    WCDMA UTRAN KPI

  • 7/30/2019 20090408_WCDMA RAN

    2/45

    IntroductionIntroduction

    z KPI definit ion

    Key performance indicator

    z KPI enti ty

    RNC level Cell level

    Clutter/region level (customized)

    z KPI analysis

    Network performance surveillance

    Trouble shooting network problems

    Network trend analysis

  • 7/30/2019 20090408_WCDMA RAN

    3/45

    UTRAN KPI OverviewUTRAN KPI Overview

    z The UTRAN KPI can be divided into 5 catalogs

    AccessibilityUTRAN Call Setup

    RetainabilityUTRAN Call Drop

    MobilityUTRAN Mobility Management

    TrafficResource and Traffic management

    Algorithm Radio Resource Management Algorithm Management

    KPI

    Accessib il ity Retainability Mobility Traffic Algori thm

  • 7/30/2019 20090408_WCDMA RAN

    4/45

    ContentsContents

    UTRAN Call Setup

    UTRAN Call Drop

    UTRAN Mobil ity Management

    Traffic Management

    Algorithm Management

  • 7/30/2019 20090408_WCDMA RAN

    5/45

    UTRAN Call SetupUTRAN Call Setup

    z UTRAN Call Setup includes the RRC connection setup and the RAB

    establish procedure. The Successful call setup involves the success

    RRC and RAB setup. The main indicators are

    RRC Setup Success Rate RAB Setup Success Rate

  • 7/30/2019 20090408_WCDMA RAN

    6/45

    RRC Setup CounterRRC Setup Counter

    z Measurement Point

    Stat. Number of RRC Connection Request in Point A1 of Figure1

    Stat. Number of RRC Connection Setup in Point B of Figure1

    Stat. Number of RRC Connection Setup complete in Point C of Figure1

    Stat. Number of RRC Connection Reject in point A of Figure2

    A1

    B

    A2

    C

    RRC CONNECTIONREQUEST

    RRC CONNECTIONSETUP COMPLETE

    RRC CONNECTIONSETUP

    UE RNC

    A

    RRC CONNECTION REQUEST

    RRC CONNECTIONREJECT

    UE RNC

    F1:successful RRC connection setup procedure F2: RRC connection reject procedure

  • 7/30/2019 20090408_WCDMA RAN

    7/45

    RRC Setup CounterRRC Setup Counter

    z RRC Setup KPI

    RRC Connection Setup Success Rate = RRC Connection Setup complete / RRC

    Connection Request

    z Main counter RRC Connection Request

    RRC Connection Setup

    RRC Connection Reject

    RRC Connection Setup complete

  • 7/30/2019 20090408_WCDMA RAN

    8/45

    RRC Setup CounterRRC Setup Counter

    z Request cause counter

    Originating conversational call

    Terminating conversational call

    Inter-RAT cell re-selection Inter-RAT cell change order

    Registration

    z Failure cause counter

    RRC Reject

    RRC setup no response

  • 7/30/2019 20090408_WCDMA RAN

    9/45

    RAB Setup CounterRAB Setup Counter

    z Measurement Point

    Stat. Number of RAB Setup Request in Point A of Figure1

    Stat. Number of RAB Setup Success in Point B of Figure1

    Stat. Number of RAB Setup Failure in Point B of Figure2

    RAB ASSIGNMENT

    REQUEST

    UE RNC CN

    A

    B

    RADIO BEARERSETUP

    RADIO BEARER

    SETUP COMPLETE

    RAB ASSIGNMENTRESPONSE

    RAB ASSIGNMENT

    REQUEST

    UE RNC CN

    A

    B

    RADIO BEARERSETUP

    RADIO BEARERSETUP FAILURE

    RAB ASSIGNMENT

    RESPONSE

    F1: Successful RAB setup procedure F2: RAB setup failure procedure

  • 7/30/2019 20090408_WCDMA RAN

    10/45

    RAB Setup CounterRAB Setup Counter

    z

    RAB Setup KPI CS RAB Success rate = CS RAB Setup Success/CS RAB Setup Request

    PS RAB Success rate = PS RAB Setup Success/CS RAB Setup Request

    z Overall counter

    CS RAB Setup Request

    CS RAB Setup Success

    CS RAB Setup Failure

    PS RAB Setup Request

    PS RAB Setup Success

    PS RAB Setup Failure

    z Traffic class based counter

    Conversational

    Streaming

    Interactive

    Background

  • 7/30/2019 20090408_WCDMA RAN

    11/45

    RAB setup counterRAB setup counter

