2018 Performance Report This report reflects the effectiveness of Eastern Quality Management Plan in regards to: • Notable Change Orders Performance • Addendums Issued Region Eastern • Estimate Accuracy # Projects Awarded 15 Value of Awarded Projects $32,391,767.04 See each of the topic areas below # Addendums Issued 18 # Notable Change Orders 57 Total # Change Orders 165 / $2,495,700 Avg. of Bid +/- Eng. Est % -1.41% Change Orders of Note Listed below are change orders issued for projects that whose coding indicate they may have been avoidable. These type change orders should be investigated to learn were failures occurred in the quality assurance process. Change Order Type Number of Total Value PI - PLAN ERROR-INFO – Designer didn’t have enough info 5 $10,500 PM - PLAN ERROR-MISTAKE – Designer made a mistake 12 $52,550 SC - SPEC CONFLICT/AMBIG – The plans and specs are in conflict or just 2 $0 don’t make OC - OMISSION IN CONTRACT PROVISIONS – Designer left something out of 2 $0 the specs that should have been there. OP - OMISSION IN THE PLANS - Designer left something out of the plans that 10 $45,700 should have been there. UC - UNANTICIPATED COND – Differing conditions than assumed during 26 $708,950 design Change orders issued for projects in construction January 1, 2018 through December 31, 2018 Addendums Issued The table below shows the addendums issued for projects. Addendums for wage rates are not included in this tabulation Number of projects Number of Addendums Avg. Number per project 18 23 1.28 Addendums issued for projects that went to AD January 1, 2018 through December 31, 2018 Estimate Accuracy FHWA stipulates that WSDOT’s engineer’s estimate must be with plus or minus 10% of the low bid amount at least 50% of the time for our estimating process to be considered reliable and credible. Number of projects Number of Projects Estimate Avg. Accuracy Projects Less than $20 million 15 -1.41% Projects More than $20 million 0 N/A Number of projects within plus or minus 10% Number of projects Exceeding plus or minus 10% 6 9 Projects Awarded January 1, 2018 through December 31, 2018
Transcript
Page 1: 2018 Performance Report - wsdot.wa.gov...Cont Contract Title Engineers Prime Bid over / Ad Date Bid Award # Estimate Amount under Open Date Amount Date 009210 Sr 25, Spokane River

2018 Performance Report

This report reflects the effectiveness of Eastern Quality Management Plan in regards to

bull Notable Change Orders Performance bull Addendums Issued Region Eastern bull Estimate Accuracy Projects Awarded 15

Value of Awarded Projects $3239176704 See each of the topic areas below Addendums Issued 18

Notable Change Orders 57

Total Change Orders 165 $2495700

Avg of Bid +- Eng Est -141 Change Orders of Note Listed below are change orders issued for projects that whose coding indicate they may have been avoidable

These type change orders should be investigated to learn were failures occurred in the quality assurance process

Change Order Type Number of Total Value

PI - PLAN ERROR-INFO ndash Designer didnrsquot have enough info 5 $10500

PM - PLAN ERROR-MISTAKE ndash Designer made a mistake 12 $52550

SC - SPEC CONFLICTAMBIG ndash The plans and specs are in conflict or just 2 $0

donrsquot make OC - OMISSION IN CONTRACT PROVISIONS ndash Designer left something out of

2 $0 the specs that should have been there

OP - OMISSION IN THE PLANS - Designer left something out of the plans that 10 $45700

should have been there

UC - UNANTICIPATED COND ndash Differing conditions than assumed during 26 $708950

design

Change orders issued for projects in construction January 1 2018 through December 31 2018

Addendums Issued The table below shows the addendums issued for projects Addendums for wage rates are not included in this

tabulation

Number of projects Number of Addendums Avg Number per project

18 23 128 Addendums issued for projects that went to AD January 1 2018 through December 31 2018

Estimate Accuracy FHWA stipulates that WSDOTrsquos engineerrsquos estimate must be with plus or minus 10 of the low bid amount at least

50 of the time for our estimating process to be considered reliable and credible

Number of projects Number of Projects Estimate Avg Accuracy Projects Less than $20 million 15 -141

Projects More than $20 million 0 NA

Number of projects within plus or minus 10 Number of projects Exceeding plus or minus 10

