DECEMEBR 23DECEMEBR 23, 2015
Procurement of Plant, Design, Supply and Install of Marala Hydropower Project (ICB # PB-001)
Procurement of Plant, Design, Supply and Install of Chianwali Hydropower Project (ICB # PB-002)
Procurement of Plant, Design, Supply and Install of Deg Outfall Hydropower Project (ICB # PB-003)
Procurement of Plant, Design, Supply and Install of Pakpattan Hydropower Project (ICB # PB-005)
REDSIP Hydropower Projects
7.64 MW
5.38 MW
4.04 MW
4.16 MW
2.82 MW
MARALA CHIANWALI DEG OUTFALL
PAKPATTAN
Location UCC RD 3+350 UCC RD 131+117 UCC RD 282+735 Pakpattan Canal RD 114+800
Design Discharge (cumec)
420 150 120 80
Rated Head (m) 2.16 4.20 4.00 4.20
Power Potential (MW)
7.64 5.38 4.04 2.82
Annual Energy (GWh)
43.47 28.22 26.46 20.86
Plant Factor (%) 65.56 59.88 74.52 84.38Amount of Contract:
Pak Rs 388,742,781 and US $30,894,947
Pak Rs 339,239,551 and US $21,142,518
Pak Rs 238,141,922 and US $16,413,885
Pak Rs 131,630,360 and US $10,635,452
GENERAL INFORMATIONS
Procurement of Plant, Design, Supply and Install of Chianwali Hydropower Project
(ICB # PB-002)
PROJECT LAYOUT
Chianwali Hydropower Project (ICB # PB-002)Chianwali Hydropower Project (ICB # PB-002)
POWERHOUSE AT RD 131+250
Chianwali Hydropower Project (FPS)(FPS)
Old RDs New RDs
Last Design Proposed Design Last Design Proposed Design
BL FSL BL FSL Q B FSD f S Q B FSD f S
128+000 723.91 734.41 723.91 734.41 10225.0 246.00 10.50 1.15 0.00015 10225.0 246.00 10.50 1.15 0.00015
128+000 718.80 729.20 723.91 734.41 9569.0 237.00 10.40 1.15 0.00015 9569.0 237.00 10.50 1.15 0.00015
129+200 129+200 718.62 729.02 723.69 734.199569.0 237.00 10.40 1.15 0.00015 9569.0 237 ~
294.36 10.50 1.15 0.00015 131+100 718.34 728.74 723.40 733.90
Powerhouse Powerhouse
131+375 718.29 728.69 712.96 723.399569.0 237.00 10.40 1.15 0.00015 9569.0 294.36
~ 237 10.40 1.15 0.00015 133+141 718.03 728.43 712.72 723.12
133+017 718.05 728.45
9569.0 237.00 10.40 1.15 0.00015 9569.0 237.00 10.40 1.15 0.00015134+000 717.90 728.30 712.57 722.97
164+000 713.35 723.75 708.07 718.47
164+400 713.29 723.69 708.01 718.41
164+400 708.09 718.29 708.01 718.419014.0 230.00 10.20 1.10 0.00015 9014.0 230.00 10.20 1.10 0.00015
165+000 708.00 718.20 708.00 718.20
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
CHP – Combined Powerhouse & Spillway Plan
7
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
CHP – Powerhouse Longitudinal Section
8
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
CHP – Spillway Plan
9
CHP : Energy Computations in Detailed DesignCHP : Energy Computations in Detailed Design
Procurement of Plant, Design, Supply and Install of Deg Outfall Hydropower Project
(ICB # PB-003)
PROJECT LAYOUT (Deg Outfall)
POWERHOUSE RD 282+100
Deg Outfall Hydropower Project (FPS)(FPS)
Old RDs New RDs
Last Design Proposed Design Last Design Proposed Design
BL FSL BL FSL Q B FSD f S Q B FSD f S
266+000 671.30 681.10 671.30 681.10 8145.0 224.00 9.80 1.10 0.00015 8145.0 224.00 9.80 1.10 0.00015
266+000 669.30 679.10 671.30 681.10
8145.0 224.00 9.80 1.10 0.00015 8145.0 224.00 9.80 1.10 0.00015267+000 669.15 678.95 671.15 680.95