    z Typical bearer based counter

    AMR speech

    CS64kbps

    PS64kbps

    PS128kbps

    PS384kbps

    z Failure cause counter

    Invalid parameters

    Unavailable

    Transport Layer failure

    Other cause

  • 7/30/2019 20090408_WCDMA RAN

    12/45

    ContentsContents

    UTRAN Call Setup

    UTRAN Call Drop

    UTRAN Mobil ity Management

    Traffic Management

    Algorithm Management

  • 7/30/2019 20090408_WCDMA RAN

    13/45

    Call Drop CounterCall Drop Counter

    z Measurement Point

    Stat. Number of Call Drop in Point A of Figure1 and in Point A of Figure2

    Definition of Call Drop : Abnormal RAB release triggered by RNC

    A

    RNC CN

    RAB RELEASE REQUES

    F1: RAB release request procedure F2: Iu connection release request procedure

    A

    IURELEASE COMMAND

    IU RELEASE COMPLETE

    RNC CN

    IU RELEASE REQUEST

  • 7/30/2019 20090408_WCDMA RAN

    14/45

    Call Drop CounterCall Drop Counter

    z Call Drop KPI

    AMR Call Drop Rate = AMR Call Drop / AMR RAB Setup Success

    VP Call Drop Rate = VP Call Drop / VP RAB Setup Success

    PS Call Drop Rate = PS Call Drop / PS RAB Setup Success

    z Overall counter

    CS call drop

    PS call drop

    z Traffic class based counter

    Conversational

    Streaming

    Interactive

    Background

  • 7/30/2019 20090408_WCDMA RAN

    15/45

    Call Drop CounterCall Drop Counter

    z Typical bearer based counter

    AMR speech

    CS64kbps

    PS64Kbps PS128Kbps

    PS384Kbps

    z Call drop cause counter

    RF loss

    RLC reset

    AAL2 failure

    GTPU loss

    Other cause

  • 7/30/2019 20090408_WCDMA RAN

    16/45

    ContentsContents

    UTRAN Call Setup

    UTRAN Call Drop

    UTRAN Mobil ity Management

    Traffic Management

    Algorithm Management

  • 7/30/2019 20090408_WCDMA RAN

    17/45

    UTRAN Mobile ManagementUTRAN Mobile Management

    z The UTRAN Mobile Management focus on the KPIs of the handover

    procedures.

    Soft handover

    Hard handover InterRAT handover

    InterRAT cell change order

    Cell update

  • 7/30/2019 20090408_WCDMA RAN

    18/45

    SHO counterSHO counter

    z Measurement Point

    Stat. Number of SHO request in Point B of Figure1

    Stat. Number of SHO success in Point C of Figure1

    Stat. Number of SHO failure in Point C of Figure2 and in Point C of Figure3

    C

    ACTIVE SET UPDATE

    ACTIVE SET UPDATE COMPLETE

    UE RNC

    A

    B

    MEASUREMENT REPORT

    z F1: Successful SHO procedure F2: SHO failure procedure (activesetupdate failure) F3:SHO failure procedure (time out)

    C

    ACTIVE SET UPDATE

    ACTIVE SET UPDATE FAILURE

    UE RNC

    A

    B

    MEASUREMENT REPORT

    C

    ACTIVE SET UPDATE

    WAITING ACTIVE SET UPDATECOMPLETE TIME OUT

    UE RNC

    A

    B

    MEASUREMENT REPORT

  • 7/30/2019 20090408_WCDMA RAN

    19/45

    SHO counterSHO counter

    z Soft handover KPI

    Soft HO Success rate=Soft HO success / Soft HO request

    Softer HO Success rate=Softer HO success / Softer HO request

    z Overall counter Soft HO request

    Soft HO success

    Softer HO request

    Softer HO success

    z Typical Service based counter

    AMR speech

    CS64kbps

    PS64kbps

    PS128kbps

    PS384kbps

  • 7/30/2019 20090408_WCDMA RAN

    20/45

    SHO counterSHO counter

    z Failure cause counter

    configuration unsupported

    incompatible simultaneous reconfiguration

    invalid configuration No response

    Other cause

    z SHO factor counter

    (1 radio link, 2 radio links, 3 radio links) active set

    SHO factor (based on radio link) = active set average link number -1

    SHO factor (based on UE) = (2 radio links active set + 3 radio links active set) / (1

    radio links active set + 2 radio links active set + 3 radio links active set)

