+ All Categories
Home > Documents > 2016 portfolio_Thomas Blair IV

2016 portfolio_Thomas Blair IV

Date post: 26-Jul-2016
Category:
Upload: thomas-blair
View: 220 times
Download: 0 times
Share this document with a friend
Description:
 
29
THOMAS BLAIR IV ARCHITECTURAL PORTFOLIO
Transcript
Page 1: 2016 portfolio_Thomas Blair IV

Illustrative Master Plan

Scale: 1m = 1000m

THOMAS BLAIR IV ARCHITECTURAL PORTFOLIO

Page 2: 2016 portfolio_Thomas Blair IV

SHELDON ANNEX. WALL SECTION

SPROUT LIFE : BOULDER WELLNESS CENTERCONTACT EMPLOYMENT HISTORY

HONORS & ACCOMPLISHMENTS

EDUCATION

MODELING

ADOBE CREATIVE SUITES

[email protected] Architectural Design Associates (Dec.2015 - Present) InternArchitect-Officebuilding&multi-familyhousingfocusedfirm

BCDM Architects (Summer 2015) InternArchitect-Education&Religiousfocusedfirm

SL Jensen Construction Inc. (Summer 2014) Generalconstructionlaborer-Residential&commercial

U.S.GreenBuildingCouncil(Sept.2014-Present) Organizationmember-Focusedongreenbuildingdesign

SigmaPhiEpsilonFraternity(Aug.2010-May2014) VicePresident-ResidentialLearningCommunity PhilanthropyPresident-Philanthropicandfund-raisingorganizer

BachelorofScienceinDesign(May2014) UniversityofNebraska-Lincoln

MasterofArchitecture(May2016) UniversityofNebraska-Lincoln

AutoCadRevit

Rhino 5

IllustratorInDesign

Photoshop

(402)-670-09991441S91stAve

Omaha,NE68124

RESUME

Page 3: 2016 portfolio_Thomas Blair IV

TABLE OF CONTENTS

POCHE WALL INSTALLATION

SL JENSEN CONSTRUCTION

SHELDON PAVILION INSTALLATION

BOX HOUSE 1

3-6

7-10

11-12

13-16

17-18

19-22

23-24

25-28

SHELDON ANNEX. WALL SECTION

SUSTAINABLE URBANISM

URBAN DESIGN INTERVENTION

SPROUT LIFE : BOULDER WELLNESS CENTER

Illustrative Master Plan

Scale: 1m = 1000m

Page 4: 2016 portfolio_Thomas Blair IV

SITE PLANBOULDER,CO

Highway 7_Arapahoe Ave

I-157 Interstate

N 75th Street

SPROUT life BOULDER WELLNESS CENTER

“from ground to growth”

SproutLifeBoulderWellnessCenterwasaprojectproposedoutsidethecitylimitsofBoulder,CO.Thewellnesscenteroriginallystartedasacriticalaccesshospitalbutafterfurtherresearch,theprojecttransformedintoawellnesscentersupportingthegrowingcommunitiesofBoulder,Lafayette,andLouisvilleColorado.

TOP:Siteplandiagram BOTTOM:Siteandaccessabilitydiagram

SPROUTLIFE:boulderwellnesscenter

Page 5: 2016 portfolio_Thomas Blair IV

SITE PLANBOULDER,CO

Highway 7_Arapahoe Ave

I-157 Interstate

N 75th Street

BOTTOM:Siteandaccessabilitydiagram

4

Page 6: 2016 portfolio_Thomas Blair IV

BACK CORRIDOR

OUT-PATIENT SERVICES

WELLNESS CENTER

IN-PATIENT CARE UNITS

TOP:Conceptformdiagrams

BOTTOM:Sectiondiagram BOTTOM:Programmaticdiagram BOTTOM:Sectionallightingdiagram

SPROUTLIFE:boulderwellnesscenter

Page 7: 2016 portfolio_Thomas Blair IV

6

Page 8: 2016 portfolio_Thomas Blair IV

TOP:30thandMasonSt.

