Workshop Part 2 19 SEPT. 2012 ISLAND SCHOOL REDEVELOPMENT Sustainable Building Design
Transcript
Page 1: 20120919 is sustain_presented-2

Workshop Part 219 SEPT. 2012

ISLAND SCHOOL REDEVELOPMENTSustainable Building Design

Page 2: 20120919 is sustain_presented-2

TODAY’S CONTENT

1. Briefing Session:- Objective of Workshop

2. Tasks Session:- Work in 3 Groups

3. Presentation Session:- Presented by 3 Groups

4. Conclusion Session:- Wrap-Up + Q&A

By RLP

By YOU

By YOU

By ALL

25 mins.

45 mins.

[10+10+10] = 30 mins.

15 mins.

2PM

4PM

Page 3: 20120919 is sustain_presented-2

THE SCHEMEConsolidated Design Based On Previous Workshops

Page 4: 20120919 is sustain_presented-2

Testing on Borrett Road Site

Special room clusters

Typical classroom clusters Flexibility to suit variety

of teaching modes

BORRETT ROAD

Page 5: 20120919 is sustain_presented-2

Testing on Borrett Road Site

Flexibility Breakout spaces

Special room clusters

Typical classroom clusters

BORRETT ROAD

Page 6: 20120919 is sustain_presented-2

COACH / VEHICLE PARKING & ENTRY

G/F PLAN (+138.0)

COACH PARKING

SEN

SPORTS HALL CAR PARKING

MECHANICAL PLANT ROOM

CHANGING ROOM

STAIRS

UNEXCAVATED AREA

UNEXCAVATED AREA

BORRETT ROAD

DRA

INA

GE

RESE

RVE

PEDESTRAIN ENTRANCE

DROP OFFENTRANCE +138.0

Page 7: 20120919 is sustain_presented-2

LEVEL 1 PLAN (+142.5)

DANCE ROOM, WEIGHTS ROOM, PE CLASSROOM

SWIMMING POOLMECHANICAL

PLANT ROOM

GYM & CARDIO

SPORT HALL

BELOW

CHANGING ROOM

STAIRS

COACH PARKING BELOW

BORRETT ROAD

UNEXCAVATED AREAPOSSIBLE AREA FOR HYDROPOOL

Page 8: 20120919 is sustain_presented-2

LEVEL 2 PLAN (+147.0)

DRAMA STUDIO & BLACKBOX

MUSIC AUDITORIUM

KITCHEN & CANTEEN

STAFF ROOM

SPORT HALL & SWIMMING POOL

BELOW

TOILETS

STAIRS

BORRETT ROAD

UNEXCAVATED AREA

BREAKOUT TO SEATING

AREA

SEATING AREA NEXT TO CANTEEN

ACCESS TO

AUDITORIUM

Page 9: 20120919 is sustain_presented-2

LEVEL 3 PLAN (+150.0)

ADMIN

MUSIC AUDITORIUM

CAFE

HOUSE

HOUSE HOUSE

HOUSEHOUSE

HOUSE

ENTRANCE PLAZA / AMPHITHEATRE

STAFF ROOM

TOILETS

STAIRS

LRC

BORRETT ROAD

7 ASIDE SOCCER FIELD(30m x 50m)

BASKETBALL COURT

Page 10: 20120919 is sustain_presented-2

LEVEL 4 (+156.5) & 5 PLAN (+159.5)

LRC

LANGUAGE

SCIENCE & TECHNOLOGY

ENGLISH

HUMANITIES

MATH

CREATIVE ARTS

STAFF ROOM

TOILETS

STAIRS

BORRETT ROAD

Page 11: 20120919 is sustain_presented-2

LEVEL 6 PLAN (+162.5)

SENIOR STUDENT

COMMONS(WITH

PRIVATE ROOMS)

LANGUAGE

SCIENCE & TECHNOLOGY

ENGLISH

HUMANITIES

MATH

CREATIVE ARTS

STAFF ROOM

TOILETS

STAIRS

BORRETT ROAD

Page 12: 20120919 is sustain_presented-2

LEVEL 7 PLAN (+165.5)

LANGUAGE

SCIENCE & TECHNOLOGY

ENGLISH

HUMANITIES

MATH

CREATIVE ARTS

STAFF ROOM

TOILETS

STAIRS

BORRETT ROAD

Page 13: 20120919 is sustain_presented-2

AERIAL VIEW FROM WEST

ENGLISHSCIENCE & TECHNOLOGY

LRCHOUSE MEETING ROOM

CREATIVE ARTS MUSIC AUDITORIUM

LANGUAGE

HUMANITIES

MATHEMATICS

ADMISSION

BO

RRETT

RO

AD

SENIOR STUDENT COMMONS

Page 14: 20120919 is sustain_presented-2

TODAY’S OBJECTIVES

To obtain your opinions on PRIORITY for different applications of Sustainable Building Design.

