2011 MODUSPEC AUDITS FOR 8 WINNER RIGS IN THE DRILLING WORKS TENDERING + 1 BACK
UP RIG
DATE: 24/05/2012
IADC CONFERENCE
FLORIN CONSTANTINESCU
I. CHALENGES II. FINDINGS III. QA/QC TOP 2011 IV. IMPROVEMENTS V. QA/QC TOP 2011 UPDATED AT MARCH 2012 VI. QA/QC PROGRAM 2012
3 P&E, Drilling & Production Engineering
I. CHALENGES
► S.C. OMV PETROM AND MODUSPEC PERFORM THE INSPECTION TO WORKING LOCATION TO VERIFY IF THE RIGS ARE IN COMPLIANCE WITH THE EQUIPMENT SPECIFIED IN THE CONTRACT PROPOSALS AND DRILLING CONTRACT. ►THE SCOPE OF INSPECTIONS : 1. FULL CONDITION SURVEY THE SURVEY WAS CONDUCTED VIA A COMBINATION OF VISUAL INSPECTION AND FUNCTION TESTING OF EQUIPMENT 2. PREVENTIVE MAINTENANCE SYSTEM AUDIT AN AUDIT OF THE PREVENTIVE MAINTENANCE SYSTEM IS INTENDED TO ASESS THE AUDITABILITY OF EXECUTED MAINTENANCE INCLUDING KEEPING OF RECORDS,ACTIVE PREVENTIVE MAINTENANCE ROUTINES AND COMPLIANCE IN EXECUTION.THIS WILL INCLUDE THE CHECK OF CURRENT MAINTENANCE STATUS.
4 P&E, Drilling & Production Engineering
Control hydraulic handles without labels Main generator Nos. 1 and 2 had burnt Metal Oxide Varistors
II. FINDINGS
5 P&E, Drilling & Production Engineering
Exposed hexagon on the input shaft Breaking/Operation system is missing from BOP trolley carriage
6 P&E, Drilling & Production Engineering
Threaded/welded connection at discharge valve mud
pump
Unauthorized pad eyes welded at substructure
7 P&E, Drilling & Production Engineering
Unproperly tighten studs Improper chains at discharge mud pump flexible lines
8 P&E, Drilling & Production Engineering
Mud pump with excessive flakes wear at middle gear train
Mud pump contaminated oil with metal from gear train wear
9 P&E, Drilling & Production Engineering
Install protective covers on the alternator and fan belts Install back-up safety lines at all mast sheaves
10 P&E, Drilling & Production Engineering
Prior to commencing operations, completely tighten and torque all fasteners at the TDS torque adaptor tube
at the mast
Replace all threaded connections for welded or flanged connections on the standpipe manifold
11 P&E, Drilling & Production Engineering
.
Unprotected battery
Improper safety clamp and safety line at vibration hose
12 P&E, Drilling & Production Engineering
.
No cable gland No safety guard
13 P&E, Drilling & Production Engineering
.
Missing split pins No safe access provided to the monkeyboard
14 P&E, Drilling & Production Engineering
.
Pole of Ladsafe climb system too short to disconnect in a safe position on the crown platform
Tongs with worn hand grips and hand protection
15 P&E, Drilling & Production Engineering
“GENERAL” FINDINGS TO ALL DRILLING CONTRACTORS 1. BOP RAMS, BOP ANNULAR, BOP GATE VALVES, CHOKE AND KILL MANIFOLD AND HYDRAULIC
PRESSURE UNIT ARE NOT IN ACCORDING TO API REQUIREMENTS & H2S SERVICE (REF: API SPE. 16.D AND API RP53)
2. THREADED CONNECTION FOR RELIEF VALVE, CHOKE AND KILL MANIFOLD, MUD PUMPS AND STAND PIPE MANIFOLD.
3. TOP DRIVE SYSTEM IS MISSING/IMPROPER. 4. INSTALL A TRANSPORT SYSTEM CONSISTING OF A TROLLEY CARRIAGE ON TRACKS TO MOVE THE
BOP STACK AWAY FROM SUBSTRUCTURE. 5. ELECTRICAL EQUIPMENT WITHIN HAZARDOUS AREAS WERE NOT EX OR ATEX CERTIFIED, OR WAS
COMPLETELY MISSING. 6. THE CASING STABBING BOARD WAS NOT IN A PROPER CONDITION. NO LOAD TEST WAS
PERFORMED. AFTER 575 ANINOASA FATALITY WERE STARTED THE MAINTENANCE/TESTS PROCEDURES BUT IN THIS MOMENTS ONE OF THIS EQUIPMENTS DON’T WORK PROPER.
