Home > Documents > 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014...

2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014...

Date post: 10-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
27
1
Transcript
Page 1: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

1

Page 2: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

For current baseline refer to SSP 54100 Multi-Increment Planning Document (MIPD)

MRM2

MRM1

(SM Zenith)

(FGB Nadir)

DC-1/ MLM/

RS Node

SM-Aft

Node-2 Zenith

Node-2 Nadir

N2 Fwd

Port Utilization

2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

32S

3/15

146 / 144

33S

5/14

167 / 167

34S

3/29 9/11

166 / 164

35S

5/30 11/10

168 / 166

36S

9/27

3/12

2/7

188 / 188 11/15 5/14

174 / 172

38S

3/28 7/20

9/16

173 / 171

39S

5/30 11/17

167 / 165

40S

10/2

166 / 164

41S

12/3

148 / 138

ATV4

6/15 10/31 180 / 172

ATV5

4/20 10/9

3R (MLM) 12/20

6R (RS-Node) 6/26

HTV4

8/9 9/8

HTV5

7/6 8/5

SpX-2

3/3 3/25

SpX-3

11/13 12/13

SpX-4

4/8 5/8

SpX-5

8/10 9/9

SpX-6

12/7 1/6

Orb-D1

6/10 7/5

Orb-1

9/15 10/15 Orb-2

12/11 1/10

Orb-3

4/8 5/8

Orb-4

10/6 11/5

Orb-5

1/18 2/17

49P

4/15

50P

51P

4/26

7/21

52P

7/26 12/18

53P

11/23 4/9

55P

4/30 6/23

56P

7/26 12/30

57P

10/24

58P

2/4

3/28 34S

TMA-08M

5/28 35S

TMA-09M

9/25 36S

TMA-10M

11/7 37S

TMA-11M

3/26 38S

TMA-12M

5/28 39S

TMA-13M

9/30 40S

TMA-14M

12/1 41S

TMA-15M

6/5 ATV4

4/12 ATV5

6/24 6R

RS-Node

NET 8/4 HTV4

7/1 HTV5

11/11 SpX-3

4/6 SpX-4

8/8 SpX-5

12/5 SpX-6

4/17 Orb-TF

6/5 Orb-D1

9/12 Orb-1

12/8 Orb-2

4/5 Orb-3

10/3 Orb-4

1/15 Orb-5

4/24 51P

M-19M

7/24 52P

M-20M

11/21 53P

M-21M

2/5 54P

M-22M

4/28 55P

M-23M

7/24 56P

M-24M

10/22 57P

M-25M

2/2 58P

M-26M

R-32

4/19

R-33

~6/26

U-21, 22u/r

Jul

R-34, 35

Aug

R-36

Nov 9

R-37

Dec

R-38, 39

Jan

R-40,41,42

Feb

R-43

Apr

R-44

Jun

R-45,46,47

Aug

R-48

Jan

06/01 - 06/10 07/31 - 08/08 11/01 - 11/08 12/29 - 01/08 05/29 -06/08 07/28 -08/06 10/29 - 11/06

Inc

Inc 35 Inc 36 Inc 37 Inc 38 Inc 39 Inc 40 Inc 41 Inc 42

HTV4: MBSU, UTA, STP-H4 SpX-3: HDEV, OPALS

SpX-4: RapidScat HTV5: CALET, CATS

SpX-5: CREAM SpX-6: SAGE Hexapod, SAGE NVP, MUSES

N K.

(32S)

R O.

(32S)

R E.

(32S)

C C. Hadfield (CDR-35) 146 days

(33S)

R R. Romanenko 146 days

(33S)

N T. Marshburn 146 days

(33S)

R P. Vinogradov (CDR-36) 167 days (34S)

R Misurkin 167 days (34S)

N Cassidy 167 days (34S)

R F. Yurchikhin (CDR-37) 166 days N K. Nyberg 166 days A L. Parmitano 166 days

R O. Kotov (CDR-38) 168 days (36S)

R S. Ryazanskiy 168 days (36S)

N M. Hopkins 168 days (36S)

J K. Wakata (CDR-39) 188 days (37S)

N R. Mastracchio 188 days (37S)

R M. Tyurin 188 days (37S)

N S. Swanson (CDR-40) 174 days (38S)

R A. Skvortsov 174 days (38S)

R O. Artemyev 174 days (38S)

R M. Suraev (CDR-41) 173 days (39S)

N R. Wiseman 173 days (39S)

E A. Gerst 173 days (39S)

N B. Wilmore (CDR-42) 167 days (40S)

R Y. Serova 167 days (40S)

R A. Samokutyayev 167 days (40S)

N T. Virts (CDR-43) 166 days E S. Cristoforetti 166 days R A. Shkaplerov 166 days

Stage EVAs Stage S/W

Soyuz Lit Landing

Launch Schedule

Solar Beta >60 External Cargo

05/25 06/15 07/23 08/15 09/17 10/22 11/13 12/23 05/27 07/25 09/19 11/15

22 d 25 d

11/7

54P

37S

3/25

6/11

1/12

#3-8 #3-8 #3-8 #3-8

6/16 -18 ATV4

8/15, 17-18

#3-76

DO01: DO02:

#3-8

#3-7 (Beta)