To obtain your opinions on LOCATIONS at New Island School of different applications of

Sustainable Building Design.

Page 15: 20120919 is sustain_presented-2

1.0 BRIEFING Sustainable Building Design

Page 16: 20120919 is sustain_presented-2

Site Aspects

Energy Use

EU

Five Categories of Sustainable Building Design

SA

Indoor Environmental

Quality

IEQWU

Water Use

Material Use

MU

1. Relocation of Existing Furniture/ Sculpture

2. Recycling of Existing Materials

3. Application of Recycled Materials4. Prefabrication5. Modular Design6. Construction/ Demolition Waste

Management Plan7. Waste Reduction8. … ….

by YOUby YOU

by YOU

1. PV Panel2. BIPV Panel3. Solar Water Tubes4. A/C Units5. Reduction of CO2 Emissions6. Operation and Maintenance7. Metering and Monitoring8. … …

1. Green Roof2. Green Wall3. Edible Garden4. Planting Area5. Soccer Field6. Environmental Management Plan7. Neighborhood Daylight Access8. Noise From Building Equipment9. … …

1. Water Quality Survey2. Water Efficient Irrigation3. Water Recycling4. Water Efficient Appliances5. Monitoring and Control6. … …

1. Ventilation in Common Areas2. Natural Lighting3. Room Acoustics4. Noise Isolation5. Construction IAQ Management6. … …

Page 17: 20120919 is sustain_presented-2

Energy Use

EU

1PhotoVoltaic System [PV Panels]

Building Integrated PhotoVoltaic System [BIPV Panels]

2

3Solar Water Heating System [Solar Water Tubes]

Page 18: 20120919 is sustain_presented-2

Energy Use

EU1 PV Panel

[PhotoVoltaic System]

As Roof Shades To convert sunlight into electricity Photovoltaic installation provides the Building

with part of its Power needs More efficient than BIPV Panel

Page 19: 20120919 is sustain_presented-2

Energy Use

EU

2BIPV Panel

[Building Integrated PhotoVoltaic System]

As Covers with Skylight To convert sunlight into electricity Photovoltaic installation provides the

Building with part of its Power needs Less efficient than PV Panel

Page 20: 20120919 is sustain_presented-2

Energy Use

EU

3Solar Water Tubes

[Solar Water Heating System] As roof shades or covers To convert sunlight into electricity for Swimming Pool

HEATING and AIR-CONDITIONING within the Campus

Page 21: 20120919 is sustain_presented-2

1Green Roof

Green Wall

Edible Garden

Site Aspects

SA 2

3

4Planting Area

Page 22: 20120919 is sustain_presented-2

Site Aspects

SA1

Green Roof Reduce CO2 emission and Heat Island Effect As Insulation of Building Enclosure Can act as Outdoor Performing / Exhibition Areas for

Arts / Music

Page 23: 20120919 is sustain_presented-2

Site Aspects

SA

2Green Wall

To Dress-up Blank Walls Can be located at External Wall Incorporate Nature into Building

Design

Page 24: 20120919 is sustain_presented-2

Site Aspects

SA

2Green Wall

To Dress-up Blank Walls of Can be located at Internal Wall Give interior space the character

of exterior

Page 25: 20120919 is sustain_presented-2

Site Aspects

SA

3Edible Garden

As Insulation of Building Enclosure For Educational Purposes and

inclusion into School Curriculum To Reduce CO2 emission and Heat

Island Effect

Page 26: 20120919 is sustain_presented-2

Site Aspects25%

SA

4Planting Area For Educational Purposes and

School Syllabus For a Better Environment for

School Campus To Reduce CO2 emission and

Heat Island Effect

Page 27: 20120919 is sustain_presented-2

Material Use

MURecycle of Existing Materials

1

2Relocation of Existing Furniture/ Sculpture

Page 28: 20120919 is sustain_presented-2

Recycle of Existing Materials

Material Use

MU1

Featured wall at strategic locations of the new school

Page 29: 20120919 is sustain_presented-2

Relocation of Existing

1. Furniture2. Sculpture, etc.

Material Use

MU

2

Collective memory Features at strategic locations

of the new school

Page 30: 20120919 is sustain_presented-2

2.0 TASKSIn THREE Groups

Page 31: 20120919 is sustain_presented-2

Material Use

MUSite Aspects

SAEnergy Use

EUGroup MUGroup SAGroup EU

45 mins. TASK

Page 32: 20120919 is sustain_presented-2

Energy Use

EUGroup EU

Page 33: 20120919 is sustain_presented-2

Energy Use

EU

35%Group EU:-WHAT TO DO… …

12 3To do (1): set Priority for

To do (2): preferred Location

?

