The Settlement at Savage Mill Savage, Maryland Colesville Design Study Community Meeting September 17, 2013 Montgomery County Department of Housing and Community Affairs
Transcript
Page 1: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, Maryland

ColesvilleDesign Study

Community MeetingSeptember 17, 2013

Montgomery CountyDepartment of Housing and Community Affairs

Page 2: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

INTRODUCTION

September 17, 2013

Montgomery County  Department of Housing and Community Affairs  Cathy Mahmud, Senior Planning Specialist

Hord Coplan Macht, Inc.Architects, Landscape Architects and Planners Miguel Iraola, ASLA Monica Robertson, AIA Matthew Fitzsimmons, AIA, AICP Matt Chiampi, ASLA

Slide 2

Page 3: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

EVENING AGENDA

September 17, 2013

7:00‐7:45 PM Presentation• Purpose of the Study• Process and Schedule• Site and Building Analysis

7:45‐ 8:30 PM  Comment Session

8:30‐8:45 PM Next Steps

Slide 3

Page 4: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

PURPOSE OF STUDY

Purpose:  The purpose of the study is to recommend an urban design strategy for physical improvements to building facades and related site conditions. 

Items to Study: Façade Improvements Streetscape Improvements Pedestrian Circulation & Safety Vehicular Circulation & Parking Infill or Redevelopment Opportunities

Lighting and Landscaping

pics

September 17, 2013

Slide 4

Page 5: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

PROCESS & SCHEDULE

Process: 

Site and Building Analysis

Inclusive and collaborative process with all stakeholders

Development of Realistic and Achievable Solutions

Final Report

SCHEDULE

September 17, 2013

Slide 5

Page 6: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

PROJECT CONTEXT

ColesvilleCommercial 

Core

To White Oak

To  I‐95

To Rockville

To Glenmont

September 17, 2013

SouthernGateway

Slide 6

Page 7: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland September 17, 2013

Monterey Center

Colesville Center

7‐Eleven

Ethio’s Corner

PROJECT LIMITS [Colesville Commercial Core]

Slide 7

Page 8: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland September 17, 2013

Meadowood Center

Hollywood Park

HOLLYWOOD AVE.

PROJECT LIMITS [Southern Gateway]

Slide 8

Page 9: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

GENERAL OBSERVATIONS

September 17, 2013

Proximity to Transportation Corridor

Identifiable and Compact ColesvilleCommercial Core

Stable and Diverse Neighborhoods

Few Vacant Properties

Larger Multi‐Tenant Center Under Single Ownership

Slide 9

Page 10: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

GENERAL OBSERVATIONS

September 17, 2013

Limited Vehicular Access

Lack of Pedestrian Comforts and Connections

Some Aging Commercial Centers

Visual Clutter

Lack of a Cohesive “Colesville” Character

Slide 10

Page 11: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

CORRIDOR CHARACTER

September 17, 2013

High Vehicular Volume and Traffic

Limited Vehicular Access to Parcels and Local Streets

Sidewalks Adjacent to the Curb

Lack of Pedestrian Comfort 

Limited Pedestrian Crossings

Overhead Utilities 

Slide 11

Page 12: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

Multiple Access Points  Perimeter Sidewalks/Aprons Adequate Parking Distribution Pathway to Adjacent Neighborhood Rear Service

COLESVILLE CENTER [CIRCULATION]

September 17, 2013

Giant

Slide 12

Sherwin Williams

Subway

ColesvillePark & Ride

CitiBank

GNC

Dunkin Donuts

Ledo

PolloMex

Page 13: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

COLESVILLE CENTER [TOPOGRAPHY + DRAINAGE]

September 17, 2013

LP+(428’)

+HP(456’)

+ (446’)

+ (438’)

+ (438’)

(430’)+

+ (448’)

Slide 13

Healthy Tenant Mix Outdoor Seating Tree Canopy

Giant

Sherwin Williams

Subway

CitiBank

GNC

Dunkin Donuts

Ledo

PolloMex

Page 14: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MONTEREY CENTER / 7-Eleven[CIRCULATION]

September 17, 2013

McDonalds7-Eleven

Giant GasStation

Slide 14

Page 15: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MONTEREY CENTER / 7-Eleven

+ LP(416’)

