2018 Performance Report
This report reflects the effectiveness of Eastern Quality Management Plan in regards to
bull Notable Change Orders Performance bull Addendums Issued Region Eastern bull Estimate Accuracy Projects Awarded 15
Value of Awarded Projects $3239176704 See each of the topic areas below Addendums Issued 18
Notable Change Orders 57
Total Change Orders 165 $2495700
Avg of Bid +- Eng Est -141 Change Orders of Note Listed below are change orders issued for projects that whose coding indicate they may have been avoidable
These type change orders should be investigated to learn were failures occurred in the quality assurance process
Change Order Type Number of Total Value
PI - PLAN ERROR-INFO ndash Designer didnrsquot have enough info 5 $10500
PM - PLAN ERROR-MISTAKE ndash Designer made a mistake 12 $52550
SC - SPEC CONFLICTAMBIG ndash The plans and specs are in conflict or just 2 $0
donrsquot make OC - OMISSION IN CONTRACT PROVISIONS ndash Designer left something out of
2 $0 the specs that should have been there
OP - OMISSION IN THE PLANS - Designer left something out of the plans that 10 $45700
should have been there
UC - UNANTICIPATED COND ndash Differing conditions than assumed during 26 $708950
design
Change orders issued for projects in construction January 1 2018 through December 31 2018
Addendums Issued The table below shows the addendums issued for projects Addendums for wage rates are not included in this
tabulation
Number of projects Number of Addendums Avg Number per project
18 23 128 Addendums issued for projects that went to AD January 1 2018 through December 31 2018
Estimate Accuracy FHWA stipulates that WSDOTrsquos engineerrsquos estimate must be with plus or minus 10 of the low bid amount at least
50 of the time for our estimating process to be considered reliable and credible
Number of projects Number of Projects Estimate Avg Accuracy Projects Less than $20 million 15 -141
Projects More than $20 million 0 NA
Number of projects within plus or minus 10 Number of projects Exceeding plus or minus 10
6 9
Projects Awarded January 1 2018 through December 31 2018
2018 Performance Report
Notable Change Order List
Cont CO Number Number
009298 1
009313 1
009189 3
009223 2
009224 2
009252 2
009252 3
009258 5
009258 7
009287 8
009296 1
009311 1
009313 5
009189 3
009189 4
009224 2
009252 6
009258 3
009189 2
009223 1
009223 2
009252 3
009258 5
009258 6
009258 7
009296 1
009298 1
009311 1
CO Date
91418
11218
101618
102218
83018
8818
81418
10318
10818
121118
92618
102518
121718
101618
111518
83018
112818
82018
101618
102218
102218
81418
10318
10318
10818
92618
91418
102518
Description
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
HOT MIX ASPHALT
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GRADINGEARTHWORK
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
PREPARATION
EROSION CONTROL AND PLANING
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
TRAFFIC
TRAFFIC
HOT MIX ASPHALT
EROSION CONTROL AND PLANING
EROSION CONTROL AND PLANING
TRAFFIC
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GRADINGEARTHWORK
TRAFFIC
STRUCTURES
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
PREPARATION
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
EROSION CONTROL AND PLANING
CO Reaso n Code
OC
OC
OP
OP
OP
OP
OP
OP
OP
OP
OP
OP
OP
PI
PI
PI
PI
PI
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
CO Net Chang e Days
1
1
CO Verbal Est Amount
$000
$000
$65000
$165000
$175000
$000
$1000000
$1000000
$50000
$350000
$650000
$300000
$880000
$65000
$310000
$175000
$000
$500000
$000
$000
$165000
$1000000
$1000000
$250000
$50000
$650000
$000
$300000
2018 Performance Report
Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est
n Code Chang Amount e Days
009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)
009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)
009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009187 8 91518 GRADINGEARTHWORK UC $310000
009187 9 91518 STRUCTURES UC 25 $4500000
009204 1 42718 STRUCTURES UC 2 $1100000
009210 1 6418 GRADINGEARTHWORK UC 65 $1000000
009210 2 71718 TRAFFIC UC $1450000
009224 1 82218 HOT MIX ASPHALT UC $3800000
009224 4 83018 STRUCTURES UC $450000
009224 6 83018 HOT MIX ASPHALT UC $105000
009224 7 83018 GRADINGEARTHWORK UC 1 $120000
009224 9 101318 HOT MIX ASPHALT UC $8500000
009258 1 7918 GRADINGEARTHWORK UC 7 $4000000
009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)
009258 4 10218 TRAFFIC UC 1 $500000
009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)
009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)
009258 10 112918 STORM SEWERS UC 2 $1000000
009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009264 5 101218 STRUCTURES UC 16 $3150000 0
009287 1 10418 TRAFFIC UC 0 $800000
009287 3 10418 HOT MIX ASPHALT UC $1000000
009287 4 10418 SIGNAL SYSTEMS UC $1000000
009296 2 92618 STRUCTURES UC $000
009311 2 102518 ITS SYSTEMS UC 2 $1300000
