+ All Categories
Home > Documents > 2013 Parks and Recreation Annual Report

2013 Parks and Recreation Annual Report

Date post: 23-Mar-2016
Category:
Upload: town-of-castle-rock
View: 221 times
Download: 4 times
Share this document with a friend
Description:
 
Popular Tags:
20
CASTLE ROCK PARKS & RECREATION ANNUAL REPORT 2013 Wrangler Park 2012 East Plum Creek Open Space 2009 Stewart Trail 2008 Bison Park Rhyolite Regional Park Ridgeline Open Space Madge Trail Red Hawk Trail Festival Park 2007 Matney Park Quarry Mesa Open Space Mitchell Creek Canyon Trail Gemstone Park 2006 Hidden Mesa Trail Chuck’s Loop Trail 2004 Castle Highlands Park 2003 Hidden Mesa Open Space Paintbrush Park 2002 Native Legend Trail 2001 Woodlands Trail 2000 Metzler Ranch Park Woodlands Bowl Open Space Gateway Mesa Open Space 1999 Mitchell Gulch Park 1997 East Plum Creek Trail 1995 Memmen Ridge Trail 1993 Miller & Gilbert Park 1992 Paul Hill Trail 1990 John Emerson Summit Trail Castle Rock Recreation Center 1988 Founders Park Rock Park Open Space Sellars Trail 1987 Baldwin Tot Lot Park Butterfield Crossing Park Plum Creek Park Memmen Ridge Open Space Castle North Park 1985 Mitchell Creek Trail Glovers Park 1983 Centennial Park 1976 Triangle Park 1965 2012
Transcript
Page 1: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 2013

Wrangler park 2012

east plum Creek open space 2009

stewart trail 2008

Bison park

Rhyolite Regional park

Ridgeline open space

Madge trail

Red Hawk trail

Festival park 2007

Matney park

Quarry Mesa open space

Mitchell Creek Canyon trail

Gemstone park 2006

Hidden Mesa trail

Chuck’s loop trail 2004

Castle Highlands park 2003

Hidden Mesa open space

paintbrush park 2002

native legend trail 2001

Woodlands trail 2000

Metzler Ranch park

Woodlands Bowl open space

Gateway Mesa open space 1999

Mitchell Gulch park 1997

east plum Creek trail 1995

Memmen Ridge trail 1993

Miller & Gilbert park 1992

paul Hill trail 1990

John emerson summit trail

Castle Rock Recreation Center 1988

Founders park

Rock park open space

sellars trail 1987

Baldwin tot lot park

Butterfield Crossing park

plum Creek park

Memmen Ridge open space

Castle north park 1985

Mitchell Creek trail

Glovers park 1983

Centennial park 1976

triangle park 1965

2012

Page 2: 2013 Parks and Recreation Annual Report

contents

Castle RoCk Parks & recreation annual RepoRt 20132

PhiliP s. Miller Park 4-5

trails 6

oPen sPace & natural resources 7

recreation 8---10

Parks 11

Post Partners 12---13

golf 14----15

financial overview 16---17

looking ahead 18---19

Produced by castle rock community relations in cooperation with castle rock Parks and recreation.

designed by: karen Mcgrath and caroline kipp

edited by: caroline kipp, karen Mcgrath, kerrianne Mukhopadhyay, kristen trbovich and kristin Zagurski

cover photos: castle rock half Marathon (front and back cover) by katie russell Photography

Photos by: Jeff Brauer, annette hayden, linnea Magee, karen Mcgrath, Mark sims, Jeff smullen, lisa sorbo, Barbara spagnuolo, versatile Marketing and kristin Zagurski

2012

Page 3: 2013 Parks and Recreation Annual Report

welcoMe

Castle RoCk Parks & recreation annual RepoRt 20133

hello and thank you for viewing the 2013 castle rock Parks and recreation annual report, which highlights the department’s accomplishments and activities. this past year was exciting as we took many steps toward a major Parks and recreation project that the community will be able to enjoy in 2014 Philip s. Miller Park. the ground breaking for Philip s. Miller Park took place in May 2013. we were fortunate to be joined by town council, who made this regional park one of the top five town priorities, and the newly formed castle rock Parks and trails foundation. after a year of planning and community feedback in 2012, we have moved forward with construction of phase one of the park. this will include many great amenities including a fieldhouse, outdoor playground, lighted outdoor synthetic field and the possibility of a partnership with private companies, who in the future plan to provide other outdoor adventure opportunities at the park.

