+ All Categories
Home > Documents > 20130220 Channel Stability - Vinje

20130220 Channel Stability - Vinje

Date post: 04-Apr-2018
Category:
Upload: loricla123
View: 225 times
Download: 0 times
Share this document with a friend

of 33

Transcript
  • 7/29/2019 20130220 Channel Stability - Vinje

    1/33

    ThiefWatershed

    CleanWaterWork

    Geomorphicassessmentofstreamsandchannelsthroughoutthewatershed

    Channelstability

    and

    bank

    erosion

    Sourcesofsediment streamchanneloroutsidesource

    Linksto

    impairments

    and

    suggestions

    for

    improvements

    DaveFriedl,JasonVinje,MinnesotaDNR

  • 7/29/2019 20130220 Channel Stability - Vinje

    2/33

    RiverStabilityTheabilityofastreamtotransportthesediment

    and

    flows

    produced

    by

    its

    watershed,whilemaintainingaconsistentdimension,pattern,andprofilewithoutaggradingordegrading(DaveRosgen,1996).

  • 7/29/2019 20130220 Channel Stability - Vinje

    3/33

    Dimension

    Pattern

    Profile

    (Topview)

    (CrossSection)

    WaterSurfaceStreamBedThalweg

    Bankfull

    LongitudinalProfile

  • 7/29/2019 20130220 Channel Stability - Vinje

    4/33

    ENERGY PATHWAYS / CONNECTI VI TY

    Month

    0

    50

    100

    150

    200

    250

    300

    FLOW(cfs)

    J F M A M J J A S O N D

    HYDROLOGY

    GEOMORPHOLOGY

    BIOLOGY

    COMPONENTS OF RIVER SYSTEMS

    WATER QUALIT Y

  • 7/29/2019 20130220 Channel Stability - Vinje

    5/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    6/33

    Variable C G G F F CInstreamCover

    OverheadCover

    SubstrateComposition PoolQuality

    HoldingCoverVelocity

    Temperature DissolvedOxygen

    MacroInvertebrates

    SpawningHabitat

    Diversity

    RearingHabitat

    IBIScore

    SedimentSupply

    BankErosion

    AquaticHabitatResponse

    StreamTypeSuccession

  • 7/29/2019 20130220 Channel Stability - Vinje

    7/33

    IndicesofChannelStability BHR Incision

    Entrenchment

    Vegetation

    Depositionalpatterns Channelsuccession Dimension

    Pattern

    Profile

    Aggradation

    Degradation

    Competence

    Capacity

    BankErosionRates

  • 7/29/2019 20130220 Channel Stability - Vinje

    8/33

    Root

    Depth

    RootDensity

    StudyBankHeight

    BankfullHeight

    45Surface

    Protection

    VeryHighBankErosionHazardIndex

    BankMaterial

    and

    StratificationAdjustments

  • 7/29/2019 20130220 Channel Stability - Vinje

    9/33

    BankAngle55

    BankfullHeight

    StudyBank

    Height

    RootDepth

    SurfaceProtection

    80%

    ModerateBEHI

  • 7/29/2019 20130220 Channel Stability - Vinje

    10/33

    LowBEHI,StudyBankSite

  • 7/29/2019 20130220 Channel Stability - Vinje

    11/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    12/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    13/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    14/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    15/33

    Virtuallynochangeintheriffleareaorelevation2011to2012hydrauliccontrolremainsthesame.

  • 7/29/2019 20130220 Channel Stability - Vinje

    16/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    17/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    18/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    19/33

    Toepin

    Studybanklocation

    Crosssectionbankpin

  • 7/29/2019 20130220 Channel Stability - Vinje

    20/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    21/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    22/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    23/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    24/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    25/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    26/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    27/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    28/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    29/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    30/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    31/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    32/33

  • 7/29/2019 20130220 Channel Stability - Vinje

    33/33

    Workthat

    will

    continue

    Assesschannelsedimentsourcesandstream

    stability

    Identifyandprioritizeproblemareastorestore

    orapply

    BMPs

    Prioritizeandprotectatrisknonproblemareas

    Identifybest

    places

    and

    ways

    to

    use

    CWL

    funds

    DaveFriedlMNDNR

    218.846.8385

    [email protected]

    Protect the best and

    restore the rest.-Rosgen


Recommended