280+000 667.20 677.00 669.20 679.00
280+889 667.07 676.87 669.07 678.87
280+889 667.07 676.87 669.07 678.878145.0 224.00 9.80 1.10 0.00015 8145.0 224 ~
291.40 9.80 1.10 0.00015 282+611 666.81 676.61 668.81 678.61
Powerhouse Powerhouse
282+968 666.75 676.55 657.52 667.32
8145.0 224.00 9.80 1.10 0.00015 8145.0291.40 ~224
9.80 1.10 0.00015
283+000 666.75 676.55 657.52 667.32
283+100 666.74 676.54 657.50 667.30
283+100 657.50 667.30 657.50 667.30
284+642 657.27 667.07
284+101 657.35 667.15 8145.0 224.00 9.80 1.10 0.00015 8145.0 224.00 9.80 1.10 0.00015285+000 657.22 667.02 657.22 667.02
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
DHP – Combined Powerhouse & Spillway Plan
14
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
DHP – Powerhouse Longitudinal Section
15
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
DHP – Spillway Plan
16
DHP: Energy Computations in Detailed DesignDHP: Energy Computations in Detailed Design
Procurement of Plant, Design, Supply and Install of Marala Hydropower Project
(ICB # PB-001)
PROJECT LAYOUT
Marala Hydropower Project (ICB # PB-001)Marala Hydropower Project (ICB # PB-001)
MR LINK CANALUCC
HEADRACE CHANNEL
TAILRACE CHANNEL
COLONY
SPILLWAY RD 3+155
POWERHOUSE RD 3+350
Marala Hydropower Project (ICB # PB-001)Marala Hydropower Project (ICB # PB-001)
Old RDs New RDs
Last Design Proposed Design Last Design Proposed Design
BL FSL BL FSL Q B FSD S Q B FSD S
0+000 791.16 803.16 798.00 810.00
16850 320.00 12.00 0.00015 16850 320.00 12.00 0.000151+000 791.01 803.01 797.85 809.85
2+000 790.86 802.86 797.70 809.70
2+116 790.84 802.84 797.68 809.68
2+116 797.68 809.68
14832 293.64 12.00 0.00015 3+000 797.55 809.55
3+218 797.52 809.52
Powerhouse Powerhouse
3+665 790.64 801.80
14832 328.74 11.16 0.00015 4+000 790.59 801.75
4+460 4+661 790.49 801.65
4+460 790.49 802.49 790.49 802.4916850 320.00 12.00 0.00015 16850 320.00 12.00 0.00015
5+000 790.41 802.41 790.41 802.41
Marala Hydropower Project (FPS)(FPS)
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
MHP – Powerhouse PlanMHP – Powerhouse Plan
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
Rabi level
Karrif level
MHP – Powerhouse SectionMHP – Powerhouse Section
MHP: Energy Computations in Detailed DesignMHP: Energy Computations in Detailed Design
Procurement of Plant, Design, Supply and Install of Pakpattan Hydropower Project
(ICB # PB-005)
26
PROJECT LAYOUT - PHPPROJECT LAYOUT - PHP
Pakpattan Hydropower Project (FPS)(FPS)
OLD RDs NEW RDs
Last Design Proposed Design Last Design Proposed Design
BL FSL BL FSL Q B FSD S Q B S
112+350 542.09 551.59 542.09 551.59 6309 186.00 9.50 0.000120 6309 186.00 0.000120
113+000 532.55 541.05 542.67 551.17 3976 150.00 8.50 0.000125 3976 177.00 0.000125
113+114 113+114 532.53 541.03 542.65 551.15 3976 150.00 8.50 0.000125 3976 177.00 0.000125
114+690 532.34 540.84 542.46 550.96 3976 150.00 8.50 0.000125 3976 177.00 0.000125
532.32 540.82 Powerhouse 3976 150.00 8.50 0.000125 Powerhouse
114+968 532.30 540.80 529.80 538.30 3976 150.00 8.50 0.000125 3976 150.00 0.000125
