21
6/19/2014 1 Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Milton Madison Bridge Slide Kentucky Society of Professional Engineers May 23 rd , 2014 – Lexington KY Project Partners Milton, KY Madison, IN The Challenge Existing Bridge 80+ year old bridge Structurally Deficient Functionally Obsolete Sufficiency Rating of 6.5 Remaining life <10 years Constructible Affordable Replacement Bridge
Transcript
Page 1: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

1

Aaron L. Stover, PE, SEMichael Baker Jr., Inc.

Milton Madison Bridge Slide

Kentucky Society of Professional EngineersMay 23rd, 2014 – Lexington KY

Project Partners

Milton, KY

Madison, IN

The Challenge

Existing Bridge

80+ year old bridge

Structurally Deficient

Functionally Obsolete

Sufficiency Rating of 6.5

Remaining life <10 years

Constructible Affordable Replacement Bridge

Page 2: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

2

Presentation Outline

Project Overview

Maintenance of Traffic

Temporary Piers

Truss Restraints

Bearings and Slide Harnesses

Dislodged Bearing

Span D Slide

Truss Slide

Open to Traffic

4

Markland Dam

Project Site

I-275

I-65

Cincinnati

Louisville

LocationOne of two Ohio River bridges between Cincinnati and Louisville

I-65 Bridge - 46 milesMarkland Dam - 26 milesI-275 Bridge – 65 miles

Project Location Map

5

Superstructure Replacement

Milton Approach Re‐construction

STR 1 Replace KY Approaches

STR 2 Truss Replacement

Pier Strengthening And Scour Mitigation 

Superstructure Replacement

6

Milton, KY

Madison, IN

• STR 3 – Replace IN Approaches

• STR 4 – Pedestrian Access

No Right-of-Way required

1 2 3

4

Page 3: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

3

Pier Strengthening

7

1. Drill holes into ex. caisson

2. Grout Rebar into Caisson

3. Add Stem Reinforcement

4. 2’ thick encapsulation

5. Pier Cap Reinforcement

6. Cast new Pier cap

7. Scour Countermeasure

SECTION A-A

A A

12’-0”LANE

8’-0”SHOULDER

5’-0” 12’-0”LANE

8’-0”SHOULDER

8

Typical Section

Existing Bridge is 20 ft curb to curb

5 ft pedestrian walkway

Selected Alternative

9

Existing Bridge

Proposed Bridge

Page 4: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

4

12 Month Closure

Design – Build Letting Summary

September 22, 2010

Five Contractors submitted bids

Formula for Effective Bid Price

lowest effective bid wins

[A + B – Adjustment]

A = construction cost 

B = closure days x $25,000/day. 

Adjustment = $3.75 million for early opening

11

Design – Build Letting Summary

September 22, 2010

Five Contractors submitted bids

Formula for Effective Bid Price

lowest effective bid wins

[A + B – Adjustment]

A = construction cost ($102‐$127 million)

B = closure days x $25,000/day. (365 days max)

Adjustment = $3.75 million for early opening(Sept 2012 or May 2013)

12

$103.7 M

10 Days

Sept 2012

Page 5: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

5

Maintenance of Traffic

13

Existing Existing Bridge

New Bridge

during 1Tie In Ramps

during 1st Closure

Slide Truss during Closure

Slide Truss during 2nd Closure

Maintenance of Traffic

14

Sliding

15

Pulling Strands

Bearing Pulling Bracket

Page 6: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

6

Temporary Towers

16

Sliding Girders

17

Sliding Girder Pedestal

18

Page 7: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

7

Sliding Girder and Pedestal

Slide 19

KY Approach Span D

Slide 20

Rebuild Common Pier

Rebuild Common Pier

N

Span DSpan D

Span D Sliding Girder Support

Slide 21

Page 8: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

8

Preparing Pier Caps

Slide 22

Pier 2 Sliding Plates for Both Slides

Span D SS Slide PL

GR 36 PL

Stainless Steel Sliding Surface

Slide 24

Page 9: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

9

Polishing Sliding Plates

Slide 25

Restraint Configuration

Slide 26

H H H H H

H

H

LongitudinalRestraint (TYP)

LongitudinalRestraint (TYP)

TransverseRestraint (TYP)

TransverseRestraint (TYP)

Restraints during Slide

Lateral Restraint was provided by pulling system

Pier 4 Bearings were restrained longitudinally

Unguided Bearing (TYP)