009311 3 12818 ITS SYSTEMS UC $130000
009311 4 12818 ITS SYSTEMS UC $80000
009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)
2018 Performance Report
Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid
Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date
Amount Date
009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218
Embankment Repair
009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218
3rd Ave Bridge Wb On-Ra
009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618
Sign Update 2017-19
009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918
Suncrest Paving
009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418
Freya
009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618
Paving
009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218
Intersection Improveme
009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818
Culvert Replacement
009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318
Stabilize Slope
009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118
Flood Repair
009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818
Region Chip Seal
009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018
Mission Ave Paving
009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018
Bridge Repair
009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318
Broadway Ave - Ramp M
009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618
Cctv Systems - New Inst
2018 Performance Report
Notable Change Order List
Cont CO Number Number
009298 1
009313 1
009189 3
009223 2
009224 2
009252 2
009252 3
009258 5
009258 7
009287 8
009296 1
009311 1
009313 5
009189 3
009189 4
009224 2
009252 6
009258 3
009189 2
009223 1
009223 2
009252 3
009258 5
009258 6
009258 7
009296 1
009298 1
009311 1
CO Date
91418
11218
101618
102218
83018
8818
81418
10318
10818
121118
92618
102518
121718
101618
111518
83018
112818
82018
101618
102218
102218
81418
10318
10318
10818
92618
91418
102518
Description
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
HOT MIX ASPHALT
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GRADINGEARTHWORK
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
PREPARATION
EROSION CONTROL AND PLANING
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
TRAFFIC
TRAFFIC
HOT MIX ASPHALT
EROSION CONTROL AND PLANING
EROSION CONTROL AND PLANING
TRAFFIC
TRAFFIC
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
GRADINGEARTHWORK
TRAFFIC
STRUCTURES
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
PREPARATION
GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)
EROSION CONTROL AND PLANING
CO Reaso n Code
OC
OC
OP
OP
OP
OP
OP
OP
OP
OP
OP
OP
OP
PI
PI
PI
PI
PI
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
CO Net Chang e Days
1
1
CO Verbal Est Amount
$000
$000
$65000
$165000
$175000
$000
$1000000
$1000000
$50000
$350000
$650000
$300000
$880000
$65000
$310000
$175000
$000
$500000
$000
$000
$165000
$1000000
$1000000
$250000
$50000
$650000
$000
$300000
2018 Performance Report
Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est
n Code Chang Amount e Days
009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)
009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)
009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009187 8 91518 GRADINGEARTHWORK UC $310000
009187 9 91518 STRUCTURES UC 25 $4500000
009204 1 42718 STRUCTURES UC 2 $1100000
009210 1 6418 GRADINGEARTHWORK UC 65 $1000000
009210 2 71718 TRAFFIC UC $1450000
009224 1 82218 HOT MIX ASPHALT UC $3800000
009224 4 83018 STRUCTURES UC $450000
009224 6 83018 HOT MIX ASPHALT UC $105000
009224 7 83018 GRADINGEARTHWORK UC 1 $120000
009224 9 101318 HOT MIX ASPHALT UC $8500000
009258 1 7918 GRADINGEARTHWORK UC 7 $4000000
009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)
009258 4 10218 TRAFFIC UC 1 $500000
009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)
009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)
009258 10 112918 STORM SEWERS UC 2 $1000000
009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009264 5 101218 STRUCTURES UC 16 $3150000 0
009287 1 10418 TRAFFIC UC 0 $800000
009287 3 10418 HOT MIX ASPHALT UC $1000000
009287 4 10418 SIGNAL SYSTEMS UC $1000000
009296 2 92618 STRUCTURES UC $000
009311 2 102518 ITS SYSTEMS UC 2 $1300000
009311 3 12818 ITS SYSTEMS UC $130000
009311 4 12818 ITS SYSTEMS UC $80000
009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)
2018 Performance Report
Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid
Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date
Amount Date
009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218
Embankment Repair
009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218
3rd Ave Bridge Wb On-Ra
009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618
Sign Update 2017-19
009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918
Suncrest Paving
009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418