HP+(436’)

+ (434’)

+ (428’)

+ (428’)

+ (428’)

+ (434’)

+ (428’)

+ (434’)

[TOPOGRAPHY + DRAINAGE]

September 17, 2013

10% slope

McDonalds7-Eleven

Giant GasStation

Slide 15

Page 16: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MONTEREY CENTER [BUILDING CHARACTER]

September 17, 2013

Architecture Style•Circa 1970    Eclectic Strip Retail 

Building Characteristics•Variety of façade materials, 

•predominately masonry, stone and some siding

•Variety of fenestration patterns: •fixed metal windows, •storefront glazing,•various glazed commercial doors

•Decorative shingle and metal mansard•roof  low over flat roof with downspouts to the rear

•Concealed mechanical systems  

Signage•Variety of Sign types:

•plastic/vinyl illuminated box signs•surface mounted painted plywood, •window signs, •movable sandwich boards, •vinyl lettering

Lighting•Surface mounted lighting under canopy  

Slide 16

Page 17: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

7-ELEVEN[BUILDING CHARACTER]

September 17, 2013

Architecture Style•Circa 1985  Mid‐Century Commercial 

Building Characteristics•Flush masonry walls•Fenestration patterns: 

•Storefront glazing, •Ribbon windows,•Glazed commercial doors

•Flat roof with metal‐capped parapet with downspouts to the rear.•Standing seam awning•Concealed mechanical systems  

Signage•Sign types:

•Plastic/vinyl illuminated box signs•Window mounted signs and vinyl lettering

Lighting•Recessed can lighting under canopy  

Slide 17

Page 18: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MONTEREY CENTER[OPPORTUNITIES]

September 17, 2013

Sufficient parking spaces

Space for redevelopment and/or expansion

Space for landscape and stormwater management

Variety of businesses‐ retail and services

Slide 18

Page 19: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MONTEREY CENTER[CONSTRAINTS]

September 17, 2013

Poor visibility Dense tree canopies along New Hampshire Avenue

Imposing mansard canopy roofs project shade on storefronts

Storefronts are located far from New Hampshire Avenue

Limited vehicular access

Steep access from Midland Road

Various levels of building maintenance

Slide 19

Page 20: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[OPPORTUNITIES]

September 17, 2013

Highly visible location

Landscape / gateway opportunity

Central location to other services and businesses

7-ELEVEN

Slide 20

Page 21: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

7-ELEVEN[CONSTRAINTS]

September 17, 2013

Limited expansion potential

Limited vehicular access

Dense tree canopies along New Hampshire Avenue

Blank facades on three sides

Slide 21

Page 22: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

ETHIOS CORNER[CIRCULATION]

September 17, 2013

Service Yard

Slide 22

Wendy’s

BB&T

VerizonChinaDynasty

PizzaHut

TheBagelry

Animal Hospital

BP Gas

Page 23: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[TOPOGRAPHY + DRAINAGE]ETHIOS CORNER

September 17, 2013

+ (432’)

+ HP(432’)

+ HP(432’)

+ LP(414’)

+ (430’)

+ (436’)

Service Yard

Slide 23

Wendy’s

BB&T

Verizon

PizzaHut

TheBagelry

Animal Hospital

BP Gas

Page 24: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[BUILDING CHARACTER]ETHIOS CORNER

September 17, 2013

Architecture Style•Circa 1970 Strip‐Retail

Building Characteristics•Flush painted masonry walls•Fenestration patterns: 

•Storefront glazing, •Glassblock,•Glazed commercial doors with roll‐up security fencing

•Flat roof with small metal‐capped parapet with downspouts to the rear.•Exposed roof‐top mechanical systems  

Signage•Sign types:

•Plastic/vinyl illuminated box sign•Vinyl banners•Window mounted signs and vinyl lettering

Lighting•Wall mounted exterior flood lights   

Slide 24

Page 25: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[OPPORTUNITIES]ETHIOS CORNER

September 17, 2013

Good diversity of uses, national and local businesses

Private and public investment

Vital Way is an appropriately scaled retail street

Infill opportunity

Landscape / gateway opportunities

Slide 25

Page 26: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[CONSTRAINTS]ETHIOS CORNER

September 17, 2013

Ethio’s Site is a narrow parcel

Rear service through adjacent parcel

Limited access and parking space 

Ethio façade is cluttered around entry – ice machine and signage not well maintained.

