4.2 PROGRAMME 1: ADMINISTRATION ....................................................................................................................................................................................................................3
SO: 4.2.1.1. To improve efficiency by implementing the necessary information technology infrastructure and systems. ............................................................................................. 3
SO: 4.2.1.2. To provide effective and efficient human resource planning and management services. .................................................................................................................................. 4
SO: 4.2.1.3. Ensure adherence to policies and standards on logistical services............................................................................................................................................................................... 5
4.3 PROGRAMME 2: HUMAN RESOURCE DEVELOPMENT, PLANNING AND MONITORING COORDINATION ..................................................................................6
SO: 4.3.1.1. Establish and maintain an integrated education and training management information system, linking all providers of education and training into a single system, to provide accurate data on skills supply and demand in the country. ...................................................................................................................................... 6
SO: 4.3.1.2. Establish and maintain coherent Career Development Services by March 2017. ................................................................................................................................................... 7
SO: 4.3.1.3. Pursue and strengthen bilateral relations with priority countries in Africa, Middle East, South and the North as well as with multilateral agencies such as COMEDAF, SADC, AU, ADEA, UNESCO, ILO, OECD and the Commonwealth. ............................................................................................................................................. 8
4.4 PROGRAMME 3: UNIVERSITY EDUCATION ......................................................................................................................................................................................................9
SO: 4.4.1.1. Expand the higher education sector in order to increase equitable access with success. ................................................................................................................................... 9
SO: 4.4.1.2. Improve success rates in higher education studies at public institutions and therefore increase graduate outputs by 2014. ............................................................17
SO: 4.4.1.3. Monitor good governance and management of the Higher Education system in order to build capacity and efficiency ....................................................................21
SO: 4.4.1.4. To develop and enhance the research capacity and productivity of universities ..................................................................................................................................................25
SO: 4.4.1.5. To maintain and enhance the Higher Education Management Information System (HEMIS) ..........................................................................................................................30
Technical indicaTor descripTion Grid
2
4.5 PROGRAMME 4: VOCATIONAL AND CONTINUING EDUCATION AND TRAINING............................................................................................................................ 32
SO: 4.5.1.1. Increase access to and improve success in programmes leading to intermediate and high level learning by 2014. ..............................................................................32
SO: 4.5.1.2. Strengthen the institutional capacity of VET institutions to improve their performance and efficiency. .....................................................................................................36
4.6 PROGRAMME 5: SKILLS DEVELOPMENT ........................................................................................................................................................................................................ 37
SO: 4.6.1.1. Provide a dynamic interface between the workplace and learning institutions and to promote quality learning at work and for work by 2017. ......................37
2014/15 AnnuAl PerformAnce PlAn
3
4.2 PROGRAMME 1: ADMINISTRATION
SO: 4.2.1.1. TO imprOve efficiency by implemenTing The neceSSary infOrmaTiOn TechnOlOgy infraSTrucTure and SySTemS.
1.
Indicator title Number of Information and Communication Technology ( ICT) Governance framework components implemented
Short definition ICT governance maturity level achieved by the Department through the implementation of the necessary infrastructure and systems by 2014/15
Purpose To measures progress made in terms of ICT infrastructure implementation
Source Self-Assessments
Method of calculation A simple count of the necessary infrastructure and systems implemented
Data limitation Skilled assessors
Type Efficiency
Reporting cycle Non-cumulative
Calculation type Annually
New indicator No
Desired performance Increased System maturity
Responsibility Sub Programme Manager: Government Information Technology Office (GITO)
Technical indicaTor descripTion Grid
4
SO: 4.2.1.2. TO prOvide effecTive and efficienT human reSOurce planning and managemenT ServiceS.
2.
Indicator title Average period it takes to fill a funded vacancy from the date of advertisement to the date of recommendation
Short definition The number of months taken to fill a vacancy, starting from the time when the post was advertised to the day the post was filled
Purpose To ensure efficient management of human resources and compliance with the public service regulations Public Service Commission norms and standards
Source Post establishment and management plan for filling of vacancies
Method of calculation Count the number of days it takes from advertising a post to actual appointment of a candidate
Data limitation Other requirements such as:
(a) Candidate having to serve notice with current employer
(b) Vetting / Screening requirements and NIA responsiveness after a recommendation is made
(c) Period of verification of qualifications after a recommendation is made
Type Output
Reporting cycle Quarterly
Calculation type Cumulative
New indicator No
Desired performance Four months to fill a vacancy
Responsibility Sub Programme Manager: HRM
2014/15 AnnuAl PerformAnce PlAn
5
SO: 4.2.1.3. enSure adherence TO pOlicieS and STandardS On lOgiSTical ServiceS.
3.