#3-75 #3-75

ICU 4/2, 4/11

X2R12.1 3/17

X2R13 9/15

#3-8

#3-7 (Beta)

#3-80

SM 8.07 9/9u/r

SpX-2 3/1

#3-8 #3-8 #3-8 #3-8

3R 12/11

MLM

#3-81

#3-7 (TDRSS)

#3-73 #3-7 (beta)

30 d 30 d

30 d

30 d

30 d

30 d 30 d 30 d 30 d 30 d 30 d

#3-7

ISS Flight Plan NASA: OC4/John Coggeshal l

MAPI: OP/Scott Pau lChart Updated: April 3rd, 2013

SSCN/CR: 13681A + Tact. Mods (In-Work)

Page 3: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Ø 

Ø 

Ø 

Ø Ø 

Ø 

4-Orbit Rendezvous

On March 28, the 34 Soyuz vehicle with the Expedition 35 Crew launched from Baikonur. Approximately 6 hours later the Crew docked to the ISS. This was the first crewed 4-orbit rendezvous to the ISS. From the USOS perspective, docking timeline is essentially identical for either rendezvous

System configurations (powerdowns, array positioning, attitude control handover) occur at same time relative to docking and are identical to any other Soyuz No changes to joint Flight Rules or USOS procedures for the 4-orbit rendezvous

U.S. and Russian flight control and engineering teams have performed standard analysis for both 4-orbit and 34-orbit dockings Soyuz generically retains enough propellant margin to support a re-rendezvous after an abort from any point in the trajectory

3

Page 4: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

4-Orbit Rendezvous

Ø  On February 21, 2013 the ISS Program conducting it Stage Operational Readiness Review and on March 6, NASA conducted the Flight Readiness Review Ø  Included detailed review of all aspects of 4 orbit Rendezvous

Ø  Vehicle configurations / timelines for 4 and 34 orbit Crew fatigue and health management Ø 

Ø  US and RS doctors approved a sleep shifting profile to align with launch / docking activities. Crew activities post ingress were limited to the Safety briefing. Ø 

Ø  Space Adaptation Syndrome – discussed with combined US / Russian medical team. Ø  Mitigated with experience crew members, preflight testing of medications, and the

availability of these medications to the crew on day of launch. Ø  Confined space / spacesuit issues

Ø  crew was allowed to ingress the Orbital Compartment for hygiene and food / water access. MAGs were approved and available to all crew members Crew able to loosen straps on-orbit to allow stretching and mitigate join pain.

Ø Ø 

Ø  Ø  The ISSP and then the FRR Board approved the 4 – orbit for 34S only.

Ø  Plan is to conduct post flight lessons learned from vehicle, ops, crew, and medical teams to understand fully the risks and to determine if 4-orbit rendezvous should be approved in the future.

4

Page 5: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Expedition 35/36 Overview

Expedition 35 Chris Hadfield (CDR) Roman Romanenko

Tom Marshburn (33S-Soyuz TMA-07M)

Expedition 36 Pavel Vinogradov (CDR) Alexander Misurkin Chris Cassidy (34S-Soyuz TMA-08M) 5

Page 6: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MRM1

SM Aft

N2 Nadir

FE-1 O. Novitskiy

FE-2 E. Tarelkin

CDR K. Ford

3/15 32S Undock

32S

Stage 34-6

FPIP SSCNs 13706/13681A IDRD Rev A CR13583

Stage 36-6 (104 Days)

Stage 35-3 Stage 35-6 Stage 36-3 Stage 36-6

Ut ilizat ionInc Ave 35

hrs / wk

More than 75 invest igat ions duringStage 35-3 and 35-6New Invest igat ions: BP reg, Car lage,FASES, ICE-GA, and UVP-2R

More than 75 invest igat ions during Stages 36-3 and 36-6New Invest igat ions: Microbiome, ICE-GA, Diapason, STP-H4, RINGS,Ocular Health, Skin-B, Space PUP, and Asian Seed.

EVA,Resupply

&Outf it ting

RS EVA #32:Obstanovka exp.Setup, ATV reflectorR&RR&O: Install ICU,iPEHG, High Def init ionCameras

RS EVA #33: R&R FGB thermal regulator panel, photoexternal surfaces of the RS MLI, remove the Foton- Gamma from Molniya-Gamma experimentUSOS EVA #36-1: MLM Pwr cable, SGTRC-2 R&R, Grapple Bar, MISSE8 & ORMatE retrieval, Z1 Jumper (1 of 2)USOS EVA #36-2: RGB V-Guides, MLM Ethernet cable, Z1Jumper, R&R JEF Fwd Cam, FGB PDGF 1553RS EVA #34: Route power from FGB to MRM2, routeEthernet cable for MRM2RS EVA #35: Set up the portable workstat ion, the two-axial target ing platform, and the medium resolut ioncamera (MRC) on the Plane IV portable workstat ionR&O: Install HTV4 H/W: JEM LAN, JEM EnvironmentalMonitor Equip, Ut ility Bonding Point, Cooler Box

E 35 CDR - C. Hadf ield (Inc 35 60 days)E 35 FE-4 - R. Romanenko (Inc 35 60 days)E 35 FE-6 - T. Marshburn (Inc 35 60 days)