BOTTOM:Stairformwork BOTTOM:Stairrebarandformwork BOTTOM:Finishedstairs

SL JENSEN CONSTRUCTION

Page 9: 2016 portfolio_Thomas Blair IV

8

Page 10: 2016 portfolio_Thomas Blair IV

TOP:Constructionphotocompilation

BOTTOM:Residentialoutdoorfireplace BOTTOM:Iowaresidentialcabinetinstallation BOTTOM:CATcompacttrackloader

SL JENSEN CONSTRUCTION

Page 11: 2016 portfolio_Thomas Blair IV

10

Page 12: 2016 portfolio_Thomas Blair IV

ThePocheWallInstallationprojectislocatedbetweentwobuildings,separatingacourtyardandastreet.Thedesignwasintendedtoallowjustenoughtransparencythroughthewalltolookin,butthecorrectamountofopacitytoconfineaclosedspace.

BOTTOM:Courtyardview TOP:Planviewshadowdiagram BOTTOM:Streetviewdiagram

POCHE WALL INSTALLATION

Page 13: 2016 portfolio_Thomas Blair IV

12

Page 14: 2016 portfolio_Thomas Blair IV

LocatedinShouguangChinatheobjectiveofthisprojectwastocreateasettlementthatfulfilledtheneedtodeveloprobustandresilientcirculationsystemsthatcollectivelyyieldalowercarbonfootprintandlesspollutionoftheenvironment.Thisframeworkdealtwithmultipleprogrammaticobstaclesincluding:afforablehousing,marketratehousing,commercial,highschool,middleschool,elementaryschoolandafullsiteliving machine.

BOTTOM:Conceptualprocessdiagrams TOP:SiteopenspacerelationshipTOP:Sitesizerelationship

FORM LAYOUT

PROGRAMMATIC LAYOUT

HOLDING THE COMMERCIAL STREET EDGE DESIGN FOR FUNCTION SITE ACCESS

COMMERCIAL FIRST FLOOR/RESIDENTIAL ABOVE VENTILATION PATH SHARED COMMUNITY SPACE

PASSAGEWAY

SEPARATE COMMUNITY SPACES

ARCH 510/610_M.HOISTAD Griess

CONCEPTSITE

DOWNTOWN LINCOLN GRID

31.1 Hectares

ARCH 510/610_M.HOISTAD Griess

CONCEPTOPEN SPACE

OPEN SPACE

OPEN SPACE

OPEN SPACE

OPEN SPACE

OPEN SPACE

JIANXING ST

GU

AN

GM

ING

RD

CH

ENM

ING

RD

XIN

GLO

NG

RD

SUSTAINABLEURBANISM:communityfacilities

Page 15: 2016 portfolio_Thomas Blair IV

Illustrative Master Plan

Scale: 1m = 1000m

14

Page 16: 2016 portfolio_Thomas Blair IV

UP

UP

1 2 3 4 5 6 7

A

B

C

D

3 BEDROOM/2 BATHROOM UNIT BEDROOMS: 31 Sq. mBATHROOM: 7 Sq. mKITCHEN: 4.5 Sq. mLIVING/DINING: 40.5 Sq. mBALCONY: 5 Sq. mTOTAL SQUARE FOOTAGE: 88 Sq. m

N

1 BEDROOM/1 BATHROOM STUDIO UNIT BEDROOMS: 8 Sq. mBATHROOM: 3 Sq. mKITCHEN: 2 Sq. mLIVING/DINING: 10 Sq. mBALCONY: 5 Sq. mTOTAL SQUARE FOOTAGE: 28 Sq. m

2 BEDROOM/1 BATHROOM UNIT BEDROOMS: 12 Sq. mBATHROOM: 4 Sq. mKITCHEN: 7 Sq. mLIVING/DINING: 25 Sq. mBALCONY: 5 Sq. mTOTAL SQUARE FOOTAGE: 53 Sq. m

UP

UP UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

1 2 3 4 5 6 7

A

B

C

D

A B C D

UP

UP

14

23

BOTTOM:Naturalventilation/lightingdiagram

SUMMER SUN

WINTER SUN

SUMMER SUN

WINTER SUN

SUSTAINABLEURBANISM:communityfacilities

Page 17: 2016 portfolio_Thomas Blair IV

16

Page 18: 2016 portfolio_Thomas Blair IV

TheSheldonAnnex.WallSectionwasdevelopedtofurtherourknowledgeontechnicalbuildingconstruction.Theobjectivewastocreatea1/2”sectionmodelofacriticalareaofoursemesterproject.

