500 4000

    73747576777879808182838485868788899091929394959697989900010203

    040506070809

    PEAK DEMAND (MW)

    YEAR

    73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09

    PEAK 38 45 57 70 76 88 10 11 13 14 14 15 17 17 18 19 20 22 22 23 23 24 24 24 24 24 24 24 29 32 34 34 37 36 36 35 37

    SIMULTANEOUS NATIONAL PEAK (MW)1973-2009 CHART 12

    20

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    26/104

    The last option is seldom applied except all else failed as switching out of a circuit

    would weaken the system security.

    Since November, 2001 System supervision through the mirrored SCADA facilities of the

    supplementary National Control Centre was of a tremendous benefit as voltage profile of

    the 330kV buses were lucidly displayed on the Man-Machine-Interface (MMI) monitors.

    1.6. Outage Planning

    In 2009, Generation and Transmission outage plans were implemented. Following

    analyses of each of these outages.

    1.6.1 Generation Outage Planning

    In fulfilling the requirement of the operational Procedure No. 10 (OP.10), each Power

    Station and Transmission Regionforwarded their planned outages schedule for the year asfrom November, 2008.

    This was sequel to NCCs memo addressed to the Chief Executive Officers in all the

    Power stations and Regional Transmission Managers of the Transmission Regions. TheIndependent Power Producers (IPPs) of AES and Okpai were also included.

    A coordinated master programme for 2009 planned outages was drawn mindful of theGrid integrity and security. Compliance with the maintenance plan was monitored in the

    year.

    1.6.2. Transmission Outage Planning

    Prior to the approval of a planned outage for either the 330/132kV Transmission/Subtransmission lines, transformers, reactorsorswitchgears,system integrity, security and

    stability were highly considered before conveying approval of the maintenance schedule

    to each Station.

    1.6.2.1 2009 Forced Outage Analysis

    The following analyses were based on the equipment forced outage records kept at NCC.

    1.6.2.2 330kV Circuit Forced OutagesNumber of 330kV forced outages in 2009was 440 (Table 5A). This was 29% higherthan 341recorded in year 2008.

    21

    contd pg. 29

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    27/104

    TABLE 4

    NIGERIAPOWER SYSTEM FREQUENCY CHART

    LIST ALLOCATION FREQUENCY REMARKS

    NO. (HZ)

    1 UPPER STATUTORY LIMIT 50.50

    2 UPPER OPERATIONAL LIMIT 50.20

    3 NORMAL FREQUENCY 50.00

    4 LOWER OPERATIONAL LIMIT 49.80

    5 LOWER STATUTORY LIMIT 49.50

    6 THREE-STAGE UNDERFREQUENCY RELAY LOAD OPERATION:-

    1 49.80HZ

    2 49.50HZ

    3 49.20HZ

    7 1ST STAGE GEN. PROTECTION AFAM I GTS 49.00 0.5 SECS. DELAY

    8 2ND STAGE GEN.PROTECTION SAPELE GTS. 48.70 1.0 SECS. DELAY

    9 3RD STAGE GEN. PROTECTION:-

    (i) AFAM II & III GAS TURBINES 48.50 INSTANTANEOUS.

    (ii) AFAM IV GAS TURBINES 48.50 0.15 SECS.DELAY

    (iii) SAPELE GAS TURBINES. 48.50 1.0 SECS.DELAY

    (iv) GEREGU UNITS 48.50 20.0 SECS.DELAY

    (v) AES UNITS 48.50 3.0 SECS.DELAY

    (vi) AFAM VI GAS TURBINES 48.50 3.0 SECS.DELAY

    10 4TH STAGE GEN. PROTECTION:

    (i) DELTA IV GAS TURBINES 48.00 0.25 SECS.DELAY

    (ii) OMOTOSHO UNITS 48.00

    (iii) OLORUNSOGO UNITS 48.00

    11 5TH STAGE GEN. PROTECTION:

    SAPELE STEAM TURBINES 47.50 2.0 SECS.DELAY

    12 6TH STAGE GEN. PROTECTION:

    EGBIN ST.UNITS STAGE 1 47.50 0.5 SECS. DELAY [Fast Call Back]

    STAGE 2 47.00 3.0 SECS.DELAY [House Load]

    13 7TH STAGE GEN. PROTECTION:

    OKPAI UNITS 46.95 0.15 SECS.DELAY

    22

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    28/104

    M

    ONTH

    FORCED

    OUTAGE

    FORCED

    CUMULATIVE

    PLANNED

    OUTAGE

    PLANNED

    CUMULATIVE

    URGENT

    OUTAGE

    URGENT

    CUMULATIVE

    EMERGENCY

    OUTAGE

    EMERGE

    NCY

    CUMULA

    TIVE

    TOTAL

    TOTALCUM.

    JAN.

    31

    31

    5

    5

    5

    5

    7

    7

    48

    48

    FEB.

    26

    57

    6

    11

    10

    15

    9

    16

    51

    99

    MAR.

    33

    90

    11

    22

    11

    26

    24

    40

    79

    178

    APR.

    31

    121

    1

    23

    11

    37

    9

    49

    52

    230

    MAY

    24

    145

    1

    24

    9

    46

    10

    59

    44

    274

    JUN.

    50

    195

    5

    29

    20

    66

    32

    91

    107

    381

    JUL.

    42

    237

    4

    33

    4

    70

    20

    111

    70

    451

    AUG.

    30

    267

    1

    34

    8

    78

    13

    124

    52

    503

    SEP.

    63

    330

    4

    38

    5

    83

    6

    130

    78

    581

    OCT.

    34

    364

    6

    44

    4

    87

    5

    135

    49

    630

    NOV.

    40

    404

    3

    47

    7

    94

    4

    139

    54

    684

    DEC.

    36

    440

    3

    50

    20

    114

    5

    144

    64

    748

    M

    ONTH

    FORCED

    OUTAGE

    FORCED

    CUMULATIVE

    PLANNED

    OUTAGE

    PLANNED

    CUMULATIVE

    URGENT

    OUTAGE

    URGENT

    CUMULATIVE

    EMERGENCY

    OUTAGE

    EMERGE

    NCY

    CUMULA

    TIVE

    TOTAL

    TOTALCUM.

    JAN.

