- 1 - CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30 th November 2016 Assignment Re-manufacture group 2 is asked to split in two groups, of which each group is asked to idenfy the treats and opportunies of the re-manufacture process in order to reuse: 1a) the steel window frame of building H (Dijkzicht, 1960) 1b) The steel structure of building Hs (2005) The exisng building components and elements are presented on the next page(s). At the end of the workshop group two is asked to present the findings of both cases in a pitch of 2-3 minutes to the other groups, see page 7. 1 st 2 nd 3 rd 4 th 5 th 6 th -1 st Hs RE-MANUFACTURE GROUP 2 | Re-manufacturing of a load-bearing structure incl. floor (sub-group 1) and steel frame facade system (sub-group 2)
Transcript

- 1 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

AssignmentRe-manufacture group 2 is asked to split in two groups, of which each group is asked to identify the treats and opportunities of the re-manufacture process in order to reuse: 1a) the steel window frame of building H (Dijkzicht, 1960)1b) The steel structure of building Hs (2005)

The existing building components and elements are presented on the next page(s).

At the end of the workshop group two is asked to present the findings of both cases in a pitch of 2-3 minutes to the other groups, see page 7.

1st

2nd

3rd

4th

5th

6th

-1st

Hs

RE-MANUFACTURE GROUP 2 | Re-manufacturing of a load-bearing structure incl. floor (sub-group 1) and steel frame facade system (sub-group 2)

- 2 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

Amount of window framesOutside 592x Inside 592x Total 1184x

Technical specification - facade frame Building H (1960)

- 3 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

Technical specification - facade frame Building H (1960)

- 4 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

Technical specification - Steel structure (2005)

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

- 5 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

Technical specification - Steel structure (2005)

- 6 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

installatio

ns

Floor level + 2700

installatio

ns

Technical specification - Steel structure (2005)

- 7 -

CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC 30th November 2016

Re-manufacture steel facade

Re-manufacture steel structureOpportunities:

Treats:

Opportunities:

Treats:


Recommended