Temporary bracing of the structure in the Basement allowing larger foundations to be placed under the columns
Concrete encased columns extend through the existing roof with a new steel structure above. An interstitial Mechanical level, between the existing roof and the new third floor, has been incorporated for great HVAC efficiency