    48

    48

    9

    9

    2

    2

    1

    1

    60

    60

    FEB.

    45

    93

    8

    17

    4

    6

    1

    2

    58

    118

    MAR.

    15

    108

    14

    31

    5

    11

    16

    18

    50

    168

    APR.

    17

    125

    8

    39

    7

    18

    10

    28

    42

    210

    MAY

    32

    157

    4

    43

    4

    22

    37

    65

    77

    287

    JUN.

    20

    177

    10

    53

    7

    29

    29

    94

    66

    353

    JUL.

    30

    207

    9

    62

    7

    36

    14

    108

    60

    413

    AUG.

    17

    224

    6

    68

    10

    46

    3

    111

    36

    449

    SEP.

    23

    247

    11

    79

    4

    50

    0

    111

    38

    487

    OCT.

    23

    270

    2

    81

    8

    58

    0

    111

    33

    520

    NOV.

    29

    299

    21

    102

    9

    67

    13

    124

    72

    592

    DEC.

    42

    341

    1

    103

    8

    75

    12

    136

    63

    655

    200

    9OUTAGESSTATISTICAL

    SUMMARY

    (330KV

    LINE

    -TABLE

    5A)

    200

    8OUTAGESSTATISTICALSUMMARY

    (330KV

    LINE

    -TABLE

    5B)

    23

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    29/104

    M

    ONTH

    FORCED

    OUTAGE

    FORCED

    CUMULATIVE

    PLANNED

    OUTAGE

    PLANNED

    CUMULATIVE

    URGENT

    OUTAGE

    URGENT

    CUMULATIVE

    EMERGENCY

    OUTAGE

    EMERGE

    NCY

    CUMULA

    TIVE

    TOTAL

    TOTALCUM.

    JAN.

    67

    67

    7

    7

    29

    29

    102

    102

    205

    205

    FEB.

    86

    153

    1

    8

    38

    67

    128

    230

    253

    458

    MAR.

    91

    244

    8

    16

    37

    104

    293

    523

    429

    887

    APR.

    106

    350

    5

    21

    27

    131

    234

    757

    372

    1259

    MAY

    98

    448

    6

    27

    29

    160

    240

    997

    373

    1632

    JUN.

    74

    522

    4

    31

    19

    179

    500

    149

    7

    597

    2229

    JUL.

    59

    581

    1

    32

    16

    195

    388

    188

    5

    464

    2693

    AUG.

    66

    647

    3

    35

    15

    210

    324

    220

    9

    408

    3101

    SEP.

    89

    736

    6

    41

    30

    240

    181

    239

    0

    306

    3407

    OCT.

    75

    811

    1

    42

    20

    260

    196

    258

    6

    292

    3699

    NOV.

    58

    869

    4

    46

    23

    283

    146

    273

    2

    231

    3930

    DEC.

    48

    917

    6

    52

    25

    308

    92

    282

    4

    171

    4101

    M

    ONTH

    FORCED

    OUTAGE

    FORCED

    CUMULATIVE

    PLANNED

    OUTAGE

    PLANNED

    CUMULATIVE

    URGENT

    OUTAGE

    URGENT

    CUMULATIVE

    EMERGENCY

    OUTAGE

    EMERGE

    NCY

    CUMULA

    TIVE

    TOTAL

    TOTALCUM.

    JAN.

    49

    49

    16

    16

    23

    23

    324

    324

    412

    412

    FEB.

    53

    102

    8

    24

    17

    40

    346

    670

    424

    836

    MAR.

    61

    163

    7

    31

    16

    56

    351

    102

    1

    435

    1271

    APR.

    48

    211

    9

    40

    17

    73

    453

    147

    4

    527

    1798

    MAY

    57

    268

    4

    44

    18

    91

    498

    197

    2

    577

    2375

    JUN.

    67

    335

    8

    52

    23

    114

    388

    236

    0

    486

    2861

    JUL.

    68

    403

    5

    57

    28

    142

    122

    248

    2

    223

    3084

    AUG.

    102

    505

    1

    58

    28

    170

    71

    255

    3

    202

    3286

    SEP.

    99

    604

    13

    71

    25

    195

    40

    259

    3

    177

    3463

    OCT.

    112

    716

    8

    79

    40

    235

    39

    263

    2

    199

    3662

    NOV.

    68

    784

    8

    87

    24

    259

    107

    273

    9

    207

    3869

    DEC.

    81

    865

    6

    93

    30

    289

    163

    290

    2

    280

    4149

    2009

    OUTAGESSTATISTICAL

    SUMMARY

    (132KV

    LINE-TABLE6A)

    2008OUTAGESSTATISTICAL

    SUMMARY

    (132KV

    LINE-TABLE6B)

    24

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    30/104

    The years peak incidents of 330kV forced outages of 63were attained in September.

    Year average was 26. The least incident of 24 occurred in May. In the previous year aminimum of 15330kV forced outages wasrecorded in March, 2008.

    1.6.2.3 132kV Circuit Forced OutagesIn 2009, there were 917 incidents of 132kV forced outages. It rose by 5.6% in

    comparison with 2008 value of 865. The year commenced with 67 number of 132kVforced outages. It peaked at 106in Apriland closed at 48incidents by December with

    a year average of 76.

    1.6.2.4 330kV Planned, Urgent And Emergency Outages

    Frequencies of occurrence planned and emergency outages in 2009were 50, 114and 144respectively compared with 103, 75 and 136 values of 2008. There was drop of 53 in

    planned outage but urgent and emergency outages increased in number by 35(9.6%) and 8(5.5%).

    1.6.2.5 132kV Planned, Urgent And Emergency OutagesIn 2009the incidents of 132kV planned,urgent and emergency outages summed up to 53,

    308 and 2824. Relative to 2008 withfigures of 93, 289and 2902respectively, incidents

    of planned and emergency outages dropped by 40(78%) and 78(2.7%) - (Tables 6Aand 6B).

    1.6.2.6 Combined 330kV and 132kV OutagesThere were 748 330kV outages comprising forced, planned, urgent and emergency

    outages in 2009. It rose by 93 compared with 2008 figure of 635. Year 2009 had a

    combined 4101 incidents of 132kV outages. It dropped by 78in comparison with 2008value of 4149.