116+338 116+467 532.13 540.63 529.62 538.12 3976 150.00 8.50 0.000125 3976 150.00 0.000125
124+950 531.06 539.56 528.54 537.04 3976 150.00 8.50 0.000125 3976 150.00 0.000125
124+950 528.54 537.04 528.54 537.04 3958 150.00 8.50 0.000095 3958 150.00 0.000095
Gov
ernm
ent o
f the
Pun
jab
Gov
ernm
ent o
f the
Pun
jab
PHP - POWER HOUSE
PHP: Energy Computations in Detailed DesignPHP: Energy Computations in Detailed Design
Progress of REDSIP Projects
MARALA HYDROPOWER PROJECT WORK SCHEDULE & PROGRESS
PROJECT NAME
MARALA HYDROPOWER PROJECT
Contract Cost Rs. 3050 Million
Sr.No. Project Components
Financial Weightage
w.r.t Project Cost
Contract Cost
(M PKR)
PlannedPhysicalProgress
Achieved PhysicalProgress
PlannedFinancialProgress
AchievedFinancialProgress
OVERALL PROJECT 100% 3050 96.12% 80.12% 96.12% 74.99%
1 DESIGN SERVICES FOR CIVIL WORKS 3.54% 108 100.00% 98.50% 100.00% 98.19%
2 DESIGN SERVICES FOR PLANT(E&M) 1.54% 47 100.00% 95.00% 100.00% 81.42%
3 PROCUREMENT OF E&M EQUIPMENT 37.02% 1132 100.00% 87.12% 100.00% 63.86%
4 CONSTRUCTION OF EMPLOYER'S FIELD FACILITIES 3.73% 114 100.00% 52.28% 100.00% 47.27%
5 CONSTRUCTION OF POWER CANAL INCLUDING HEAD & TAIL RACE 1.74% 53 100.00% 66.68% 100.00% 48.23%
6 CONSTRUCTION OF SPILLWAY INCLUDING DIVERSION CHANNEL 8.74% 267 100.00% 98.64% 100.00% 94.86%
7 CONSTRUCTION OF POWER HOUSE(Civil) 38.65% 1179 100.00% 92.61% 100.00% 89.93%
8 RAISING OF BANK OF UCC 1.01% 31 100.00% 49.33% 100.00% 17.40%
9 ACCESS ROAD 0.06% 2 100.00% 0.00% 100.00% 0.00%
10 E&M ELCTROMECHNICAL INSTALLATIONS 3.82% 117 95.00% 34.26% 95.00% 21.57%
11 INTERCONNECTION STUDY AND TRANSMISSION LINE 0.15% 2 100.00% 10.00% 0.00% 0.00%
Plan % will be revised according to EOT-2 submitted.
PAKPATTAN HYDROPOWER PROJECT WORK SCHEDULE & PROGRESS
PROJECT NAMEPAKPATTAN HYDROPOWER PROJECT
Contract Cost Rs. 1048 Million
Sr.No. Project Components
Financial Weightage
w.r.t Project Cost
Contract Cost
(M PKR)
PlannedPhysicalProgress
Achieved PhysicalProgress
PlannedFinancialProgress
AchievedFinancialProgress
OVERALL PROJECT 100% 1048 100.00% 85.12% 100.00% 76.16%
1 DESIGN SERVICES FOR CIVIL WORKS 1.42% 15 100.00% 99.00% 100.00% 97.64%
2 DESIGN SERVICES FOR PLANT(E&M) 6.19% 65 100.00% 95.00% 100.00% 80.26%
3 PROCUREMENT OF E&M EQUIPMENT 37.65% 405 100.00% 88.12% 100.00% 52.17%
4 CONSTRUCTION OF EMPLOYER'S FIELD FACILITIES 5.66% 59 100.00% 93.30% 100.00% 89.50%
5 CONSTRUCTION OF POWER CANAL INCLUDING HEAD & TAIL RACE 4.53% 47 100.00% 100.00% 100.00% 100.00%
6 CONSTRUCTION OF SPILLWAY (Civil) 12.75% 134 100.00% 100.00% 100.00% 100.00%
7 CONSTRUCTION OF POWER HOUSE(Civil) 19.26% 202 100.00% 100.00% 100.00% 100.00%
8 CONSTRUCTION OF BRIDGES 3.97% 42 100.00% 100.00% 100.00% 99.10%
9 EXCAVATION OF PAKPATTAN CANAL 3.21% 34 100.00% 100.00% 100.00% 100.00%
10 ACCESS ROAD 0.47% 5 100.00% 0.00% 100.00% 0.00%
11 E&M ELCTROMECHNICAL INSTALLATIONS 3.19% 33 100.00% 62.38% 100.00% 23.90%
12 INTERCONNECTION STUDY AND TRANSMISSION LINE 1.70% 7 100.00% 10.00% 100.00% 0.00%
Plan % will be revised according to EOT-2 submitted.