E 36 FE-4 - F. Yurchikhin (Inc 36 - 104 days)E 36 FE-5 - L. Parmitano (Inc 36 - 104 days)

E 36 FE-6 - K. Nyberg (Inc 36 - 104 days)

3/29 34S Dock

Stage 35-3 (14 Days)

9/11 34S Undock

N2 Zenith

DC-1

E35 FE-1 /E36 CDR - P. Vinogradov (Inc 35 - 46 days, Inc 36 - 120 days)E35/E36 FE-2 - A. Misurkin ( Inc35 - 46 days, Inc 36 - 120 days)

E35/E36 FE-3 - C. Cassidy (Inc 35 - 46 days, Inc 36 - 120 days)

Stage 36-3 (16 Days)

Stage 35-6 (45 Days)

RS #32 April 19, 2013

Mar-2013 Apr-2013 May-2013 Jun-2013 Jul-2013 Aug-2013 Sep- 2013

Inc 34 Inc 37

51P26-April 21-July 52PATV4

RS #34

MRM2

RS #33

Orb-1

15 - Sept Berth

RS #35

HTV49-Aug Berth

8-Sept Unberth

33S 14- May

34S 11-Sept 29- Mar 3/15 Undock

Increment 36 Increment 35

35S30-May

49P 15-Apr

50P 23-Apr

Orb-D1 5-July Unberth

17-June Berth

5/30 35S Dock

5/14 33S Undock

33 Soyuz Crew

Mar

shbu

rn

Rom

anen

ko

Had

field

35 Soyuz Crew

Nyb

erg

Par

mita

no

Y

urch

ikhi

n

26-July

34 Soyuz Crew

Cas

sidy

Mis

urki

n

Vin

ogra

dov

SpX-2 25-Mar Unberth

USOS 36 - #1 & 2 July 2013

6

it

Page 7: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

ISS Expedition 35 Mission Objectives

Perform an average of 35 hrs/week for payload investigations

FASES Invest igates the emulsion stability in relat ion to the physical-chemistry of droplet interfaces to obtain a modeling ofemulsion dynamics to be transferred to industrial applicat ionson Earth.

BP Reg Will test the eff icacy of an in-flight manipulat ion ofarterial blood pressure (BP) as an indicator of post-flightresponse to a brief stand test.

Microbiome This study will carry out a thoroughevaluat ion of how long-term space travel impacts the humanmicrobiome and ult imately human health, and it will form thebasis for further studies towards the design of therapies tomitigate any microbiome changes or related health issuesfound as a result of this project.

Ocular Health Collect evidence to characterize the riskand define the visual changes and central nervous system (CNS)changes observed during a six month exposure to microgravityincluding postflight time course for recovery to baseline.

Tritel Characterizes the radiat ion environment within the Columbus module of the ISS with high accuracy. It uses acombinat ion of three different detector types measuring theradiat ion amount, direct ion and history to determine absorbeddose and dose equivalent from solar and galat ic radiat ion.

Support visiting vehicle traffic including: SpaceX-2 unberthing, planned March 25th

34 Soyuz docking, planned March 30th, first Soyuz to perform a 4-orbit rendezvous prof ile. 49 Progress undocking, planned April 15th RS EVA #32, planned April 19th 50 Progress undocking, planned April 23rd 51 Progress docking, planned April 26th ATV-4 docking, planned May 1st

Installation of Ku Comm Unit Will increase hi rate Ku downlink from 150 Mbps to 300 Mbps, adds S/G3 and S/G4 (audio), adds two more channels of downlink video, reduces video bandwidth consumption (using new encoder algorithm), provides increased solid state recording of payload and video data.

Space-X Dragon capsule approaching and berthed to the ISS

7

Page 8: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Orb-D1 )

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

900.00

1000.00

0

10

20

30

40

50

60

70

80

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Cum

ulat

ive

Sche

dule

d Cr

ew T

ime

(Hou

rs)

Wee

kly

Crew

Tim

e (H

ours

)

OOS Planned USOS Executed 35 Hrs/Wk Avg Requirement

OOS Planned Cumulat ive USOS Cumulat ive Extended

SpX-2(1/20/13 - 2/19/13)SpX-1(10/11/12 - 10/28/12)

)

ATV3 (Undock on 9/25/12) (Undock on 9/28/12)

US EVA #20 11/1/12) * CONT

(3/3/13 Inc 35)

Pre-Decisional, For Internal Use Only

Inc 36

Increment 33_34 Utilization Crew Time

Executed through Increment Wk (WLP week) 25 = 25.0 of 24.8 work weeks 100.81 % through the Increment

USOS IDRD & OOS Allocation: 868.0 hours Additional USOS Allocation for Stage 34-6: 928.0 hours (Additional 60 hours)

USOS Actuals: 938.73 hours 101.2 % through updated Stage 34-6 Allocation 108.1 % through IDRD and OOS Allocation

Total USOS Average Per Work Week: 37.55 hours/work week Voluntary Science Totals to Date: 5.08 hours (Not included in the above totals or graph)

OC/OZ reconciliation is

complete through Week 25 with the exception of ESA

time.