    The reduction in total number of incidents in 2008 could be attributed to measures takenin June, 2008 to address incessant system disturbance. It involves a 12-hour,2-Zonal load

    allocation arrangement. A Zone had supply for 12-hours as the other was on outage.

    This arrangement ensured full and uninterrupted supply to a Zone.

    1.7 ENERGY PRODUCTIONThe total energy generated from all the Power Stations owned by the Power Holding

    Company of Nigeria (PHCN) was 13577979.69MWH. This figure was by 16.61% lowerthan that generated in 2008.

    25

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    31/104

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    CUMMULATIVEFREQUENCYOFOUTAGE

    S

    MONTHS

    330KV FORCED OUTAGES (2008 & 2009)CHART 13 (TABLES 5A & 5B)

    2008MONTHLY 2009MONTHLY 2008CUM 2009CUM

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    CUMMU

    LATIVEFREQUENCY

    OFOUTAGES

    MONTHS

    132KV FORCED OUTAGES (2008 & 2009)CHART 14 (TABLES 6A & 6B)

    2008MONTHLY 2009MONTHLY 2008CUM 2009CUM

    26

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    32/104

    COMBINED 2008 & 2009 330KV OUTAGESCHART 15 (TABLES 5A & 5B)

    0

    100

    200

    300

    400

    500

    600

    700

    800

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    MONTHS

    CUMMULA

    TIVEFREQUENCYOFOUTAGES

    2008MONTHLY 2009MONTHLY

    COMBINED 2008 & 2009 132KV OUTAGESCHART 16 (TABLES 5A & 5B)

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    MONTHS

    CUMULATIVEFREQUE

    NCYOFOUTAGES

    2008MONTHLY 2009MONTHLY

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    33/104

    0

    20

    40

    60

    80

    100

    120

    140

    160

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    CUMULATIVE

    FREQUENCY

    OFOUTAGES

    MONTHS

    330KV PLANNED, URGENT & EMERGENCY OUTAGES (2008 & 2009)CHART 17 (TABLES 5A & 5B)

    2008 PLAN CUM 2009 PLAN CUM 2008 URGENT CUM

    2009 URGENT CUM 2008 EMERGENCY CUM 2009 EMERGENCY CUM

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    CUMULATIVE

    FREQUENCY

    OFOUTAGES

    MONTHS

    132KV PLANNED, URGENT & EMERGENCY OUTAGES ( 2008& 2009)CHART 18 (TABLES 5A & 5B)

    2008 PLAN CUM 2009 PLAN CUM 2008 URGENT CUM

    2009 URGENT CUM 2008 EMERGENCY CUM 2009 EMERGENCY CUM

    28

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    34/104

    Independent Power Plants (IPPs) which included AES (former Enron), Okpai, Ibom,

    Omoku (P/H) and Afam VI all together generated 7315453.11MWH (see Table 7.)

    This figure was higher than 2008 figure of 5025638.94MWH by 45.56%.

    The Niger-Delta problem affected the energy production from the Thermal Power

    Stations gravely.

    The Nigerian Electricity Supply Corporation Limited (NESCO) and Omoku (PH) were

    still feeding isolated portion of the grid on 33kV network.

    The total energy pooled by all the PHCN owned Power Stations and the IPPs excluding

    NESCO was 20893432.80MWH.

    Overall, the total energy produced in the country including NESCO fell by 1.93% incomparison with the energy produced in 2008.

    Hydro Power Generation in 2009 was 7464640.00(35.73%) while the thermal powerPlants produced 13428792.80MWH (64.27%) (see Table 8.0)

    Maintenance of the units in hydro power stations was normally scheduled to hold

    during the dry seasononly(July - September).

    Jebba P.S produced less energy in 2009 (2676860.00MWH) when compared with the

    energy production in 2008 (2794976MWH). The decrease was as a result of reducedinflow into the Lake.

    The shortfall in thermal generation could be attributed to:

    a. Unstable dry gas supply from Nigerian Gas Companyb. Each time there was system disturbance,thermal plants seldom came back quickly

    especially the steam turbines.

    29

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    35/104

    The simultaneous National Peak Generation for 2009was 3710.0MW which occurred on

    December 24, 2009. It was greaterthan the previous year by 114.1MW(3.17%).

    All the power stations consumed a total of 563981.38MWH in 2009, bringing the overall

    consumption to 2.70% of total generation.

    The net energy sent out to the various injection substations, via the Transmission lineswas 20329451.42MWH. Total energy made available for sales and Distribution losses

    by the end of 2009was 18620097.53MWH. Thisrepresented 91.59% of the total energy

    sent out.

    The overall transmission losses and substation consumption amounted to 8.41% of the

    total energy sent out (see Table 10)

    1.7.1 Energy Sales Analysis

    Tables 10 and 11 show the total Energy made available for the eight (8) TransmissionRegion across the country.

    (a) Lagos Region

    (Ikeja West, Akangba, Egbin & Aja

    Area Transmission) 4971291.81MWH

    Injection points (26.69%)

    (b) Enugu Region

    (New Haven, Onitsha Area Transmission) 1722387.71MWH

    Injection points (9.25%)

    (c) Osogbo Region

    (Osogbo, Ayede, OmotoshoArea Transmission) 2358247.56MWH

    Injection points (12.66%)

    (d) Port- Harcourt Region

    (Alaoji Area Transmission) 1825474.76MWHInjection points (9.80%)

    (e) Kaduna Region

    30

    contd. pg. 35

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    36/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    37/104

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    38/104

    MONTHS

    HYDRO

    ENERGY

    GENERATE

    D

    HYDRO

    ENERGY

    USED

    IN

    STATION

    THERMAL

    ENERGY

    GENERATED

    THERMAL

    ENERGY

    USED

    IN

    STATION

    TOTAL

    ENERGYUSED

    IN

    STATION

    HYDR

    OENERGY

    SE

    NTOUT

    THERMAL

    ENERGYSENT

    OUT

    TOTA

    LENERGY

    GENERATED

    TOTAL

    ENERGY

    SENTOUT

    JAN.

    710021.00

    2149.23

    1225195.05

    44784.42

    46933.65

    707871.77

    1180410.63

    19

    35216.05

    1888282.40

    FEB.

    604528.00

    1954.48

    1176801.42

    44414.49

    46368.97

    602573.52

    1132386.93

    17

    81329.42

    1734960.45

    MAR.

