    Sample of good assignment

    FACULTY OF SCIENCE AND TECHNOLOGY

    SEMESTER MAY 2012

    SBFS1103

    THINKING SKILLS AND PROBLEM SOLVING

    MATRICULATION NO :

    IDENTITY CARD NO. :

    TELEPHONE NO. :

    E-MAIL :

    LEARNING CENTRE :

  • 7/30/2019 20121012102332Sample Assignment Answer

    2/19

    1

    TABLE OF CONTENTS

    1. INTRODUCTION ..................................................................................................... 2

    Figure 1 Stepwise Conception. .................................................................................. 4

    2. IDENTIFICATION OF APPROPRIATE DECISION MAKING TOOL. ............................... 5

    2.1 Benchmarking. .................................................................................................... 5

    Figure 2 Benchmarking Results. ................................................................................ 6

    2.2 Decision Tree .................................................................................................... 7

    Figure 3 Decision Tree Illustrations . ........................................................................ 7

    2.3 SWOT Analysis. ................................................................................................. 9

    Figure 4 SWOT Analysis Illustration 1 . ................................................................... 9

    Figure 5 SWOT Analysis Illustration 2 . ................................................................. 10

    2.4 Definition and explanations of SWOT analysis ............................................... 11

    3. HOW TO DERIVE TO THE CHOICE OF SUB-CONTRACTOR. ..................................... 11

    Figure 6 Gantt Chart Lai Hock Builders .................................................................. 11

    3.1 Gantt Chart ....................................................................................................... 13

    3.2 Time Factor - Explanation ............................................................................... 14

    4. PROFIT MARGIN CALCULATION AND COST DOWN ACTIVITIES. ........................... 15

    Figure 7 Profit and Loss Statement of Lai Hock Builders .................................... 15

    4.1 Cost Down Activities ....................................................................................... 16

    a) Reduce Indirect Costs ............................................................................. 16

    b) Out Source Jobs ...................................................................................... 16

    b) Safe Working Procedures.................................................................... 16

    5. CONCLUSION ......................................................................................................... 17

    6. REFERENCES .......................................................................................................... 18

  • 7/30/2019 20121012102332Sample Assignment Answer

    3/19

    2

    1.0 INTRODUCTION

    Humans are often burdened with life questions which require answers to be decidedby a decision. The decision must be made on about love, work, home, children's

    education, career and common things such as what to eat and what clothes I wear.

    Sometimes, this decision is easily made in just a blink of the eye only. Sometimes

    we will be sleepless thinking about what things should be done to overcome the

    problems ahead moreover if it involves money or love.

    How can we define Decision making? Decision making can be defined as mental

    process that involves a person is acting to select a choice from several options

    available based on the purpose and specific criteria. Of course we want to avoid the

    adverse decision. Therefore, we are not able to think in a hurry. We need to use the

    resource-based information and to consider various options to find the best options.

    So you need a rational, patient, think long and deep so that the decisions you make is

    accurate, permanent, and final, without any doubt and loss.

    Forgarty Robin James Bellanca (1990) Teach Them Thinking categorize thinking

    skills as critical thinking, decision making and defines it as "making a choice based

    on reasoned judgment". They give a synonymous word "decision making" with

    "judging, choosing, and selecting".

    The decision refers to the choice made by the various alternatives available. Choices

    is a function of the objectives of decision makers today, then in the assessment of

    alternatives to choose from, the makers are also interested to know the result of the

    action, as a result of choices made. Choice also involves elements of uncertainty.

    Decision-making process is the most important process to perfection in the field of

    management for all organizations.

  • 7/30/2019 20121012102332Sample Assignment Answer

    4/19

    3

    Decision-making process not only in management but there is also faced by each

    individual, the decision about yourself, your family, at home and at work.

    Sometimes our lives can be felt consists of thousands of decisions, both large and

    small. The issue that we are going to identify discusses and justify among two

    shortlisted contractors with from different companies where the construction job that

    to be offered to.