as this large-scale project gets underway, staff continues to provide excellent Parks and recreation services to the community with new programs and updates to our facilities. from aesthetic and functional improvements to parks, to expanding our already impressive trail system, to meeting the needs of a growing youth and senior population with programming, the Parks and recreation staff always strives to exceed the expectations of our citizens.

i invite your feedback as we expand and plan for new facilities and amenities. there will be open house opportunities in 2014. You can always find us on facebook and twitter, along with our website, crgov.com/parks and crgov.com/recreation. in the meantime, please enjoy castle rock’s small-town charm and all of the recreational opportunities that are available.

sincerely,

rob hanna Parks and recreation director

we are committed to service, innovation, community, teamwork and fun.

Mission statementto enhance the quality of life and well-being of the residents of castle rock by acquiring and developing parks and trails and preserving open space and offering quality programs and facilities designated to meet the needs of our community.

Vision statementas the town of castle rock’s population continues to grow, so does the demand for more parks, recreation programs and facilities, golf opportunities, interconnected trails and a need to set aside greater amounts of open space.

to address these challenges, the department will make the public a partner; streamline operations to make them more efficient and service-oriented; maximize the use of alternative funding sources; and place an increased emphasis on seeking opportunities for regional and local cooperation.

Page 4: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 20134

Progressof all the town’s park initiatives, Philip s. Miller Park is the highest priority. this project was one of the top five townwide priorities considered when developing the 2013 town budget.

this year, staff completed a great deal of planning and preparation for phase one the park. the “behind the park” work completed this year included:

• in January 2013, Parks staff reviewed contract Management/general contractor (cM/gc) proposals, interviewed firms and forwarded to council a recommendation to enter into a preconstruction services agreement with turner construction for the Philip s. Miller Park and fieldhouse project.

• in March, Parks staff submitted a $250,000 grant application to great outdoors colorado. this effort was rewarded in June with approval of a grant that will be used to help fund the adventure playground and trail system at Miller Park.

•turner construction worked with the town and a design team, led by Bha design inc., through the winter to complete construction documents and provide constructability reviews and cost estimates for the project.

PhiliP s. Millerparkpark

• town council approved on May 7, 2013, the first contract to start construction. the groundbreaking for the project was held on May 15, 2013.

•work Package/guaranteed Maximum Price (gMP) no. 1 included construction survey, mass excavation, grading and stormwater improvements, water and sanitary sewer infrastructure, erosion control and materials testing and inspection.

•through the summer, town council approved two additional work packages with turner construction, which now includes all of phase one:•fieldhouse and aquatic center• lighted athletic field•all infrastructure required to build phase one

and future phases of the project • landscaping and parking

at the park site, many large machines were preparing the ground for vertical construction. in 2013, turner construction:•completed all over lot grading• installed storm sewer, sanitary sewer

and water line utilities•started the installation of natural gas

and electrical utilities• installed curb, gutter and asphalt •began the installation of the foundation system

for the fieldhouse

Page 5: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 2013 5

*FieldHouse More than just a fieldhouse, this new center is a two-story 64,500-square-foot building that will include:

•aquatics center• four-lane lap pool• leisure pool with zero-depth entry and play features•vortex play area•water slide• two party rooms• locker rooms

• indoor youth play area•1,900-square-foot indoor play area geared toward

toddlers and young children•synthetic turf field and warm-up area

•85-by-185-foot field for indoor sports and fitness classes

• 75-by-105-foot warm-up and practice area with drop-down batting cages

• trampoline play area• 85-by- 42-foot area designed with

wall-to-wall trampolines

liGHted outdooR syntHetiC tuRF Field

•240-by-360-foot field with lights for needed additional athletic programming space

• Park pavilions: three pavilions set alongside the athletic field. these spaces will make a great gathering place for those using the park.

adventuRe play aRea

a unique outdoor playground designed to fit within the natural terrain of the park.

natuRal suRFaCe tRails

More than seven miles of trails moving through the beautiful landscape of the park.

puBliC/pRivate paRtneRsHips

castle rock is working with two separate private companies to enhance the park with some exciting amenities. the weston group is examining the viability of a year-round snow hill operation. this could include a terrain park, tubing and downhill slope, along with a restaurant and lodge. royal gorge Zip line tours is planning a zip-line course through the park. these ventures would be privately operated and managed but would work in partnership with the town. *all measurements are estimated and are subject to change at build-out.