    700038.00

    2340.53

    1280314.49

    45286.57

    47627.10

    697697.47

    1235027.92

    19

    80352.49

    1932725.39

    APR.

    555838.00

    2361.50

    1151407.19

    48136.51

    50498.01

    553476.50

    1103270.68

    17

    07245.19

    1656747.18

    MAY.

    532167.00

    2045.41

    1114125.54

    39645.38

    41690.79

    530121.59

    1074480.16

    16

    46292.54

    1604601.75

    JUN.

    392378.00

    2285.85

    994052.42

    41036.66

    43322.51

    390092.15

    953015.76

    13

    86430.42

    1343107.91

    JAN-JUN

    TOTAL

    3494970.00

    13137.00

    6941896.11

    263304.03

    276441.03

    34

    81833.00

    6678592.08

    10436866.11

    10160425.08

    JUL.

    379769.00

    2120.00

    919010.05

    44915.08

    47035.08

    377649.00

    874094.97

    12

    98779.05

    1251743.97

    AUG.

    572760.00

    1995.12

    983326.82

    38145.94

    40141.06

    570764.88

    945180.88

    15

    56086.82

    1515945.76

    SEP.

    783355.00

    2068.10

    926470.04

    41976.01

    44044.11

    781286.90

    884494.03

    17

    09825.04

    1665780.93

    OCT.

    765787.00

    2274.98

    1020586.60

    47374.44

    49649.42

    763512.02

    973212.16

    17

    86373.60

    1736724.18

    NOV.

    721265.00

    2143.32

    1208386.43

    49452.10

    51595.42

    719121.68

    1158934.33

    19

    29651.43

    1878056.01

    DEC.

    746734.00

    2239.24

    1429116.75

    52836.02

    55075.26

    744494.76

    1376280.73

    21

    75850.75

    2120775.49

    JUL-DEC

    TOTAL

    3969670.00

    12840.76

    6486896.69

    274699.59

    287540.35

    39

    56829.24

    6212197.10

    10456566.69

    10169026.34

    ANNUAL

    TOTAL

    7464640.00

    25977.76

    13428792.80

    538003.62

    563981.38

    74

    38662.24

    12890789.18

    20893432.80

    20329451.42

    TABLE8:HYDRO

    &THERMALGE

    NERATED(MWH

    )JAN-DEC.2009

    33

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    39/104

    PERCENTAGE ENERGY USED IN POWER STATIONS

    JANUARY - DECEMBER 2008/2009 CHART 19 (SEE TABLE 9)

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    7.00

    8.00

    9.00

    10.00

    11.00

    12.00

    13.00

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    MONTHS

    %ENERGYUSEDINPOWER

    STATIONS

    2008 2009

    HYDRO, THERMAL & TOTAL ENERGY GENERATED (MWH)

    JANUARY - DECEMBER 2009 CHART 20 (SEE TABLE 8)

    0

    500

    1000

    1500

    2000

    2500

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    Thousands

    MONTHS

    ENERGY

    GENERATED(MWH)

    HYDRO ENERGY GENERATED (MWH)

    THERMAL ENERGY GENERATED (MWH)

    TOTAL ENERGY GENERATED (MWH)

    34

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    40/104

    (Kaduna and Kano Area Transmission) 1755436.59MWH

    Injection points (9.42%)

    (f) Shiroro Region

    (Shiroro, Birnin Kebbi, Jebba & Katampe 2990617.91MWH

    Area Transmission)Injection points (16.05%)

    (j) Bauchi Region

    (Gombe and Jos Area Transmission) 903556.68MWH

    Injection points (4.85%)

    (h) Benin Region

    (Benin & Ajaokuta Area Transmission) 2100718.42MWH

    Injection points (11.28%)

    Lagos Region consumed 26.69% of the total energy made available for sales

    in 2009. In 2008, the Region consumed 29.40% of the energy made available for sales.

    Similarly, Enugu Region in 2009consumed 9.25% while in 2008 it consumed 8.54%. of

    the total energy made available for sales. The incessant trippings of Benin/ Onitshaand Onitsha/Alaoji 330kV Lines contributed to loss of revenue from this axis.

    It has been observed that Osogbo, PortHarcourt,Shiroro and Benin Regions improved

    in their consumption, 12.66% , 9.80 %, 16.05% and 11.18% respectively from 11.38%, 8.42%,15.18% and 10.56% in 2008.

    Bauchi and Kaduna Regions both dropped in their consumption from 5.27% and 11.26%in 2008 to 4.85% and 9.24% in 2009.

    For three consecutives years the energy made available for sales has been dropping. In2007 it dropped by 2.58% , in 2008 by 7.51%and in 2009 by 1.36%.

    1.7.2. GAS SUPPLY TO THERMAL STATIONS

    PHCN is a major consumer of the abundant natural gas marketed by Nigerian Gas

    Company (NGC) to generate power for the country and her neighbours. All the PHCN

    owned Thermal Power Stations namely Egbin, Sapele, Delta, Afam 1-V, Geregu,

    35

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    41/104

    Omotosho and Olorunsogo, and IPPs such as AES, Okpai, Ajaokuta, AfamVI ran primarily on

    natural gas. During the period of drought or low lake levels, all these Power Station depended

    solely on the gas supply. Okpai G.S. rarely had gas problems because they own and maintain

    their gas wells. Over the years, the quantity and quality of this commodity supplied by NGC,had not been adequate for PHCN operations. Some of the consequences of this inadequate

    supply were:

    1. Inability of PHCN to utilize available thermal plants capacity for power generation.

    2. Plants breakdowns due to ingress of condensate in the Combustion chamber or incessant

    . forced outage.