BOTTOM:Roofdetail

BOTTOM:Detailsectionmodel BOTTOM:Wallsectionlinedrawing

PRESSURED-TREATED TOPMETAL FLASHING

1’ CONCRETE WALL

2”ROOFMEMBRANE

3”INSULATEDCONCRETE

2”POUREDCONCRETE

3”METALDECKING

OPEN-WEB STEEL JOISTEMBEDDED METAL PLATE

ANGLEDBRACKET

SHELDON ANNEX. WALL SECTION

Page 19: 2016 portfolio_Thomas Blair IV

BOTTOM:Wallsectionlinedrawing

18

Page 20: 2016 portfolio_Thomas Blair IV

‘O’ STREET ‘O’ STREET ‘O’ STREET

27TH

STR

EET

27TH

STR

EET

27TH

STR

EET

UrbanDesignInterventionwasagroupefforttoredesignanurbanlandscapeindowntownLincolnNebraska.Ourgrouppurposeda10-30yearmasterplantoredefinetheeightblockregion.

BOTTOM:Lincolnfigureground TOP:Urbanplandiagrams BOTTOM:Masterplansitediagram

N ST

M ST

L ST

17TH

ST

18TH

ST

AN

TELO

PE

VA

LLE

Y P

KW

Y

20TH

ST

21S

T S

T

“M” STREET ZONE OF LINCOLN DOWNTOWN DISTRICT | SITE PLAN SCALE: 1” = 40’N

URBAN DESIGN INTERVENTION

Page 21: 2016 portfolio_Thomas Blair IV

20

Page 22: 2016 portfolio_Thomas Blair IV

TOP:Conceptstudymodel TOP:Biketraildiagram BOTTOM:Masterplanrendereddiagram

N ST

M ST

L ST

17TH

ST

18TH

ST

AN

TELO

PE

VA

LLE

Y P

KW

Y

20TH

ST

21S

T S

T

GREEN SPACE BUILDING BIKE TRAIL“M” STREET ZONE OF LINCOLN DOWNTOWN DISTRICT | BIKE TRAIL DIAGRAM

URBAN DESIGN INTERVENTION

Page 23: 2016 portfolio_Thomas Blair IV

N ST

M ST

L ST

17TH

ST

18TH

ST

AN

TELO

PE

VA

LLE

Y P

KW

Y

20TH

ST

21S

T S

T

GREEN SPACE BUILDING BIKE TRAIL“M” STREET ZONE OF LINCOLN DOWNTOWN DISTRICT | BIKE TRAIL DIAGRAM

22

Page 24: 2016 portfolio_Thomas Blair IV

TheSheldonArtMuseumpavilioninstallationwasaprojecttodesignanintimatespaceforpublicandprivateuselocatedinthesunkengardensneartheSouthendofthemuseum.

BOTTOM:Westviewinsunkengardens TOP:Physicalprogressionprocess BOTTOM:Topview

SHELDON PAVILION INSTALLATION

Page 25: 2016 portfolio_Thomas Blair IV

24

Page 26: 2016 portfolio_Thomas Blair IV

TheBoxHouse1projectisadesign-buildshippingcontainerhousescheduledtostartconstructionMarch2016.Ourclasspartneredwithalocalnon-profitorganization,NeighborWorksLincoln,tocollaberateinresearch,designdevelopment,andconstructionoftheproject.