Date Color Key: Completed 33-34 Final OOS FPIP Plan

Page 9: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

900.00

1000.00

0

10

30

40

50

60

70

80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Cum

ulat

ive

Sche

dule

Cre

w T

ime

(Hou

rs)

Wee

kly

Crew

Tim

e (H

ours

)

OOS PLanned USOS Executed 35 Hrs/Wk Avg Requirement

OOS Planned Cumulat ive USOS Cumulat ive Executed

%%

%%

Increment 35_36 Utilization Crew Time

%SpX-2

Orb-D1

ATV4 US EVA

3-Crew 6- Crew 3-Crew 6-Crew Increment 35 Increment 36

March April May June July August Sept

US EVA

(Unberth on 3/24/13) (Unberth on 3/25/13)

(Berth on 5/8/13) Below the line

(Dock on 5/1/13)

HTV4

Pre-Decisional, For Internal Use Only

Date Color Key: Completed 35-36 Final OOS FPIP Plan

OC/OZ reconciliation

completed as of Week 2.

(Berth on6/10/13)

(Dock on 6/15/13) (8/9/13 - 9/8/13)

Executed through Increment Wk (WLP week) 2 = 2.0 of 24.4 work weeks 8.20 % through the Increment

USOS IDRD Allocation: 875 hours OOS USOS Planned Total: 876.5 hours

USOS Actuals: 81.41 hours 9.3 % through IDRD Allocation 9.3 % through OOS Planned Total

Total USOS Average Per Work Week: 40.71 hours/work week Voluntary Science Totals to Date: 0.00 hours (Not included in the above totals or graph)

Page 10: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

ISS Research Statistics as of Feb 28, 2013

Number of USOS Invest igat ions for 35/36 : 140

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CSA ESA JAXA NASA/US

82 NASA/U.S.-led invest igat ions58 International-led invest igat ions30 new USOS invest igat ions

Over 400 invest igatorsrepresentedOver 500 scient if ic resultspublicat ions (Exp 0 - present)1 CSA

4 ESA Roscosmos data st ill in work

7 JAXA18 NASA/U.S.

ISS Research Disciplines by Partner AgencyIncrements 35/36

Biology and Biotechnology

Earth and Space Science

Educat ional and Cultural Act ivit ies

Human Research

Physical Science

Technology

TBD

9 20 29 82

Number of Invest igat ions Expedit ion 0-32: 1549* *USOS + Roscosmos10

Page 11: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Total ISS Consumables Status: Total On-orbit Capability 28-March-13 51P SORR, 51P (Dock 26-Apr-13)

T1: Current Capability with no resupply T2: Current Capability with 51P

Consumable – based on current, ISS system status Date to Reserve Level Date to zero supplies Date to Reserve Level Date to zero supplies

Food – 100% (1) (2) September 28, 2013 November 13, 2013 October 18, 2013 December 10, 2013

KTO June 11, 2014 July 26,2014 August 1, 2014 September 15, 2014

Filter Inserts October 9, 2014 December 2, 2014 (2) December 1, 2014 January 15, 2015

Toilet (ACY) Inserts (2) April 15, 2014 June 6, 2014 May 11, 2014 July 1, 2014

EDV (UPA Operable) (2) (3) (4) August 21, 2013 November 9, 2013 November 29, 2013 February 7, 2014

Consumable - based on system failure

EDV (UPA Failed) (3) July 16, 2013 August 30, 2013 September 10, 2013 October 31, 2013 (2)

Water, if no WPA (Ag & Iodinated) (2) (5) August 24, 2013 October 16, 2013 October 12, 2013 December 4, 2013

O2 if Elektron supporting 3 crew & no OGA (2) (6) July 5, 2013 December 2, 2013 July 18, 2013 December 15, 2013

O2 if neither Elektron or OGA (2) (6) May 1, 2013 July 6, 2013 May 7, 2013 July 13, 2013

~18 Days LiOH (7)

(CDRAs and Vozdukh off) ~4 Days ~18 Days ~4 Days

(1) Includes food on Soyuz; after RS goes to zero, both sides share USOS food. (2) Reserve level to Zero is different than 45 days due to varying crew size. (3) Progress tanks included in assessment for urine dumping only. (4) A-RFTA operations as of 8/6/12. Assumes 74% recovery rate and no RS urine processing. (5) RS processes all condensate in event of WPA failure. (6) Includes metabolic O2 for 45 day/6-crew reserve and the O2 for greater of CHeCs or 4 contingency EVAs. (7) LiOH Canisters will be used for CO2 removal from the ISS if the CDRAs are inoperable. Total LiOH Reserve Level is 14 days for 6 crew. (Reserve Level for USOS LiOH is ~13.3 days for 3 crew (20 canisters), and for RS LiOH is 15 days for 3 crew (15 canisters).) 11

Page 12: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Challenges

Ø  Photovoltaic Thermal Control System (PVTCS) 2B Ammonia Leak - Monitoring Ø  In 2007 it was confirmed that the Channel 2B PVTCS exhibited a relatively constant leak rate of ~1.5 lbm/

year that later accelerated to between 5.8 and 9.5 lbm/year by late 2012. USOS EVA 20 was performed on 11/1/12 to isolate the 2B Photovoltaic Radiator (PVR) and provide cooling via the Early External Active Thermal Control System (EEATCS) PVR via jumpers. Trending has confirmed that the isolated 2B PVR is not leaking. The new combined (hybrid) system is operating nominally. However, initial behavior suggests that the hybrid system is leaking and characterization of the rate is underway. Data to date indicates a rate in the range of ~5 lbm/yr, but many months are required to develop a reliable trend.