    3. Frequent system disturbances.

    4. Embarrassment to PHCN corporate image in particular and the country at large.

    5. Loss of revenue to PHCN and economic activities throughout the country.

    6. Enironmental pollution as some customers put on their personal generators inin the absence of PHCN supply.

    7. Insecurity Evil practices thrived in locations without electricity.

    8. Much demand was put on the hydro turbines, making it difficult to follow planned projections.

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    42/104

    ENERGY GENERATED IN HYDRO P.S. (MWH)JANUARY-DECEMBER 2009 CHART 21 (SEE TABLE 7)

    0

    50

    100

    150

    200

    250

    300

    350

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    Thou

    sands

    MONTHS

    ENERGYGENERATED(MW

    H)

    KAINJI JEBBA SHIRORO

    ENERGY GENERATED IN MAJOR THERMAL P.S. (MWH)JANUARY-DECEMBER 2009 CHART 22 (SEE TABLE 7)

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    Thousan

    ds

    MONTHS

    ENERGYGENERATED(MWH)

    EGBIN SAPELE DELTA AFAM OMOTOSHO GEREGU OLORUNSOGO

    37

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    43/104

    MONTHS

    ENERGY

    GENERATED

    (MWH)

    USED IN

    POWER

    STATIONS

    (MWH)

    % ENERGY USED IN POWER

    STATIONS

    JAN. 1935216.05 46933.65 2.43

    FEB. 1781329.42 46368.97 2.60

    MAR. 1980352.49 47627.10 2.40

    APR. 1707245.19 50498.01 2.96

    MAY. 1646292.54 41690.79 2.53

    JUN. 1386430.42 43322.51 3.12-

    TOTAL 10436866.11 276441.03 2.65

    JUL. 1298779.05 47035.08 3.62

    AUG. 1556086.82 40141.06 2.58

    SEP. 1709825.04 44044.11 2.58

    OCT. 1786373.60 49649.42 2.78

    NOV. 1929651.43 51595.42 2.67

    DEC. 2175850.75 55075.26 2.53-

    TOTAL 10456566.69 287540.35 2.75

    TOTAL 20893432.80 563981.38 2.70

    TABLE 9: ENERGY GENERATION AND POWER

    CONSUMPTION RECORDS: JAN - DEC 2009

    38

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    44/104

    AVAILABLE ENERGY FOR SALES

    JANUARY - DECEMBER 2009 CHART 23 (SEE TABLE 10)

    200

    700

    1200

    1700

    2200

    2700

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    Thousands

    MONTHSENER

    GYINMWH

    MWH FOR SALES MWH SENT OUT MWH GENERATED

    TOTAL MONTHLY ENERGY FOR SALES (MWH)

    JANUARY-DECEMBER 2008/2009 CHART 24 (SEE TABLE 11)

    0

    500

    1000

    1500

    2000

    2500

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    Thousands

    MONTHS

    ENERGYAVAILABLEFOR

    S

    ALES(MWH)

    2008 2009

    39

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    45/104

    MONTHS

    ENERGY

    GENERATED

    (MWH)

    ENERG

    Y

    SENTO

    UT

    (MWH

    )

    ENERGY

    AVAILABLE

    FORSALES&

    DIST.LOSSES

    MWH

    TX

    .LOSSES

    &S

    UB.STN.

    CONSUMPSI

    ON

    (MWH)

    TX.LOSSES

    &

    SUB.STN.

    CONSUMPS

    IO

    N%OF

    ENERGYSE

    NT

    ENERGY

    AVAILABLE

    FORSALES&

    DIST.LOSSES%

    OFENERGY

    JAN.

    1935216.05

    1888282.40

    1699465.95

    188816.45

    10.00

    90.00

    FEB.

    1781329.42

    1734960.45

    1577290.34

    157670.11

    9.09

    90.91

    MAR.

    1980352.49

    1932725.39

    1760663.30

    172062.09

    8.90

    91.10

    APR.

    1707245.19

    1656747.18

    1542223.78

    114523.40

    6.91

    93.09

    MAY.

    1646292.54

    1604601.75

    1484568.92

    120032.83

    7.48

    92.52

    JUN.

    1386430.42

    1343107.91

    1226006.23

    117101.68

    8.72

    91.28

    -

    TOTAL

    10436866.11

    10160425

    .08

    9290218.52

    870206.56

    8.56

    91.44

    JUL.

    1298779.05

    1251743.97

    1187732.36

    6

    4011.61

    5.11

    94.89

    AUG.

    1556086.82

    1515945.76

    1423773.75

    9

    2172.01

    6.08

    93.92

    SEP.

    1709825.04

    1665780.93

    1559646.24

    106134.69

    6.37

    93.63

    OCT.

    1786373.60

    1736724.18

    1575205.17

    161519.01

    9.30

    90.70

    NOV.

    1929651.43

    1878056.01

    1712447.57

    165608.44

    8.82

    91.18

    DEC.

    2175850.75

    2120775.49

    1871073.92

    249701.57

    11.77

    88.23

    JUL-DEC

    TOTAL

    10456566.69

    10169026

    .34

    9329879.01

    839147.33

    8.25

    91.75

    ANNUAL

    TOTAL

    20893432.80

    20329451

    .42

    18620097.53

    17

    09353.89

    8.41

    91.59

    TA

    BLE10:MONTHLY

    ENERGYBALANCESUMMARYJAN.-DEC.2009

    40

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    46/104

    REGION

    LAG

    OS

    ENUGU

    OSOGBO

    P/HARCOURT

    KADUNA

    SHIRORO

    BAUCHI

    BE

    NIN

    TOTAL

    JAN.

    467

    638.34

    150787.10

    194697.84

    143435.60

    180371.76

    270657.40

    88714.40

    20

    3163.51

    1699465.95

    FEB.

    421

    596.83

    134366.30

    187599.94

    153921.00

    175038.21

    239551.01

    81150.98

    18

    4066.08

    1577290.35

    MAR.

    504

    800.46

    143376.70

    211977.58

    165608.69

    182429.21

    278405.10

    85192.70

    18

    8872.86

    1760663.30

    APR.

    411

    807.52

    135475.80

    205085.81

    147386.67

    156191.41

    248514.00

    75885.10

    16

    1877.47

    1542223.78

    MAY.

    391

    686.65

    139354.40

    183441.16

    134566.90

    140976.01

    249517.20

    72122.10

    17

    2904.50

    1484568.92

    JUN.

    276

    153.76

    140562.00

    168589.73

    151412.70

    98888.64

    210268.30

    48287.50

    13

    1843.60

    1226006.23

    JAN-

    APRIL

    2473

    683.56

    843922.301151392.06

    896331.56

    933895.24

    1496913.01

    451352.78104

    2728.02

    9290218.53

    JUL.