6 9

Projects Awarded January 1 2018 through December 31 2018

2018 Performance Report

Notable Change Order List

Cont CO Number Number

009298 1

009313 1

009189 3

009223 2

009224 2

009252 2

009252 3

009258 5

009258 7

009287 8

009296 1

009311 1

009313 5

009189 3

009189 4

009224 2

009252 6

009258 3

009189 2

009223 1

009223 2

009252 3

009258 5

009258 6

009258 7

009296 1

009298 1

009311 1

CO Date

91418

11218

101618

102218

83018

8818

81418

10318

10818

121118

92618

102518

121718

101618

111518

83018

112818

82018

101618

102218

102218

81418

10318

10318

10818

92618

91418

102518

Description

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

HOT MIX ASPHALT

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GRADINGEARTHWORK

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

PREPARATION

EROSION CONTROL AND PLANING

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

TRAFFIC

TRAFFIC

HOT MIX ASPHALT

EROSION CONTROL AND PLANING

EROSION CONTROL AND PLANING

TRAFFIC

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GRADINGEARTHWORK

TRAFFIC

STRUCTURES

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

PREPARATION

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

EROSION CONTROL AND PLANING

CO Reaso n Code

OC

OC

OP

OP

OP

OP

OP

OP

OP

OP

OP

OP

OP

PI

PI

PI

PI

PI

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

CO Net Chang e Days

1

1

CO Verbal Est Amount

$000

$000

$65000

$165000

$175000

$000

$1000000

$1000000

$50000

$350000

$650000

$300000

$880000

$65000

$310000

$175000

$000

$500000

$000

$000

$165000

$1000000

$1000000

$250000

$50000

$650000

$000

$300000

2018 Performance Report

Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est

n Code Chang Amount e Days

009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)

009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)

009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009187 8 91518 GRADINGEARTHWORK UC $310000

009187 9 91518 STRUCTURES UC 25 $4500000

009204 1 42718 STRUCTURES UC 2 $1100000

009210 1 6418 GRADINGEARTHWORK UC 65 $1000000

009210 2 71718 TRAFFIC UC $1450000

009224 1 82218 HOT MIX ASPHALT UC $3800000

009224 4 83018 STRUCTURES UC $450000

009224 6 83018 HOT MIX ASPHALT UC $105000

009224 7 83018 GRADINGEARTHWORK UC 1 $120000

009224 9 101318 HOT MIX ASPHALT UC $8500000

009258 1 7918 GRADINGEARTHWORK UC 7 $4000000

009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)

009258 4 10218 TRAFFIC UC 1 $500000

009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)

009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)

009258 10 112918 STORM SEWERS UC 2 $1000000

009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009264 5 101218 STRUCTURES UC 16 $3150000 0

009287 1 10418 TRAFFIC UC 0 $800000

009287 3 10418 HOT MIX ASPHALT UC $1000000

009287 4 10418 SIGNAL SYSTEMS UC $1000000

009296 2 92618 STRUCTURES UC $000

009311 2 102518 ITS SYSTEMS UC 2 $1300000

009311 3 12818 ITS SYSTEMS UC $130000

009311 4 12818 ITS SYSTEMS UC $80000

009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)

2018 Performance Report

Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid

Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date

Amount Date

009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218

Embankment Repair

009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218

3rd Ave Bridge Wb On-Ra

009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618

Sign Update 2017-19

009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918

Suncrest Paving

009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418

Freya

009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618

Paving

009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218

Intersection Improveme

009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818

Culvert Replacement

009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318

Stabilize Slope

009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118

Flood Repair

009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818

Region Chip Seal

009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018

Mission Ave Paving

009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018

Bridge Repair

009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318

Broadway Ave - Ramp M

009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618

Cctv Systems - New Inst

Page 2: 2018 Performance Report - wsdot.wa.gov...Cont Contract Title Engineers Prime Bid over / Ad Date Bid Award # Estimate Amount under Open Date Amount Date 009210 Sr 25, Spokane River

2018 Performance Report

Notable Change Order List

Cont CO Number Number

009298 1

009313 1

009189 3

009223 2

009224 2

009252 2

009252 3

009258 5

009258 7

009287 8

009296 1

009311 1

009313 5

009189 3

009189 4

009224 2

009252 6

009258 3

009189 2

009223 1

009223 2

009252 3

009258 5

009258 6

009258 7

009296 1

009298 1

009311 1

CO Date

91418

11218

101618

102218

83018

8818

81418

10318

10818

121118

92618

102518

121718

101618

111518

83018

112818

82018

101618

102218

102218

81418

10318

10318

10818

92618

91418

102518

Description

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

HOT MIX ASPHALT

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GRADINGEARTHWORK

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

PREPARATION

EROSION CONTROL AND PLANING

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

TRAFFIC

TRAFFIC

HOT MIX ASPHALT

EROSION CONTROL AND PLANING

EROSION CONTROL AND PLANING

TRAFFIC

TRAFFIC

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

GRADINGEARTHWORK

TRAFFIC

STRUCTURES

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

PREPARATION

GENERAL REQUIREMENTS (STD SPECIFICATION DIVISION 1)