DEG OUTFALL HYDROPOWER PROJECT WORK SCHEDULE & PROGRESS
PROJECT NAMEDEG OUTFALL HYDROPOWER PROJECT
Contract Cost Rs. 1668 Million
Sr.No. Project Components
Financial Weightage w.r.t
Project Cost
Contract Cost
(M PKR)
PlannedPhysicalProgress
Achieved PhysicalProgress
PlannedFinancialProgress
AchievedFinancialProgress
OVERALL PROJECT 100% 1668 78.45% 63.60% 78.45% 52.34%1 Design Services for Civil Works 3.86% 64 98.00% 96.80% 98.00% 94.56%2 Design Services for Plant 4.83% 81 98.00% 90.00% 98.00% 75.44%3 Procurement of E&M Equipment 28.03% 485 100.00% 66.74% 100.00% 18.40%4 Construction of Employer's Field Facilities 7.26% 121 100.00% 84.90% 100.00% 81.20%5 Construction of Power Canal (Head & Tail Race) 5.74% 96 76.12% 59.70% 76.12% 58.89%6 Construction of Spillway 9.78% 163 90.00% 70.70% 90.00% 53.31%7 Construction of Power House(Civil) 25.57% 427 100.00% 96.70% 100.00% 95.65%8 Raising of Bed and Bank of UCC 1.34% 22 100.00% 0.00% 100.00% 0.00%9 Dismantling and Removal of Fall Structure 0.30% 5 0.00% 0.00% 0.00% 0.00%
10 Relocation of Feeder & Construction of New Outlets 1.54% 26 100.00% 18.20% 100.00% 12.05%11 Construction of Bridges 0.52% 9 100.00% 0.00% 100.00% 0.00%12 Construction of Aquaduct & Distributry 1.16% 19 100.00% 0.00% 100.00% 0.00%13 Strengthening of Foundation of Road Bridges 0.40% 7 0.00% 0.00% 0.00% 0.00%14 Machine Hall 3.23% 54 100.00% 0.00% 100.00% 0.00%15 Control Building 1.94% 32 100.00% 0.00% 100.00% 0.00%16 Access Road 0.06% 1 85.00% 0.00% 85.00% 0.00%17 E&M ELCTROMECHNICAL INSTALLATIONS 2.94% 49 52.00% 25.00% 24.61% 24.61%
18 INTERCONNECTION STUDY AND TRANSMISSION LINE 1.5% 8 80.00% 15.00% 0.00% 0.00%
Plan % will be revised according to EOT submitted.
CHIANWALI HYDROPOWER PROJECT WORK SCHEDULE & PROGRESS
PROJECT NAMECHIANWALI HYDROPOWER PROJECT
Contract Cost Rs. 2160 Million
Sr.No. Project Components
Financial Weightage
w.r.t Project Cost
Contract Cost
(M PKR)
PlannedPhysicalProgress
Achieved PhysicalProgress
PlannedFinancialProgress
AchievedFinancialProgress
OVERALL PROJECT 100% 2160 73.84% 44.80% 73.84% 35.38%
1 DESIGN SERVICES FOR CIVIL WORKS 4.24% 92 92.00% 88.32% 92.00% 87.22%
2 DESIGN SERVICES FOR PLANT 2.77% 60 92.00% 90.00% 92.00% 75.37%
3 PROCUREMENT OF E&M EQUIPMENT 24.09% 552 100.00% 65.34% 100.00% 19.00%
4 CONSTRUCTION OF EMPLOYER'S FIELD FACILITIES 5.83% 126 100.00% 34.00% 100.00% 33.26%
5 CONSTRUCTION OF POWER CANAL INCLUDING HEAD & TAIL RACE 3.78% 82 82.20% 39.30% 82.20% 38.86%
6 CONSTRUCTION OF SPILLWAY 11.78% 254 87.20% 23.70% 87.20% 14.12%
7 CONSTRUCTION OF POWER HOUSE(civil) 21.33% 461 100.00% 87.50% 100.00% 86.77%
8 CONSTRUCTION OF BRIDGES 6.05% 131 70.00% 16.20% 70.00% 10.11%
9 CONSTRUCTION OF FEEDING CHANNEL 9.18% 198 88.10% 0.00% 88.10% 0.0%
10 EXCAVATION OF UCC 6.56% 142 0.00% 0.00% 0.00% 0.0%
11 ACCESS ROAD 0.10% 2 75.00% 0.00% 75.00% 0.0%
12 E&M ELCTROMECHNICAL INSTALLATIONS 2.29% 49 48.00% 32.00% 31.97% 31.97%