    We have to identify a proper problem or issue using identifying tools as so that to

    enable us to verify it and conceptualized problem. There are various types of

    mapping tools used in system dynamics of conceptualization processes such as

    hybrid diagram, stock and flow diagram, sector diagram finally policy structured

    diagram as classified by Luna-Reyes Luis F (2003). Figure 1 elaborates sector

    diagram that relates the matters and target of work related to the whole project of

    construction.

  • 7/30/2019 20121012102332Sample Assignment Answer

    5/19

    4

    FIGURE 1: STEPWISE CONCEPTION PROCESS

  • 7/30/2019 20121012102332Sample Assignment Answer

    6/19

    5

    2.0 IDENTIFICATION OF THE APPROPRIATE DECISION MAKING TOOL

    Problem solving and decision making tools are basically is same although the time

    and technology has changed. Maybe the technicality has been modified to suite the

    application to be computerized or available in soft wares. Normally problems solving

    tools are used in complicated situation where some common and complex tools such

    as benchmarking, Decision Tree, Cause and effect diagrams, flow charts, and SWOT

    analysis and prioritization matrix used. (Kanthilal, Dr. Haresh Kumar, Espira, Dr.

    Anton, OUM Thinking Skill and Problem Solving, 2008) The tools that we are going

    to use for problem solving for Lai Hock Builders are:

    i) Benchmarking.ii) Decision Treeiii)SWOT Analysis.

    2.1 Benchmarking

    The motive of benchmarking is to verify internal and external organizations

    continuous improve performance and based to the knowledge received. (Bennett,

    Catherine D 2004) Benchmarking is the process of comparing one's businessprocesses and performance matrix to industry outstanding practices from other

    companies where measurement done conventionally based to the quality, time and

    cost.

    In the process of benchmarking, management identifies the best in their management

    as compared to, another company with the same kind of processes, and by comparing

    the results and processes of those evaluated to the present results and processes. In

    this way, they learn how well the targets perform and, more importantly, the business

    processes that explain in Wikipedia, articles on Benchmarking explain why these

    firms are successful.

    http://en.wikipedia.org/wiki/Performance_metrichttp://en.wikipedia.org/wiki/Performance_metric
  • 7/30/2019 20121012102332Sample Assignment Answer

    7/19

    6

    No. Targets Raymond Ooi Ghulam Rasool

    1 Determine weaknesses Have interviews to get second

    opinions.

    Interview the staffs to getinformation.

    2 Benchmark team result

    Form team to performpersonnel auditing.

    Investigate the customers whohave used the builder.

    3 Brainstorm potential (voting)

    Organize voting strategy toaccomplish results.

    Have cause and effect analysiswithin group members.

    4a Information gathered

    Having the informationgathered to derive final

    conclusion.

    Plot all the information to createa graph or trend for better

    image.

    4b Information from 3rd

    party consultant This will be the final test mark

    to evaluate the candidate

    particulars.

    5 Benchmark result

    Final results will be clarified to move

    on to the next move.

    Select

    FIGURE 2: BENCHMARK RESULTS

  • 7/30/2019 20121012102332Sample Assignment Answer

    8/19

    7

    FIGURE 3: DECISION TREE

  • 7/30/2019 20121012102332Sample Assignment Answer

    9/19

    8

    2.2 Decision Tree

    Decision trees can be defined as a tool that could help to analyze to identify a strategy

    that could target on goal achieving. It is also call a model algorithm paralleled by a

    probability model to take on decisions although there is an incomplete knowledge

    available. According to Wikipedia article on Decision Tree, elaborates that it is a

    descriptive model to justify the probabilities. Further to that it has been explained, in

    some activities where assets and risks are sequential but linked to each other also can

    derive conclusions by plotting to a decision tree as suggested in the journal

    probabilistic.