EROSION CONTROL AND PLANING

CO Reaso n Code

OC

OC

OP

OP

OP

OP

OP

OP

OP

OP

OP

OP

OP

PI

PI

PI

PI

PI

PM

PM

PM

PM

PM

PM

PM

PM

PM

PM

CO Net Chang e Days

1

1

CO Verbal Est Amount

$000

$000

$65000

$165000

$175000

$000

$1000000

$1000000

$50000

$350000

$650000

$300000

$880000

$65000

$310000

$175000

$000

$500000

$000

$000

$165000

$1000000

$1000000

$250000

$50000

$650000

$000

$300000

2018 Performance Report

Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est

n Code Chang Amount e Days

009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)

009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)

009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009187 8 91518 GRADINGEARTHWORK UC $310000

009187 9 91518 STRUCTURES UC 25 $4500000

009204 1 42718 STRUCTURES UC 2 $1100000

009210 1 6418 GRADINGEARTHWORK UC 65 $1000000

009210 2 71718 TRAFFIC UC $1450000

009224 1 82218 HOT MIX ASPHALT UC $3800000

009224 4 83018 STRUCTURES UC $450000

009224 6 83018 HOT MIX ASPHALT UC $105000

009224 7 83018 GRADINGEARTHWORK UC 1 $120000

009224 9 101318 HOT MIX ASPHALT UC $8500000

009258 1 7918 GRADINGEARTHWORK UC 7 $4000000

009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)

009258 4 10218 TRAFFIC UC 1 $500000

009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)

009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)

009258 10 112918 STORM SEWERS UC 2 $1000000

009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009264 5 101218 STRUCTURES UC 16 $3150000 0

009287 1 10418 TRAFFIC UC 0 $800000

009287 3 10418 HOT MIX ASPHALT UC $1000000

009287 4 10418 SIGNAL SYSTEMS UC $1000000

009296 2 92618 STRUCTURES UC $000

009311 2 102518 ITS SYSTEMS UC 2 $1300000

009311 3 12818 ITS SYSTEMS UC $130000

009311 4 12818 ITS SYSTEMS UC $80000

009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)

2018 Performance Report

Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid

Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date

Amount Date

009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218

Embankment Repair

009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218

3rd Ave Bridge Wb On-Ra

009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618

Sign Update 2017-19

009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918

Suncrest Paving

009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418

Freya

009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618

Paving

009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218

Intersection Improveme

009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818

Culvert Replacement

009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318

Stabilize Slope

009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118

Flood Repair

009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818

Region Chip Seal

009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018

Mission Ave Paving

009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018

Bridge Repair

009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318

Broadway Ave - Ramp M

009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618

Cctv Systems - New Inst

Page 3: 2018 Performance Report - wsdot.wa.gov...Cont Contract Title Engineers Prime Bid over / Ad Date Bid Award # Estimate Amount under Open Date Amount Date 009210 Sr 25, Spokane River

2018 Performance Report

Cont CO CO Date Description CO CO CO Verbal Number Number Reaso Net Est

n Code Chang Amount e Days

009313 3 111318 GENERAL REQUIREMENTS (STD PM $960000 SPECIFICATION DIVISION 1)

009313 5 121718 GENERAL REQUIREMENTS (STD PM $880000 SPECIFICATION DIVISION 1)

009252 1 72718 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009313 1 11218 GENERAL REQUIREMENTS (STD SC $000 SPECIFICATION DIVISION 1)

009187 2 9518 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009187 8 91518 GRADINGEARTHWORK UC $310000