Ø  Sequential Shunt Unit (SSU) 1A Power on Reset (POR) - Monitoring Ø  On 1/10/13, SSU 1A started experiencing PORs during insolation passes, with this series of PORs ending

on 1/13/13. Previously SSU 1A had experienced 3 other PORs. The impact from these PORs has been minimal. When the SSU performs a POR, the primary power channel momentarily goes to battery power (approx 1.5 seconds). Data gathering activities were developed that could assist the team in characterizing the issue if the PORs start re-occurring. The SSU will be operated as is while specialist continue their investigation through a similar solar beta period in March. Should the SSU have a hard failure, the Flight Control Team will perform the Seamless Power Channel Handover procedure to continue providing power to the loads on this channel.

Ø  Ku-Band Antenna Group 2 (AG2) Forward Link Anomaly – Troubleshooting Ø  On GMT 351, the Ku-band Group 2 failed to acquire TDRS. The Ku-band was configured to open loop

pointing, with success in acquiring the return link, but not the forward link. Ku-band swapped to Antenna Group 1, acquiring TDRS nominally. Antenna Group 2 is currently powered off, with heaters enabled. Root cause identified a suspect failure in the Space to Ground Transmitter Receiver Controller (SGTRC). A spare SGTRC is available on-board. Removal and replacement is planned for US EVA #21 in June ‘13.

12

Page 13: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Ø Ø 

Ø Ø 

Ø 

USOS System Challenges

Loss of Columbus Water Pump Assembly (WPA2) - Monitoring On 1/13, ESA was not successful in switching the active Internal Thermal Control System pump from WPA1 to WPA2. The switch over is a nominal activity in support of WOOV cycling conducted on a 3-month interval. Attempts to start WPA2 were unsuccessful, so the Columbus module is operating on WPA1 with no redundancy. Engineering evaluation of the fault is in-work, but the cause of the anomaly is not understood yet. A coolant top-off was performed on 2/14/13 to accommodate coolant sampling as well as margin for nominal leakage. There is no spare WPA on-board. A spare is scheduled to launch on ATV4.

Increased N3 Common Cabin Air Assemblies (CCAA) Indications - Workaround Water carryover events due to degraded heat exchanger (HX) in N3 CCAA. No spare CCAA HXs on orbit; one targeted for manifesting on HTV5. FR Waiver in work to increase time prior to Carbon Dioxide Removal Assembly (CDRA) command to standby in the event of a continuous wet indication

13

Page 14: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Challenges

Ø  MERLIN2 Shutdown Due to False Fire Alert - Troubleshooting

Ø  Event believed to be a result of a radiation hit on this system (Station at high latitude). MERLIN 2 used for galley food storage and has remained unpowered. Procedure in work to check the current system status after power up.

Ø  Space Acceleration Measurement System II Remote Triaxial Sensor/Drawer 2 (SAMS-RTS/D2) Loss of Health and Status – Troubleshooting

Ø  On 2/11, SAMS-RTS/D2 lost health and status. Log files show no communication between SAMS and ICU. Troubleshooting isolated issue to either ER4 PEHB or JAXA LEHX. MART identified additional troubleshooting steps to be performed on 3/26 to isolate to one of these two systems.

Ø  MBSU 2 RBI 5 Trip (feeds Russian Segment Service Module [CHT] 21 & 22) – Troubleshooting

Ø  Noise from the [CHT]s is believed to have caused MBSU2 RBI5 to trip off on GMT 206. Team developing procedures to use on-orbit oscilloscope to test the input side of the [CHT]s in the April/May timeframe.

14

Page 15: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Challenges

Ø  Dragon Draco Thruster Check Valve Ø  During the SpX-2 mission, 3 of 4 propulsion manifolds were not properly pressurized following

second stage separation. The issue was overcome real-time and SpaceX has identified root cause due to failure of in-line check valves. SpaceX is working design modification for follow-on missions During approach and release/departure, 3 of 4 quads are required to complete operations. An abort to protect ISS requires 2 of 4 thruster quads to be operational. Analysis has shown that Dragon will safely drift away from ISS in the event that all four quads failed Although check valves operated nominally upon entry into ISS ellipsoid, sufficient blowdown was available should an abort be required Check valve operated nominally for departure and re-entry

Ø 

Ø 

Ø 

Ø  HTV3 Abort Ø  The HTV3 abort was caused by an interaction between the grapple fixture cam arms on the

vehicle and the initial motion of the SSRMS during back away due to the relative positions of the HTV and the ISS. This interaction created rates on the HTV vehicle that, when checked on board the HTV, indicated the HTV would leave its designed departure corridor and thus it initiated an abort per joint safety requirements. No damage was done to the ISS. NASA has assessed a number of options to eliminate this interaction to mitigate risk of an abort on future vehicles and is implementing a modified SSRMS release approach to incorporate a delay in the start of initial SSRMS back away. Implementation is on schedule and includes refining visual cues for the crew to monitor the release as well as potentially adjusting SSRMS configuration parameters to provide a smooth separation between the SSRMS and the vehicle. NASA has assessed other free flyer vehicles (Dragon and Cygnus) and has implemented a corresponding approach to mitigate the concern.