BOTTOM:Renderedsiteplan TOP:Containerconfigurationdiagram

BOX HOUSE 1

Page 27: 2016 portfolio_Thomas Blair IV

26

Page 28: 2016 portfolio_Thomas Blair IV

T.O. EAVE111'-6 1/4"

0' -

2"

AL

IGN

ROOF MEMBRANE, LIGHT-GRAY

TPO OR APPROVED EQUAL

INSTALL PER MANUF'S

INSTRUCTIONS

GSM FLASHING, PTD.

GSM GUTTER, TUCK UNDER

ROOF FLASHING, PTD.

GSM FLASHING, PTD. TO

MATCH ROOFING & WALL,

TUCK UNDER ROOF

FLASHING

ELASTOMETRIC FLASHING

MIN. 6" DOWN WALL & 12" UP

ROOF

1/2" RIGID INSULATION

5/16" FIBER CEMENT PANEL,

PTD.

7/16" SHTG, SSD

CONT. 2X WOOD BLOCKING

BLDG. WRAP, TAPE

INTERMEDIATE AND EDGE

JOINTS

WD. ROOF TRUSS, SSD

MAINTAIN 2" MIN. AIR SPACE

INSULATION

SEE A2.01 FOR TYP. ROOF

ASSEMBLY

7/16" SHTG, SSD

T.O. CONTAINER109'-0"

B.O. CEILING109'-10 1/2"

0' -

1 1

/2"

2"

AL

IGN

AL

IGN

5/16" FIBER CEMENT PANEL, PTD.

7/16" SHTG, SSD

GSM FLASHING W/ DRIP HEM &

PERFORATED TOP FACE, PTD.

TO MATCH CONTAINER, CARRY

MIN. 4" UP WALL

2x4 FRAMING

SEALANT

GERKIN 5800F FIXED WINDOW

FRAME W/ OPTIONAL ANCHOR

COVER

GWB W/ "J" BEAD & 1/8"

CONT. SEALANT @

WINDOW

BLDG. WRAP WITH

TAPED SEAMS

3/16" METAL SCREW

MAINTAIN 2" MIN. AIR SPACE

TRUSS, SSD

BLOCKING, AS REQ'DT.O. FINISH FLOOR100'-1"

8" CONC. WALL & ANCHOR,

SSD

2X8 PT PLATE, SSD

SLOPE GSM

2X10 RIM JOIST, SSD

ELASTOMETRIC FLASHING, LAP

UNDER WINDOW AND OVER

SILL PLATE

GSM FLASHING, LAP

UNDER WINDOW SILL

PT DECK JOIST, SSD

WD DECK BOARDS

TYPICAL FLOOR ASSEMBLY,

SEE 1/A2.01

3/16" METAL SCREW

GERKIN 5800F FIXED WINDOW

FRAME W/ OPTIONAL ANCHOR

COVER

DRIP HEM & CONT. CLEAT,

PTD. TO MATCH WINDOW

SEE W-D1 FOR TYP WALL

ASSEMBLY

1"

BOTTOM:740.0_RoofGutter,(Typ.) BOTTOM:740.3_RoofReveal@RearWindowWall

DW

DN

33

1

A2.01

1

A2.02

1

A2.03

101A

102

105

108B

108A

A B B

AA B

A4.01

5

7

BEDROOM 1

105

BATH 1

108

BEDROOM 2

109

MASTER

BEDROOM

104

CLOSET

103

MASTER BATH

102

KITCHEN

101

LIVING / DINING

100

HALL

107

CLOSET

106

6

A4.01

3

4

1

2

A4.01 10

109

AA

102C

A6.0

7

ALIG

N

ALIGN

ALIGN

1'-8"

3'

- 0

"

CLR

ALIG

N

ALIGN

1

2

5

6

7

3

38

ALIG

N

9

10

11

14

8

D

A6.02

9

A6.02

4 Typ

3'-0" 4' - 11" 2' - 2 3/4" 4' - 11 1/4" 2' - 11 1/2"

---

-

A6.02

8 Typ

A6.02

9

A5.02

2

2

ALIGN

DN

16

15

17

1 / A

3.0

2

2 / A

3.0

2

2 / A3.01

1 / A3.01

CLCLCL

CL CL CL

2'-3"

2'-4 5

/8"

2'-7 1

/4"

+/- 0"

B1

C2

B2

A2

A1

C1

A1

B1

B1

A1

A2

8

4 18

12

A6.02

12

A6.02

11

A6.02

13

1' - 7"

18

4

---

-

12

A6.0

6

A6.0

9

20

SIM

A1SIM

WD

.(E

) F

LR

.