Phase oneconstruction of Philip s. Miller Park began in May 2013. the Parks and recreation department is excited to present phase one to the community and is eagerly anticipating the grand opening in 2014. all of the elements in phase one came from community feedback and were chosen based on the most urgent parks and recreation facility needs in our town.

Page 6: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 20136

trails

Trail projects

HangMan’s gulcH Trail and cHannel iMProVeMenTsthe completion of this project means castle rock residents and visitors now have a direct path from the castle rock recreation center to the east Plum creek trail and beyond.

in addition to being a key link for castle rock, the completion of hangman’s gulch trail is also significant for the front range, because it forms the “crossroads” of the colorado front range trail, which will eventually take users to both chatfield state Park (via the east Plum creek trail) and cherry creek state Park (via the cherry creek trail).

Phase one, a 1-mile segment of 10-foot-wide concrete trail from front street to woodlands Boulevard was completed in 2012. the town then acquired the right of way for phase two from the union Pacific railroad, scott family and colorado department of transportation.

the second phase added 0.7 miles along the hangman’s gulch drainage/open space from front street, under interstate 25, to east Plum creek trail. Phase two included two drop structures, seven check structures, improvements to the i-25 and liggett road box culverts, debris and storm flow structure beneath the union Pacific railroad line, and

a spur connection to liggett road. castle rock Parks and recreation received a state trails grant for $193,166 to assist with construction and shared costs with the utilities stormwater division.Project costs:Phase one: $832,505, 0.8 miles (Budget $843,000)Phase two: $663,198, 0.7 miles (Budget $670,000)total project: $1,495,703, 1.5 miles (Budget $1,513,000)

RHyolite Bike paRk pRoJeCt

in 2013, the town added a session zone to the rhyolite Bike Park. the session zone includes: beginner, intermediate, advanced and return lines totaling nearly a half mile in length; 16 rollers; 10 jumps, 10 berms; and a steel wood decked curved wall ride. the new session zone allows users to develop riding skills at all levels. with help from staff, volunteers and contractor Progressive trail design, the sessions zone was completed in May 2013.Project costs:contract amount: $24,900in-house labor and materials: $5,000total project cost: $29,900

Red HaWk tRail pRoJeCt

started in 2012, this project aimed to curb erosion issues from the trail that impacted local residents. the trail upgrades were completed in april 2013.

Castle RoCk Parks & recreation annual RepoRt 20136

Page 7: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 20137

ColoRado BlueBiRd pRoJeCt

this highly successful program added three more sites (flagstone elementary, woodlands Bowl open space and red hawk ridge golf course) to the 20 sites previously managed by volunteers. volunteers checked 130 nest boxes at the 23 sites. there were 540 total fledged birds for 2013, which was a total increase of 21 percent over 2012.

interestingly, the program documented a rare occurrence of pink bluebird eggs in two successive clutches by the same female Mountain Bluebird, in the same nest box. this female laid pink eggs in the same nest box last year.

tRail pRoteCtion

to protect the east Plum creek trail from flooding, parks staff installed pond leveling devices along the creek. these innovative devices are inexpensive, easy to install and allow staff to keep beaver dams intact while controlling water levels.

tRail diReCtional siGns

new trail directional signs were installed at the intersections of east Plum creek trail and sellars gulch trail and at east Plum creek trail and hangman’s gulch trail. the signs identify the trail as a front range regional trail and provide direction and distances to important landmarks and destinations.

neW pRoGRaM - BasiCs oF BiRd WatCHinG

sixty residents attended the Basics of Bird watching class held in april at Philip s. Miller library. the group met a second time in May for a guided birding program along east Plum creek.

Wild in ouR toWn

town staff, in partnership with douglas county, hosted the fourth-annual Wild in Our Town program in May. More than 80 people attended the program to learn about local wildlife from town staff, douglas county open space staff, animal control and district wildlife managers.

natural resourcesoPen sPace andnatural resources

Page 8: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 20138

recreation

athleticsyouth program highlights: a partnership with the town of Parker allowed the youth softball program to expand and provide a much better experience than in prior years. little tykes soccer increased 23 percent with participation reaching nearly 1,000 kids. cougar track, which began in 2007 with 35 kids, is now up to 333 kids, nearly doubling 2012’s participation rates. Youth flag football participation increased by 42 players, bringing the total participation up to 413 kids.