Indicator title Average period it takes to award a bid from the date of receiving the draft bid specifications from programme managers
Short definition Time taken to award a bid following the processing of a request by Programme Managers with reference to the date of receipt and final award
Purpose The number of months it takes to award a bid from the date of receiving the draft bid specifications from programme managers
Source To ensure compliance with performance indicators and Supply Chain Management (SCM) Procurement Plan
Method of calculation The three bid committees
Data limitation Calculation from the date the draft specification is received at SCM until the date the letter of appointment between the Department and successful bidder
Type Bids received incomplete/not according to specification or need for bid change
Reporting cycle Output
Calculation type Annual
New indicator Cumulative
Desired performance Yes
Responsibility Sub Programme Manager: Supply Chain Management
Technical indicaTor descripTion Grid
6
4.3 PROGRAMME 2: HUMAN RESOURCE DEVELOPMENT, PLANNING AND MONITORING COORDINATION
SO: 4.3.1.1. eSTabliSh and mainTain an inTegraTed educaTiOn and Training managemenT infOrmaTiOn SySTem, linking all prOviderS Of educaTiOn and Training inTO a Single SySTem, TO prOvide accuraTe daTa On SkillS Supply and demand in The cOunTry.
4.
Indicator title Percentage of public institutions with data integrated into the education and training management information system according to the data specifications list of fields as approved by the HETMIS Standard Committee
Short definition Integration of data from public institutions
Purpose Measure the integration of public institutional data into education and training management information system to facilitate integrated reporting on enrolment data for the post-school sector
Source DHET management information system
Method of calculation Number of public institutions with data integrated divided by total number of public institutions * 100
Data limitation None, as the number of public institutions is known
Type Output
Reporting cycle Annual
Calculation type Non-cumulative
New indicator Yes
Desired performance It is desirable that 100% of institutions have their data integrated into the DHET management information system
Responsibility Sub Programme Manager :Information Systems
2014/15 AnnuAl PerformAnce PlAn
7
SO: 4.3.1.2. eSTabliSh and mainTain cOherenT career develOpmenT ServiceS by march 2017.
5.
Indicator title A draft and a final career development policy and implementation strategy developed, consulted and gazetted
Short definition Development of a career development policy and implementation strategy
Purpose To develop a coherent career development policy and implementation strategy
Source DHET
Method of calculation The career development policy and implementation strategy developed on the basis of inputs from various internal and external stakeholders, as is signed off by Minister.
Data limitation None
Type Output
Reporting cycle Annually
Calculation type Non-cumulative
New indicator Yes
Desired performance The career development policy and implementation strategy developed and approved by Minister
Responsibility Sub Programme Manager: Career Development and Open Learning
Technical indicaTor descripTion Grid
8
SO: 4.3.1.3. purSue and STrengThen bilaTeral relaTiOnS wiTh priOriTy cOunTrieS in africa, middle eaST, SOuTh and The nOrTh aS well aS wiTh mulTilaTeral agencieS Such aS cOmedaf, Sadc, au, adea, uneScO, ilO, Oecd and The cOmmOnwealTh.
6.
Indicator title Engagement plans developed and implementation report compiled
Short definition Implementation plans with priority countries and multilateral agencies developed and approved by the DG
Purpose To ensure bilateral agreements signed are implemented and relations strengthened
Source Signed bilateral agreements
Method of calculation Implementation plans developed
Data limitation Political instability and changes in political relations
Type Activities
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Plans developed and implemented
Responsibility Sub Programme Manager: International Relations
2014/15 AnnuAl PerformAnce PlAn
9
4.4 PROGRAMME 3: UNIVERSITY EDUCATION
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
8.
Indicator title Number of students enrolled in higher education studies at universities
Short definition Headcount student registered at universities
Purpose To track the extent of growth and expansion of the system
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Unit record dataset extracted by Universities on a census date per academic period1
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Input (registered students enrolment)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Actual headcount reported to equal or exceed projected headcount
Responsibility Sub Programme Manager: HEMIS (supported by Directorate: Academic Planning, Monitoring and Evaluation)
9.
Indicator title Number of first time enrolments at universities
Short definition Headcount enrolments of 1st time students at universities in a particular academic year
Purpose To track the extent of access to and growth of the system
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Unit record dataset extracted by Universities on a census date per academic period
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Input (registered students enrolment)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Actual first time enrolled students reported to equal or exceed projected first time enrolled students
Responsibility Sub Programme Manager: HEMIS (supported by Directorate: Academic Planning, Monitoring and Evaluation)
Technical indicaTor descripTion Grid
10
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
10.
Indicator title Number of African students at universities
Short definition African students enrolled at universities
Purpose To track the extent of growth of African students enrolled in the system
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Unit record dataset extracted by Universities on a census date per academic period
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Input (registered African students)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Actual headcount reported to equal or exceed projected headcount
Responsibility Sub Programme Manager: HEMIS (supported by Directorate: Academic Planning, Monitoring and Evaluation)
11.
Indicator title Number of female students at universities
Short definition Female students enrolled at universities
Purpose To track the extent of growth in absolute numbers of female students enrolled in higher education programmes across the system
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Unit record dataset extracted by Universities on a census date per year
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Input (registered female students)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Actual headcount reported to equal or exceed projected headcount
Responsibility Sub Programme Manager: HEMIS (supported by Directorate: Academic Planning, Monitoring and Evaluation)
2014/15 AnnuAl PerformAnce PlAn
11
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
12.