Unguided Bearing (TYP)

Transverse Restraints

Slide 27

TransverseRestraint

TransverseRestraint

Stowed for Transit

Page 10: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

10

Longitudinal Restraint for Slide

Slide 28

Installed At Pier 4Guided Angles

Installed At Pier 4

Pier 4 Bearing Harness

Disc Bearings

Slide 29

Sole PL

Permanent Slide PL

Bearing PL

Disc Bearing

SS Sliding Surface

Base PL

Erection Slide PL

Sliding Surface

Bearing Pulling Harnesses

Slide 30

Page 11: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

11

Bearing Pulling Harness

Slide 31

Lead Bearing

Trailing Bearing

Pulling Strands

Clamping Rods

Pulling Rod from Lead Bearing

Push PL

Push PL

Lead Bearing Harness

Slide 32

Push PL

Pulling Rods to Trailing BearingPulling Rods to Trailing Bearing

StrandsRestraint PL

Push PL

Trailing Bearing Harness

Slide 33

Pulling Rods From Lead Bearing

Pulling Rods From Lead Bearing

Upper Sliding Surface

Upper Sliding Surface

Pulls Bearing during the slide

Locks Upper Slide PL wrt. Upper Bearing PL

Permits Lower sliding surface movement

Lower Sliding Surface

Lower Sliding Surface

Page 12: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

12

Then, a Problem

Slide 34

Dislodged Bearing

Slide 35

10” Drop

Dislodged Bearing

Slide 36

Page 13: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

13

Upper Lateral Bracing

Slide 37

Slippage at Upper Chord Bracing

Slide 38

Analysis of Drop

Slide 39

Analysis of Drop

6/19/2014 39

Page 14: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

14

Jacking to Replace Bearing

Slide 40

Additional Lateral Restraint

Slide 41

Additional Longitudinal Restraint

Slide 42

Pier 2 and 6

Stuffers Installed

Prevent bearing from moving during slide

Page 15: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

15

Harness Vertical Support

Slide 43

Added Pipe Sliders to keep Harnesses AlignedAdded Pipe Sliders to

keep Harnesses Aligned

Span D Slide Process

44

Jack Completed Bridge

Remove Permanent Bearings

Attach Strands

Slide Bridge / Jack Bridge

Reinstall Bearings

Elastomeric Bearing Elastomeric Bearing

Pier 2 PedestalPier 2 Pedestal

Jack AssemblyJack Assembly

Sliding GirderSliding Girder

Span D DiaphragmSpan D DiaphragmSliding Bearing Sliding Bearing

Span D Sliding Bearing

Slide 45

Page 16: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

16

Span D Slide

Slide 46

Sliding Plates

Slide 47

Pier 2 (Below)

Pier 3 / Pier 5 (Rt)

Slide Lubricant

Slide 48

Atypical Use: Bridge Sliding Grease

Page 17: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

17

VSL Strand Jacks

Slide 49

VSL Heavy Lifting Equipment

Slide 50

Strand Jacking

Design Load (10% Friction)

Reserve Capacity

Observed Friction  was much less

Slide 51

Page 18: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

18

VSL Strand Setup

Slide 52

VSL Command Center

Slide 53

Bumper System

Slide 54

Page 19: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

19

Truss Slide Video

Slide 55

Needs Brakes

Slide 56

Sliding from Girder onto Pier

Slide 57

Page 20: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

20

Playing “Chicken”

Slide 58

Expansion Joint Installation

Slide 59

Open to Unrestricted Traffic

Slide 60

Page 21: 2014 KSPE Milton Madison Bridge Slide · Microsoft PowerPoint - 2014 KSPE Milton Madison Bridge Slide.pptx Author: astover Created Date: 6/19/2014 9:47:59 AM ...

6/19/2014

21

By the Numbers – Questions?

61

Wt. for Slide 15,260 tons

Slide Distance 55 feet

Length of Truss 2427 feet

Height of Truss180 feet above 

water

Wt. of Truss Members

8000 tons

Truss Members 2200 pieces

Bolts 145,000 pieces

Length of Concrete Beam

3462 feet

Wt. of Asphalt 4000 tons

Wt. of Stone 46,000 tons

Concrete Poured 12,730 cu yds

Wt. of Rebar 1,907,000 lbs

Workers (Peak) 135

Workers (Average) 50

Equipment 300 pieces

Explosives 124 charges

ADT 11,000

Project Cost $ 104 Million


Recommended