adult program highlights: new in 2013, the athletics division added spring flag football to the adult sport lineup. this effort came after a successful inaugural fall league in 2012. there were eight teams in the spring, and the fall league doubled in size, growing to 10 teams.

sponsorships: in 2013, the athletics division received more than $20,000 in donations/sponsorships from local businesses. Major contributors included castle rock adventist hospital, Patriot Plumbing, Play it again sports, sports authority and image tek Photography.

admissiondaily visits to the recreation center•total daily visits – 9 percent increase over 2012 (316,921 visits)•senior visits – 11 percent increase (63,500 visits)•adult visits – 9 percent increase (205,252 visits)•Youth visits – 7 percent increase (48,169 visits)•family passes –7 percent decrease over 2012 (1,128 passes)

revenues stayed similar to 2012, bringing in an estimated $1.1 million.

special eventsdaddy-daughter Ball: the Beautiful Blue dance brought in just under 1,150 daddies and daughters to the annual event in february.

tri the Rock: the eighth annual youth triathlon saw a 12 percent increase in participation over 2012, with 560 racers registered. the event raised $5,600 for local area schools, bringing the race total to over $35,000 donated to physical education programs since 2006.

neW! Castle Rock Half Marathon: 2013 marked the inaugural race series in downtown including a 5-mile run, the rock challenge which includes an ascent up the town’s namesake, and the half marathon, which is run along the beautiful east Plum creek trail. the race reached maximum capacity of 400 runners in its first year.

pooch plunge: the doggie friendly swim at Butterfield crossing Pool raised $775 for the dumb friends league while 280 dogs got a break from the heat in the pool.

pedal the Moon: under the light of a full moon, more than 100 bikers made their way down east Plum creek trail 6-miles to festival Park where riders enjoyed prizes, snacks and wildly decorated bikes.

Page 9: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 20139

Youth programsadventure Club preschool: the preschool is licensed by the state of colorado. the program meets colorado’s early childhood requirements and recommendations and conducts assessments on all enrolled children twice a year. in addition, adventure club partners with the children’s hospital for rn delegation and trainings. adventure club had 81 Pre-k students and 48 Preschool students in 2013. all morning sessions were serving at full capacity.

youth classes: currently, the youth division offers 25 classes for ages ranging from 12 months to 12 years of age. these programs serve around 550 children per year.

tykes toyland: drop in childcare continues to run at full capacity daily.

Birthday parties: with birthday party rooms at Burgess Pool and at the recreation center leisure Pool, the recreation division was able to host 413 birthday parties this year. in addition to the leisure pool parties, staff incorporated jumping castle, dodge ball/basketball parties in the recreation center gymnasium.

FitnessClasses: fitness class attendance has been steady over 2012, with the average attendance holding at 13 per class.silversneakers classes are always full with an average class attendance of 21 participants, and the average visits per participant are right around 6 visits per month. the fitness division held a survey of class participants and the results were very positive. overall, customers are extremely satisfied with the classes and instructors.

new in 2013: in the fall of 2013, the fitness division started using a software program called groupexPro which helps organize classes, instructors and tracks class attendance. for recreation users there is a live version of the fitness schedule online that includes any changes in instructor, time or location. in the fall of 2013, the fitness division added Barre fitness. these classes topped the american college of sports Medicine fitness trends for 2013 and 2014, and our attendance numbers have been phenomenal since day one.

r.e.a.l. (recreation empowerment and active living)the r.e.a.l. program planned 20 fun and exciting events for participants in 2013. included were paintings on canvas, a rockies baseball game, karaoke singing, bowling, nature hikes, a camping trip, movie nights, swimming pizza party, and the fifth annual ski trip to winter Park. r.e.a.l hosted about 180 visits.

Page 10: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 201310

aquaticsprogramming:

•adult swim lessons increased 23 percent•scuBa open water dive increased 20 percent•stroke/conditioning clinics increased 25 percent•hosted the second annual castle rock Masters swim

meet with 93 participants (more than double last year’s attendance)

new programs gaining traction:

•Home school swim lesson program: provided 203 lessons to kids who are available during the slowest times mid-day on weekdays.