    The above quoted tree drawing explains on how Lai Hock Builders will gain profit by

    offering to the lower tender and higher tender to his sub- contractors for partial of his

    main jobs. Eventually if we could see, the visual profit on papers is when Lai Hock

    Builders offer his tender to sub-contractor Raymond Ooi where the final balance from

    the initial contract value is about RM260 to continue with his rest of his work. It is

    also similar to sub-contractor Ghulam Rasool been offered and will get a balance cash

    of RM 290,000 in hand where Lai Hock Builders has to complete the rest of his jobs.

    With the cash in hand of RM 260,000 if Raymond Ooi is proceeding with the jobswith some final jobs on hold, Lai Hock Builders must find other solutions of cost

    down to enable them to go for higher profit. Whereas if Ghulam Rasool selected for

    his sub-contract jobs , then Lai Hock Builders will retain cash of RM290,000 in hand

    to proceed with other final jobs. Although there is a big cash difference between

    Raymond Ooi and Ghulam Rasools contract offering but the matter here is only time.

    Time constraint plays a very important role as the difference of forty five days will

    between Raymond Ooi and Ghulam Rasool can give a big impact to Lai Hock

    Builders in business line especially matters line such as reputation concern, new

    business venture and also investment of labours. We can clearly elaborate these facts

    in the following articles to stress onto itemized job task, material usage and other

    construction related aspects.

  • 7/30/2019 20121012102332Sample Assignment Answer

    10/19

    9

    2.3 SWOT Analysis

    FIGURE 5: SWOT ANALYSIS SUB- CONTRACTOR - GHULAM RASOOL

    FIGURE 4: SWOT ANALYSIS SUB- CONTRACTOR - RAYMOND OOI

    IN

    T

    E

    R

    N

    A

    L

    F

    A

    CT

    O

    R

    S

    POSITIVE NEGATIVE

    STRENGTHS WEAKNESSES

    Technical Skills Leading Contractor Distribution Channels Customer Loyalty and

    relationship Finished Quality Management Skill

    Absence of important skills New Contractor Poor access to distribution Low customer retraction Unreliable finishing quality

    Lacks Management SkillE

    X

    T

    E

    R

    N

    A

    L

    F

    A

    C

    T

    O

    R

    S

    POSITIVE NEGATIVE

    OPPORTUNITIES TREATS

    Changing in customer desire Technology Advance Changes in governmental

    policies Cheaper material Change in plan or structure New Distribution Channel

    Changing in customer desire Technological Advance Change in governmental policies Price increase in material Change in plan or structure New Distribution channels

  • 7/30/2019 20121012102332Sample Assignment Answer

    11/19

    10

    FIGURE 5: SWOT ANALYSIS SUB- CONTRACTORGHULAM RASOOL

    I

    N

    T

    ER

    N

    A

    L

    F

    A

    C

    T

    O

    RS

    POSITIVE NEGATIVE

    STRENGTHS WEAKNESSES

    Technical Skills Leading Contractor Distribution Channels Customer Loyalty and

    relationship Finished Quality

    Management Skill

    Absence of important skillsNew ContractorPoor access to distribution

    Low customer retraction Unreliable finishing quality

    Lacks Management Skill

    E

    X

    T

    E

    R

    N

    A

    L

    F

    A

    C

    T

    O

    R

    S

    POSITIVE NEGATIVE

    OPPORTUNITIES TREATS

    Changing in customer desire Technology Advance Changes in governmental

    policies Cheaper material Change in plan or structure New Distribution Channel

    Changing in customer desire Technological Advance Change in governmental policies Price increase in material Change in plan or structure New Distribution channels

  • 7/30/2019 20121012102332Sample Assignment Answer

    12/19

    11

    2.4 SWOT analysis can be defined as a method to enhance strategic planning as to

    assess the Strengths, Weaknesses or Limitations, Opportunities and Threats

    complicated in a mission or in a professional project as illustrated in Figure 4 and 5.It involves specifying the objective of the business risk in finding the internal and

    external influences that are satisfactory and unsatisfactory to accomplish that purpose

    according to the Wikipedia, SWOT analysis.