    260

    205.43

    129477.70

    167403.80

    127981.40

    98969.53

    198635.80

    47735.40

    15

    7323.30

    1187732.36

    AUG.

    339

    881.95

    130486.60

    213891.10

    164338.50

    113934.20

    240889.60

    57087.30

    16

    3264.50

    1423773.75

    SEP.

    405

    466.65

    142885.10

    202449.20

    161159.90

    139985.69

    257728.90

    72661.10

    17

    7309.70

    1559646.24

    OCT.

    414

    256.97

    143864.30

    193957.90

    150003.60

    165483.90

    272391.90

    83600.30

    15

    1646.30

    1575205.17

    NOV.

    504

    211.16

    146949.74

    199524.00

    158442.30

    145440.17

    257493.10

    89736.10

    21

    0651.00

    1712447.57

    DEC.

    573

    586.09

    184801.97

    229629.50

    159583.60

    157727.86

    266565.60

    101383.70

    19

    7795.60

    1871073.92

    JUL-DEC

    TOTAL

    2497

    608.25

    878465.411206855.50

    921509.30

    821541.35

    1493704.90

    452203.90105

    7990.40

    9329879.01

    ANNUAL

    TOTAL

    4971

    291.811722387.712358247.561817840.86

    1755436.59

    2990617.91

    903556.68210

    0718.4218620097.54

    DISTRIBUTIONLOSSESINEACHREGION(MWH)JAN-DECEM

    BER2009

    41

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    47/104

    MONTH

    EGBIN

    AES

    DELTA

    SAPELE

    AFAM

    OM

    OTOSHO

    GEREGU

    OLORUNSO

    GO

    TOTAL

    JAN

    4112503794.00

    1968713700.00

    2390641251.00

    0.00

    172077631.00

    1536

    84452.67

    804088378.00

    455997730.00

    10057706936.67

    FEB

    364920471

    .40

    1981069900.00

    2289295589.25

    0.00

    78708685.00

    3472

    33183.64

    623684977.00

    85072722

    .00

    5769985528.29

    MAR

    3924360317.00

    2141829700.00

    2685364532.17

    0.00

    64588685.00

    5307

    82542.99

    733242392.00

    47979545

    .00

    4891782917.17

    APR

    3527146835.00

    2186922000.00

    2297479815.66

    0.00

    96414437.00

    3713

    40756.50

    678364432.71

    218293183.00

    8107963087.66

    MAY

    3141182586.00

    1757155600.00

    1718808539.56

    0.00

    224844210.00

    2808

    99748.55

    460962078.92

    67943183

    .00

    7651795946.03

    JUN

    2346841177.00

    2095357700.00

    1956246857.44

    0.00

    270174314.00

    2276

    82868.00

    0.00

    0.00

    6896302916.44

    JUL

    2040317043.00

    1521875300.00

    1422456932.05

    0.00

    242656832.00

    2648

    74365.84

    0.00

    0.00

    5492180472.89

    AUG

    2236037702.00

    1770775400.00

    1188863320.50

    0.00

    285176224.00

    2900

    74232.65

    0.00

    0.00

    5770926879.15

    SEP

    2637801045.00

    1733363400.00

    927947900.14

    0.00

    81860940.00

    3175

    62721.35

    146549308.60

    0.00

    5845085315.09

    OCT

    2822260379.00

    1690016600.00

    1089816182.12

    333656876.00

    77912048.00

    1920

    51740.00

    506931861.35

    0.00

    6712645686.47

    NOV

    3808197380.00

    1458147400.00

    2017036381.42

    768833581.00

    229498757.00

    9193

    76197.00

    711815048.70

    64934093

    .00

    8281713499.42

    DEC

    4175838761.00

    1641033300.00

    1944353761.68

    300362556.00

    451309375.00

    3838

    70379.00

    405571293.23

    0.00

    8512897753.68

    TOTAL

    35137407490.40

    21946260000.00

    21928311062.99

    1402853013.00

    2275222138.00

    4279

    433188.19

    5071209770.51

    94022045

    6.00

    82690053704.39

    42

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    48/104

    MONTH

    E

    GBIN

    AES

    DELTA

    SAPELE

    AFAM

    OM

    OTOSHO

    GEREGU

    LORUN

    SOG

    TOTAL

    JANUARY

    129,543,869.51

    62,014,481.55

    75,305,199.41

    0.00

    5,420,445.38

    4

    ,841,060.26

    25,328,783.91

    14,363,928

    .50

    316,817,768.51

    FEBRUARY

    114,949,948.49

    62,403,701.85

    72,112,811.06

    0.00

    2,479,323.58

    10,937,845.28

    19,646,076.78

    2,679,790.74

    285,209,497.78

    MARCH

    123,617,349.99

    67,467,635.55

    84,588,982.76

    0.00

    2,034,543.58

    16,719,650.10

    23,097,135.35

    1,511,355.67

    319,036,653.00

    APRIL

    111,105,125.30

    68,888,043.00

    72,370,614.19

    0.00

    3,037,054.77

    11,697,233.83

    21,368,479.63

    6,876,235.26

    295,342,785.99

    MAY

    98,9

    47,251.46

    55,350,401.40

    54,142,469.00

    0.00

    7,082,592.62

    8

    ,848,342.08

    14,520,305.49

    2,140,210.26

    241,031,572.30

    JUNE

    73,9

    25,497.08

    66,003,767.55

    61,621,776.01

    0.00

    8,510,490.89

    7

    ,172,010.34

    0.00

    0.00

    217,233,541.87

    JULY

    64,2

    69,986.85

    47,939,071.95

    44,807,393.36

    0.00

    7,643,690.21

    8

    ,343,542.52

    0.00

    0.00

    173,003,684.90

    AUGUST

    70,4

    35,187.61

    113,942,839.50

    106,429,169.3

    7

    0.00

    16,154,181.10

    15,515,552.87

    0.00

    0.00

    322,476,930.45

    SEPTEMBER

    83,0

    90,732.92

    54,600,947.10

    29,230,358.85

    0.00

    2,578,619.61

    10,003,225.72

    4,616,303.22

    0.00

    184,120,187.43

    OCTOBER

    88,9

    01,201.94

    53,235,522.90

    34,329,209.74

    10,510,191.59

    2,454,229.51

    6

    ,049,629.81

    15,968,353.63