ALIG

N

(E)FLR. L

(E)

FLR

.W

D.

(E) FLR. L

8

WD

.(E

) F

LR

.

A1

A1 SIM

2 5 13

(E)

FLR

.W

D.

REF.

SIM

21

22

23

1/A2.01

1/A

2.0

3

1/A2.02

A8.03

10

24

25

26

27

28

29

3030

3030

31

32

33

33

34

35

5

4R @ 6"3T @ 12"

10

34

CL W.C.

C2

EQ

EQ

9

C L

16 R @ 7"14 T @ 11"

1' - 4" 3' - 0"

ALIG

N

---

-

A6.0

8

A6.0

3

3' - 10 1/2" 7' - 1 1/4" 3' - 1" 2' - 6 1/2"

+/- 4' - 1 3/4"

30

' - 0

"

8' -

0"

4' -

0"

10

' - 0

"8

' - 0

"

4' - 4 3/4" 7' - 8 1/2"

+/- 6' - 1 1/2"

-

---

N

5912 Maple StreetOmaha, NE 68104

P 402.551.0306F 402.551.0312E [email protected]

OWNER

Neighborworks- Lincoln2530 Q StreetLincoln, NE 68503

Phone: (402) 477-7181

STRUCTURAL

Shaffer & Stevens PC9910 North 48th St.Omaha, NE 68150

Phone: (402) 455-7698

ISS

UE

/

RE

VIS

ION

DATE

DATE:

CHECKED:

SHEET:

OF SHEETS

B O

X

H O

U S

E

O N

E

2028

S. 8T

H S

TR

EE

T

LIN

CO

LN

, N

E

BID

SE

T2/

22/1

6B

ID S

ET -

NO

T F

OR

CO

NSTR

UC

TIO

N

02/22/16

First Floor Plan

A1.02FIRST FLOOR PLAN 1/2" = 1' - 0"1

A1.02 PLAN NOTES

1 REPURPOSED SHIPPING CONTAINER,MODIFIED & PAINTED, TYP.

2 LINE OF ROOF ABOVE

3 ALTERNATE: SCREEN FENCE WITHSTEEL STRUCTURE, SEE A9.0`

4 (N) CONCRETE SLAB ON GRADE

5 EDGE OF WD DECK

6 (E) CONTAINER DOORS WELDED SHUTW/ INSULATED WALL INSIDE

7 LINE OF FLOOR EDGE BELOW =BOTTOM RISER @ STAIR

8 ROD & SHELF, TYP.

9 GUARDRAIL = HSS 1 1/2" X 1 1/2" W/ SSWIRE NETTING, PTD.

10 BUILT-IN CABINET TO BE FABRICATEDBY FACT

11 COMPACTED GRAVEL PATIO

12 ORNAMENTAL TALL GRASS

13 STEEL EDGING BETWEEN GRAVELAND PLANTING BED, TYP

14 EDGE OF SOFFIT ABV.

15 WALL PANEL, EXTERIOR FACE TOMATCH WINDOW FRAME

16 REMOVE (E) CONTAINER DOOR

17 TALL CABINET, SIDE PANEL CONT.OVER WALL

18 WOOD STEPS TO MATCH DECK

19 ORNAMENTAL TALL GRASS

20 CONTROL JOINT, TYP.

21 CLERESTORY WINDOW, ABOVE, SEEELEVATIONS

22 PLAM COUNTERTOP WITH STEELLEGS, SEE INTERIOR ELEVATIONS

23 WHITE SHOWER INSERT, MOUNT TOSTUDS AS REQ'D. AQUATIC #13232POR APPROVED EQUAL

24 PROVIDE 3 SHELVES, PTD.

25 LOCATE PLUMBING VENT ATINTERIOR WALL, TYP.

26 RETURN AIR DUCT, CONTRACTOR TOCOORDINATE SIZE AND LOCATIONWITH ARCHITECT

27 THRESHOLD TO MATCH CONTAINER

28 4 X 4 WD. POST @ DOOR/WINDOWJAMB

29 (E) CONTAINER BOTTOM SIDE RAIL,GRIND SMOOTH, PRIME AND PAINT,TYP. WHERE EXPOSED AT FLOOR

30 MTL. PLATE @ CONTAINER END, PTD.,TYP.

31 (E) CONTAINER FLOOR SANDED ANDSEALED, TEST AND VERIFY WITHARCHITECT BEFORE PROCEEDING

32 PUNCHED WINDOWS TO BE LOCATEDRELATIVE TO (E) WALLCORRUGATIONS PER DETAIL THUSLOCATION DIMENSIONS AREAPPROX., TYP.

33 ROLLING DOOR FROM SALVAGEDCONTAINER WALL, SEE DETAILS

34 SEE DETAILS FOR LOCATION OFWINDOW AND DOOR

35 WHITE TUB/SHOWER INSERT, MOUNTTO STUDS AS REQ'D. AQUATIC#2603302P OR APPROVED EQUAL.

BOTTOM:852.2_Sill@WindowWall,(Typ.)

BOX HOUSE 1

Page 29: 2016 portfolio_Thomas Blair IV

DW

DN

33

1

A2.01

1

A2.02

1

A2.03

101A

102

105

108B

108A

A B B

AA B

A4.01

5

7

BEDROOM 1

105

BATH 1

108

BEDROOM 2

109

MASTER

BEDROOM

104

CLOSET

103

MASTER BATH

102

KITCHEN

101

LIVING / DINING

100

HALL

107

CLOSET

106

6

A4.01

3

4

1

2

A4.01 10

109

AA

102C

A6.0

7

ALIG

N

ALIGN

ALIGN

1'-8"

3'

- 0

"

CLR

ALIG

N

ALIGN

1

2

5

6

7

3

38

ALIG

N

9

10

11

14

8

D

A6.02

9

A6.02

4 Typ

3'-0" 4' - 11" 2' - 2 3/4" 4' - 11 1/4" 2' - 11 1/2"

---

-

A6.02

8 Typ

A6.02

9

A5.02

2

2

ALIGN

DN

16

15

17

1 / A

3.0

2

2 / A

3.0

2

2 / A3.01

1 / A3.01

CLCLCL

CL CL CL

2'-3"

2'-4 5

/8"

2'-7 1

/4"

+/- 0"

B1

C2

B2

A2

A1

C1

A1

B1

B1

A1

A2

8

4 18

12

A6.02

12

A6.02

11

A6.02

13

1' - 7"

18

4

---

-

12

A6.0

6

A6.0

9

20

SIM

A1SIM

WD

.(E

) F

LR

.

ALIG

N

(E)FLR. L

(E)

FLR

.W

D.

(E) FLR. L

8

WD

.(E

) F

LR

.

A1

A1 SIM

2 5 13

(E)

FLR

.W

D.

REF.

SIM

21

22

23

1/A2.01

1/A

2.0

3

1/A2.02

A8.03

10

24

25

26

27

28

29

3030

3030

31

32

33

33

34

35

5

4R @ 6"3T @ 12"

10

34

CL W.C.