    SWOT analysis to proceed after setting the target and objective as to the concern of

    the organization where the actual meanings as follows:

    a) Strengths are defined as the features of the business that contribute anadvantage upon the others.

    b) Weaknesses (or Limitations) are descriptions that place the group at aweakness comparative to others.

    c) Opportunities are the exterior chances to advance operation as to make largerprofits comply with the environment.

    d) Threats are the exterior features in the environment that could cause problemfor the business or project.

    3. 0 HOW TO DERIVE THE CHOICE OF SUB-CONTRACTOR

    FIGURE 6: Contract Schedule Table - Gantt chart

    No Task Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    1 Contract writing

    Anil Kumar

    (Owner)

    2 Contract signing

    Anil Kumar

    (Owner)

    3 Secure Financing

  • 7/30/2019 20121012102332Sample Assignment Answer

    13/19

    12

    No Task

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    4 Obtain Permits

    Anil Kumar

    (Owner)

    Agreed

    Construction

    duration

    5 Site Work

    (Construction)

    Lai Hock Builders

    Raymond Ooi

    Ghulam Rasool

    6 Plumbing

    Lai Hock Builders

    Raymond Ooi

    Action: Ghulam

    Rasool

    7 Electrical

    Lai Hock Builders

    Raymond Ooi

    Ghulam Rasool

    8 Roof

    Lai Hock Builders

    Raymond Ooi

    Ghulam Rasool

    9 Inspection for CF

    DBKL

    10 Move In

    Anil Kumar

    a b c

    Penalty Durations

    d

  • 7/30/2019 20121012102332Sample Assignment Answer

    14/19

    13

    3.1 Gantt chart

    A Gantt chart is a horizontal bar chart known as a production control tool founded by

    and American engineer and social scientist namely Henry L. Gantt. This Gantt chart

    is very often used in project management with graphical explanations of task and

    schedule, planning, coordination as to monitor the motive of a project.

    A Gantt chart also explains a project schedule when it starts and ends with target

    date, events, project summary, and also breakdown of work structure with the

    percentage of job done and many other things that relates to the main task of the work

    planned and update as it goes on.

    As to the explanation of the Gantt chart above in Figure 6, it has been elaborated in a

    breakdown of task of the types of jobs to be carried out by the contractors. As we

    have derived here and plotted the main contract builder as well as the sub-contractor

    builder to specify and illustrate their job task as if they were carrying out this project.

    It has been explained earlier that the objective of Lai Hock builder is to reduce cost

    without ruin his reputation as classed builder and to sub a certain part of construction

    to a relevant contractor as to ease his burden of completion the project. The chart

    explains that a is the actual target agreed between Anil Kumar and Lai Hock Builders,

    b is the 10% delay if offered to Raymond Ooi, e is the target of completion delayed

    about 50% is offered to Ghulam Rasool. If we can note here time is the most

    important factor although both sub-contractors are relevant and capable of completing

    the job. The difference of price can contribute a RM30, 000 cheaper if job offered to

  • 7/30/2019 20121012102332Sample Assignment Answer

    15/19

    14

    Ghulam Rasool but when comes to time constrain it delays about two and half months

    that will be 75 days in figure.

    3.2 Time Factor

    The time value of money is the value of money assuming in a given amount of benefit

    received over a specified amount of time. The time value of money is the

    fundamental perception in finance philosophy. The time value of money means for

    every minute of delay its cost the bank interest, penalty for delay, overhead expenses

    and labour costs. Completion of project earlier 45 days if offered to the experience

    contractor will enable to build up good reputation, recommendation from the

    customer Anil Kumar to his fellow friends and family members in KL regarding the

    efficiency of Lai Hock Builders and also Lai Hock Builders can move forward

    utilizing the 45 days in advance to new building contract. As mentioned in Figure 6

    Gantt chart, a is the initial agreed time line of completion of project, b is the time

    line of completion if offered to sub-contractor Raymond Ooi and c and d are

    completion and moving in time line if offered to Ghulam Rasool.