    0.00

    211,448,339.12

    NOVEMBER

    119,958,217.47

    45,931,643.10

    63,536,646.01

    24,218,257.80

    7,229,210.85

    28,960,350.21

    22,422,174.03

    2,045,423.93

    314,301,923.40

    DECEMBER

    137,838,920.97

    51,692,548.95

    61,247,143.49

    9,461,420.51

    14,216,245.31

    12,091,916.94

    12,775,495.74

    0.00

    299,323,691.92

    TOTAL

    1,216

    ,583,289.59

    749,470,604.40

    759,721,773.2

    6

    44,189,869.91

    78,840,627.39

    14

    1,180,359.97

    159,743,107.77

    29,616,944

    .36

    3,179,346,576.65

    AVERAGE

    101,381,940.80

    62,455,883.70

    63,310,147.77

    3,682,489.16

    6,570,052.28

    11,765,030.00

    13,311,925.65

    2,468,078.70

    264,945,548.05

    TABLE13

    COSTOFGAS(NAIRA)AGAINSTE

    NERGYENERATED

    200

    9

    43

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    49/104

    GENER

    ATED

    SEN

    T

    OUT

    GENERAT

    ED

    SENTOUTGENERA

    TED

    SENT

    OUT

    GENER

    ATED

    SENT

    OUT

    GENER

    ATED

    SENT

    OUT

    GENERA

    TED

    SENT

    OUT

    GENER

    ATED

    SENT

    OUT

    GENERA

    TED

    SENT

    OUT

    GENER

    ATED

    SENT

    OUT

    GENERA

    TED

    SENT

    OUT

    JAN

    0.3570

    0.3833

    0.4099

    0.4221

    0.4359

    0.4387

    0.0000

    0.0000

    0.5221

    0.5344

    0.3604

    0.3691

    0.4324

    0.4366

    0.4106

    0.4239

    0.3939

    0.4105

    0.2092

    0.2141

    FEB

    0.3572

    0.3851

    0.4094

    0.4223

    0.4489

    0.4518

    0.0000

    0.0000

    0.4810

    0.5018

    0.3686

    0.3731

    0.3685

    0.3716

    0.1161

    0.1219

    0.3823

    0.3989

    0.2112

    0.2165

    MAR

    0.3571

    0.3845

    0.4105

    0.4217

    0.4622

    0.4652

    0.0000

    0.0000

    0.6099

    0.6542

    0.3509

    0.3558

    0.3726

    0.3757

    0.1166

    0.1275

    0.3893

    0.4055

    0.2100

    0.2149

    APR

    0.3104

    0.3333

    0.4119

    0.4255

    0.4619

    0.4740

    0.0000

    0.0000

    0.5067

    0.5277

    0.3647

    0.3694

    0.4431

    0.4475

    0.3591

    0.3810

    0.3751

    0.3932

    0.2199

    0.2264

    MAY

    0.3315

    0.3564

    0.4129

    0.4263

    0.4317

    0.4320

    0.0000

    0.0000

    0.5720

    0.5855

    0.3702

    0.3767

    0.4858

    0.4924

    0.2998

    0.3545

    0.4010

    0.4193

    0.2176

    0.2233

    JUN

    0.4016

    0.4454

    0.4111

    0.4234

    0.4232

    0.4366

    0.0000

    0.0000

    0.6136

    0.6232

    0.3648

    0.3726

    0.0000

    0.0000

    0.0000

    0.0000

    0.4051

    0.4279

    0.2316

    0.2395

    JUL

    0.3911

    0.4366

    0.4140

    0.4258

    0.4251

    0.4415

    0.0000

    0.0000

    0.4888

    0.4964

    0.2815

    0.3777

    0.0000

    0.0000

    0.0000

    0.0000

    0.4204

    0.4541

    0.2234

    0.2332

    AUG

    0.3755

    0.4110

    0.4111

    0.4252

    0.4100

    0.4101

    0.0000

    0.0000

    0.4968

    0.5047

    0.3701

    0.3770

    0.0000

    0.0000

    0.0000

    0.0000

    0.3975

    0.4170

    0.1765

    0.1806

    SEP

    0.3987

    0.4411

    0.4119

    0.4255

    0.3885

    0.3979

    0.0000

    0.0000

    0.5617

    0.5901

    0.4050

    0.4128

    0.4454

    0.4493

    0.0000

    0.0000

    0.4039

    0.4292

    0.1486

    0.1521

    OCT

    0.3956

    0.4326

    0.4114

    0.4241

    0.3854

    0.4091

    0.3618

    0.4190

    0.3687

    0.3801

    0.2458

    0.2504

    0.4013

    0.4047

    0.0000

    0.0000

    0.4088

    0.4145

    0.1648

    0.1660

    NOV

    0.3553

    0.3809

    0.4094

    0.4234

    0.4198

    0.4248

    0.3554

    0.3891

    0.3947

    0.4006

    0.3643

    0.3674

    0.4871

    0.4925

    0.3260

    0.3953

    0.3836

    0.4015

    0.2040

    0.2093

    DEC

    0.3534

    0.3781

    0.4107

    0.4223

    0.4536

    0.4612

    0.3930

    0.4663

    0.3880

    0.3912

    0.3563

    0.3616

    0.4198

    0.4249

    0.0000

    0.0000

    0.3857

    0.4045

    0.1966

    0.2016

    AVERAGE

    0.3654

    0.3974

    0.4112

    0.4240

    0.4289

    0.4369

    0.0652

    0.0735

    0.5003

    0.5158

    0.3502

    0.3636

    0.3213

    0.3246

    0.1357

    0.1503

    0.3955

    0.4147

    0.2011

    0.2065

    MONTHS

    MONTHLY

    THERMAL

    OPT.COST

    COST/UNIT

    AFAM

    COST/UNIT

    COST/UNIT

    OLORUNSOG

    O

    COST/UNIT

    TOT.MONTHLY

    HYD/THERMAL

    PROD.COST

    COST/UNIT

    GEREGU

    COST/UNIT

    TABLE14OPERATING

    FUELCOST(NAIRA/KW

    h)JANUARY-DECEMBER

    2009

    EGBIN

    COST/UN

    IT

    AES

    COST/UNIT

    OMOT

    OSHO

    COST/UNIT

    DELTA

    COST/UNIT

    SAPELE

    44

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    50/104

    REGIONAL ENERGY FOR SALES (MW)

    JANUARY-DECEMBER 2009, CHART26(TABLE 11)

    2100718.42

    11.28%903556.68

    4.85%

    2990617.91

    16.06%

    1755436.59

    9.43% 1817840.86

    9.76%

    2358247.56

    12.67%

    1722387.71

    9.25%

    4971291.81

    26.70%

    LAGOS ENUGU OSOGBO P/HARCOURT

    KADUNA SHIRORO BAUCHI BENIN

    TRANSMISSION REGIONS MONTHLY ENERGY FOR SALES

    (MWH)

    JANUARY-DECEMBER 2009, CHART 25 (SEE TABLE 11)

    0

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    JAN. FEB. MAR. APR. MAY. JUN. JUL. AUG. SEP. OCT. NOV. DEC.

