Imagination at work.
Davide Franceschi March 24th, 2015
GEs Operating Rhythm
GE proprietary and confidential
Companys profile
GE Outlook
3
GE proprietary and confidential
Creating competitive advantage in the GE Store
O&G Revenues $18,7B OP $2,6B OP @19%
4
GE proprietary and confidential
Purposeful portfolio moves
5
GE proprietary and confidential
6
GE proprietary and confidential
GE consolidated results
7
GE proprietary and confidential
2014 General Electric Company - All rights reserved
GE Oil & Gas today From extraction, to transportation, to end use
8
Subsea Systems
$3.5B Subsea production
systems
Turbomachinery Solutions
$5.4B LNG, on- and offshore,
pipeline
Downstream Technology
Solutions
$1.7B Refinery and gas
distribution
Drilling & Surface
$4.9B BOPs and risers,
onshore trees,
Artificial lift
~45,000 employees ~$19B revenues 14
Delivering customer solutions by applying systems-level engineering across the value chain
Measurement & Control
$3.8B Valves, controls, diagnostics
8
GE proprietary and confidential
Our technology solutions Subsea Systems Subsea trees & wellheads
Subsea power & processing
Controls
Manifolds
Flexible risers
Flow lines
Specialty connectors & pipes
Measurement & Control Asset condition monitoring, control sensing
& inspection solutions
Optimization & diagnostic software
Pipeline inspection and integrity services
Control & safety relief valves
Fuel dispensers & payment terminals
Fuel control & retail systems
Drilling & Surface Drilling risers
Blow-out preventers
Electric submersible pumps
Logging while drilling & wire line tools
Surface wellheads & flow control
Logging services
Well Performance Services
Lufkin
Artificial lift: rod lift, gas lift, plunger lift, progressive cavity pumps, hydraulic pumping units
Service & repair
Engineered industrial gears
Fluid film bearings
Turbomachinery Solutions Turbomachinery equipment and services for the upstream, midstream and LNG segments including:
Gas turbines
Axial & centrifugal compressors
Electric motor driven compressors
Turn-key industrial modular solutions
Turboexpanders & heat exchangers
Contractual & maintenance services
Upgrades & industrial applications
Monitoring & diagnostics
~45,000 employees
~$19B revenues 14
Delivering customer solutions by applying systems-level engineering across the portfolio
Downstream Technology Solutions Equipment & services for the refinery & petrochemical, distributed gas and industrial applications including:
Steam turbines
Reciprocating compressors
Distributed gas solutions small LNG & CNG
Pumps, valves & distribution systems
Blowers & compressors
Maintenance services & remote monitoring & diagnostics
9
GE proprietary and confidential
A Turbo Machinery company
Well Support Pressure Control
Electrical Submersible Pumps
Logging Services
Developed a Service
model
Expanded in Inspection
Technologies
Entered the Drilling &
Production segment and
Subsea
Expanded to sensing and
flow
Ideal partner for new
challenging O&G
developments
$1
$2
$4 2007
$10
~$16
~$20
1994 1997 2004 2008 2011 2013
Where we are now growth of GE Oil & Gas Orders - $ in billions
10
GE proprietary and confidential
Our technology solutions 45,000 employees across the globe
Subsea Systems
Turbomachinery Solutions
Drilling & Surface
Downstream Technology
Solutions
Measurement & Control
Aberdeen Houston Florence Houston Boston
Advanced turbomachinery equipment and services for the upstream, midstream
and LNG segments
Drilling, completion & production solutions for
unconventional resources, deepwater
drilling & EOR applications
Comprehensive systems & expertise
for reliable subsea
production, control and optimized life-of-field
2014 General Electric Company
Equipment & services for refinery, petrochemical,
distributed gas & industrial
applications
Asset condition monitoring, control sensing & inspection solutions delivering healthcare for the industry
11
GE proprietary and confidential
Turbomachinery Solutions 6,000+ PEOPLE ACROSS 6 CONTINENTS
Offshore
Adjacent segments
Pipeline
Floating LNG
AN INTEGRATED BUSINESS
HIGH-TECH PRODUCTS &
SERVICES
PROJECT MANAGEMENT
CONTRACTUAL & MAINTENANCE
SERVICES & UPGRADES
SERVING KEY SEGMENTS
LNG Onshore
DRIVERS
Aeroderivative Gas Turbines
Heavy Duty Gas Turbines
Synchronous & Induction Electric Motors
COMPRESSORS
Centrifugal & Axial
Integrated
Direct Drive High Speed
Subsea
Turbo expanders
TURN-KEY SOLUTIONS
Industrial Modules Waste Heat Recovery
OUR PORTFOLIO
2014 General Electric Company
COMPACT CONTROL
SYSTEMS
AIR COOLED HEAT
EXCHANGERS
12
GE proprietary and confidential
Key Turbomachinery Solutions hubs
2014 General Electric Company
Where we are
Headquarters
Regional Hubs
Manufacturing Facilities
Service Shops
Edmonton, Canada
Houston, USA
Rio de Janeiro, Brazil
Florence, Italy Massa, Italy Avenza, Italy Vibo Valentia, Italy Talamona, Italy
Aberdeen, UK
Le Creusot, France
Maracaibo, Venezuela
Moscow, Russia
Abu Dhabi, MENAT Doha, MENAT
Beijing, China
Jandakot, Australia
Kuala Lumpur, Malaysia
Gurgaon, India Port Harcourt, Nigeria
Hassi R' Mel, Algeria
Barcelona, Spain
Port of Spain, Trinidad
Fot, Hungary
Recife, Brazil
13
GE proprietary and confidential
O&G Operational view
14
GE proprietary and confidential
O&G 2014 results
15
GE proprietary and confidential
GE Op Mechanism
Finance Competency Model
17
GE proprietary and confidential
Vision - CFO Agenda
Finance Vision: Partners in Building Shareowner Value Through Integrity, Excellence, and Leadership
Leadership Development Business Partners Drive Initiatives Services, Globalization, Simplification VCP, ROIC, Fastwork Digitization Providing Real Time Management Information and Solutions Controllership Fundamental
18 GE proprietary and confidential
GEs Operating Rhythm
Quarterly Earning Release to communicate externally the performance
The annual drumbeat that keeps the Company moving
Linkage of Processes and Meetings Form a Powerful Operating System to accelerate
Business and Cultural Change.