  • 7/30/2019 20090408_WCDMA RAN

    21/45

    HHO counterHHO counter

    z Measurement Point

    Stat. Number of HHO request in Point B of Figure1

    Stat. Number of HHO success in Point C of Figure1

    Stat. Number of HHO failure in Point A of Figure2 and in Point A of Figure3

    RADIO LINK SETUP

    REQUEST

    UE NodeB RNC

    RADIO LINK SETUPRESPONSE

    A

    B

    PHYSICAL CHANNEL RECONFIGURATION

    PHYSICAL CHANNELRECONFIGURATION COMPLETE

    C

    MEASUREMENT REPORT

    z F1: Successful HHO procedure F2: HHO failure (physical channel configuration failure) F3:HHO failure (time out)

    UE RNC

    A

    PHYSICAL CHANNELRECONFIGURATION

    PHYSICAL CHANNELRECONFIGURATION FAILURE

    UE RNC

    A

    PHYSICAL CHANNELRECONFIGURATION

    WAITING PHYSICAL CHANNELRECONFIGURATION TIME OUT

  • 7/30/2019 20090408_WCDMA RAN

    22/45

    HHO counterHHO counter

    z HHO KPI

    Intra-frequency HHO Success rate = Intra-frequency HHO success / Intra-

    frequency HHO request

    Inter-frequency HHO Success rate = Inter-frequency HHO success / Inter-

    frequency HHO request

    z Overall counter

    Intra-frequency HHO request

    Intra-frequency HHO success

    Intra-frequency HHO failure

    Inter-frequency HHO request

    Inter-frequency HHO success

    Inter-frequency HHO failure

  • 7/30/2019 20090408_WCDMA RAN

    23/45

    HHO counterHHO counter

    z Typical Service based counter

    AMR speech

    CS64kbps

    PS64kbps

    PS128kbps

    PS384kbps

    z Failure cause counter

    Configuration unsupported

    Physical channel failure

    Incompatible simultaneous reconfiguration

    Cell update occurred

    Invalid configuration

    No response

    Other cause

  • 7/30/2019 20090408_WCDMA RAN

    24/45

    Inter-RAT Handover out counterInter-RAT Handover out counter

    z Measurement Point

    Stat. Number of Handover outgoing prepare in Point A

    Stat. Number of Handover outgoing prepare success in Point B

    Stat. Number of Handover outgoing attempt in Point C

    Stat. Number of Handover outgoing success in Point D

    RELOCATIONREQUIRED

    UE SRNC CN

    HANDOVER FROMUTRAN COMMAND

    RELOCATIONCOMMAND

    IU RELEASECOMMAND

    A

    B

    C

    D

    F1: Successful inter-RAT HO outgoing procedure

  • 7/30/2019 20090408_WCDMA RAN

    25/45

    Inter-RAT handover out counterInter-RAT handover out counter

    z Inter-RAT handover KPI

    Inter-RAT handover out prepare success rate = Handover outgoing prepare

    success/Handover outgoing prepare

    Handover outgoing success rate = Handover outgoing success/Handover

    outgoing attempt

    z Overall counter

    Handover outgoing prepare

    Handover outgoing prepare success

    Handover outgoing attempt

    Handover outgoing success

  • 7/30/2019 20090408_WCDMA RAN

    26/45

    Inter-RAT handover out counterInter-RAT handover out counter

    z Failure cause counter

    Prepare failure

    9 Relocation Failure in Target CN/RNC or Target System

    9 TRELOCalloc Expiry

    9 Relocation not supported in Target RNC or Target system

    9 No Resource Available

    9 Unknown Target RNC

    9 No response

    9

    Handover failure

    9 Configuration Unsupported

    9Physical Channel Failure