12 INTERCONNECTION STUDY AND TRANSMISSION LINE 2.00% 11 87.20% 15.00% 0.00% 0.00%
SNAPS
Marala Hydropower Project
MARALA HYDROPOWER PROJECT
SEPTEMBER 2014
MARALA HYDROPOWER PROJECT
JANUARY 2015
MARALA HYDROPOWER PROJECT
APRIL 2015
MARALA HYDROPOWER PROJECT
JULY 2015
41
MARALA HYDROPOWER PROJECT
DEC 2015
42
MARALA HYDROPOWER PROJECT
DEC 2015
43
MARALA HYDROPOWER PROJECT
DEC 2015
44
MARALA HYDROPOWER PROJECT
DEC 2015
45
MARALA HYDROPOWER PROJECT
DEC 2015
46
MARALA HYDROPOWER PROJECT
DEC 2015
47
MARALA HYDROPOWER PROJECT
DEC 2015
Pakpattan Hydropower Project
49JANUARY 2014
PAKPATTAN HYDROPOWER PROJECT
50SEPTEMBER 2014
PAKPATTAN HYDROPOWER PROJECT
51APRIL 2015
PAKPATTAN HYDROPOWER PROJECT
PAKPATTAN HYDROPOWER PROJECT
JULY 2015
53DEC 2015
PAKPATTAN HYDROPOWER PROJECT
54DEC 2015
PAKPATTAN HYDROPOWER PROJECT
55DEC 2015
PAKPATTAN HYDROPOWER PROJECT
56DEC 2015
PAKPATTAN HYDROPOWER PROJECT
57DEC 2015
PAKPATTAN HYDROPOWER PROJECT
58DEC 2015
PAKPATTAN HYDROPOWER PROJECT
59DEC 2015
PAKPATTAN HYDROPOWER PROJECT
60DEC 2015
PAKPATTAN HYDROPOWER PROJECT
61DEC 2015
PAKPATTAN HYDROPOWER PROJECT
62DEC 2015
PAKPATTAN HYDROPOWER PROJECT
Deg Outfall Hydropower Project
64JANUARY 2015
DEG OUTFALL HYDROPOWER PROJECT
65APRIL 2015
DEG OUTFALL HYDROPOWER PROJECT
DEG OUTFALL HYDROPOWER PROJECT
JULY 2015
DEG OUTFALL HYDROPOWER PROJECT
DEC 2015
DEG OUTFALL HYDROPOWER PROJECT
DEC 2015
DEG OUTFALL HYDROPOWER PROJECT
DEC 2015
DEG OUTFALL HYDROPOWER PROJECT
DEC 2015
DEG OUTFALL HYDROPOWER PROJECT
DEC 2015
Chianwali Hydropower Project
73JANUARY 2015
CHIANWALI HYDROPOWER PROJECT
74APRIL 2015
CHIANWALI HYDROPOWER PROJECT
CHIANWALI HYDROPOWER PROJECT
JULY 2015
76DEC 2015
CHIANWALI HYDROPOWER PROJECT
77DEC 2015
CHIANWALI HYDROPOWER PROJECT
78DEC 2015
CHIANWALI HYDROPOWER PROJECT
SECURITY MEASURES
80
SECURITY ARRANGEMENTS FOR THE CHINESE WORKING AT HYDRO POWER PROJECTS IN PUNJAB
Name of Project Chianwali Hydropower Project (CHP) Chinese State Twenty One (21) Police Guards (SPU) 3x HC & 42 x Constables (45) Elite Guards 2x HC & 8 x Constables (10)Private Security Guards 2x Supervisors & 9 x Guards (11)Name of Security Company GB Security (Pvt) Ltd.Employees, labour and staff One Hundred Six (106)CCTV Cameras Seven (7) Search Lights Twenty (20)Metal Detector One (1)Vehicle Scanner One (1)Walki Taltkie Sets Four (4)Escort Register Being Maintained Visitor’s Register Being MaintainedEmployees Card IssuedEscort Chinese Being ensuredBoundary Wall Exists Barriers Two (2)Watch Tower Four (4)Focal Person Lt Col ® Ejaz
81
SECURITY ARRANGEMENTS FOR THE CHINESE WORKING AT HYDRO POWER PROJECTS IN PUNJAB
Name of Project Marala Hydropower Project (MHP)Chinese State Twenty Four (24)Police Guards 2x SI & 31x Constables (33)Elite Guards 1x SI & 15x Elite Guards (16)Private Security Guards 2x Supervisors & 12x Guards (14)Name of Security Company GB Security (Pvt) Ltd.CCTV Cameras Ten (10)Search Lights Sixteen (16)Metal Detector Three (3)Vehicle Scanner One (1)Entry Barriers Two (2)Exit Barriers Two (2)Employees Two Hundred and Fifteen (215)Visitor’s Register Being MaintainedEmployees Card IssuedEscort Chinese Being ensuredFocal Person Maj ® Zafar