    MONTHS

    ENERGYAVAILABLEFORSALES(M

    WH)

    LAGOS ENUGU OSOGBO

    P/HARCOURT KADUNA SHIRORO

    BAUCHI BENIN

    45

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    51/104

    MAJOR

    TH

    ERMALSTATIONSFUELCOSTS.

    C

    HART27(SEETAB

    LE13)

    0.00

    20,000,

    000.00

    40,000,

    000.00

    60,000,

    000.00

    80,000,

    000.00

    100,000,

    000.00

    120,000,

    000.00

    140,000,

    000.00

    160,000,

    000.00

    JAN

    FEB

    M

    AR

    APR

    MAY

    JUN

    JUL

    AUG

    SEP

    O

    CT

    NOV

    DEC

    MONTHS

    COSTS IN NAIRA (MILLIONS)

    EGBIN

    AES

    DELTA

    SAPELE

    AFAM

    OMOTOSHO

    GEREGU

    OLORUNSOGO

    46

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    52/104

    MONTHLY

    UNITPROD.COST(

    NAIRA/UNIT)

    CHART28(SEETABLE

    14)

    0.0

    0.1

    0.1

    0.2

    0.2

    0.3

    0.3

    0.4

    0.4

    0.5

    0.5

    J

    AN

    FEB

    MAR

    AP

    R

    MAY

    JUN

    JUL

    AUG

    SEP

    OCT

    NOV

    DEC

    MONTH

    S

    UNIT PRODUCTION COST (NAIRA/UNIT).

    THMALGEN.COST

    THMALSENTOUTCOST

    THMAL&

    HYGEN.

    COST

    THMAL&HYD

    SENTOUTC

    OST

    47

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    53/104

    STATIO

    NSAVE.PROD.COST

    S(NAIRA/UNIT)

    CHART29(SEETAB

    LE14)

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    EGBIN

    AES

    DELT

    A

    SAPELE

    AFAM

    OM

    OTOSHO

    GEREGU

    OLORUNSO

    GO

    POWERSTATION

    S

    UNIT PRODUCTION COSTS (NAIRA/UNIT)

    48

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    54/104

    2.0. CONSTRAINTS TO GRID OPERATIONS

    This subject is treated under the following sub-headings: 2.1. System Control Constraints

    2.2. Generation Constraints.

    2.3. Transmission Constraints

    2.1. Constraints to Grid Operations: System Communications

    2.1.1 Achievements

    2.1.1.1 System Communications

    In the System Communications Maintenance Subsector great efforts are continually being madeto ensure availability of reliable telecommunications for effective Power System Operations andControl. Following are some of the achievements made in the year under review.

    i. Provision of HOTLINE Communication to OKPAI Power Station.ii. Restoration of HICOM Optic Fibre Voice Communication to Akangba T.S. (Extension

    2287) and Ikeja West (Extension 2286). This doubles the media of communicationfrom NCC to these stations.

    iii.

    Installation of Voice Communication through PAX/PLC (Power Link Type) andMicrowave Radio to following 132KV Stations Ile-Ife, Ilesa, Ondo, Akure, Offa andOmuaran.

    iv. Provision of Fibre Optics Communication via SOPHO PAX between Osogbo (NCC) and

    Ayede 330KV T.S. This is to augment the existing PAX/PLC Communication to Ayede.v. Restoration of PLC Communication media to Afam P.S., Jebba T.S., Alaoji T.S. and

    Delta P.S. after a major breakdown of the PLC equipment in these stations. CorporateHeadquarters provided the spare RF converter (P4LQ) modules used to replace the

    faulty ones.vi. Restoration of HICOM Optic Fibre telephone line No. 2282 to Benin T.S. This facilitates

    having double media to Benin T.S. also.

    The above achievements have really enhanced effective Power System Operations and Controlunlike the previous years. There is now redundancy to most stations where NCC cancommunicate to through Optic Fibre medium and Power Line Carrier medium. This makescommunication more reliable and System Operations easier.

    2.1.2. Constraints

    2.1.2.1. System Communications

    i. As a result of the vandalized ADLASH Optic Fibre cable between Benin T.S., Sapele and

    Delta Power Stations, communication to these stations has been a big problem

  • 7/14/2019 2009 AnnualReport Final-13!05!10

    55/104

    especially during system restoration after a collapse. For reliability ofcommunication to these stations there is need to restore these Optic Fibre cables.Meanwhile only PAX/PLC with limited channel is in use to reach the two stations.

    ii. Contract has been awarded to rehabilitate the DC S255 switches in New Haven,

    Kaduna, Kano, Gombe, Onitsha, Alaoji and Egbu 330KV Transmission Stations for moreefficient interconnectivity between the various stations and NCC, Osogbo.

    iii. Contract hasbeen awarded for provision of Direct Voice Communication line fromNCC to Kainji, Ayede, Ikeja West, Egbin, Jebba T.S., Jebba G.S., Shiroro, Benin, DeltaP.S., Sapele P.S. via the existing PDH Optic Fibre equipment.

    iv. Contracts have also been awarded to extend the reach of Optic Fibre technology fromShiroro to Kaduna to Kano route and Kaduna-Jos-Gombe route.

    v. Contracts for rehabilitation of 11no. PLC links have been awarded in order to improveGRID Telecommunication.

    vi.Another big constraint to System Communication which has not been taken care of islack of communication me