    9 Unspecified

    9 Relocation abort

    9 No response

    9 Other cause

  • 7/30/2019 20090408_WCDMA RAN

    27/45

    Inter-RAT handover in counterInter-RAT handover in counter

    z Measurement Point

    Stat. Number of Handover incoming request in Point A

    Stat. Number of Handover incoming prepare success in Point B

    Stat. Number of Handover incoming success in Point C

    F1: Successful inter-RAT HO incoming procedure

    RELOCATIONREQUEST

    CN TRNC

    A

    HANDOVER TOUTRAN COMPLETE

    RELOCATION

    REQUESTACKNOWLEDGE

    B

    CRELOCATION

    COMPLETE

    D

    NodeB UE

    RADIO LINKRESTORE

    INDICATION

  • 7/30/2019 20090408_WCDMA RAN

    28/45

    Inter-RAT handover in counterInter-RAT handover in counter

    z Inter-RAT handover in KPI

    Handover in prepare success rate = Handover incoming prepare

    success/Handover incoming request

    Handover in success rate = Handover incoming success/Handover incoming

    request

    z Overall counter

    Handover incoming request

    Handover incoming prepare success

    Handover incoming success

    I RAT h d i

  • 7/30/2019 20090408_WCDMA RAN

    29/45

    Inter-RAT handover in counterInter-RAT handover in counter

    z Failure cause Prepare failure

    9 No Resource Available

    9 Relocation Failure in Target CN/RNC or Target System

    9 Relocation not supported in Target RNC or Target system

    9 Relocation abort

    9 Other cause

    Handover failure

    9 Relocation abort

    9 No response

    9 Other cause

    I RAT ll hI t RAT ll h t

  • 7/30/2019 20090408_WCDMA RAN

    30/45

    Inter-RAT cell change counterInter-RAT cell change counter

    z Measurement Point Stat. Number of cell change outgoing request in Point B of Figure1 and Point A

    of Figure2

    Stat. Number of cell change outgoing success in Point D of Figure1 and Point B

    of Figure2

    UE SRNC CN

    CELL C HANGEORDER FROM

    UTRAN

    IU RELEASECOMMAND

    A

    B

    C

    MEASUREMENTREPORT

    IU RELEASECOMPLETE

    D

    F1: UTRAN-controlled cell change outgoing procedure F2: UE-controlled cell change outgoing procedure

    A SRNS CONTEXT RESPON

    SRNS CONTEXT REQUES

    SRNC CN

    IU RELEASE COMMAND

    IU RELEASE COMPLETEB

    Inter-RAT cell change counterInter-RAT cell change counter

  • 7/30/2019 20090408_WCDMA RAN

    31/45

    Inter-RAT cell change counterInter-RAT cell change counter

    z Inter-RAT cell change KPI

    Success rate = Cell change success / Cell change outgoing request

    z Overall counter

    Cell change outgoing request Cell change outgoing success

    z Typical bearer based counter

    PS64kbps

    PS128kbps

    PS384kbps

    z Failure cause counter

    Configuration unacceptable

    Physical Channel Failure

    Unspecified

    No response

    Other

    C ll d t tC ll d t t

  • 7/30/2019 20090408_WCDMA RAN

    32/45

    Cell update counterCell update counter

    z Measurement Point

    Stat. Number of cell update request in Point A

    Stat. Number of cell update success in Point B in case1 or case2

    Stat. Number of cell update success in Point C in case3

    Case1:the UE camps on the same cells and keeps in CELL_PCH state before and after cell update