Remarks: Security Situation is being regularly discussed with Chinese
82
SECURITY ARRANGEMENTS FOR THE CHINESE WORKING AT HYDRO POWER PROJECTS IN PUNJAB
Name of Project Pakpatan Hydropower Project (PHP)Chinese State Sixteen (16)Police Guards 1x ASI, 3 x Constables (4)Elite Guards 1x ASI & 3x Constables (4)Special Protection Unit Guard 1x SI, 4x HC, 47 x Guards (52)Private Security Guards 2x Supervisors & 8x Guards (10)Name of Security Company GB Security (Pvt) Ltd.CCTV Cameras Six (6)Search Lights Ten (10)Metal Detector One (1)Vehicle Scanner One (1) Entry Barriers One (1) Exit Barriers One (1) Employees, staff and labour Nighty (90)Boundary Wall ExistsVisitor’s Register Being MaintainedEmployees Card IssuedEscort Chinese Being providedFocal Person Mr. Zulfiqar
Remarks: Security situation is regularly discussed with Chinese
83
SECURITY ARRANGEMENTS FOR THE CHINESE WORKING AT HYDRO POWER PROJECTS IN PUNJAB
Name of Project Deg Outfall Hydropower Project (DHP) Chinese Twenty Five (25) Police Guards 1x HC & 7 x Constables (8) Elite Guards 1x HC & 4 x Constables (5) Private Security Guards 2x Supervisors & 8 x Guards (10)Name of Security Company GB Security (Pvt) Ltd. CCTV Cameras Eight (8) Search Lights Fourteen (14) Metal Detector One (1) Vehicle Scanner One (1) Employees, labour, staff Thirty Five (35)Boundary Wall Exist around Chinese residenceBarbed Wire Exist over boundary wallObservation Post One (1)Visitor’s Register Being MaintainedEscort Register Being MaintainedEmployees Card IssuedEscort Chinese Being ensuredFocal Person Nil
Remarks: Security update is being regularly shared with Chinese
84
SECURITY ARRANGEMENTS FOR THE CHINESE WORKING AT HYDRO POWER PROJECTS IN PUNJAB
Name of Project Sinotec Co., Ltd, Lahore Chinese Six (6) Police Guards 1x HC & 3 x Constables (4) Private Security Guards Two (2)Name of Security Company GB Security (Pvt.) Ltd. CCTV Cameras Four (4) Search Lights Four (4) Metal Detector One (1) Vehicle Scanner One (1) Alarm System Installed Entry Point One (1) Exit Point One (1) Employees Forty (40)Visitor’s Register Being MaintainedEmployees Card IssuedEscort Chinese Being ensuredChief Coordinator Col ® Sajid HameedRemarks Chinese living in 4 FCC Muratab Ali
Road and 33-A, Block – G, Gulberg III, Lahore
THANKSTHANKS
86
REDSIP PROJECTS
Description Unit MHP PHP CHP DHP Overall
E & M Cost Million USD 15.00 43% 5.89 49% 7.75 32% 7.10 38% 35.73 40%
E & M Cost per MW Million USD 1.96 2.09 1.44 1.76 1.80
Civil Work Cost Million USD 19.79 57% 6.06 51% 16.79 68% 11.69 62% 54.33 60%
Civil Works Cost per MW Million USD 2.59 2.15 3.13 2.89 2.73
Project EPC Cost Million USD 34.78 11.95 24.53 18.80 90.06
Project Installed Capacity MW 7.64 2.82 5.37 4.04 19.87
Project EPC Cost per MW Million USD 4.55 4.24 4.57 4.65 4.53