Freya
009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618
Paving
009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218
Intersection Improveme
009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818
Culvert Replacement
009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318
Stabilize Slope
009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118
Flood Repair
009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818
Region Chip Seal
009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018
Mission Ave Paving
009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018
Bridge Repair
009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318
Broadway Ave - Ramp M
009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618
Cctv Systems - New Inst
2018 Performance Report
Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est
n Code Chang Amount e Days
009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)
009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)
009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)
009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009187 8 91518 GRADINGEARTHWORK UC $310000
009187 9 91518 STRUCTURES UC 25 $4500000
009204 1 42718 STRUCTURES UC 2 $1100000
009210 1 6418 GRADINGEARTHWORK UC 65 $1000000
009210 2 71718 TRAFFIC UC $1450000
009224 1 82218 HOT MIX ASPHALT UC $3800000
009224 4 83018 STRUCTURES UC $450000
009224 6 83018 HOT MIX ASPHALT UC $105000
009224 7 83018 GRADINGEARTHWORK UC 1 $120000
009224 9 101318 HOT MIX ASPHALT UC $8500000
009258 1 7918 GRADINGEARTHWORK UC 7 $4000000
009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)
009258 4 10218 TRAFFIC UC 1 $500000
009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)
009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)
009258 10 112918 STORM SEWERS UC 2 $1000000
009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)
009264 5 101218 STRUCTURES UC 16 $3150000 0
009287 1 10418 TRAFFIC UC 0 $800000
009287 3 10418 HOT MIX ASPHALT UC $1000000
009287 4 10418 SIGNAL SYSTEMS UC $1000000
009296 2 92618 STRUCTURES UC $000
009311 2 102518 ITS SYSTEMS UC 2 $1300000
009311 3 12818 ITS SYSTEMS UC $130000
009311 4 12818 ITS SYSTEMS UC $80000
009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)
2018 Performance Report
Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid
Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date
Amount Date
009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218
Embankment Repair
009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218
3rd Ave Bridge Wb On-Ra
009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618
Sign Update 2017-19
009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918
Suncrest Paving
009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418
Freya
009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618
Paving
009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218
Intersection Improveme
009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818
Culvert Replacement
009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318
Stabilize Slope
009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118
Flood Repair
009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818
Region Chip Seal
009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018
Mission Ave Paving
009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018
Bridge Repair
009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318
Broadway Ave - Ramp M
009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618
Cctv Systems - New Inst
2018 Performance Report
Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid
Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date
Amount Date
009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218
Embankment Repair
009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218
3rd Ave Bridge Wb On-Ra
009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618
Sign Update 2017-19
009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918
Suncrest Paving
009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418
Freya
009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618
Paving
009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218
Intersection Improveme
009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818
Culvert Replacement
009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318
Stabilize Slope
009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118
Flood Repair
009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818
Region Chip Seal
009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018
Mission Ave Paving
009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018
Bridge Repair
009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318
Broadway Ave - Ramp M
009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618
Cctv Systems - New Inst