    Case2:the UE camps on the same cells and keeps in CELL_FACH state before and after cell update,

    also the update cause is not cell reselection

    Case3: all cases except case1 and case2

    B

    CELL UPDATE

    CELL UPDATE CONFIRM

    UE RNC

    PHYSICAL CHANNEL RECONFIGURATIO

    C

    A

    F1: cell update procedure

    C ll d t tCell update counter

  • 7/30/2019 20090408_WCDMA RAN

    33/45

    Cell update counterCell update counter

    z Cell update KPI

    Cell update success rate = Cell update success/Cell update request

    z Overall Counter

    Cell update request Cell update success

    z Cell update cause counter

    Cell reselection

    Periodical cell update

    Uplink data transmission

    Paging response

    Re-entered service area

    Radio link failure

    RLC unrecoverable error

    ContentsContents

  • 7/30/2019 20090408_WCDMA RAN

    34/45

    ContentsContents

    UTRAN Call Setup

    UTRAN Call Drop

    UTRAN Mobil ity Management

    Traffic Management

    Algorithm Management

    Traffic CounterTraffic Counter

  • 7/30/2019 20090408_WCDMA RAN

    35/45

    Traffic CounterTraffic Counter

    z User number

    RRC state based user number

    9 Cell DCH, Cell FACH, Cell PCH, URA PCH

    Traffic class based equivalent user

    9 Conversational

    9 Streaming

    9 Interactive and background

    z Cell throughput Directional counter

    9 Cell uplink throughput

    9 Cell downlink throughput

    Traffic class based counter

    9 Conversational, streaming, interactive, background

    All supported bandwidth

    Traffic CounterTraffic Counter

  • 7/30/2019 20090408_WCDMA RAN

    36/45

    Traffic CounterTraffic Counter

    z Iub bandwidth utilization

    Common channel (RACH, FACH, PCH) volume

    Traffic class based service volume

    Uplink and downlink volume

    z OVSF code utilization

    SF based

    9 SF=4

    9 SF=8

    9

    9 SF=512

    z RTWP and Carrier Power

    Cell RTWP

    Transmission Carrier Power

    ContentsContents

  • 7/30/2019 20090408_WCDMA RAN

    37/45

    ContentsContents

    UTRAN Call Setup

    UTRAN Call Drop

    UTRAN Mobil ity Management

    Traffic Management

    Algorithm Management

    Algorithm CounterAlgorithm Counter

  • 7/30/2019 20090408_WCDMA RAN

    38/45

    Algorithm CounterAlgorithm Counter

    z DCCC Overall counter

    9 Channel switch request

    9 Channel switch success

    DCHDCH channel switch counter

    9 Channel switch success (DL Bit Rate upgrade )

    9 Channel switch success (DL Bit Rate degrade )

    DCHFACH/RACH channel switch counter

    9 Channel switch success (To common channel)

    9 Channel switch success (From common channel)

    z AMRC

    Uplink AMR control counter (degrade)

    Downlink AMR control counter (upgrade)

    z CAC

    UL Admission deny counter

    DL Admission deny counter

  • 7/30/2019 20090408_WCDMA RAN

    39/45

    Appendix: Nastar KPI Analysis RoutineAppendix: Nastar KPI Analysis Routine

  • 7/30/2019 20090408_WCDMA RAN

    40/45

    pp ypp y

    Define monitor area: RNC group or cell group

    Query Performance Item

    Query Top N cell list

    Query related item

    Import raw data

    Define cluster

    Select Issue

    Find out trouble cause

    Raw counter Analysis

    Select performance analysis issue

    Query metric item, find the fault or trouble

    Query TopN cell list in pre-defined cluster, find

    the worst cell or cell group

    Query related metric item in the specified worst

    cells

    Query and find out the fault or trouble cause

    Analyze raw counter if necessary

    Import performance counter from NE M2000

    Appendix: Nastar KPI Analysis Example

  • 7/30/2019 20090408_WCDMA RAN

    41/45

    z Step1: Check RRC metric item by RRC setup analysis issue

    RRC SetupRate is

    lower

    Appendix: Nastar KPI Analysis Example

  • 7/30/2019 20090408_WCDMA RAN

    42/45

    z Step2: Find the worst TopN cell list in former cluster by Forward

    Appendix: Nastar KPI Analysis Example

  • 7/30/2019 20090408_WCDMA RAN

    43/45

    z Step3: Find the worst cell in TopN list

    Appendix: Nastar KPI Analysis Example

  • 7/30/2019 20090408_WCDMA RAN

    44/45

    z Step4: Query RRC reject cause in specified cell by Forward

    Appendix: Nastar KPI Analysis Example

  • 7/30/2019 20090408_WCDMA RAN

    45/45

    z Step5: Find the RRC reject cause in the worst cell


Recommended