Date post: | 04-Jul-2015 |
Category: |
Real Estate |
Upload: | peterbraster |
View: | 142 times |
Download: | 1 times |
Where Connections Happen
Peter J. Braster
Senior Development Manager
Tra
nsit S
yste
m M
ap
Opened 12/2010
Downtown Carrollton
Where Connections Happen!
Downtown Carrollton, 1908
Downtown Carrollton, 1964
Downtown Carrollton, 1970
Downtown Carrollton, 2014
Downtown Carrollton, 2014
Shifting the Paradigm
Belt Line
Ca
rro
llto
n C
irc
a 2
00
7
Ca
rro
llto
n C
irc
a 2
01
3
DART Arrives December 2010
DART Arrives December 2010
South Main Street Reconstruction 2011
South Main Street Reconstruction 2011
Pioneer Park 2011
DART Arrives December 2010
South Main Street Reconstruction 2011
“Green” Parking Lot 2011
Pioneer Park 2011
DART Arrives December 2010
South Main Street Reconstruction 2011
Regional Retention Pond 2012
“Green” Parking Lot 2011
Pioneer Park 2011
DART Arrives December 2010
South Main Street Reconstruction 2011
Crosby Rec Center 2011
Hike and Bike Trails 2014
Festival at the Switchyard
1st Saturday in November
Schematic Design
Completing the Founders’ Promise.
Downtown Carrollton
Catalyst Project:
Union at Carrollton Square
Square
Square
• 314 Apartments:
Phase 1 = 8 Live/Work + 170 apartments
Phase 2 = 134 apartments
• Twisted Root Restaurant
• Dead Wax Records
• Parking Garage: 460 spaces
which includes 125 municipal spaces
• Development Budget: Phase 1 $25,941,667
Phase 2 $10,754,723
Carroll Ave and S. Main Street: Before