19
GE proprietary and confidential
How we oversee risk
20
GE proprietary and confidential
GE Oil & Gas Op Mechanism
Executive summary
2
3
4
1
Drive & influence behaviors
Aligned with key O&G and GE HQ events
Designed to be more action-oriented, topical, allow cross-functional engagement & best practices sharing
Solid Predictability is not an option
22
GE proprietary and confidential
Organizational Structure GE Oil & Gas
Latam MENAT Sub S Africa
Russia & CIS
China APac
TMS DTS D&S
Lufkin SubSea M&C
ENG Quality Finance
Communic. Marketing Global
Supply C.
IM HR
Legal Biz Dev
CEO
Regions Business P&Ls
Functions
Project Management
23
GE proprietary and confidential
Project Mgmt
Portfolio Analysis
Planning
Risk Management
Stakeholders
23/03/2015 24
Biz Model
Orders
Revenues
Op Profit, rate %
CFOA
Business Model
Project Management
Financial Plan & Analysis
= +
Dynamic loops between Project Directors & FP&A
Opportunities
Customers
Projects
Bids
FEEDs
Biz Objectives
Orders
Revenues
Op Profit, rate %
CFOA
Project Directors
Financial Planning
Sales Force
C- suite
From tendering to execution
24
GE proprietary and confidential
Turbomachinery Project Organization
TM - OTR
PROJECT
MANAGER
PROJ. QUALITY
MANAGER
PROJECT
ENGINEER
MFG Fullfillment Cells
SOU Fullfillment Cells
DESIGN ENGINEERS *
PROJECT
PLANNER INSTALLATION
MANAGER
SITE TEAM *
WARRANTY
MANAGER
TM - QUA ENG Supply
Chain Global
Service
Operations Finance
25
GE proprietary and confidential
26
GE proprietary and confidential
Portfolio Orientation & Implementation
Targets
PM & Funct. Measured on Same Target
Shared Team Accountability
Operating rhythm
Projects
So
urc
ing
TGT
$/%
Ma
nu
factu
ring
En
gin
ee
ring
$/% $/%
Merge Project & Financial Rhythms to drive all functions on a common
goal
$/%
Projects $/% $/% $/%
23/03/2015 27 27
GE proprietary and confidential
Project Execution Phases... Key Processes ITO/OTR Hand-off
Project Contract Activation Project Plan Creation Project Budget Baseline Customer Kick Off Meeting Pre-inspection Meeting
Engineering Project Design Reviews Project Documentation Mngt . (VDR)
Sourcing Material Procurement Management Supplier Deviation Request Mngt .
Manufacturing Manufacturing Plan Reviews NC Mngt . during production phase
Shipping Meeting Packing & Shipment Transportation/Handling Process
Events directly involving Customers 28
GE proprietary and confidential
Installation & Warranty Phases... Key Processes
Site Survey & Pre-Installation
Meeting Warranty
COD Site
Start
Warranty
Expiration
Planning and Monitoring Red Flag Review Technical Briefing Technical Package for Installation Management of NC detected at site
Site Survey Pre-installation meeting
Warranty Claim Mngt Hand-Off from TM to CSA
Installation Contract
Erection Pre-Commissioning
& Commissioning Start-Up
RFR
Oil Flushing
Mechanical
Completion RFR
Green Light RFR
Loop Checks
Events directly involving Customers
29
GE proprietary and confidential
Project Control & Risk Milestones Approach
Launch Execution Shipment Installation Warranty
Risk Reviews
Customer Milestones
Project Control Review
Project Risk Reviews - @ Milestones
Identify/Capture main Prj Risks for each milestone
Risk Check-List, Risk Priority Number Action/Mitigation Plan & Risk Register Update
Project Control Reviews Monthly
Schedule, budget, quality and any other aspect related to project Issue & risk management
Internal Reviews
Pre-PO
Impact
Low High
1 3 9
High 9 9 27 81 Red Significant Risk
3 3 9 27 Yellow Proceed with caution
Low 1 1 3 9 Green No concern
Gray Not yet evaluated / No risk
Pro
babili
ty
30
GE proprietary and confidential
Project Budget unique baseline
Keep As Bid cost estimation constantly aligned
Freeze As Bid versions
Order booking As Sold Budgetformally communicate
As Sold Budget to Hand-Off (RAC) playersshare and analyze
Input As Sold Budget into BOM structure
As Sold true-up meeting with Finance/PM
Support AE to update cost estimate
Superviseupdate financial plan
Analyze and check Order Plan consistency
Attend Hand-Offcontribute!