Indicator title Proportion of higher education enrolments in Science, Engineering and Technology (SET), Business Science and Humanities
Short definition Proportion of students in SET, Business Science and Humanities
Purpose To track the extent of the proportion students enrolled in major fields of studies in higher education across the system
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Enrolments in SET divided by total enrolments x100, Enrolments in Business Science divided by total enrolments x100, Enrolments in Humanities (including Education) divided by total enrolments x100,
Data limitation Accuracy of data depends upon the reliable provision of data by the universities
Type Input (registered students enrolments in SET, Business Science and Humanities)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator Yes
Desired performance Proportion of students in SET, Business Science and Humanities to equal or exceed projected proportions
Responsibility Sub Programme Manager: HEMIS (supported by Directorate: Academic Planning, Monitoring and Evaluation)
13.
Indicator title Number of public higher education institutions established
Short definition New public higher education institutions established
Purpose Tracks progress on the process to increase the number of public institutions offering higher education programmes
Source Government Gazette
Method of calculation Promulgation of seat of new higher education institution in Government Gazette
Data limitation none
Type Output
Reporting cycle Annually after 2013
Calculation type Cumulative over the MTEF
New indicator No
Desired performance 1 new university established as a juristic person in terms of the Higher Education Act by March 2015
Responsibility Sub Programme Manager: DDG University Education supported by CD Academic Planning and Management (Branch project)
Technical indicaTor descripTion Grid
12
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
14.
Indicator title A monitoring report on the use of the earmarked grant to support the development of each of the newly established universities
Short definition A report produced on the use of the earmarked grants (infrastructure, teaching development; research)disbursed to the 2 new universities.
Purpose To monitor the progress on the development of the 2 new universities and their use of funds
Source DHET New University Project team reports; annual reports and audit reports from 2 universities; monitoring reports from the units responsible for earmarked funds
Method of calculation Simple count of analysis reports produced
Data limitation Dependence upon timeous and reliable reports from various resources
Type Output (report)
Reporting cycle Annually
Calculation type Cumulative over the MTEF
Desired performance An annual analytic monitoring report that indicates the effective utilisation of funds towards the full establishment and functioning of the 2 universities
Responsibility Sub Programme Manager: Financial and Physical Planning (supported by Post School Teaching (formerly Continuing Professional Teacher Development; Policy and Development Support; Management Support)(Branch Project)
2014/15 AnnuAl PerformAnce PlAn
13
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
15.
Indicator title Number of universities supported to offer programmes for FET College lecturers in line with new FET lecturer qualification policy
Short definition Number of universities that are supported through workshops, donor funding and other methods to develop programmes that are taken through the various processes to enable them to develop programmes and the capacity to offer FET college lecturers
Purpose To measure universities given support for the introduction of qualifications for FET College lecturers
Source DHET Programme Qualification Mix (PQM) clearance database
Method of calculation Number of universities that have submitted qualifications for FET College lecturers for inclusion on their programme-qualification mix.
Data limitation None
Type Output
Reporting cycle Annually
Calculation type Cumulative over the MTEF
New indicator Yes
Desired performance At least 5 universities have submitted applications for PQM approval to offer qualifications for FET college lecturers by 31st March 2015; an additional 5 universities have submitted for PQM approval by March 2016; and 10 universities will be offering such programmes in the 2017 academic year
Responsibility Sub Programme Manager: Post School Teaching (formerly Continuing Professional Teacher Development)
Technical indicaTor descripTion Grid
14
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
16.
Indicator title A national policy on professional qualifications for educators in Community and Adult Education and Training is published in the Government Gazette
Short definition A policy document on Qualifications for Community and Adult Educators developed, and universities supported to develop programmes in line with the policy over the MTEF period
Purpose A qualifications policy for community and adult educators will assist to professionalise this sector and will provide uniform direction to universities on the design of such qualifications.
Source Government Gazette
Method of calculation Policy is Gazetted.
Data limitation Not applicable
Type Output (policy document)
Reporting cycle Non-cumulative
Calculation type Annually
New indicator Yes
Desired performance A policy document on Qualifications for Community and Adult Educators is gazetted by 2014/15 for implementation.
Responsibility Sub Programme Manager: Post School Teaching (formally Continuing Professional Teacher Development)
2014/15 AnnuAl PerformAnce PlAn
15
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
17.
Indicator title Amount (in Rand value) of infrastructure grants disbursed to universities for the improvement of different projects
Short definition Amount allocated to 23 universities for infrastructure development projects in a number of different categories including student housing
Purpose To measure the grants given to public universities. These grants assist universities to maintain and expand their infrastructure which contributes positively to expand access to higher education and improve teaching, learning and living environments, and therefore, improve the quality of higher education offered across the system
Source Ministerial Statement on University Funding
Method of calculation The funding in the baseline allocation to universities for infrastructure over the MTEF
Data limitation Dependent on amounts in the MTEF being made available by National Treasury
Type Input
Reporting cycle Annually (however allocations committed in a three year cycle)
Calculation type Cumulative over MTEF (three reports)
New indicator Yes
Desired performance R2.2 billion disbursed to universities by 31 March 2015.