1. on Model2. on Perspective

??B. BIPV Panel

A. PV Panel

C. Solar Water Tubes

Page 34: 20120919 is sustain_presented-2

Energy Use

EUGroup EU:-

POSSIBLE AREAS:- Roof Top

Group EU’s Consideration:- Orientation of Massing

1. Mark on Model…2. Mark on Perspective…

POSSIBLE AREA:- Any Roof Top

POSSIBLE AREA:- Over the Courtyard to create a Semi-Open Space

POSSIBLE AREA:- As Sun-Shading Screens for Classrooms

B. BIPV Panel

A. PV Panel

C. Solar Water Tubes

Page 35: 20120919 is sustain_presented-2

Energy Use

EUGroup EU:-

CONSTRAINTS Only on 3 Locations

SAY:-

Group EU’s Consideration:- Orientation of Massing

1. Mark on Model…2. Mark on Perspective…

B. BIPV Panel

A. PV Panel

C. Solar Water Tubes

AB

C

Page 36: 20120919 is sustain_presented-2

Site Aspects

SA

Group SA

Page 37: 20120919 is sustain_presented-2

Group SA:-WHAT TO DO… …

To do (1): set Priority

To do (2): preferred Location 1. on Model2. on Perspective

Site Aspects

SA

12 3

???Green Wall

Green Roof

Edible Garden

Planting Area

Page 38: 20120919 is sustain_presented-2

Group SA:-

POSSIBLE AREAS:-Roof Top, Internal Areas [green wall]

Group EU’s Consideration:- Orientation of Massing

1. Mark on Model…2. Mark on Perspective…

Site Aspects

SA

POSSIBLE AREAS:-• Roof Top, External Wall• Internal Areas [Green Wall]• Grounds, Open SpacesB. Green Wall

A. Green Roof C. Edible Garden

D. Planting Area

Page 39: 20120919 is sustain_presented-2

Group SA:-

CONSTRAINTS Only on 4 Locations

SAY:-

Group EU’s Consideration:- Orientation of Massing

1. Mark on Model…2. Mark on Perspective…

Site Aspects

SA

B. Green Wall

A. Green Roof C. Edible Garden

D. Planting Area E. SPECIAL TOPIC:-Real Grass OR Artificial ?• Maintenance Cost• Operation Schedule/ Opening Hours

AB

C

D

Page 40: 20120919 is sustain_presented-2

Material Use

MU

Group MU

Page 41: 20120919 is sustain_presented-2

Group MU:-WHAT TO DO… …

To do (1): 30 mins. Site Walk

To do (2): preferred Location

&

1. on Model2. on Perspective

Material Use

MU

1 2

Existing Materials

To Be Recycled

Relocation of Existing Furniture/ Sculpture To Record

Page 42: 20120919 is sustain_presented-2

Group MU:-

WHAT & WHERE ? A. What to Pick B. Where to Put

SAY:-

Group MU’s Consideration:- at Entrance/ Common Space or Internal Area? items with collective memories?

Sculpture

1. Mark on Model…2. Mark on Perspective…

Material Use

MU Wall built by existing Materials

Page 43: 20120919 is sustain_presented-2

Material Use

MU

Site Aspects

SA

Energy Use

EU

Question for All Groups,

MONITOR for 1. Energy Generation & 2. Energy Consumption

WHERE to Put?

+

+

Page 44: 20120919 is sustain_presented-2

Mark on Model…

To be placed at Courtyard ?

To be placed at Main Entrance ?Or Somewhere else ?

Material Use

MU

Site Aspects

SA

Energy Use

EU+

+

Monitor for Energy Generation & Consumption

Page 45: 20120919 is sustain_presented-2

Group EU, SA & MALET’S GO

Page 46: 20120919 is sustain_presented-2

3.0 PRESENTATION By Group EU, SA & MA

Page 47: 20120919 is sustain_presented-2

4.0 CONCLUSIONQuestions & Answers

Page 48: 20120919 is sustain_presented-2

ENDThank You


Recommended