Ø 

Ø 

15

Page 16: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Comparing Boeing 787 Li-Ion Battery to ISS Li-Ion

Ø  January 7, Boston – post-landing, battery fire, see photos below January 16, Japan – emergency landing, pilots reported smoke odor, error battery messages Ø 

Ø No fire, electrolyte leakage, battery case swollen Ø  January 17, all 787s grounded pending investigation

Ø  Boeing (Satellite Systems), GS Yuasa, NTSB, FAA Boeing (Houston) in communication with team and with NASA to understand the incidents Ø 

Ø  787 battery is manufactured by Thales, using 8 GS Yuasa 65 Ah Li-ion cells ISS battery is manufactured by PWR, using 30 GS Yuasa 134 Ah Li-ion cells Ø 

16

Page 17: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

ISS Li-Ion Truss Batteries

ISS Li-Ion Battery Design 1 Li-Ion ORU will replace 2 series connected Ni-H2 ORUs 10-year design life (58,000 charge/discharge cycles) 134-Amp-hr (Ah) nameplate capacity, 15 kW-hours power Multiple layers of redundant controls and safeguards

Hardware and software / inside and outside the battery ORU Photovoltaic Control Application (PVCA) Battery Charge Discharge Unit (BCDU) Battery Interface Unit (BIU)

ORU Design Ø 

Ø Ø Ø Ø 

Ø Ø Ø Ø 

Ø 

High fidelity Engineering Model

Cell Selection Process Ø  2010 Risk Mitigation Study

Ø  Evaluate candidate cells to meet ISS mission requirements Assessed for uniformity, design features, and manufacturing quality 7 Li-Ion cell designs were tested 2 remained viable candidates

Ø Ø Ø 

Ø  2012 Cell selection Consideration Ø  Supplier performance (lead time, current production, established baseline)

Management (preparation, participation, timeliness & accuracy) Technical (ability to maintain baseline material, meet specified requirements) Cost (total cost of product) GS Yuasa Lithium Power of Rosewell GA selected to provide cells

Ø Ø Ø Ø 

Ø  Each individual cell must pass rigorous acceptance testing before if can be used in an ISS battery

LSE 134 Cell

17

Page 18: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Enhancements

Ø Carbon Dioxide Removal Assembly (CDRA) “-4” Desiccant/Adsorbent Beds- Monitoring Ø  Two new CDRA beds will be launched on SpX-2

New features include a redesigned heater core with significantly thicker Kapton insulation to reduce risk of short, and completely re-engineered attachment points to the wiring harness to reduce strain at the wiring interface New beds have been manufactured under clean-room conditions to reduce chance for built-in FOD Sheets for the heater core have been re-engineered to reduce sharp edges and weld points which were potential FOD sources from welding slag Beds incorporate new temperature sensors which have been changed from a thin-film sandwich type to a completely new helical wire-wound construction, significantly improving sensor survivability under repeated thermal cycles (similar to commercial applications in aircraft brakes) Shape of the desiccant and absorbent materials were changed to allow for more efficient packing on the ground and to potentially reduce dusting due to material abrasion when exposed to long term thermal/vacuum cycles on-orbit Housing of the bed was updated to accommodate the addition of captive fasteners and other features to allow the crew to partially disassemble the adsorbent bed on-orbit to remove the dust that accumulates from operation of the CDRA without having to return the beds to the ground for refurbishment

Ø 

Ø 

Ø 

Ø 

Ø 

Ø 

18

Page 19: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Enhancements

Ø Continue replacement of legacy ISS avionics with Obsolescence Driven Avionics Replacement (ODAR) components Ø  Integrated Communications Unit (ICU) ready for activation in early April - doubling the downlink

data rate (300 Mbps) and an eight-fold increase in the uplink data rate (25 Mbps) improved Payload Ethernet Hub Gateway (iPEHG) ready for activation in late May – tenfold increase in medium rate onboard data communications (100 Mbps) 2 flight ICUs and 4 iPEHGs are on-orbit; 3rd flight ICU planned for launch on ATV4 Installation is planned for April 2013

Ø 

Ø Ø 

19

Page 20: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Enhancements

Ø  The ELC Wireless system provides a COTS solution for external high data rate 802.11n wireless capability to payloads on the Express Logistic Carrier (ELC) The system consists of two separate segments Ø Ø  US Lab

Ø  COTS Wireless Access Points (WAP) placed inside the lab with external antennas to provide the core wireless capability

Ø  Payloads/Users Ø  Characterization of a wireless solution for the payloads/users to integrate and provide

piece parts to the developers Ø  External Wireless users can connect using two methods:

Ø  Use an IEEE 802.11n Network Interface Card in their device Ø  The NIC can be integrated directly into the Payload. (e.g. a PCI card)

NASA can provide a USB NIC to a user that can be integrated into the Payload. Ø Ø  Provide an IEEE 802.3 wired Ethernet interface and connect to Wireless Media Converter