Responsibility Sub Programme Manager: Financial and Physical Planning
Technical indicaTor descripTion Grid
16
SO: 4.4.1.1. expand The higher educaTiOn SecTOr in Order TO increaSe equiTable acceSS wiTh SucceSS.
18.
Indicator title A monitoring report on the effective use of infrastructure grants by each university produced
Short definition A report will be produced on the progress of infrastructure projects funded through the infrastructure grant
Purpose To monitor the progress of infrastructure investments and the quality of teaching, learning and living environments at universities
Source Progress reports from universities; audited financial statements on the use of funds; oversight monitoring reports
Method of calculation Simple count of analysis report produced.
Data limitation Dependence on information from universities
Type Output(reports)
Reporting cycle Annually
Calculation type Cumulative over the MTEF
New indicator Yes
Desired performance 1 consolidated monitoring report on the effective use of infrastructure grants compiled annually (3 reports over the MTEF)
Responsibility Sub Programme Manager: Financial and Physical Planning
2014/15 AnnuAl PerformAnce PlAn
17
SO: 4.4.1.2. imprOve SucceSS raTeS in higher educaTiOn STudieS aT public inSTiTuTiOnS and TherefOre increaSe graduaTe OuTpuTS by 2014.
19.
Indicator title Number of University Teaching Development Plans (3 years) for each university produced and approved by the Director-General
Short definition Teaching Development Plans describe how a university will utilise the earmarked Teaching Development Grant (TDG) allocated to it over a three-year period. Qualitative and Analytical monitoring reports will be produced on the use of the funds, assessed against approved plans and the criteria in the Ministerial statement on the use of the TDG.
Purpose The Teaching Development Grants, and therefore the Teaching Development Plans are intended to support improvement in teaching and learning at universities.
Source Universities Teaching Development Plans (Universities submit plans which are evaluated, and approved by the Director-General if they comply with the DHET’s policy on the use of the teaching development grants), audited financial statements on the use of the funds, data collection through oversight visits were required.
Method of calculation Simple count of analysis report produced.
Data limitation Dependant of the quality of plans and reports from universities
Type Impact
Reporting cycle Plans approved every three years: monitoring report annually
Calculation type Plans non- cumulative; reports cumulative over MTEF
New indicator yes
Desired performance 24 university 3-year Teaching Development Plans produced and approved by the Director-General by June 2014. 2 Annual analytic monitoring reports produced by September 2016
Responsibility Sub Programme Manager: Post School Teaching (formerly Continuing Professional Teacher Development)
Technical indicaTor descripTion Grid
18
SO: 4.4.1.2. imprOve SucceSS raTeS in higher educaTiOn STudieS aT public inSTiTuTiOnS and TherefOre increaSe graduaTe OuTpuTS by 2014.
20.
Indicator title Total number of students in foundation provisioning programmes at universities
Short definition Number of students in foundation provisioning programmes at universities
Purpose To measure the number of underprepared students entering universities through supporting them academically via foundation provisioning programmes, and therefore increasing the likelihood that they will successfully compete undergraduate programme
Source HEMIS together with data collected through on-going qualitative monitoring of approved programmes
Method of calculation Unit record dataset extracted by Universities on a census date per academic period
Data limitation Accuracy of data depends upon the reliable provision of data per academic period
Type input
Reporting cycle Annually
Calculation type Non-cumulative
New indicator Yes
Desired performance Actual headcount reported to equal or exceed projected headcount
Responsibility Sub Programme Manager: Post School Teaching (formally CPTD), supported by the Directorates: Academic Planning and Monitoring and Financial and Physical Planning
2014/15 AnnuAl PerformAnce PlAn
19
SO: 4.4.1.2. imprOve SucceSS raTeS in higher educaTiOn STudieS aT public inSTiTuTiOnS and TherefOre increaSe graduaTe OuTpuTS by 2014.
21.
Indicator title Percentage success rates of students on foundation provisioning
Short definition Success rate of students enrolled in higher education studies at public institutions
Purpose To track the performance of students across the system per year
Source Audited Institutional HEMIS sub data set from Universities’ student production system
Method of calculation FTE degree credits divided by FTE enrolments. These calculations, for a programme or for an institution as a whole, produce weighted average success rates for a group of courses.
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Output
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Actual academic performance reported to equal or exceed projected performance
Responsibility Sub Programme Manager: Academic Planning, Monitoring and Evaluation, supported by the Directorate: HEMIS
Technical indicaTor descripTion Grid
20
SO: 4.4.1.2. imprOve SucceSS raTeS in higher educaTiOn STudieS aT public inSTiTuTiOnS and TherefOre increaSe graduaTe OuTpuTS by 2014.
22.
Indicator title Annual monitoring report on the outputs of scarce skill graduates from public universities with recommendations for interventions
Short definition Analytic monitoring and evaluation reports on the production of graduates in engineering, human and animal health sciences, physical and life sciences and teacher education
Purpose To monitor the progress on the production of graduates in the scarce skills areas and to make recommendations for interventions to improve the production
Source Audited Institutional HEMIS sub data set from universities’ student production system; interaction with university Deans of scarce skills areas, professional bodies
Method of calculation Unit record dataset extracted by universities on a census date per year; analysis of qualitative monitoring data
Data limitation Accuracy of data depends upon the reliable provision of data by the universities; quality of quantitative data collected from institutions and other stakeholders.
