2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving SDG 18 - Remavingthe UXO abstacleta Developnentin Lao PDR Outcome 1i Ailwomen and men h.ve increased opportunities for d€cent ivel hoods and jobs Natlona Regulrtory Authorityfor UXO sector {NRA) The Min stryofLabourand Socia w€fare Brief Description This project has been designed based on the recomnrendations of the 2015 evaluation of UNDp,s ongoing support io the uxo secror, the 2014 capacity Assessmeni of the NRA, .s wel as the decision by the Government of Lao and UNDP to uiitize a project modality in lieu of the Trust Fund, and is a igned with rhe Government of Lao's 8th NationalSocio Economtc Deve oprn€nt plan (8NSEDp), UXO Sector Sp 2011_2020, UXO Sector 5-year plan 2016 2020 as wei as national gender equality strategies and relevant international conventions, and norrns. lt wt I contribute to progress towards achieving the national Sustainable Deve opment Goal 18. This project wil provide the progranrmatic and technical support necessary for the nationa institutions within the UXO sector {NRA and UXO Lao) to pursue the targets set out in the UXO Sector Five Year Work Plan 2016-2020, as well as ihe NRA,s strategy for acceterated survey and c earance, MRE and VA activities. In 2018, the NRA will continue to ir.prove the coordination of the UXO Secior in the imp ementation of the Five Year Sector Work Plan for 2016-2020. NRA will also be developing a 201S sector workp an and wi be playing the malor roe in overseetng its inrplementation. Arnong other resutts, the NRA wi focus on increasing quality of rkk education to support UXO risk educaiion in UXO communities of Lao pDR through radio programming, update to MRE curricutum and matertats; facititating the provision of support to uXO victims; accelerating the implementation of the new evidence based survey and clearance methodology to increase efficiency and preparing for the impremeniation of the nationar cluster munitions survey; doubling the Quality Assurance/Quality Control capacity and majntaining an effective tnformation Management system. The NRA will a so focus on its institutional strengthening through the imp ementatjon of the recomrnendations from the capacity assessrnent carried out in 2014. ln order to minimize the funding gaps and to ensure NRA operations continue throughout the year, NRA wi actively take part in resource nrobilization efforts and proactive y approach different development partners. NRA will also contribute inputs to the 8'h NsEDp nrid term review and the progress on sDG18 as well as to the first voluntary National Reporting (vNR) of the susiainabte Development Goals which will be submitted to the uN in July 2018. Page r of2 llF
Transcript
Page 1: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

2018 Annual Work PIan

Project Titie:

UNDAF and CPD Outcome(s):

lmplementing partner

Responsible Parties:

Mavingtowards achieving SDG 18 - RemavingtheUXO abstacleta Developnentin Lao PDR

Outcome 1i Ailwomen and men h.ve increasedopportunities for d€cent ivel hoods and jobs

Natlona Regulrtory Authorityfor UXO sector {NRA)

The Min stryofLabourand Socia w€fare

Brief Description

This project has been designed based on the recomnrendations of the 2015 evaluation of UNDp,s ongoingsupport io the uxo secror, the 2014 capacity Assessmeni of the NRA, .s wel as the decision by theGovernment of Lao and UNDP to uiitize a project modality in lieu of the Trust Fund, and is a igned with rheGovernment of Lao's 8th NationalSocio Economtc Deve oprn€nt plan (8NSEDp), UXO Sector Sp 2011_2020,UXO Sector 5-year plan 2016 2020 as wei as national gender equality strategies and relevant internationalconventions, and norrns. lt wt I contribute to progress towards achieving the national SustainableDeve opment Goal 18. This project wil provide the progranrmatic and technical support necessary for thenationa institutions within the UXO sector {NRA and UXO Lao) to pursue the targets set out in the UXOSector Five Year Work Plan 2016-2020, as well as ihe NRA,s strategy for acceterated survey and c earance,MRE and VA activities.

In 2018, the NRA will continue to ir.prove the coordination of the UXO Secior in the imp ementation of theFive Year Sector Work Plan for 2016-2020. NRA will also be developing a 201S sector workp an and wi beplaying the malor roe in overseetng its inrplementation. Arnong other resutts, the NRA wi focus onincreasing quality of rkk education to support UXO risk educaiion in UXO communities of Lao pDR throughradio programming, update to MRE curricutum and matertats; facititating the provision of support to uXOvictims; accelerating the implementation of the new evidence based survey and clearance methodology toincrease efficiency and preparing for the impremeniation of the nationar cluster munitions survey; doublingthe Quality Assurance/Quality Control capacity and majntaining an effective tnformation Managementsystem. The NRA will a so focus on its institutional strengthening through the imp ementatjon of therecomrnendations from the capacity assessrnent carried out in 2014. ln order to minimize the funding gapsand to ensure NRA operations continue throughout the year, NRA wi actively take part in resourcenrobilization efforts and proactive y approach different development partners.NRA will also contribute inputs to the 8'h NsEDp nrid term review and the progress on sDG18 as well as tothe first voluntary National Reporting (vNR) of the susiainabte Development Goals which will be submittedto the uN in July 2018.

Page r of2

llF

Page 2: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

UNDP Project lD: 00105819

2018 Annual budget - NRA

Total budget required: USD 1,978,478

Total Resources throueh UNDP forWork Plan: USD 1.453,9CX

.EU

. Canada

. lreland

. Luxemberg

. Newzealand

. Republic of Korea

. KOICA

4O9,484

2s,o02498,512

177,823

r38,O17

27,OOO

L74,122

Total Resources allocated throuqh Bilateralin 2018: TBC

. USA (Sterlind: FBC).Note: Discusslons with bilateraldonors are ongoingto fulfill part ofthe unfunded gaps.

Remainins Fundine Needed to Fullv Fund 2018 Work plan: USD 524.457

Agreed by (lmplem€nting partner): Mr. phoukhieoAuthority for the UXO S€ctor (NRA)

Arreed by (UNDP

Director of the National Regulatory

iI. ---t

'-i.lt.

il:l,

PaEe 2 ol2

Page 3: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

NRAAnnualWork Pran 2013 Fin:r

:.i,1

Page 4: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

ti,,- -"..,-. ".,,.."-.".. --,"r,

1\i

Page 5: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

!!/1

Page 6: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

a!,"Maf.'!!..".""".;i'@

l.r:,

Page 7: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving
Page 8: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

ti:

Page 9: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

u",....,,'.""."d.".|.""|i'."..'"!..".,"-@

@

Page 10: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving
Page 11: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

:rl :ilial1lTrr

Page 12: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving
Page 13: 2018 Annual Work PIan Project Board Meeting... · 2018 Annual Work PIan Project Titie: UNDAF and CPD Outcome(s): lmplementing partner Responsible Parties: Mavingtowards achieving

<,^1


Recommended