Ø  NASA is investigating providing a hardware (circuit card with wired Ethernet port and antenna out port) solution that will allow a Payload to use a standard wired Ethernet port and this hardware perform the wired to wireless conversion This hardware will be “smart” and require some configuration by the Payload in order to access the network Radiation testing on candidate hardware is being performed January 16 – 18

Ø 

Ø 

20

Page 21: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

USOS System Enhancements

Ø  In an effort to increase the utilization of Commercial off the Shelf (COTS) hardware with limited or no modifications to support on-orbit operations, the ISS Program worked with commercial industry to develop a power inverter which converts the DC power generated from the ISS solar arrays to AC power just as you would find in your home. The provision of AC power allows ISS systems and payload developers to simplify and reduce the schedule and cost for the development, integration and delivery hardware into the ISS. The ISS power inverter (pictured below) comes in two models: 120Vdc-to120Vac and 28Vdc-to-120Vac respectively to support the primary power input voltages provided throughout the ISS (USOS and Russian Segments) and payload power interfaces. The 120Vdc-to120Vac power inverter provides power AC power provides: four (4) standard three prong AC power outlets and is capable of providing a total of 750W @ 60hz. The 28Vdc-to120Vac power inverter provides power AC power provides: four (4) standard three prong AC power outlets and is capable of providing a total of 400W @ 60hz.

Ø 

Ø 

Ø 

Ø 

21

Page 22: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Ø Ø 

Ø 

Ø 

Ø 

Ø 

Ø 

Ø 

Ø 

Ø 

Ø Ø 

Ø Ø Ø 

Ø 

International Space Station SpaceX-2

SpX-2 Cargo

577 kg of pressurized launch cargo included the following:

95 kg of crew supplies and computer and EVA hardware 347 kg of utilization hardware including 2 GLACIERs and 5 double cold bags 135 kg of vehicle hardware including 2 Carbon Dioxide Removal Assembly (CDRA) desiccant absorbent beds

221 kg of unpressurized external cargo (first SpaceX flight with external cargo to ISS) included the following:

Two (2) Heat Rejection Subsystem Grapple Fixtures (HRSGF) (Grapple Bars)

1235 kg of pressurized return cargo plan included the following:

197 kg of crew supplies and computer and EVA hardware 576 kg of utilization hardware including 1 GLACIER and 5 double cold bags 462 kg of vehicle hardware

Status Successfully launched on 3/1 and berthed to ISS on 3/3 Grapple bars were successfully extracted on 3/6 Dragon unberthing/re-entry occurred on 3/26 with early destow cargo arrival at Long Beach on 3/27 and nominal return cargo arrival at McGregor scheduled for 4/2 Post-flight briefing to NASA occurred on 4/16

Dragon 4 (SpX-2) berthed to ISS on 3/3

Grapple bars in Dragon trunk ready for extraction

Photo Credits: NASA 22

Page 23: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Orbital Status

Ø  7K Hot Fire Test successfully completed on 2/22 Ø Post-test flame trench inspection yielded positive results; no

rework prior to Test Flight On-pad inspections and cleaning of Engines 2 & 3 completed Pad modifications on track for addition of a helium heat exchanger

Ø Ø 

Ø Will improve the Liquid Nitrogen (LN2) subcooler’s ability to chill down helium entering the vehicle to meet launch vehicle requirements

Ø  Test Flight status Ø Payload simulator mated on 2/20

Launch planned for NET 4/20 Ø Ø  Demo Launch status

Ø  Pressurized Cargo Module (PCM) Initial Cargo Load occurred on 3/22 PCM-to-SM mate occurred on 4/1 – 4/2 Final Flight Software regression testing conducted on 3/19 and Joint Test 4 Software Stage Verification conducted on 4/2 – 4/5 Joint Multi-Segment Training (JMST) #10 (long rendezvous) simulation was successfully conducted on 3/21 NASA’s Vehicle Assessment Review (VAR) is planned on 5/2 Cargo upmass allocation is 704 kg

Ø Ø 

Ø 

Ø Ø 

Ø Ascent manifest consists of crew provisions, food, laptops, and other non-critical hardware (no utilization)

Successful 7K Hot Fire Test

Test Flight Fairing and Payload Simulator

Photo Credits: OSC

23

Page 24: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

International Space Station ATV4

ATV4: Albert Einstein Ø  Launch

Ø  The launch date for ATV4 was moved out due to a connector inside of the pressurized module requiring a repair as well as a Digital Signal Processing Unit (DSPU) being removed and replaced

Ø  Cargo Ø  Nominal cargo load is complete

Late load is planned at L-3 weeks Manifest (in kg): ~2200 prop for ISS use, 860 prop for transfer, 100 (air and O2), 570 water, and ~2700 packed dry cargo

Ø Ø 

Ø  Status Ø  ATV target on Service Module has contamination

which has caused pitch/yaw noise on all ATVs. Noise has been worsening on each flight. ESA management has decided to have RSCE swap out target during 4/19 Russian EVA ATV2 and ATV3 cabin fan failure investigations largely complete with no clear identification of root cause. Spare fan on board ISS will be installed if ATV4 fan should fail. Most ATV operations may continue without operational ATV cabin fan (covered by a Flight Rule) Stage Operations Readiness Review is planned for 5/13