7. PREVENTIVE MAINTENANCE SYSTEM IS MORE OR LESS IN THE IMPLEMENTATION PHASE. 8. INSPECTIONS, FUNCTIONAL TESTS, LIFTING EQUIPMENTS, PRESSURE EQUIPMENTS TESTS, DROPPED-
OBJECTS INSPECTION, HIGH-PRESSURE HOSES WERE NOT FOUND OR REPORTED IN THE PREVENTIVE MAINTENANCE SYSTEM.
9. NONE OF DRILLING CONTRACTORS FULFILLED 100% REQUIREMENTS/DEAD LINE FOR START DRILLING OPERATIONS SO THEY PROMISED DURING TENDERING PROCESS.
16 P&E, Drilling & Production Engineering
III. QA/QC TOP 2011- IMMEDIATELY AFTER AUDIT
NR. DRILLING CONTRACTOR - RIG - DATE MODUSPEC SURVEY AUDIT PREV. MAINTENANCE SYSTEM TODAY ASPECTS
SEVERITY IF SF % S1(%) CMMS S.F/T.F S2(%) POSITIVE NEGATIVE
1 Rig A/ 10.06.2011 CRITICAL 30 26 87
87,79 50%
0 / 8
50% BOP
MAJOR 48 42 88
ASIS MINOR 12 12 100 0%
2 Rig B/ 28.09.2011 CRITICAL 18 14 78
83,35 50%
0 / 11
50%
BOP MAJOR 21 20 95
ORACLE-SIVECO MINOR 24 24 100 0% THREADED CONN
3 Rig C/ 22.06.2011 CRITICAL 39 15 38
41,45 25%
0 / 12
25% BOP TDS MAJOR 78 31 40
PAPER - CMMS MINOR 13 10 77 0%
4 Rig D/ 24.12.2011 CRITICAL 21 13 62
65,63 50%
2. / 18
55% BOP ATEX??? MAJOR 32 23 72
RAM MINOR 17 14 82 5%
5 Rig E/ 22.05.2011 CRITICAL 21 20 95
96,67 50%
0 / 11
50% BOP MAJOR 56 56 100
EresMan MINOR 10 10 100 0%
6 Rig F/ 23.06.2011 CRITICAL 44 16 36
33,44 50%
1. / 11
55% BOP MAJOR 82 16 20
EresMan MINOR 16 8 50 5%
7 Rig G/ 24.05.2011 CRITICAL 25 23 92
92,31 25%
0 / 9
25% BOP MAJOR 88 80 91
EXCEL - EresMan MINOR 13 13 100 0%
8 Rig H/ 22.10.2011 CRITICAL 14 13 93
92,3 50%
0 / 8
50% BOP TDS MAJOR 42 39 93
EXPERT MINOR 33 28 85 0%
9 Rig I/ 25.09.2011 CRITICAL 32 25 78
75,17 25%
0 / 10
25% BOP TDS MAJOR 82 55 67
PAPER - CMMS MINOR 36 26 72 0%
IF - NUMBER OF INITIAL FINDINGS S1=SCORE=(0.7 X P CRITICAL)+(0.23 X P MAJOR)+(0.07 X P MINOR) SF - SOLVED FINDINGS S2=SCORE=CMMS PERCENTAGE+0.5 X (S.F/T.F PERCENTAGE) T.F - TOTAL FINDINGS CMMS - COMPUTER MAINTENANCE MANAGEMENT SYSTEM
17 P&E, Drilling & Production Engineering
FULL CONDITION SURVEY
1. Rig E 96 %
2. Rig G 92 %
3. Rig H 92 %
4. Rig A 87 %
5. Rig B 83 %
6. Rig I 75 %
7. Rig D 65 %
8. Rig C 41 %
9. Rig F 33 %
PREVENTIVE MAINTENANCE SYSTEM
1. Rig D 55 %
2. Rig A & Rig E 50 %
3. Rig B 50 %
4. Rig H 50 %
5. Rig F 50 %
6. Rig G 25 %
7. Rig C 25 %
8. Rig I 25 %
18 P&E, Drilling & Production Engineering