•The Castle Rock Dive Team: grew from just in-house diving to a competitive team traveling for meets.

the Castle Rock Cruisers swim team increased 16 percent, from 259 participants in 2012 to 308 in 2013. the program is at maximum capacity.

new water treatment: aquatics staff installed sphagnum Moss in the circulation systems of the lap pool and the hot tub resulting in significant improvement of the water quality and clarity. this cutting edge product naturally breaks down the bio-organics introduced to swimming pools by swimmers. in addition to cleaner and clearer water, the moss helps save on chemical costs by breaking down some of the organic material that would otherwise require oxidation via chlorine.

outdoor pools: Burgess Memorial Pool operated well in its second year after the remodel. Butterfield crossing Pool saw a slight increase in revenue over 2012, and continues to run at capacity during the summer with the cruisers swim team.

Burgess Memorial pool cost recovery

2011 2012 2013

Revenue $26,504 $75,467 $70,177admission $7,045 $18,061 $14,911Cost Recovery 56% 149% 148%

rink at the rock in 2013-2014, the recreation division partnered with the downtown Merchants association (dMa) to operate rink at the rock. the recreation division entered into a management agreement with the dMa to provide programming, labor, financial reporting and operations for the rink from nov. 23 through feb. 16. overall, the rink had a successful second season in downtown castle rock.

Page 11: 2013 Parks and Recreation Annual Report

in addition to planning for the next big park in town, Parks staff spends a great deal of time and effort maintaining and improving our expansive park system. Parks staff completes a wide variety of projects every year that address safety issues and keep our parks and trails functional for our growing community. Below are just a few of the projects Parks staff tackled in 2013.

Butterfield ball field improvements: Parks staff added chain link fence to the existing backstop down the first and third base line. this new fence enhances player safety and increases field use by allowing more teams to safely use the fields.

Centennial ball field improvements: staff expanded the infield to a full-size field so it could be more utilized and programmed for baseball and softball leagues.

Mitchell Gulch park: staff members constructed a new ball field at the park. staff brought in 1,100 yards of dirt from Philip s. Miller Park and completed the grading process in early 2013. the ball field was open for use all summer.

Rock park: staff added 120 feet of smooth strand wire fencing at rock Park to keep hikers on the designated path to prevent social trails. staff also added 100 feet of fencing on the west-facing portion of the rock to prevent wash-outs that were creating an issue for the church located at the base.

Metzler Ranch park: in an effort to maintain the Metzler ranch Park landscape and for the safety of park users, the Parks team engaged in a project to control landscape erosion due to drainage challenges. Parks staff focused their efforts on landscape aesthetics, durability and safety. the Parks team installed 30 feet of designer cinder block to create a 5-foot retaining wall in a mortar-less system that accommodated the grade change. the new retaining wall adds character and safety to the Metzler ranch Park Pavilion.

safety: in an effort to protect town property and reduce vandalism at Butterfield crossing and founders Parks, and to assist law enforcement, the Parks division installed six heavy surveillance and high resolution infrared vision cameras. the swan Pro service ultimate optical Zoom security cameras will enable officials to view unlawful activity that may occur in or around the parks. additionally, this security will enable law enforcement to apprehend, identify and prosecute suspects. also in november, a 25-foot light pole was installed at Mitchell gulch Park in order to equip a solar powered camera in efforts to reduce vandalism.

Parks

Castle RoCk Parks & recreation annual RepoRt 201311

Page 12: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 201312

2013 Program Highlights

approximately 1,100 volunteers contributed more than 3,900 hours to help the department in 2013. for details about specific projects and a list of volunteers and volunteer groups, visit crgov.com/postpartners.

keepers of the Rock: celebrating their 10-year anniversary of adopting rock Park, the “keepers,” in cooperation with castle rock’s teen court Program, contributed 736 hours to trail maintenance at the park this year. over the decade, keepers have contributed 9,881 hours of service, which equates to a $218,765 value in contributed labor.

Hangman’s Gulch trail opening and post partner adoption: the douglas county high school cheerleaders cleaned up trash along hangman’s gulch trail in preparation for the trail’s grand opening as part of castle rock’s national trail day celebration.