Ø 

Ø  Pressurized module for Albert Einstein (ATV4) on production line

Photo Credits: ESA 24

Page 25: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Ø Ø  ~

Ø 

Ø Ø 

Ø Ø Ø Ø 

Ø Ø 

Ø 

Ø 

International Space Station HTV4

HTV4 Cargo – (Manifest Requests (MRs) pending)

3144 kg currently manifested for ISS 2257 kg of pressurized cargo, including crew supplies and computer resources (582 kg), water bags and flight support equipment (571 kg), vehicle hardware (676 kg), utilization hardware (357 kg), EVA supplies (71 kg), and 887 kg of unpressurized cargo

External cargo includes: Space Test Program – Houston 4 (STP-H4) Main Bus Switching Unit (MBSU) Utility Transfer Assembly (UTA) For disposal: STP-H3

Status Launch date moved due to a potential Earth Sensor Assembly(ESA) issue found during acceptance test on an HTV7 unit. STP-H4, UTA, and MBSU have been integrated onto the Exposed Pallet. For MBSU/UTA IAs, this was the first time JAXA performed all physical integration at TNSC without NASA touch labor (observers only); STP-H4 personnel performed offline testing and checkouts prior to turnover to JAXA; Processing of water and filling of the Contingency Water Containers – Iodine (CWCI) began in early March; leak subsequently discovered on one bag and replacement bags have been shipped. NASA is flying 24 CWCIs

HTV launch from Tanegashima Space

Center

HTV on approach to ISS Photo Credits: JAXA/NASA 25

Page 26: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

ISS Top Program Risk Matrix Post April 10, 2013 PRAB

Risks (L x C) continued Score: 2 x 4

L I K E L I H O O D

p

pp

p p p

p

p

p

p

p

p

p

p

p

p

6368 - Development of ISS On-Orbit Nitrogen and Oxygen Recharge Capability - (OG) - (C,S,T,Sa)

Score: 3 x 2 p 6393 - Channel 2B PVTCS Ammonia Leak

Increasing - (OB) - (C,S,T,Sa) Score: 2 x 2 p 6347 - Temporary Urine and Brine Stowage

System Catastrophic leak of a Tox-2 Fluid - (OB) - (C,S,T,Sa)

6032 - On-Orbit Stowage Short-Fall (Pressurized Volume) - (OC) - (T,Sa)

p

Corrective/Preventative Actions None

Watch Items None

Continual Improvement None

5 2 1

4 2 3

3 1 3 1 3

2 2 1

1

1 2 3 4 5 CONSEQUENCE

Low Medium High

C – Cost S – T – Schedule Technical Sa – Safety

p – Top Program Risk (TPR)

Removed: 6198 - ODAR/ICU, 6234 - Institutional Gaps, and 6407 - SpX Engine Anomaly

Risks (L x C) Score: 5 x 5

6352 - Overlap in Commercial Crew & Soyuz Launch Services - (OH) - (C,S,T,Sa)

Score: 5 x 4 6370 - ISS Pension Harmonization - (OH) - (C) 6344 - ISS Operations Budget Reduction - (OH) - (C)

Score: 4 x 4 6399 - ISS Budget and Schedule - (OH) - (C,S,T) 6372 - Full ISS Utilization - (OZ) - (S) 6169 - Visual Impairment / Intracranial Pressure - (SA) -

(C,S,T,Sa)

Score: 3 x 5 6420 - NDS and IDA Qualification Schedule - (OG) -

(C,S,T,Sa) 5688 - ISS Solar Array Management Operations Controls

and Constraints - (OM) - (C,S,T,Sa) 2810 - Russian Segment (RS) capability to provide

adequate MM/OD protection - (OM) - (C,S,T,Sa)

Score: 3 x 4 6408 - FGB Sustaining Contract and FGB spares plan

post 2016 undefined - (OB) - (C,S,T,Sa)

Score: 4 x 3 6413 - ELC ExPCA Low Voltage Power Supply (LVPS)

Board Design Flaw - (OB) - (C,S,T,Sa) 5269 - The Big 13 Contingency EVA's - (OB) - (S,T,Sa)

Score: 3 x 3 6402 - SpaceX Dragon splash down - water intrusion /

power outage - (ON) - (S,T) 6277 - Loss of utilization flexibility based on CRS

capabilities - (OZ) - (C,T) 5184 - USOS Cargo Resupply Services (CRS) Upmass

Shortfall - 2010 through 2016 - (ON) - (C,S,T,Sa)

26

Page 27: 2013 2014 2015 - NASA · 2013-04-18 · Zenith Orb-3 Node-2 Nadir N2 Fwd Port Utilization 2013 2014 2015 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

ISS Program Focus

Tact icalMaintain/increase crew t ime & resources for ut ilizat ionCont inue preparat ions for 1 year IncrementFY13 budget postureExecute SpaceX-3 mission & complete Orbital test anddemonstrat ion missionsATV 4 launchHTV 4 launchBetter ut ilize on-orbit stowage to improve crew t imeef f iciencyCommercial Crew Integrat ion

StrategicMaximum ut ilizat ion of ISS as a Nat ional LabTechnology development and demonstrat ionTest bed for Explorat ion and extension of ISS capabilit ies foruse in deep spaceCrew transportat ion planTechnical analysis & planning of ISS life extensionsionBudget formulat ion to address challenges over the budgethorizon

27