2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014
Transcript
Page 1: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

2014 MRL Safety Inspection

Pre-Inspection Meeting February 13, 2014

Page 2: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

OverviewTentative Inspection Schedule

For the most up-to-date calendar, please go to: http://mrl.illinois.edu/operations/safety

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

30 31

Team 5: PM Team 5: PM Team 5: PM Team 5: PM Team 5: PM

Team 3: PM Team 3: PM Team 3: PM Team 3: PM Team 3: PM

Team 3: PM Team 3: PM Team 3: PM Team 3: PM Team 3: PM

Team 2: PM Team 2: PM Team 2: PM Team 2: PM

Team 1: AM Team 1: AM Team 1: AM Team 1: AM Team 1: AM

(~9am - noon) (~1pm-5pm) AM: Morning Hours PM Afternoon Hours

~ March 2014 ~Sunday Monday Tuesday Wednesday Thursday Friday Saturday

2014 MRL Safety Inspection Teams:

Team 1: Doug, Ed: ESB-B, ESB-1, ESB-2

Team 2: Mauro, Lou Ann: Supercon-B, MRL-BTeam 3: Julio, Tim: MRL-1, MRL-3

Team 4: Steve, Shiva: MRL-2, MRL-4

Team 5: Jim, Kris, Susie: Supercon 1, 2, & 3 (offices)

Page 3: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

• Time for general lab clean up, time to get your lab safety up to date• Commonly cited items last year• Common issues and particular things that we’ll be looking for• Lab Hygiene • Incidents• Time for questions & discussion about: Inspections, LSMs, CHPs, SOPs,

Chem. inventories, Incidents, etc.

OverviewMarch 2014

Tentative Inspection Schedule

Page 4: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 5: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 6: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

clearance: 3 feet

Page 7: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 8: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 9: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 10: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Fire extinguishers not inspected within the last month

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Page 11: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Items cited several times

Door signs: out of date, hazard sections not completed

Cluttered labs/storage areas/aisles

Missing equipment guards, panels

Blocked electrical panels

Electrical cord placement/routing/condition

Lack of first aid kits, spill kits

Fire extinguishers not inspected within the last month

Lack of Lab Safety Manuals, incl. CHPs, SOPs, chemical inventories, MSDS sheets, emergency procedures & shutdown instructions

PPE use, availability (eye protection, lab coats)

Chem. storage by compatibility

Chem. storage: secondary containment

Unsecured gas cylinders

Improper labeling of chemicals

Page 12: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Safety Inspection: Improvements

Less accumulation of waste chemicals before processing for disposal

Storage of toxics/carcinogens not used

Storage of large quantities when less is sufficient

Page 13: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Common Issues

Particular things that we’ll be looking for…

Page 14: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Disposing old equipment

Take responsibility to find out if there are any ‘items of concern’ in equipment that you’re going to dispose. Can’t simply throw everything away any more.

• Toxic materials, such as PCBs, dyes, batteries, etc. must be disposed properly.

State Law: No electronics may be thrown in the trash.

If you are unsure, contact us.

Page 15: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Syringes

Considered PIMW – must not be disposed in trash.Waste transfer station workers can’t tell the difference.

Syringes must always be disposed in a Sharps container...

• Syringes of any material

• Any part of a syringe (needles, bodies, plungers)

• Regardless of use

• includes unused syringes

Page 16: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Water lines

Water lines must be reinforced tubing.

Connections must be clamped.

Secured

Nylon reinforced PVC

Page 17: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Water lines

Water lines that aren’t pressurized are exempt but must still be secure.

Example: water lines that free-flow into the drain.

Secured

Bad Good

Page 18: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

a bit of

Basic Lab Hygiene

Page 19: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

GLOVES!a bit of

Basic Lab Hygiene

Page 20: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

GLOVES!

a bit of

Basic Lab Hygiene

Page 21: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

GLOVES!

GLOVES!

a bit of

Basic Lab Hygiene

Page 22: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

GLOVES!

GLOVES!

GLOVES!

a bit of

Basic Lab Hygiene

Page 23: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

GLOVES!

GLOVES!

GLOVES!GLOVES!

a bit of

Basic Lab Hygiene

Page 24: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Gloves are PPE

1. They protect YOU from – - the process that you’re

performing- the materials that you’re

handling

Page 25: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Gloves are PPE - sometimes

1. They protect YOU from – - the process that you’re

performing- the materials that you’re

handling

2. They protect YOUR MATERIALS from you (skin particles, oils, etc.)

Page 26: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Remove Your PPEbefore using “public” equipment.

Page 27: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Public Ress

PPE is for LAB WORK.

Do not handle personal items or touch “common fixtures” with your gloves.

Transport your materials through public areas in a manner that doesn’t require you to wear gloves.

Consider gloves to be “single task” use. Gloves are useful for protection. As always, this is

true only if used sensibly.

Restroom

Page 28: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Restroom

Page 29: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Transporting Chemicals

• Always transport chemicals using secondary containment.• Chemicals and equipment are NOT to be transported on

passenger elevators. Use the freight elevators.• Do not transport chemicals or heavy carts through the 2nd

floor MRL hallway interpass. Use the 1st or 3rd floor hall to transport items between buildings.