Type Impact
Reporting cycle Annually
Calculation type Cumulative over MTEF
New indicator Yes
Desired performance An annual report which tracks the increase in the number of graduates in the scares skills areas, highlights any blockages and recommends interventions for further improvements (3 reports over MTEF)
Responsibility Sub Programme Manager: Academic Planning, Monitoring and Evaluation, supported by the Directorate: HEMIS and Teaching and Learning Development.
2014/15 AnnuAl PerformAnce PlAn
21
SO: 4.4.1.3. mOniTOr gOOd gOvernance and managemenT Of The higher educaTiOn SySTem in Order TO build capaciTy and efficiency
23.
Indicator title A set of key financial, performance and good governance indicators developed to evaluate governance and management of public higher education institutions
Short definition Three types of indicators will be developed against which the governance and management of universities will be evaluated on an annual basis: financial health indicators; performance indicators; and good governance indicators
Purpose To develop indicators to monitor and evaluate the university education system on an on-going basis, and to enable identification of problems in the system so that timeous interventions can be made to ensure that all universities are well governed, managed effectively and efficiently, and provide quality higher education.
Source Expert input on indicators; Annual reports from Universities reporting on governance and management aspects as required by the Regulations for Reporting by HEI, Higher Education Act 1997 as amended; progress reports from institutions under administration; any other monitoring reports on institutions produced on an on-going basis.
Method of calculation Analysis of reports and professional assessment of the state of governance and management of institutions against predetermined criteria
Data limitation Quality of reports and quantity of inputs
Type Output (report)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator Yes
Desired performance A set of financial indicators to evaluate the financial health of the system are developed by March 2015. A set of key governance indicators are developed by March 2016. A set of key performance indicators are developed by March 2016 and an evaluation report of the public higher education system against the approved financial indicators, performance and governance indicators with recommendations for improvement is compiled by March 2017. It is desired that all universities are functioning well and none are under administration or exhibiting problems requiring independent assessments.
Responsibility Sub Programme Manager: Management Support
Technical indicaTor descripTion Grid
22
SO: 4.4.1.3. mOniTOr gOOd gOvernance and managemenT Of The higher educaTiOn SySTem in Order TO build capaciTy and efficiency
24.
Indicator title Annual report on the financial health of each university with recommendations for improvements
Short definition Reports produced reflecting a comparative analysis of the financial health of the 25 universities
Purpose To track the extent of financial sustainability in the system
Source Audited financial statements of universities and supplementary financial data sets
Method of calculation Simple count of analysis report produced
Data limitation Accuracy of financial data depends upon the reliable provision of data by the universities and auditor interpretations according to the international financial regulations.
Type Output (report)
Reporting cycle Annually
Calculation type Cumulative (3 reports over MTEF)
New indicator Yes
Desired performance An annual report on the financial health of 25 universities showing that their finances, according to national and international benchmarks are healthy
Responsibility Sub Programme Manager: Management Support
2014/15 AnnuAl PerformAnce PlAn
23
SO: 4.4.1.3. mOniTOr gOOd gOvernance and managemenT Of The higher educaTiOn SySTem in Order TO build capaciTy and efficiency
25.
Indicator title Revised regulations for regulating Private Higher Education Institutions (PHEIs) developed and approved for implementation
Short definition PHEIs are regulated in terms of a set of Regulations published under the Higher Education Act of 1997 (as amended). These Regulations will be revised and published as policy
Purpose To revise the Regulations to ensure that they are responsive to charges within the Private Higher Education Sector: to improve oversight of PHEIs; and to protect the public by ensuring that PHEIs are effectively regulated
Source Research; Consultation with the sector
Method of calculation Government Gazette published
Data limitation None
Type Output (policy document)
Reporting cycle Annually
Calculation type Non-cumulative
New indicator None
Desired performance Revised regulations are published in the Government Gazette as policy
Responsibility Sub Programme Manager: Management Support
Technical indicaTor descripTion Grid
24
SO: 4.4.1.3. mOniTOr gOOd gOvernance and managemenT Of The higher educaTiOn SySTem in Order TO build capaciTy and efficiency
26.
Indicator title An annual monitoring report on the compliance of PHEIs
Short definition A monitoring report on the Private Higher Education sector indicating the extent to which institutions comply to the regulations and operate according to the law
Purpose To monitor the Private Higher Education sector and ensure that all registered institutions comply with the regulations and operate according to the law
Source Conditions of registration and annual reports submitted by institutions to the Department; reports from the public and institutions in illegal activities and desktop research in the sector
Method of calculation Simple count of analysis report produced
Data limitation Quality of annual reports provided by the system; illegal activities not reported
Type Output(reports)
Reporting cycle Cumulative (3 reports over MTEF)
Calculation type Annually
New indicator Yes
Desired performance Annual monitoring report showing that 100% of institutions comply with the regulations and no illegal activity exist by 31 March 2015
Responsibility Sub Programme Manager: Management Support
2014/15 AnnuAl PerformAnce PlAn
25
SO: 4.4.1.4. TO develOp and enhance The reSearch capaciTy and prOducTiviTy Of univerSiTieS
27.