IV. IMPROVEMENTS “THE ALMOST FINDINGS WERE SOLVED TILL MARCH 2012”
19 P&E, Drilling & Production Engineering
“THE ALMOST FINDINGS WERE SOLVED TILL MARCH 2012”
20 P&E, Drilling & Production Engineering
“THE ALMOST FINDINGS WERE SOLVED TILL MARCH 2012”
21 P&E, Drilling & Production Engineering
V. QA/QC TOP 2011 UPDATED AT MARCH 2012
NR. DRILLING CONTRACTOR - RIG - DATE MODUSPEC SURVEY AUDIT PREV. MAINTENANCE SYSTEM TODAY ASPECTS SEVERITY IF SF % S1(%) CMMS S.F/T.F S2(%) POSITIVE NEGATIVE
1 Rig A/ 10.06.2011 CRITICAL 30 30 100
99,52 50%
5 / 8
81% BOP
MAJOR 48 47 98
ASIS MINOR 12 12 100 31%
2 Rig B/ 28.09.2011 CRITICAL 18 16 89
91,13 50%
7 / 11
82%
BOP MAJOR 21 20 95
ORACLE-SIVECO MINOR 24 24 100 32% THREADED CONN.
3 Rig C/ 22.06.2011 CRITICAL 39 37 95
94,64 50%
5 / 12
71% BOP TDS MAJOR 78 72 92
ASIS MINOR 13 13 100 21%
4 Rig D/ 24.12.2011 CRITICAL 21 20 95
96,67 50%
13 / 18
86% BOP MAJOR 32 32 100
RAM MINOR 17 17 100 36%
5 Rig E/ 22.05.2011 CRITICAL 21 21 100
100 50%
5 / 7
85% BOP MAJOR 56 56 100
EresMan MINOR 10 10 100 35%
6 Rig F/ 23.06.2011 CRITICAL 45 45 100
99,72 50%
5 / 7
85% BOP MAJOR 82 81 99
EresMan MINOR 16 16 100 35%
7 Rig G/ 24.05.2011 CRITICAL 25 25 100
99,74 50%
2 / 9
61% BOP MAJOR 88 87 99
EresMan MINOR 13 13 100 11%
8 Rig H / 22.10.2011 CRITICAL 14 13 93
93,69 50%
5 / 8
81% BOP TDS MAJOR 42 40 95
EXPERT MINOR 33 32 97 31%
9 Rig I/ 25.09.2011 CRITICAL 32 31 97
97,25 50%
6 / 10
80% BOP TDS MAJOR 82 80 98
CMMS MINOR 36 36 100 30%
IF - NUMBER OF INITIAL FINDINGS S1=SCORE= (0.7 X P CRITICAL)+(0.23 X P MAJOR)+(0.07 X P MINOR) SF - SOLVED FINDINGS S2=SCORE=CMMS PERCENTAGE+0.5 X (S.F/T.F PERCENTAGE) T.F - TOTAL FINDINGS CMMS - COMPUTER MAINTENANCE MANAGEMENT SYSTEM
22 P&E, Drilling & Production Engineering
FULL CONDITION SURVEY
1. Rig E 100%
2. Rig F 99 %
3. Rig G 99 %
4. Rig A 99 %
5. Rig I 97 %
6. Rig D 96 %
7. Rig C 94 %
8. Rig H 93 %
9. Rig B 91%
PREVENTIVE MAINTENANCE SYSTEM
1. Rig D 86 %
2. Rig E & Rig A 85 %
3. Rig B 82 %
4. Rig H 81 %
5. Rig F 81 %
6. Rig I 80 %
7. Rig C 71 %
8. Rig G 61 %
23 P&E, Drilling & Production Engineering
1. TO CONTINUE THE MODUSPEC AUDIT FOR OTHER THREE–FOUR RIGS
2. TO WORK JOINTLY (MODUSPEC AND PETROM TEAM) FOR CONDUCTING RIG START-UP AUDITS (AROUND 180 WELLS/2012)
VI. QA/QC PROGRAM 2012