C2

EQ

EQ

9

C L

16 R @ 7"14 T @ 11"

1' - 4" 3' - 0"

ALIG

N

---

-

A6.0

8

A6.0

3

3' - 10 1/2" 7' - 1 1/4" 3' - 1" 2' - 6 1/2"

+/- 4' - 1 3/4"

30

' - 0

"

8' -

0"

4' -

0"

10

' - 0

"8

' - 0

"

4' - 4 3/4" 7' - 8 1/2"

+/- 6' - 1 1/2"

-

---

N

5912 Maple StreetOmaha, NE 68104

P 402.551.0306F 402.551.0312E [email protected]

OWNER

Neighborworks- Lincoln2530 Q StreetLincoln, NE 68503

Phone: (402) 477-7181

STRUCTURAL

Shaffer & Stevens PC9910 North 48th St.Omaha, NE 68150

Phone: (402) 455-7698

ISS

UE

/

RE

VIS

ION

DATE

DATE:

CHECKED:

SHEET:

OF SHEETS

B O

X

H O

U S

E

O N

E

2028

S. 8T

H S

TR

EE

T

LIN

CO

LN

, N

E

BID

SE

T2/

22/1

6B

ID S

ET -

NO

T F

OR

CO

NSTR

UC

TIO

N

02/22/16

First Floor Plan

A1.02FIRST FLOOR PLAN 1/2" = 1' - 0"1

A1.02 PLAN NOTES

1 REPURPOSED SHIPPING CONTAINER,MODIFIED & PAINTED, TYP.

2 LINE OF ROOF ABOVE

3 ALTERNATE: SCREEN FENCE WITHSTEEL STRUCTURE, SEE A9.0`

4 (N) CONCRETE SLAB ON GRADE

5 EDGE OF WD DECK

6 (E) CONTAINER DOORS WELDED SHUTW/ INSULATED WALL INSIDE

7 LINE OF FLOOR EDGE BELOW =BOTTOM RISER @ STAIR

8 ROD & SHELF, TYP.

9 GUARDRAIL = HSS 1 1/2" X 1 1/2" W/ SSWIRE NETTING, PTD.

10 BUILT-IN CABINET TO BE FABRICATEDBY FACT

11 COMPACTED GRAVEL PATIO

12 ORNAMENTAL TALL GRASS

13 STEEL EDGING BETWEEN GRAVELAND PLANTING BED, TYP

14 EDGE OF SOFFIT ABV.

15 WALL PANEL, EXTERIOR FACE TOMATCH WINDOW FRAME

16 REMOVE (E) CONTAINER DOOR

17 TALL CABINET, SIDE PANEL CONT.OVER WALL

18 WOOD STEPS TO MATCH DECK

19 ORNAMENTAL TALL GRASS

20 CONTROL JOINT, TYP.

21 CLERESTORY WINDOW, ABOVE, SEEELEVATIONS

22 PLAM COUNTERTOP WITH STEELLEGS, SEE INTERIOR ELEVATIONS

23 WHITE SHOWER INSERT, MOUNT TOSTUDS AS REQ'D. AQUATIC #13232POR APPROVED EQUAL

24 PROVIDE 3 SHELVES, PTD.

25 LOCATE PLUMBING VENT ATINTERIOR WALL, TYP.

26 RETURN AIR DUCT, CONTRACTOR TOCOORDINATE SIZE AND LOCATIONWITH ARCHITECT

27 THRESHOLD TO MATCH CONTAINER

28 4 X 4 WD. POST @ DOOR/WINDOWJAMB

29 (E) CONTAINER BOTTOM SIDE RAIL,GRIND SMOOTH, PRIME AND PAINT,TYP. WHERE EXPOSED AT FLOOR

30 MTL. PLATE @ CONTAINER END, PTD.,TYP.

31 (E) CONTAINER FLOOR SANDED ANDSEALED, TEST AND VERIFY WITHARCHITECT BEFORE PROCEEDING

32 PUNCHED WINDOWS TO BE LOCATEDRELATIVE TO (E) WALLCORRUGATIONS PER DETAIL THUSLOCATION DIMENSIONS AREAPPROX., TYP.

33 ROLLING DOOR FROM SALVAGEDCONTAINER WALL, SEE DETAILS

34 SEE DETAILS FOR LOCATION OFWINDOW AND DOOR

35 WHITE TUB/SHOWER INSERT, MOUNTTO STUDS AS REQ'D. AQUATIC#2603302P OR APPROVED EQUAL.

BOTTOM:852.2_Sill@WindowWall,(Typ.)

28


Recommended