Landscape and parking is not well maintained. 

Slide 26

Page 27: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[CONSTRAINTS]ETHIOS CORNER

September 17, 2013

Right‐in and right‐out to Vital Way

Abrupt grade changes between parcels

Blank walls facing public spaces

Dumpsters are highly visible 

Slide 27

Page 28: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

MEADOWOOD CENTER [CIRCULATION]

September 17, 2013

Slide 28

Vacant

GreenApple

Laundry

Dominic”s

Page 29: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[TOPOGRAPHY + DRAINAGE]MEADOWOOD CENTER

+ HP(404’)

September 17, 2013

VacantLot + (400’)

+ (390’)

+ (402’)

+ (402’)

+ (402’)

+ LP(388’)

+ (402’)

MeadowoodPark

Slide 29

Vacant

GreenApple

Laundry

Dominic”s

Page 30: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[BUILDING CHARACTER]MEADOWOOD CENTER

September 17, 2013

Architecture Style•Circa 1950 Strip‐Retail

Building Characteristics•Flush painted masonry walls•Fenestration patterns: 

•Large storefront glazing•glazed commercial doors •garage door bays

•Flat roof with downspouts to the rear•Vinyl awning with business signage•Window unit Air conditioners along front façade.

Signage•Sign types:

•Awning signs•window mounted signs •Neon signs• vinyl lettering

Lighting•Wall mounted fluorescent tube lights under canopy   •No site lighting

Slide 30

Page 31: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[OPPORTUNITIES]MEADOWOOD CENTER

September 17, 2013

Southern gateway opportunity 

Easy access from New Hampshire Avenue

Proximity to public park

Space for pedestrian amenities

Slide 31

Page 32: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[CONSTRAINTS]MEADOWOOD CENTER

September 17, 2013

Lots of asphalt

Flush retail sidewalk with parking lot

Pedestrian desire lines across New Hampshire Avenue

Limited sidewalk width along New Hampshire Avenue

Horizontal and monotonous building elevation

Slide 32

Page 33: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

HOLLYWOOD PARK[CIRCULATION]

September 17, 2013

Slide 33

Garden Center

Church

Page 34: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[TOPOGRAPHY + DRAINAGE]HOLLYWOOD PARK

September 17, 2013

Swale+ (396’)

+ (396’)

+ (400’)

Slide 34

Church

Page 35: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[BUILDING CHARACTER]HOLLYWOOD PARK

September 17, 2013

Architecture Style•Circa 1950 Strip‐Retail

Building Characteristics•Variety of painted masonry, aluminum siding•Fenestration patterns: 

•fixed metal windows,•sash vinyl windows•glazed commercial doors 

•Flat roof with downspouts to the rear.•Exposed roof‐top mechanical systems  

Signage•Variety of sign types:

•plastic/vinyl illuminated box sign•vinyl banners•window mounted signs and vinyl lettering•Neon 

Lighting•Wall mounted exterior flood lights   

Slide 35

Page 36: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[OPPORTUNITIES]HOLLYWOOD PARK

September 17, 2013

Easy access from New Hampshire Avenue

Parking and services behind businesses

Outdoor / pedestrian spaces 

Redevelopment

Slide 36

Page 37: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

[CONSTRAINTS]HOLLYWOOD PARK

September 17, 2013

Building sits lower than New Hampshire Avenue

No edge between parking lot and Hollywood Avenue

Blank walls facing New Hampshire Avenue

Building appears to have been expanded and/or renovated multiple times without maintaining a consistent look

Front retailers are not accessible from parking lot 

Slide 37

Page 38: 2013 0917 FINAL ColesvilleVision€¦ · Final Report SCHEDULE September 17, 2013 Slide 5. The Settlement at Savage Mill Savage, Maryland Colesville-Design Study Colesville, Maryland

The Settlement at Savage MillSavage, MarylandColesville- Design StudyColesville, Maryland

COMMENT SESSION

September 17, 2013

We Need Your Input on: Areas to Focus Attention  Problem Areas Areas for Opportunity Areas doing OK

Slide 38


Recommended