Indicator title Number of postgraduate graduates
Short definition Postgraduate students graduated in an academic year
Purpose To track the extent of growth of students receiving post graduate qualifications (honours’, masters’ and doctorate qualifications)
Source Audited Institutional HEMIS sub data set from Universities’ student production system
Method of calculation Unit record dataset extracted by Universities on a census date per academic period
Data limitation Accuracy of data depends upon the reliable provision of data by the Universities
Type Output (graduates)
Reporting cycle Annually
Calculation type Cumulative over the MTEF
New indicator No
Desired performance The number of students receiving a post graduate qualification to equal or exceed projected targeted number of post graduates in institutions’ enrolment plans
Responsibility Sub Programme Manager: Academic Planning, Monitoring and Evaluation, supported by the Directorate: HEMIS
Technical indicaTor descripTion Grid
26
SO: 4.4.1.4. TO develOp and enhance The reSearch capaciTy and prOducTiviTy Of univerSiTieS
28.
Indicator title Number of doctoral graduates
Short definition Students graduated with Doctoral Degrees in the current academic year
Purpose To track the extent of growth of students graduating with a Doctoral Degree
Source Audited Institutional HEMIS sub data set from Universities student production system
Method of calculation Unit record dataset extracted by Universities on a census date per academic period
Data limitation Accuracy of data depends upon the reliable provision of data by Universities
Type Output
Reporting cycle Annually
Calculation type Cumulative over the MTEF
New indicator No
Desired performance The number of student receiving a Doctoral Degree qualification to equal or exceed projected targeted number in the enrolment plan
Responsibility Sub Programme Manager: Academic Planning, Monitoring and Evaluation, supported by the Directorate: HEMIS
2014/15 AnnuAl PerformAnce PlAn
27
SO: 4.4.1.4. TO develOp and enhance The reSearch capaciTy and prOducTiviTy Of univerSiTieS
29.
Indicator title An improved Policy on the measurement of research outputs of universities published in the government gazette for implementation
Short definition A revised and improved Research Output Policy, which provides the criteria for what counts as research outputs that will be subsidised, and how these will be measured
Purpose To review published a revised Research Output Policy to factor in recent changes/advancements and improvements in types of research outputs from HEIs
Source Research outputs from system
Method of calculation Government gazette
Data limitation None
Type Output
Reporting cycle Once off
Calculation type Non cumulative
New indicator Yes
Desired performance Policy approved by the Minister and made available to the public by 31 March 2015
Responsibility Sub Programme Manager: University Policy and Development Support
Technical indicaTor descripTion Grid
28
SO: 4.4.1.4. TO develOp and enhance The reSearch capaciTy and prOducTiviTy Of univerSiTieS
30.
Indicator title An annual report on improved research productivity of universities
Short definition An annual report on research productivity is published. Research productivity is a measurement of research outputs from individual universities, measured according to their Research Outputs Policy, which are converted onto units for the purpose of the subsidy
Purpose To report on the research output units of individual institutions, to track the improvement of research productivity across the system, and to provide and analysis of the overall research performance of public higher education institutions
Source Research outputs data from Universities
Method of calculation Simple count of analysis report produced
Data limitation Accuracy of data from the HEIs
Type Output
Reporting cycle Annually
Calculation type Cumulative over the MTEF (3 years)
New indicator Yes
Desired performance Research Output report finalised and distributed to institutions by the end of each financial year
Responsibility Sub Programme Manager: University Policy and Development Support
2014/15 AnnuAl PerformAnce PlAn
29
SO: 4.4.1.4. TO develOp and enhance The reSearch capaciTy and prOducTiviTy Of univerSiTieS
31.
Indicator title Number of Research Development Plans (3 years) and monitoring reports for each university produced and approved by the DG
Short definition DHET provides research funding to Universities in the form of Research Development Grants (RDGs). Universities are required to submit comprehensive proposals detailing the Capacity Building plans ,that are evaluated and approved , before funds can be released
Purpose To measure Research Development Plans of universities approved and monitored. The aim is to build research capacity and capability at universities in order to improve the quality and productivity of research in the system
Source RDG plans provided by Universities
Method of calculation Analysis of plans
Data limitation Quality of plans received from universities
Type Output
Reporting cycle Annually
Calculation type Non-accumulative
New indicator Yes
Desired performance 24 universities three year research development plans have been submitted evaluated and approved by June 2014
Responsibility Sub Programme Manager: University Policy and Development Support
Technical indicaTor descripTion Grid
30
SO: 4.4.1.5. TO mainTain and enhance The higher educaTiOn managemenT infOrmaTiOn SySTem (hemiS)
32.