Ray Waterman memorial and Cornerstone tribute: in an effort to leave a living legacy to ray waterman, past castle rock Mayor and dchs teacher, waterman’s family created a Memorial fund with the Post Partners Program. efforts resulted in the planting of more than a dozen new trees along sellars gulch trail, where ray and his wife, linda, often walked. key Bank employees volunteered to plant the trees as part of their “neighbors Make a difference day.” with remaining funds, a memorial bench was installed at the end of cantril street. additionally, town council unanimously approved a cornerstone tribute plaque for ray waterman, which was installed near the grove of trees and memorial bench.

tree painting project makes local and national news: almost 20 scouts, parents and other volunteers from local Boy scout troop 765 painted more than 60 select native trees at hier & gannon open space along east Plum creek with a sand-paint mix as protection from girdling and felling by beavers. Media coverage of the work included an article in Your hub, denver Post and a television interview on kdvr-denver fox 31 news. as a result of the news coverage, Parks staff fielded questions from a park manager in washington county, utah, looking for assistance with similar tree girdling and felling issues.

post partnersvolunteerpost partners

Page 13: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 201313

volunteer Connect: through the Partnership of douglas county governments, the town of castle rock collaborated with staff members from lone tree, highlands ranch, castle Pines, Parker, larkspur, douglas county libraries, douglas county school district and douglas county to develop a new county-wide volunteer portal website,at volunteerconnectdc.org. Parks and recreation will be using this newly developed website as a resource to recruiting volunteers for our events and Post Partner activities.

eagle scout projects:

•construction of 10 bluebird nest-boxes, which were used for site expansion and nest-box replacement – Michael osborne, troop 62 in colorado springs (38.5 hours).

•construction and installation of six bluebird nest-boxes for site expansion at red hawk ridge golf course. these nest-boxes also included snake guards over the t-poles used to hold the boxes – alex cromwell, troop 261 (78 hours).

•four split-log benches installed at ridgeline open space – ryan remer, troop 465 (135 hours).

tHank you to ouR sponsoRs

dog waste stations: got2go Petsitting, Plum creek veterinary services, rest assured Pet care, sparkle Bark, suzy’s doggie delights, tails up, and the Pooch Mobile

Community garden: dutch heritage gardens donated 50 tomato plants, peppers and miscellaneous herbs

eagle scout projects and Colorado Bluebird project: the home depot

Festival of trees: Blue spruce animal clinic, castle rock historical society, castle rock services, chick-fil-a, guaranty Bank, kids nite out, rest assured Pet care, teen advisory group (tag), treasures on Park st. and the douglas/elbert county task force, tropical Paradise, and wedding treasures

Memorial Bench program: in memory of Jeff whitacre at Bison Park, Jeff Maxey along hangman’s gulch trail, and ray waterman along sellars gulch trail

Memorial tree program: donation from the daughters of the american revolution-Parker chapter and a flowering crabapple tree planted in memory of annabelle Matney at Matney Park

operation Castle Bloom: dutch heritage gardens donated flowers for the town’s 25 large planter boxes, the bridge column vessels, and many of the town’s planting beds.

Page 14: 2013 Parks and Recreation Annual Report

golf operations•Totalrevenuegrewalmost1percentdespitepoorweatherinthe

spring and coming off a great revenue year in 2012.

•Revenueperroundgrewby7percent,whichindicatesthecourse is providing value and that golfers are spending more during each visit. this growth happened without an increase in fees.

•Tournamentrevenuegrewby12percent,demonstratingthatred hawk ridge provides excellent service and a high-quality product.

•Men’sClubroundsgrewby6percentdespitethefactthatthemembership count stayed the same.

•AnalreadyactiveandlargeLadies’Clubgrewby6percentcompared to 2012.

• co-ed league membership grew by 19 percent over 2012. this type of golf league is gaining in popularity because it is all about fun and spending time with significant others.

•CompetitiveLeaguemembershipgrewby24percentover2012. this is a positive sign that this type of offering is important to our golf community.

golf

Castle RoCk Parks & recreation annual RepoRt 201314

Page 15: 2013 Parks and Recreation Annual Report

certified audubon cooperative sanctuaryin 2013, red hawk ridge achieved all six categories of certification for the audubon cooperative sanctuary Program for golf courses. the six categories include:•environmental Planning

•water conservation

•outreach and education

•water quality management

•chemical use reduction and safety

•wildlife and habitat management

clubhouse grill• food and beverage revenue grew by 10 percent

with per-round revenue increasing 17 percent, demonstrating that the clubhouse grill is offering quality items and getting them out in a timely manner.

course maintenance•the maintenance crew added 150 tons of recycled

asphalt to the cart paths on the seventh and 13th holes.

• staff finished growing in 8,000 square feet of bent grass on the nursery renovation so that there will be sod for tee box leveling in 2014.

• rhyolite rock edges were put in on the first, second, 11th and 18th holes to buffer cart traffic wear areas.