009187 9 91518 STRUCTURES UC 25 $4500000

009204 1 42718 STRUCTURES UC 2 $1100000

009210 1 6418 GRADINGEARTHWORK UC 65 $1000000

009210 2 71718 TRAFFIC UC $1450000

009224 1 82218 HOT MIX ASPHALT UC $3800000

009224 4 83018 STRUCTURES UC $450000

009224 6 83018 HOT MIX ASPHALT UC $105000

009224 7 83018 GRADINGEARTHWORK UC 1 $120000

009224 9 101318 HOT MIX ASPHALT UC $8500000

009258 1 7918 GRADINGEARTHWORK UC 7 $4000000

009258 2 81618 GENERAL REQUIREMENTS (STD UC $400000 SPECIFICATION DIVISION 1)

009258 4 10218 TRAFFIC UC 1 $500000

009258 8 10818 GENERAL REQUIREMENTS (STD UC 2 $900000 SPECIFICATION DIVISION 1)

009258 9 112918 GENERAL REQUIREMENTS (STD UC $7000000 SPECIFICATION DIVISION 1)

009258 10 112918 STORM SEWERS UC 2 $1000000

009264 3 101218 GENERAL REQUIREMENTS (STD UC $000 SPECIFICATION DIVISION 1)

009264 5 101218 STRUCTURES UC 16 $3150000 0

009287 1 10418 TRAFFIC UC 0 $800000

009287 3 10418 HOT MIX ASPHALT UC $1000000

009287 4 10418 SIGNAL SYSTEMS UC $1000000

009296 2 92618 STRUCTURES UC $000

009311 2 102518 ITS SYSTEMS UC 2 $1300000

009311 3 12818 ITS SYSTEMS UC $130000

009311 4 12818 ITS SYSTEMS UC $80000

009313 2 11218 GENERAL REQUIREMENTS (STD UC -$50000 SPECIFICATION DIVISION 1)

2018 Performance Report

Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid

Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date

Amount Date

009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218

Embankment Repair

009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218

3rd Ave Bridge Wb On-Ra

009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618

Sign Update 2017-19

009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918

Suncrest Paving

009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418

Freya

009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618

Paving

009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218

Intersection Improveme

009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818

Culvert Replacement

009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318

Stabilize Slope

009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118

Flood Repair

009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818

Region Chip Seal

009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018

Mission Ave Paving

009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018

Bridge Repair

009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318

Broadway Ave - Ramp M

009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618

Cctv Systems - New Inst

Page 4: 2018 Performance Report - wsdot.wa.gov...Cont Contract Title Engineers Prime Bid over / Ad Date Bid Award # Estimate Amount under Open Date Amount Date 009210 Sr 25, Spokane River

2018 Performance Report

Estimate Accuracy All Projects Engineerrsquos Estimate compared to Low Bid

Cont Contract Title Engineers Prime Bid over Ad Date Bid Award Estimate Amount under Open Date

Amount Date

009210 Sr 25 Spokane River Bridge N $215942350 $142655150 -5137 12218 22218 3218

Embankment Repair

009264 I-90 2nd Ave W Bridge And $199604340 $143333350 -3926 4918 51618 52218

3rd Ave Bridge Wb On-Ra

009240 Sr 20 Et Al Er Curve Warning $88274500 $73387656 -2029 3518 32818 4618

Sign Update 2017-19

009223 Sr 291 Charles Rd To $165993200 $142149400 -1677 22018 31418 31918

Suncrest Paving

009252 Us 395 Nsc - Columbia To $888866880 $821720256 -817 31918 5918 51418

Freya

009352 Reardan To Espanola Rd $223455850 $222222222 -056 111918 121918 122618

Paving

009258 Us 395 Deer Park Corridor $280708979 $295995900 516 32618 42518 5218

Intersection Improveme

009289 Sr 20 Calispel Lake Drainage $10120300 $10902630 718 52118 61318 61818

Culvert Replacement

009296 Sr 31 South Of Metaline $63444180 $68570300 748 62518 71818 72318

Stabilize Slope

009298 Sr 21 Curlew To Canada $64465160 $69999800 791 7918 72518 73118

Flood Repair

009224 Sr 21 Et Al 2018 Eastern $793042675 $888751135 1077 22018 32118 32818

Region Chip Seal

009287 Sr 290 Hamilton St To $170075590 $192292200 1155 51418 6618 62018

Mission Ave Paving

009313 I-90 Tokio Interchange $45661900 $53100300 1401 81318 82018 82018

Bridge Repair

009311 I-90 Us 2 Garden Springs To $20991400 $28102900 2531 8618 82218 82318

Broadway Ave - Ramp M

009332 Us 2 Et Al Eastern Region $8529400 $11513400 2592 101518 11718 111618

Cctv Systems - New Inst


Recommended