Indicator title Number of updates on the HEMIS for audited student and staff data
Short definition Updates on the HEMIS for audited student and staff data
Purpose To provide reliable and accurate data for the planning and monitoring of the university sector in relation to their infrastructure
Source Validated database of a subset of data on students and staff extracted from the universities’ HEMIS system
Method of calculation Unit record datasets (one for students and one for staff) extracted by Universities as at the 31st December and audited by the 31st July
Data limitation The accuracy of the data depends upon the timeous and reliable provision of data by universities
Type Output
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance Two (one student and one staff) updates for 23 universities by 31 March 2015
Responsibility Sub Programme Manager: HEMIS
2014/15 AnnuAl PerformAnce PlAn
31
SO: 4.4.1.5. TO mainTain and enhance The higher educaTiOn managemenT infOrmaTiOn SySTem (hemiS)
33.
Indicator title Number of updates on the HEMIS system for final building space data from the universities
Short definition One update on the HEMIS for final building space data from the universities
Purpose To provide reliable and accurate data for the planning and monitoring of the university sector in relation to their infrastructure
Source Validated database of a subset of data on final building space from the universities
Method of calculation Unit record dataset extracted by universities as at the 31st December
Data limitation The accuracy of the data depends upon the timeous and reliable provision of data by universities
Type Output
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance One annual update for 23 universities by 31 March 2015
Responsibility Sub Programme Manager: HEMIS
Technical indicaTor descripTion Grid
32
4.5 PROGRAMME 4: VOCATIONAL AND CONTINUING EDUCATION AND TRAINING
SO: 4.5.1.1. increaSe acceSS TO and imprOve SucceSS in prOgrammeS leading TO inTermediaTe and high level learning by 2014
34.
Indicator title Number of FET Colleges annual headcount enrolments on Ministerial approved and occupationally directed programmes in an academic year
Short definition 800 000 headcount enrolments in public FET college programmes
Purpose To track expansion of access to FET Colleges
Source Annual Survey
Method of calculation Simple headcount of students enrolled in all formal qualifications and programmes offered in FET Colleges
Data limitation Subject to accuracy of Survey data
Type Outputs
Calculation type Cumulative
Reporting cycle Annually
New indicator No
Desired performance Actual enrolment target
Responsibility Sub Programme Manager: Ms T Futshane
2014/15 AnnuAl PerformAnce PlAn
33
SO: 4.5.1.1. increaSe acceSS TO and imprOve SucceSS in prOgrammeS leading TO inTermediaTe and high level learning by 2014
35.
Indicator title Certification rates in exit levels in the Report 190/1 and NCV qualifications in an academic year
Short definition Percentage rates of college students meeting all requirements to be issued with certificates upon completion of levels of programme in public FET Colleges
Purpose To track student success of public FET Colleges
Source Examination and assessment data
Method of calculation Examination and assessment datasets and enrolment datasets extracted and analysed against each other to determine success rates
Data limitation Reliability of data after processing to certification rates
Type Manual
Calculation type Non-Cumulative
Reporting cycle Annually
New indicator No
Desired performance Reliable and calculations of success rates
Responsibility Sub Programme Manager: Dr Mahlobo and Ms Pote
Technical indicaTor descripTion Grid
34
SO: 4.5.1.1. increaSe acceSS TO and imprOve SucceSS in prOgrammeS leading TO inTermediaTe and high level learning by 2014
36.
Indicator title Pass rate in the NCV Levels 2 to 4 Maths and Maths Literacy programmes in an academic year
Short definition Percentage rates of college students found competent on NCV Maths and Maths Literacy levels 2 to 4 in an academic year in public FET Colleges
Purpose To track pass rates of college students taking Maths and Maths Literacy across all levels in public FET Colleges
Source Examination and assessment data
Method of calculation Examination and assessment datasets and enrolment datasets extracted and analysed against each other to determine success rates
Data limitation Reliability of data after processing to certification rates
Type Manual
Reporting cycle Non-Cumulative
Calculation type Annually
New indicator No
Desired performance Reliable calculations of pass rates
Responsibility Sub Programmes Manager: Dr Mahlobo and Ms Pote
2014/15 AnnuAl PerformAnce PlAn
35
SO: 4.5.1.1. increaSe acceSS TO and imprOve SucceSS in prOgrammeS leading TO inTermediaTe and high level learning by 2014
37.
Indicator title Certification rates for bursary recipients enrolled in the Report 190/1 and NCV qualifications in an academic year
Short definition Percentage rates of college students meeting all requirements to be issued certificates upon completion of levels of programme in public FET Colleges
Purpose To track student success of public FET Colleges
Source Examination and assessment data
Method of calculation Examination and assessment datasets and enrolment datasets extracted and analysed against each other to determine success rates
Data limitation Reliability of data after processing to certification rates
Type Manual
Calculation type Non-Cumulative
Reporting cycle Annually
New indicator No
Desired performance Reliable calculations of success rates
Responsibility Sub-Programme Manager: Dr Mahlobo and Ms Pote
Technical indicaTor descripTion Grid
36
SO: 4.5.1.2. STrengThen The inSTiTuTiOnal capaciTy Of veT inSTiTuTiOnS TO imprOve Their perfOrmance and efficiency
38.
