Date post: | 04-Apr-2018 |
Category: |
Documents |
Upload: | loricla123 |
View: | 225 times |
Download: | 0 times |
of 33
7/29/2019 20130220 Channel Stability - Vinje
1/33
ThiefWatershed
CleanWaterWork
Geomorphicassessmentofstreamsandchannelsthroughoutthewatershed
Channelstability
and
bank
erosion
Sourcesofsediment streamchanneloroutsidesource
Linksto
impairments
and
suggestions
for
improvements
DaveFriedl,JasonVinje,MinnesotaDNR
7/29/2019 20130220 Channel Stability - Vinje
2/33
RiverStabilityTheabilityofastreamtotransportthesediment
and
flows
produced
by
its
watershed,whilemaintainingaconsistentdimension,pattern,andprofilewithoutaggradingordegrading(DaveRosgen,1996).
7/29/2019 20130220 Channel Stability - Vinje
3/33
Dimension
Pattern
Profile
(Topview)
(CrossSection)
WaterSurfaceStreamBedThalweg
Bankfull
LongitudinalProfile
7/29/2019 20130220 Channel Stability - Vinje
4/33
ENERGY PATHWAYS / CONNECTI VI TY
Month
0
50
100
150
200
250
300
FLOW(cfs)
J F M A M J J A S O N D
HYDROLOGY
GEOMORPHOLOGY
BIOLOGY
COMPONENTS OF RIVER SYSTEMS
WATER QUALIT Y
7/29/2019 20130220 Channel Stability - Vinje
5/33
7/29/2019 20130220 Channel Stability - Vinje
6/33
Variable C G G F F CInstreamCover
OverheadCover
SubstrateComposition PoolQuality
HoldingCoverVelocity
Temperature DissolvedOxygen
MacroInvertebrates
SpawningHabitat
Diversity
RearingHabitat
IBIScore
SedimentSupply
BankErosion
AquaticHabitatResponse
StreamTypeSuccession
7/29/2019 20130220 Channel Stability - Vinje
7/33
IndicesofChannelStability BHR Incision
Entrenchment
Vegetation
Depositionalpatterns Channelsuccession Dimension
Pattern
Profile
Aggradation
Degradation
Competence
Capacity
BankErosionRates
7/29/2019 20130220 Channel Stability - Vinje
8/33
Root
Depth
RootDensity
StudyBankHeight
BankfullHeight
45Surface
Protection
VeryHighBankErosionHazardIndex
BankMaterial
and
StratificationAdjustments
7/29/2019 20130220 Channel Stability - Vinje
9/33
BankAngle55
BankfullHeight
StudyBank
Height
RootDepth
SurfaceProtection
80%
ModerateBEHI
7/29/2019 20130220 Channel Stability - Vinje
10/33
LowBEHI,StudyBankSite
7/29/2019 20130220 Channel Stability - Vinje
11/33
7/29/2019 20130220 Channel Stability - Vinje
12/33
7/29/2019 20130220 Channel Stability - Vinje
13/33
7/29/2019 20130220 Channel Stability - Vinje
14/33
7/29/2019 20130220 Channel Stability - Vinje
15/33
Virtuallynochangeintheriffleareaorelevation2011to2012hydrauliccontrolremainsthesame.
7/29/2019 20130220 Channel Stability - Vinje
16/33
7/29/2019 20130220 Channel Stability - Vinje
17/33
7/29/2019 20130220 Channel Stability - Vinje
18/33
7/29/2019 20130220 Channel Stability - Vinje
19/33
Toepin
Studybanklocation
Crosssectionbankpin
7/29/2019 20130220 Channel Stability - Vinje
20/33
7/29/2019 20130220 Channel Stability - Vinje
21/33
7/29/2019 20130220 Channel Stability - Vinje
22/33
7/29/2019 20130220 Channel Stability - Vinje
23/33
7/29/2019 20130220 Channel Stability - Vinje
24/33
7/29/2019 20130220 Channel Stability - Vinje
25/33
7/29/2019 20130220 Channel Stability - Vinje
26/33
7/29/2019 20130220 Channel Stability - Vinje
27/33
7/29/2019 20130220 Channel Stability - Vinje
28/33
7/29/2019 20130220 Channel Stability - Vinje
29/33
7/29/2019 20130220 Channel Stability - Vinje
30/33
7/29/2019 20130220 Channel Stability - Vinje
31/33
7/29/2019 20130220 Channel Stability - Vinje
32/33
7/29/2019 20130220 Channel Stability - Vinje
33/33
Workthat
will
continue
Assesschannelsedimentsourcesandstream
stability
Identifyandprioritizeproblemareastorestore
orapply
BMPs
Prioritizeandprotectatrisknonproblemareas
Identifybest
places
and
ways
to
use
CWL
funds
DaveFriedlMNDNR
218.846.8385
Protect the best and
restore the rest.-Rosgen