• drainage lines were installed on the third and 12 holes to firm up wet areas.

•earth work was completed on the 15th tee to improve water run-off.

other highlights• red hawk ridge was featured on altitude sports on the

golf @ altitude program throughout the summer months.• staff at the course was able to extend the life of the

golf carts beyond the normal lease and save the course more than $70,000 in lease payments.

• the course issues email surveys to all players every year. the course continued to receive positive reviews for conditions and overall enjoyment.

Castle RoCk Parks & recreation annual RepoRt 201315

“congratulations on being designated as a certified audubon cooperative sanctuary! You have shown a clear commitment to enhancing wildlife habitat, protecting water quality, conserving resources, and education. through preserving and managing water, wildlife, and other natural resources, you are significantly contributing to the conservation of biological diversity at a time when the rates of species extinction and habitat loss are at an unprecedented high. Your efforts are contributing to a nation-wide system of lands that are being managed for wildlife habitat and natural resource conservation. Perhaps more importantly, you are helping to serve as a model for making decisions in the future that benefit both business and our environment. as you continue to pursue a higher environmental standard through re-certification, the lasting impacts of your efforts will continue to grow. keep up the good work!” - audubon cooperative sanctuary Program for golf courses

auduboninternational.org

Page 16: 2013 Parks and Recreation Annual Report

24+22+8+14+3213+5+7+17+4+1+531+2+3+55+11+2+1+6+8+111+1+2+5+10+35+46

Castle RoCk Parks & recreation annual RepoRt 201316

Tax used per resident for services 2013 2012recreation programs $4.82 $6.95

recreation center (including all pools) $25.21 $21.59

developed parks $39.75 $42.95

open space $5.18 $5.51

streetscape/trails $8.70 $8.67

golf (funded by user fees) $0.00 $0.00

unaudited financial information *Parks, open space and trails expenses are budgeted in the general fund. a portion of the sales tax in the general fund is marked for these expenses. **a rink at the rock cost center was added to the recreation budget for reporting purposes. the revenues and expenses in this cost center did not affect the overall budget.

Parks, open space and trailsParks revenue $196,725

expenditures $3,105,821

Parks administration $383,219

developed parks $1,969,582

open space $281,060

streetscape/trail maintenance $471,960

total expenditures $3,105,821

recreation**

revenues

expenditures expenditures

golf

Based on a population of 54,238 51,573

the Parks and recreation department operates on three funds: the community center fund, the Parks fund and the golf course fund. the community center fund is used to operate the recreation center, aquatics facilities and recreational programs. it receives revenue through sales tax, building-use tax, motor vehicle tax and user fees. the Parks fund is used for park, open space and trail maintenance and administration. it receives revenues from the town’s general fund. the golf fund operates on user fees.

financialfinancialoverviewoverview

Youth, teen & toddler$268,707

special events $96,317

special interest $42,959

fitness$256,959

Management fees$495,504

special interest$42,585

Youth, teen & toddler$350,690

debt and financing$40,761

Youth programs/lessons$19,387

other income$124,582

driving range$124,643

revenues

transfer to golf$80,000

cost per rounddebt service $17.79

administration $5.83

golf operations $16.38

Maintenance $24.20

total cost per round $64.20

fitness $53,685

special events $81,691

Maintenance$818,369

food and beverage$364,570

administration $197,033

debt service$601,594

golf operations$553,759

greens fees$1,475,022

food and beverage$462,097

golf carts$366,821

Pro shop sales$186,758

fees and other revenue$1,753,018

athletics$492,689

taxes$2,274,603

athletics$501,897

recreation center$2,398,768

capital improvements $146,160

Page 17: 2013 Parks and Recreation Annual Report

capital fundscapital funds are used for specified projects. all the funds may not be entirely used every year, so the balances in the accounts are rolled over from year-to-year to ensure the dedicated money will be available only for the particular projects related to that fund.

paRks and ReCReation Capital Fund

in 2013, the recreation capital fund and the Parks capital fund were combined to create one capital fund for the department. this fund accounts for the construction, expansion and improvement of town parks and recreation facilities. the primary source of revenue for this fund is from development impact fees collected when a building permit is issued. in 2013, the fund received the bond proceeds for the fieldhouse at Miller Park ($9.2 million) as well as a transfer from the conservation trust fund to prepare for the continued construction of Miller Park in 2014.

