2014
External Review Team Conference Call:Preparing the Team for Off-site Review Work
<insert date>
2014
Purpose
• Prepare team members for off-site review work
• Discuss External Review Team Workspace
• Provide context of the system • Discuss schedule/logistics• Q & A
External Review Team Member Training
• Online team member training is optional for fall, 2014.
• Online team member training is required beginning January, 2015.
• Asynchronous training sessions
https://advanced.instructure.com/enroll/DNMHNT
2014
Home Tab
2014
School and System Expectations
<insert appropriate information about school – see examples below>• New state mandates – Common Core Standards– Assessment System– Program Review– Teacher Evaluations
• School closings and reconfigurations• Systems Accreditation used to validate
and guide strategic direction
• Meet AdvancED Accreditation Standards for Quality
• Implement a continuous improvement process • Conduct Internal Review
• Executive Summary• Standards Self Assessment • Stakeholder Feedback Diagnostic• Student Performance Diagnostic• Improvement Plan• Assurances
• Host External Review• Respond to Improvement Priorities
2014
<insert name of system>
<insert appropriate information about school – see examples below>• New state mandates – Common Core Standards– Assessment System– Program Review– Teacher Evaluations
• School closings and reconfigurations• Systems Accreditation used to validate
and guide strategic direction
2014
Index of Education Quality™
The Index of Education Quality provides a holistic measure of overall performance based on data aggregated from each AdvancED Standard and diagnostic results from student, parent and staff/teacher surveys
The work of the External Review Team will be centered around the Domains of the IEQ.
2014
Team Member Assignments
• Team Members will be assigned to a Standard and an IEQ Domain.– Standard assignment – responsible for leading
the team in the discussion and analysis of the evidence found.
– IEQ Domain – responsible for working with the Domain team to make connections between related Indicators and supporting evidence.
• All Team Members will individually rate every indicator and Evaluative Criteria.
2014
Team Member Assignments
Team Member
1 – insert name, insert name2 – insert name, insert name3 - insert name, insert name4 - insert name, insert name5 - insert name, insert name
Standards and IEQ DomainsTeaching and Learning Impact• Standard 3 – Teaching and
Assessing for Learning• Standard 5 – Using Results for
Continuous ImprovementLeadership Capacity• Standard 1 – Purpose and
Direction• Standard 2 – Governance and
LeadershipResource Utilization• Standard 4 – Resources and
Support Systems
2014
Team Member Off-site Review Work
• Review/study Self-Assessment (SA) and Executive Summary (ES)– Are the artifacts relevant to standard indicators?– Does the artifact(s) inform the standard indicator?– How?
• Use the External Review Team Workbook to record your review work:– Questions to ask stakeholders– Artifacts to review– Patterns and/or trends– Successes and/or challenges– “Listen for’s” during interviews and presentations– Potential powerful practices and opportunities for improvement
• Review institution’s website – Insert website address
2014
• Review additional documents– Stakeholder Feedback and Student
Performance diagnostics – System Improvement/Strategic Plan– Assurances
• Team members should be prepared to share an overview of the evidence for their assigned standard and IEQ Domain during team meeting on-site (Sunday
• Bring your laptop (optional)
Team Member Off-site Review Work
2014
Observing Effective Learning Environments
Purposes of observation• Team members will use the Effective Learning
Environment Observation Tool™ (eleot™) • Identify and document observable evidence of the
classroom environments conducive to student learning
• Results used to corroborate information obtained from
• Interviews• Artifacts• Student performance data• Stakeholder feedback data
© 2014 AdvancED
2014
External Review Schedule
Sunday - Arrival at hotel Team work session # 1 / Prepare for Day 1
Monday System presentation/Leadership interviews Interviews with stakeholders (BOE, System Level
stakeholders) Evening work session # 2 / Prepare for Day 2
Tuesday School presentation Interviews with stakeholders / classroom
environment observations Evening work session # 3 / Prepare for Day 3
2014
External Review Schedule
Wednesday Clarify unknowns / interviews Work session # 4 (Final work session) -
Discussions / Deliberations Prepare Exit Report Meet with Head of System / Superintendent Deliver Exit Report to stakeholders
2014
Logistics
Insert the following information:• Hotel name, address, phone, website
Check-in time• LE cell number• Team Work Session # 1 – insert meeting
time• Team Dinner – insert time
2014