  • 7/30/2019 20121012102332Sample Assignment Answer

    16/19

    15

    4.0 PROFIT MARGIN CALCULATION AND COST DOWN ACTIVITIES

    FIGURE 7: Profit and Loss Summary of LAI HOCK BUIDERS

    No Items Formula

    LAI

    HOCK

    Builders

    Raymond

    Ooi

    Sub- Con Actual Budget Difference

    1 Agreed Contract Value A 260,000 240,000 500,000 500,000 0

    2 Direct Cost

    3 Fixed Labour cost 44,600 60,200 104,800 100,000 -4,800

    4 Construction materials 25,000 60,000 85,000 90,000 5,000

    5 Piling 7,000 7,000 5,000 -2,000

    6 Mansonary works and tiles 30,000 30,000 35,000 5,000

    7 Carpentry works 18,000 18,000 20,000 2,000

    8 Plumbings and fittings 12,000 12,000 15,000 3,000

    9Electrical installations andfittings 28,000 28,000 30,000 2,000

    10 Security system 4,500 4,500 5,000 500

    11 Metal structure 7,500 7,500 7,000 -500

    Sub-Total (Direct Expenses) B 162,100 134,700 296,800 307,000 10,200

    12 Indirect Cost

    13 Labour Overtime 15,000 20,000 35,000 30,000 -5,00014 Insurance 25,000 25,000 30,000 5,000

    15 Claims 4,000 5,000 9,000 10,000 1,000

    16 Transport 5,000 12,000 17,000 20,000 3,000

    17 Professional Expense 3,500 3,500 3,500 0

    18Repair, MaintenanceExpense 1,000 2,000 3,000 500 -2,500

    19 Rental of Others 15,000 15,000 12,000 -3,000

    20 Electricity Water 1,000 1,000 2,000 1,000

    21 House-Rent Expense 3,000 3,000 3,000 0

    22 Penalty for delay 15,000 15,000 20,000 5,000

    Sub-Total (IndirectExpenses) C 54,500 72,000 126,500 131,000 4,500

    Total Expenses Direct +

    Indirect B+C 216,600 206,700 423,300 438,000 14,700

    23 Gross Profit/Loss

    D=(A-

    (B+C) 43,400 33,300 76,700 62,000 -14,700

    24 Administrative Expenses E 2,000 2,000 5,000 3,000

    25 Net Profit/Loss D-E 41,400 33,300 74,700 57,000 -17,700

  • 7/30/2019 20121012102332Sample Assignment Answer

    17/19

    16

    4.1 Cost Down Activities

    As to bring down operations cost so that can enable Lai Hock Builders go gain profit

    from the project such as:a) Reduce Indirect Costs

    i) Lai Hock Builder can put in more effort to bring down the indirect costs such

    as Indirect Overtime by putting in restriction to the workers not to carry out

    unnecessary overtime works beyond the actual working hours.

    ii) Can introduce two shift systems as the first group will be working from

    7:00am till 3:00pm and the 2nd

    group will be working from 11:00am to

    7:00pm as they can overlap their works without proceeding with overtime.

    b) Out-source jobs

    i) Outsource skilled jobs such as masonry and tiles work as to reduce burden ofdaily pay basis as it will be expensive as to their special skill. Jobs like this can

    be outsourced with terms of completion and can stop dragging of work of in

    house workers who drags work as to accumulate the workmanship.

    ii) Even jobs like plumbing and electrical jobs also can be outsourced to reduce theimpact of high expenditures from domestic workers.

    iii) Subsidiary jobs as above and lot more can be done separately instead of given asturnkey project.

    c) Safe Working Procedures

    Both the building main contractor and sub-contractor need to practice a good safety

    and health work procedures as they could avoid unwanted accidents that will force

    claims, medical leaves and loss time injury that might effects the task of completion

    of the project.

  • 7/30/2019 20121012102332Sample Assignment Answer

    18/19

    17

    5.0 CONCLUSIONS

    Decisions are made from the choices of selection that could be optional to justify

    either positively or negatively or to consider the others. To enable an effective

    decision, we have to study at various aspects and formula before we come back with a

    firm result neither than to regret later after decision.