Page 30: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Incidents at Illinois…

Page 31: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Fire in ESB

Very brief summary

• Oil bath in fume hood overheated and caught fire• Attempt to use fire extinguisher spread the fire

Lessons learned

• Damage confined to fume hood• Temperature probe was not immersed in oil bath (set to 70°C)• Training needed on use of fire extinguishers• Avoid unattended operations• No one pulled the alarm, but the Fire Dept. was called

Page 32: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Implosion of Glass Tube

Very brief summary

• Lab worker placing Schlenk tube under vacuum into glove box• While opening ante chamber, tube was struck and imploded

causing lacerations

Lessons learned

• Prepare SOPs for operations• Always wear appropriate PPE (in this case: gloves)• Know emergency procedures

Page 33: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Very brief summary

• Lab worker cleaning glassware, tried to unclog sink and was cut by cover slip

Lessons learned

• Use discretion on procedures for cleaning glassware and clearing clogged drains

• Good housekeeping is important

Cut from Sharp Object

Page 34: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Reporting Spills/Injury

Very brief summary

• The men’s bathroom in MRL was smeared with what appeared to be blood.

Lessons learned• Report spills/injury to MRL staff. • Refer to the DRS webpage regarding spill response if spill

occurs after hours. • If there is an injury, seek medical attention first and report to

the MRL Business Office immediately afterward to complete paperwork for an injury report – must happen within 24 hours.

• Do not leave bio-hazardous messes without informing someone.

Page 35: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

• Proper safety training will help everyone to be prepared.• Wearing PPE is the easiest thing one can do be safe.• Reporting of incidents and near misses provides a valuable

opportunity to learn.• SOPs minimize consequences. Template includes a signature

line for documentation of training – this isn’t by chance.• Without documentation, essentially no training has occurred in

the eyes of regulatory/investigating bodies.

Lessons - in a broad sense

Page 36: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Questions?

http://mrl.illinois.edu/safety

Inspection calendar:

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

30 31

Team 5: PM Team 5: PM Team 5: PM Team 5: PM Team 5: PM

Team 3: PM Team 3: PM Team 3: PM Team 3: PM Team 3: PM

Team 3: PM Team 3: PM Team 3: PM Team 3: PM Team 3: PM

Team 2: PM Team 2: PM Team 2: PM Team 2: PM

Team 1: AM Team 1: AM Team 1: AM Team 1: AM Team 1: AM

(~9am - noon) (~1pm-5pm) AM: Morning Hours PM Afternoon Hours

~ March 2014 ~Sunday Monday Tuesday Wednesday Thursday Friday Saturday

2014 MRL Safety Inspection Teams:

Team 1: Doug, Ed: ESB-B, ESB-1, ESB-2Team 2: Mauro, Lou Ann: Supercon-B, MRL-BTeam 3: Julio, Tim: MRL-1, MRL-3Team 4: Steve, Shiva: MRL-2, MRL-4Team 5: Jim, Kris, Susie: Supercon 1, 2, & 3 (offices)

Page 37: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Reference slides…

Page 38: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Long form 1/3

Page 39: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Long form 2/3

Page 40: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Long form 3/3

Page 41: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Office Insp. form

Page 42: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Short Form

Page 43: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Short Form part 1/3

Page 44: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Short Form part 3/3

Page 45: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Short Form part 2/3

Page 46: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Door sign

http://www.drs.illinois.edu/gls/forms/pdf/emergencycontactsign.pdf

Page 47: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

MRL safety page:http://mrl.illinois.edu/safety

e-mail: [email protected] Lab Inspection short form:http://mrl.illinois.edu/sites/default/files/pdfs/ShortFormForLabSelfInspections.pdfLab inspection full form & instructions:http://mrl.illinois.edu/sites/default/files/pdfs/UofILabSafetyInspectionForm.pdfhttp://mrl.illinois.edu/sites/default/files/pdfs/UofILabSafetyInspectionFormInstructions.pdfMRL Office inspection form:http://mrl.illinois.edu/sites/default/files/pdfs/2009MRLOfficeInspectionForm.pdfUniversity of Illinois Lab Safety Manual Template:http://www.drs.illinois.edu/factsheets/index.aspxUniversity of Illinois Chemical Hygiene Plan template:http://mrl.illinois.edu/sites/default/files/pdfs/UofICHPNotebook.pdfU of I CHP page:http://www.drs.illinois.edu/css/guidesplans/chypBlank MRL Chemical Inventory form:http://mrl.illinois.edu/sites/default/files/pdfs/ChemicalInventoryForm-blank.docUniversity of Illinois Laboratory Door Sign Editable PDF form:http://www.drs.illinois.edu/gls/forms/pdf/emergencycontactsign.pdf

Links

Page 48: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Very brief summary

• Troubleshooting electrolysis cell• Spark ignited residual hydrogen

Lessons learned

• Good SOPs minimize consequences of accidents• Do not use email to get help• Accidents can (and often do) happen during upset conditions

Hydrogen Explosion

Page 49: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

UCLA t-BuLi fire• http://pubs.acs.org/cen/science/87/8731sci1.html - Includes numerous links for

more info.• http://pubs.acs.org/cen/news/87/i04/8704news1.html• http://www.latimes.com/news/local/la-me-1228-ucla-death-

20111228,0,7543387.story

TTU Ni hydrazine perchlorate explosion• http://www.csb.gov/investigations/detail.aspx?SID=90&Type=2&pg=1&F_All=y• http://cen.acs.org/articles/88/i34/Texas-Tech-Lessons.html

Video covering both incidentshttp://www.csb.gov/videoroom/detail.aspx?VID=61 *

* Well done - recommended

Page 50: 2014 MRL Safety Inspection Pre-Inspection Meeting February 13, 2014.

Alcatel Vacuum pumps

Affected ModelsThese pumps include models in the ALCATEL PASCAL Series ‐ in sizes from 5 to 21 m3/h (cubic meters per hour). Specific models include:1005, 1010, 1015, 1021: ‐ including those with "SD" or "C1" suffixes2005 SD, I, C1, or H12010 SD, I, C1, or C22015 SD, I, C1, C2, or H12021 SD, I, C1, or C2

Affected models all have serial numbers BELOW 408960.


Recommended