PLANET AGILE17E BPUG SEMINAR
Projecten opleveren met het oog op
.
Projecten opleveren met het oog op toekomstige generaties:
Hoe doe je dat met Agile?
Manfred van Veghel
Projectmanagement en Duurzaamheid
1992: Rio Declaration: Severn Suzuki:
The Voice of Our Children2008: IPMA World Congress
Key Note by Mary McKinlay
“The further development of the project
management profession requires project managers to take responsibility for
sustainability”.
www.bpug.nl 2
2009: book “Sustainable
Development & Project
Management” (Eid,
2009) Mohamet Eid:
“Project management standards fail to
address sustainability”
19 mei 2014: Wubbo Ockels:
Happy Energy. The movement for a sustainable Earth and Us; Humanity.
Wat kun jij doen als (Agile) Projectmanager?
• Sta eens stil bij de impact die jouw project heeft op de wereld?
• Ga na welke duurzame componenten er zitten in jouw project?
• People
www.bpug.nl
• People
• Planet
• Profit
• Processen
• Producten
• Leer meer over toepasbare Duurzaamheidstechnieken, zoals P5™.
• Pas deze technieken toe en verander je gedrag, processen en producten.
3
Wat is P5™?
• P5™ is de link tussen:
• de Projectlevenscyclus;
• de ‘Triple Bottom Line’ (People, Planet, Profit);
• het GRI G4 Framework (Global Reporting Institute);
• de 10 principes van de VN Global Compact;
• de Post-2015 Engagement Architecture.
• P5™ is een tool voor projectmanagers die:
• ingezet kan worden vanaf de start van het project;
www.bpug.nl 4
• ingezet kan worden vanaf de start van het project;
• als basis dient voor het Project Duurzaamheidsmanagementplan.
• een 360 graden beeld geeft over:
• hoe de waarde van het project kan worden verhoogd;
• wat de impact van het project is op de omgeving;
• gaan voor minder energiegebruik, minder watergebruik, minder afval, minder transport, een lagere impact op de omgeving, een goede balans tussen mens en werk, behoud voor toekomstige generaties.
Het P5™ overzicht
www.bpug.nl 5
Het P5™ overzicht
www.bpug.nl 6
De P5™ impact analyse
Een samenvatting van
een P5™ impact
analyse en de stappen
die wenselijk zijn om de
negatieve gevolgen te
reduceren en kansen
www.bpug.nl 7
reduceren en kansen
mogelijk te maken.
Duurzaam Agile Projectmanagement
1. Focus on the business need
2. Deliver on time
3. Collaborate
4. Never compromise on quality
5. Build incrementally from firm foundations
www.bpug.nl 8
5. Build incrementally from firm foundations
6. Develop iteratively
7. Communicate continuously and clearly
8. Demonstrate control
9. Sustainable processes and outputs
Duurzaamheid Agile PM® Practices
Termen en Definities :•Duurzaamheid
•Duurzaamheidsrapportages
•Maatschappelijke verantwoordelijkheid
•Maatschappelijke duurzaamheid
•Economische duurzaamheid
•Milieuduurzaamheid
•ISO 21500
•ISO 14001
•ISO 26000
•ISO 50001
www.bpug.nl 9
•Milieuduurzaamheid
•VN Global Compact
•People, Planet, Profit
•P5 Concept
•PESTLE
•Duurzaamheidsmanagementplan
•Energiemanagementsysteem
•ISO 50001
•ISO 9001
•Primaire Energiebronnen
•Secondaire Energiebronnen
•Kwaliteit
•Milieu
•Arbeidsomstandigheden
Duurzaam Agile Projectmanagement
A Sustainable AgilePM® project has defined lifecycle and products for which an impact analysis has been carried out to minimize the negative impact on people, planet
and optimize profit, process and products.
www.bpug.nl 10
and optimize profit, process and products.
Agile PM® Practices:1.Facilitated Workshops
2.MoSCoW Prioritization
3.Iterative Development
4.Timeboxing
5.Modelling
6.Sustainability
Corporate Social Responsibility (CSR) Officer
• prepares and presents
• the corporate social responsibility report
for the company
• the regulatory financial statements
• helps to implement an open, transparent
communication policy that serves to
formulate the company's management
policies.
CSR
Officer
Rollen en Organisatie SAPM®
www.bpug.nl 11
Documenten SAPM®
Business:
• 1.1 Terms of Reference
• 2.1 Feasibility Assessment
• Outline Business Case
• Outline Solution
• 3.1 Business Foundations
• Business Vision
• Detailed Business Case
6.1 Benefits Assessment
Solution:
• 3.3 Solution Foundations
• 4.1 Evolving Solution
• 4.2 Solution Assurance Pack
• 5.1 Deployed Solution
Management:
• 2.2 Outline Plan
• 2.2.1 P.A.Q.
• 2.3 Sustainability Management Plan
• 3.4 Management Foundations
• 3.5 Delivery Plan
• 4.4 TimeBox Plan
www.bpug.nl 12
• 6.1 Benefits Assessment • 4.3 Deployment Plan
• 4.5 TimeBox Review Record
• 5.2 Project Review Record
P5™ in de Projectlevenscyclus
PRISM® Activiteiten Agile PM® Fase PRINCE2® Proces
Review Duurzaamheidsdoelen van de
OrganisatiePre-Project Opstarten van een Project
Opstellen Globale Business Case
Feasibility Phase Opstarten van een Project
Afstemming tussen Business Case en
Milieumanagement systemen
Uitvoeren P2 Impact Analyse
www.bpug.nl 13
Definieer Duurzaamheidsdoelen
Opstellen Globale
Duurzaamheidsmanagementplan
Vaststellen
DuurzaamheidskwaliteitscomponentenFoundations Phase Initiëren van een Project
Duurzaamheidsmanagementplan Afronden
Duurzaamheidsbijeenkomst met
DuurzaamheidsmedewerkerEnd of Deployment Phase Afsluiten van een Project
Processen SAPM®
www.bpug.nl 14
Wat nu?
Download:
•The P5™ Standard: http://www.greenprojectmanagement.org
•More information on SAPM® at: htt p://www.greenprojectmanagement.org/certification/the-gpm-m-certification/gpm-m-technical-papers
Volg een training:
•PRISM® Foundation, Practitioner, Integration
•SAPM® of SP2®
www.bpug.nl 15
•SAPM® of SP2®
Lees over Duurzaamheid en Projectmanagement:
•Duurzaam Projectmanagement: De nieuwe realiteit van de projectmanager (2014)
Ontwikkel mee:
•IPMA_NL Interessegroep Duurzaam Projectmanagement: http://www.ipma-nl.nl/groepen/interessegroepen/duurzaamheid-voor-projecten-en-programmas
Voor meer informatie:
Manfred van Veghel
06-50288086
www.oppidum.nl