    In the cases of this assignment it is quite complicating because the decision will affect

    both parties as the situation is not normal. If there were no delay in the completion

    task then the selection job will be very much easier as we could select the cheapest

    and complete the job.

    We have derived all the feasible method of decision making where the final

    conclusion such as stepwise conceptions, benchmark, decision tree, SWOT analysis

    and Gantt chart is used as the tool. It was a bit too much to use many kinds of tools

    for evaluation but as for a satisfaction we elaborate the problems in all aspects to

    make precisely a positive decision.

    The building referred in this assignment belongs to Mr. Anil Kumar who is basically acharter accountant who is more toward accounts and monitory consultation.

    Psychologically account dealing personals will be very much stringent with all the

    input and output in terms of monitory concern furthermore will get emotion if things

    are not to their expectations especially in cases of delayed jobs particularly.

    Intelligently we have to play save although the time factor was too complicated and

    has to commit with further penalty charges , the turmoil of the whole project. As to

    this topic of discussion we are not in the position not to give a trial for Ghulam Rasool

    contractor where this is not time to take a very high risk, simply to get a big return. It

    might give either positive or negative result but is no way for us to make any

    immediate remedy if mistakes found.

  • 7/30/2019 20121012102332Sample Assignment Answer

    19/19

    18

    We can give a trial for first timer Ghulam Rasool if there are projects in future where

    there is no rush for the lead time for completion of the project.

    Decision making is a process of planned movement to administrative, cost-effective,

    and social life. Decision making is also a crucial module of time organization

    assistances that can manage excellently hence in making decisions as explained in the

    BusinessWeek magazine on decision making process.

    (Three thousand and Thirteen Words)

    REFERENCES

    http://bx.businessweek.com/decision-making-process-dmp accessed on 09/06/2012

    http://www.businessdictionary.com/definition/decision-making.html, accessed on09/07/2012

    Catherine D. Bennett, CPCU, ARM Cost Control Concepts, Inc. (2004).

    Forgarty Robin James Bellanca (1990) Teach Them Thinking

    http://people.stern.nyu.edu/adamodar/pdfiles/papers/probabilistic.pdf accessed on

    09/06/2012.

    http://searchsoftwarequality.techtarget.com/definition/Gantt-chart accessed on10/06/2012.

    Luis F. Luna-Reyes (2003) citing website,http://www.systemdynamics.org/conferencepdf Model Conceptualization: a Critical review accessed on 09/06/2012.

    http://en.wikipedia.org/wiki/Benchmarking accessed on 06/06/2012

    http://en.wikipedia.org/wiki/Decision_tree accessed on 07/06/12

    http://en.wikipedia.org/wiki/SWOT_analysis accessed on 11/06/12.

    Kanthilal, Dr. Haresh Kumar, Espira, Dr. Anton, OUM Thinking Skill and ProblemSolving, 2008

    http://bx.businessweek.com/decision-making-process-dmphttp://www.businessdictionary.com/definition/decision-making.htmlhttp://people.stern.nyu.edu/adamodar/pdfiles/papers/probabilistic.pdfhttp://searchsoftwarequality.techtarget.com/definition/Gantt-charthttp://en.wikipedia.org/wiki/Benchmarkinghttp://en.wikipedia.org/wiki/Decision_treehttp://en.wikipedia.org/wiki/SWOT_analysis%20accessed%20on%2011/06/12http://en.wikipedia.org/wiki/SWOT_analysis%20accessed%20on%2011/06/12http://en.wikipedia.org/wiki/Decision_treehttp://en.wikipedia.org/wiki/Benchmarkinghttp://searchsoftwarequality.techtarget.com/definition/Gantt-charthttp://people.stern.nyu.edu/adamodar/pdfiles/papers/probabilistic.pdfhttp://www.businessdictionary.com/definition/decision-making.htmlhttp://bx.businessweek.com/decision-making-process-dmp

Recommended