2013 actual expenses: $6,124,403 2013 revenue: $20,207,913

2013 projects •PhilipS.MillerPark •Otherparkimprovements

ConseRvation tRust Fund

the conservation trust fund has been used for open space purchases and the development and renovation of qualifying parks, recreation facilities and parks infrastructure. this fund receives revenues from the colorado lottery, based on a per capita distribution; the douglas county open space tax shareback, based on motor vehicle registration in municipalities; and recreational license fees from pavilion and field rentals. funds from conservation trust were transferred to Parks capital in order to fund Miller Park construction.

2013 actual expenses: $2,248,843 2013 revenue: $2,523,693

2013 projects •RhyoliteBikeParkimprovements •Parkandtrailsigns •MillerParktransfer •POSTPartnerVolunteerProgram

GeneRal Fund (tRail iMpRoveMents)

the town’s general fund is used for a variety of government services, including some Parks and recreation projects. Projects from the fund this year include annual trail improvements and construction, and various park improvements. this fund receives $500,000 annually from the town’s transportation fund, in addition to outside contributions for trail construction and improvements.

2013 actual expenses: $640,683 2013 revenue: $693,166 (trail grant earned: $193,166)

2013 projects •Hangman’sGulchTrail •GilbertStreetlandscaping •Annualtrailimprovements

unaudited financial information

Castle RoCk Parks & recreation annual RepoRt 201317

Page 18: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 201318

lookingaheadahead

new indoor recreation space 2014 is going to bring some exciting new recreational spaces to castle rock. this new fieldhouse at Miller Park includes carefully selected amenities that will allow the recreation staff to provide new and expanded programming opportunities.

aquatics center: the new indoor leisure pool offers additional play space to the castle rock recreation center’s very popular leisure pool. four lap lanes will give the many swim teams and lap-swimmers additional space and will give more teaching areas for our swim lesson programs.

youth recreation: the fieldhouse at Philip s. Miller Park will improve the recreational options for youth in the community with the trampoline area and indoor playground.

synthetic turf field and warm-up area: this functional area will allow for many programming options for all ages including indoor athletics, new fitness classes, an indoor batting cage, sport training classes and more.

new and expanded programmingthe fieldhouse and aquatic center is going to allow for some new programming options in addition to expanding upon some of the recreation division’s current near or at capacity programs.

Just some of the new and expanded program ideas include:•swim lessons• indoor athletic leagues for youth, adults and seniors•boot-camp style fitness classes•sport training classes•birthday parties•trX classes•youth and toddler play groups

fieldhouse and aquatic centerat Philip S. Miller Park

Page 19: 2013 Parks and Recreation Annual Report

Castle RoCk Parks & recreation annual RepoRt 201319

other Parks and recreation projects

Castle RoCk ReCReation CenteR ReModel

with the Parks and recreation administrative offices moving to Philip s. Miller Park, the castle rock recreation center will undergo a remodel in 2014. this work will include conversion of the garage and administrative areas into functional fitness space along with new circuit weight equipment in the current lifting area.

east pluM CReek tRail (soutH)

as part of the town’s effort to complete its main north-south spine trail – the east Plum creek trail – staff will finalize conceptual plans to continue the trail south from its current location at south Perry street to crystal valley Parkway, connecting the southern portion of town to downtown castle rock and beyond. once the concept is complete, staff will advertise for design and engineering consultants to complete construction documents in preparation for trail construction.

sHade stRuCtuRe and ConCRete RepaiRs at MetzleR RanCH paRk

there are plans for a new shade structure near the playground at Metzler ranch Park. this project would provide greatly needed relief from the sun at that playground. in addition, there are repairs to concrete sidewalk in the same area.

pHilip s. MilleR paRk

in order to meet our phase one goals for Miller Park, $1 million is included in the 2014 budget to complete the park pavilions, adventure playground and trail system. these improvements will be added to the turner construction contract in order to meet the fall 2014 project completion date.

Parks and recreation staff, along with leaders from the weston group and royal gorge Zip line tours, will work together to develop recommendations for the public/private partnerships. these opportunities will be further evaluated during 2014 and presented to town council for consideration.

Page 20: 2013 Parks and Recreation Annual Report

Castle RoCk Parks and recreation 2301 woodlands Blvd. castle rock, co 80104 303-814-7444 crgov.com/parks

castle rock half Marathoninagural run through downtown and East Plum Creek Trail


Recommended