Provide dummy template for BOM costing recast
Validate and upload in Oracle
As Bid Budget
As Sold Budget
Hand-Off (RAC)
Project Budget
Commercial Ops Team Finance Team
31
GE proprietary and confidential
Month 1
1 2 3 4 5
8 9 10 11 12
15 16 17 18 19
22 23 24 25 26
29 30 31 1 2
Project finance rhythm
Calendar
QMI 1
3
KPIs weekly pacing ... Operations + Finance
Month 2
1 2 3 4 5
8 9 10 11 12
15 16 17 18 19
22 23 24 25 26
29 30 31 1 2
Month 3
1 2 3 4 5
8 9 10 11 12
15 16 17 18 19
22 23 24 25 26
29 30 31 1 2
As Sold As Delivered
Backlog review + B&B/ TO GO + Prodty
BC
E
BC
E
BC
E
Project reviews
BCE ( Project Margin review)
2
3
1
32
GE proprietary and confidential
Rigorous process to track/ review project costs for long term contracts
Drive productivity initiatives and project margin expansion
Scalable and digitized process
Formal reviews with key stakeholders Finance to lead
Project margin review process
Highlights
33
GE proprietary and confidential
Operations Finance
B1) MATERIALS (EXTERNAL SUPPLY)
Sez Item Sub-item Description Q.tyUnit Cost
(Euros)
Total Cost
(Euros)
100 0010 -
100 0050 Outer casing -
100 0100 Suction Head flange -
100 0101 Discharge Head flange -
100 0310 0010 Shaft 1 7,000.00 7,000.00
100 0310 0020 Impeller 1 12,000.00 12,000.00
100 0310 0030 Impeller 1 5,000.00 5,000.00
100 0310 0040 Impeller 4 3,500.00 14,000.00
100 0310 0050 Impeller -
100 0310 0060 Impeller -
100 0310 0070 Impeller -
100 0310 0080 Impeller -
100 0310 0090 Impeller -
100 0310 OTH Completion parts 1 18,000.00 18,000.00
100 0221 0010 Inner Casing 1 21,000.00 21,000.00
100 0221 0020 Inner Casing -
100 0221 0030 Inlet Diaphragm 1 4,000.00 4,000.00
100 0221 0040 Inlet Diaphragm -
100 0221 0050 Interph./Disch. Diaphragm -
100 0221 0060 Models -
100 0221 0070 Intermediate Diaphragm 1 5,000.00 5,000.00
100 0221 0080 Intermediate Diaphragm 4 4,500.00 18,000.00
100 0221 0090 Intermediate Diaphragm -
100 0221 0100 Intermediate Diaphragm -
100 0221 0110 Intermediate Diaphragm -
100 0221 0120 Intermediate Diaphragm -
100 0221 OTH Other 1 1,500.00 1,500.00
100 0160 -
100 0161 -
COST CONTROL SEZ. 100
Sez100
0
AL JUBAIL
CUSTOMER :
END USER :
PROPOSAL # :
PLANT :
Rotor
Rotor
Rotor
Rotor
Diaphragms set
Diaphragms set
Diaphragms set
Diaphragms set
Suction end cover
Discharge end cover
Diaphragms set
Rotor
Diaphragms set
Diaphragms set
Diaphragms set
Diaphragms set
SCOPE of SUPPLY :
Rotor
Rotor
Description
Outer casing assembling accessories
Rotor
Rotor
Diaphragms set
Diaphragms set
Diaphragms set
Rotor
Diaphragms set
Project Budget
Unique baseline for measurement Built on BOMcommon ITO/OTR language Shortened process available @ Hand-off
Earlier visibility to protect/enhance margin Monthly rhythm calendar & dashboards Leakages RCA WF basedfunctions involvement
Project Reviews
OTR ITO
Feedback to ITO
Leverage on lessons learned Enable cost estimation improvementSource Books + Configuration Mgmt On Line & Oracle based tools
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
Sourcebooks
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
0
20
40
60
Q1 '08 Q2 '08 Q3 '08 Q4 '08 Q1 '09
Sourcebooks
Project budget loop back
34
GE proprietary and confidential
Simple Understandable
Forward Looking
Provide Operational Explanations
Provide Accountability
Focus Efforts In the Right Places
Broadly applicable across businesses
Accurate Timely
Cost effective
Difficult to manipulate
Attributes of good performance metrics
35
GE proprietary and confidential
Q& A