Indicator title Number of public institutions identified for declaration as community colleges
Short definition Public institutions identified for declaration as community colleges
Purpose To identify public institution to be declared as community colleges
Source Submission approved by the Minister
Method of calculation Number of public institutions identified for declaration as community colleges against the number as approved by the Minister
Data limitation Double training, some colleges send same people to similar types of training, resulting in double counting
Type Activity-input
Reporting cycle Annually
Calculation type Non-cumulative
New indicator No
Desired performance 9 public institutions identified for declaration as community colleges
Responsibility Sub Programme Manager: Dr EB Mahlobo
2014/15 AnnuAl PerformAnce PlAn
37
4.6 PROGRAMME 5: SKILLS DEVELOPMENT
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
39.
Indicator title The number of artisan learners registered nationally
Short definition Artisan learners entering learning nationally
Purpose Records number of new and/or RPL artisan learners entering artisan learning programmes annually in support of economic growth
Source SETAs and INDLELA coordinated by National Artisan Development Support Centre
Method of calculation Simple count of artisan learners reported by SETAs and INDLELA
Data limitation No reports or late or inaccurate reports received
Type Measures Inputs
Reporting cycle Cumulative that is compared against annual target
Calculation type Cumulative
New indicator On-going from previous years
Desired performance Achieve or exceed cumulative monthly SETA & INDLELA targets
Responsibility Sub Programme Manager: INDLELA
Technical indicaTor descripTion Grid
38
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
40.
Indicator title Number of artisan candidates found competent nationally
Short definition 13 000 artisan candidates found competent nationally
Purpose Records number of persons becoming qualified artisans in support of economic growth
Source SETAs and INDLELA coordinated by National Artisan Development Support Centre
Method of calculation Simple count of artisan candidates reported by SETAs and INDLELA
Data limitation No reports or late or inaccurate reports received
Type Measures Outputs
Reporting cycle Cumulative that is compared against annual target
Calculation type Cumulative
New indicator On-going from previous years
Desired performance Achieve or exceed cumulative monthly SETA & INDLELA targets
Responsibility Sub Programme Manager: INDLELA
2014/15 AnnuAl PerformAnce PlAn
39
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
41.
Indicator title Number of graduates receiving Structured Work Place Learning
Short definition Graduates and students receiving Work Integrated Learning (WIL)
Purpose Records numbers of learners entering workplaces to complete or complement their learning programmes to enhance their employability
Source Reports from SETAs, FET Colleges and Universities
Method of calculation Simple count of graduates reported from SETAs, FET Colleges and Universities
Data limitation No reports or late or inaccurate reports received
Type Measures Outcomes
Reporting cycle Cumulative that is compared against annual target
Calculation type Annually
New indicator New
Desired performance Performance must be at target level or more
Responsibility Sub Programme Manager: WIL
Technical indicaTor descripTion Grid
40
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
42.
Indicator title Percentage of INDLELA national artisan learners pass trade test
Short definition INDLELA’s national artisan learners pass trade test by 2014/15
Purpose Records number of persons passing a national trade test in support of improved artisan training and testing.
Source INDLELA Trade Test Centre and MerSETA
Method of calculation Simple count of national artisan learners pass trade test reported by INDLELA and MerSETA
Data limitation No reports or late or inaccurate reports received
Type Measures Outputs
Reporting cycle Quarterly
Calculation type Quarterly
New indicator On-going from previous years
Desired performance Achieve or exceed quarterly targets
Responsibility Sub Programme Manager: INDLELA
2014/15 AnnuAl PerformAnce PlAn
41
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
43.
Indicator title Number of audits conducted at SETA or QCTO accredited trade training or trade test centres
Short definition The increase in the number of audits conducted at SETA or QCTO accredited trade test centres
Purpose To measure and record the number of audits at SETA or QCTO accredited trade test centres in support of improved quality of artisan development
Source National Artisan Moderation Body
Method of calculation Simple count of audits reported by National Artisan Moderation Body
Data limitation No audits conducted
Type Measures Outputs
Reporting cycle Quarterly
Calculation type Quarterly
New indicator On-going from previous years
Desired performance Achieve or exceed quarterly target
Responsibility Sub Programme Manager: INDLELA
Technical indicaTor descripTion Grid
42
SO: 4.6.1.1. prOvide a dynamic inTerface beTween The wOrkplace and learning inSTiTuTiOnS and TO prOmOTe qualiTy learning aT wOrk and fOr wOrk by 2017
44.
Indicator title Number of FET Colleges with partnership agreements with SETAs
Short definition SETAs should enter into partnership agreements with FETs regarding provision of learning programmes
Purpose To ensure that learning programmes offered in FETs directly respond to the real needs of the various sectors
Source SETA reports, Copies of partnership agreements
Method of calculation Simple count of partnership agreements signed
Data limitation Integrity of information submitted
Type Input and impact
Reporting cycle Cumulative
Calculation type Bi-annually
New indicator New
Desired performance To ensure that each SETA has partnership agreements with FET Colleges
Responsibility Sub Programme Manager: SETA Coordination