GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Date: 22.A1.2019 Ref. No. : G|ACU201B-191S93 To, Member Secretary Expert Appraisa! Gommittee (lndustry - 2) Ministry of Environment, Forests and ctimate change (MoEFCC); Paryavaran Bhavan, Aliganj, Jorbag Road, New Delhi- {{0 003. Sub.: Regarding "Essential Details Sought (EDS)" w.r.t Environmental Ctearance (EC) for expansion of molasses based distillery from 60 KLPD to 150 KLPD (Expansion by g0 KLPD). proposat No. tA/MH/tND2/s5812t2014 Ref.:1.Online EIA report submitted on 27.12.2019 2. EDS by Member Secretary (MS) on 16.01 .ZO1g Dear sir, This has reference to the Final EIA report submitted to your office on 27.12.201g. The same is w.r.t. expansion of molasses based distillery from 60 KLPD to 150 KLPD (expansion by g0 KLPD) by Gangamai lndustries And Constructions Ltd. (GlAcL), Najik Babulgaon, post- Rakshi, Tal.: shevgaon, Dist.: Ahmednagar, Maharashtra' During evaluation and scrutiny of our application; certain essentiat details have been sought through foilowing communication - Please inform/clarify tlte fottowing:-Accreditation of the EIA consuttant is valid only up to 21/1A/2018 and as such, the EtN EMP report is not acceptable. Copy of thZ EC dated 18n0/2017 to be uptoaded against column G (d) of Form-2. Firm commitment of the regulatory authoity to suppty surface water if Zru cum/day. Accordingly, we are hereby submitting the point wise compliance towards information sought. Point 1: Accreditation of the EIA consultant is vatid onty up ta ZinOtZylg and as such, the EINEMP report is not acceptable. Glarification: The EIA Consultant organization is an ISO 9001-2015 with e6l - NABET accreditation. As per the requirements under QCI-NABET accreditation scheme for ACos (accredited cons-ultant organizations); our consultant has atready submitted an online application for renewal of its accreditation. The same il presently under consideration and processing at QCI's end. An email in this regard ' received from the QCI-NABET is presented a1 Annexure - l. Also, the name of our EIA consultant organization is reflected in the latest updated list of accredited ACOs (December 2018) published by QCI which is enclosed at Annexure -ll. From the Operation : Harinagar, Najik Babhulgaon, Post : Rakshi, Tq.Shevgaon, Dist. Ahmednagar (M.S.)-414502,Te\.: (02429) 217255,211309 Mob.: +91 - 9921994999, 9921995999, E-mail :[email protected], [email protected] Gorporate Office : 2nd Floor, Tapadia Terraces, Adalat Road, Aurangabad-431001(MS)lndia. Tel.: +91-240-2333933, 2332512, Faxi +91(240) 2333335, E-mail : [email protected]
Transcript
Page 1: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

GIANGAMAIINDUSTRIES & CONSTRUCTIONS LTD.

Date: 22.A1.2019Ref. No. : G|ACU201B-191S93

To,Member SecretaryExpert Appraisa! Gommittee (lndustry - 2)Ministry of Environment, Forests and ctimate change (MoEFCC);Paryavaran Bhavan,Aliganj, Jorbag Road,New Delhi- {{0 003.

Sub.: Regarding "Essential Details Sought (EDS)" w.r.t Environmental Ctearance(EC) for expansion of molasses based distillery from 60 KLPD to 150 KLPD(Expansion by g0 KLPD). proposat No. tA/MH/tND2/s5812t2014

Ref.:1.Online EIA report submitted on 27.12.20192. EDS by Member Secretary (MS) on 16.01 .ZO1g

Dear sir,

This has reference to the Final EIA report submitted to your office on 27.12.201g.The same is w.r.t. expansion of molasses based distillery from 60 KLPD to 150KLPD (expansion by g0 KLPD) by Gangamai lndustries And Constructions Ltd.(GlAcL), Najik Babulgaon, post- Rakshi, Tal.: shevgaon, Dist.: Ahmednagar,Maharashtra' During evaluation and scrutiny of our application; certain essentiatdetails have been sought through foilowing communication -

Please inform/clarify tlte fottowing:-Accreditation of the EIA consuttant is valid onlyup to 21/1A/2018 and as such, the EtN EMP report is not acceptable. Copy of thZEC dated 18n0/2017 to be uptoaded against column G (d) of Form-2. Firmcommitment of the regulatory authoity to suppty surface water if Zru cum/day.Accordingly, we are hereby submitting the point wise compliance towardsinformation sought.

Point 1: Accreditation of the EIA consultant is vatid onty up ta ZinOtZylg and assuch, the EINEMP report is not acceptable.

Glarification: The EIA Consultant organization is an ISO 9001-2015 with e6l -NABET accreditation. As per the requirements under QCI-NABET accreditationscheme for ACos (accredited cons-ultant organizations); our consultant has atreadysubmitted an online application for renewal of its accreditation. The same ilpresently under consideration and processing at QCI's end. An email in this regard' received from the QCI-NABET is presented a1 Annexure - l. Also, the name of ourEIA consultant organization is reflected in the latest updated list of accredited ACOs(December 2018) published by QCI which is enclosed at Annexure -ll. From the

Operation : Harinagar, Najik Babhulgaon, Post : Rakshi, Tq.Shevgaon, Dist. Ahmednagar (M.S.)-414502,Te\.: (02429) 217255,211309Mob.: +91 - 9921994999, 9921995999, E-mail :[email protected], [email protected]

Gorporate Office : 2nd Floor, Tapadia Terraces, Adalat Road, Aurangabad-431001(MS)lndia. Tel.: +91-240-2333933, 2332512,Faxi +91(240) 2333335, E-mail : [email protected]

Page 2: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

-

GANGIAMAIIIIDUSTRIES & CONSTRUCTIONS LTD.

documents received from QCI and details on QCI-NABET web site; it could be seenthat the QCI has not discontinued accreditation of our consultant organizationneither it is prohibited from doing any EIA related studies. As such; kindly considerour EIA for appraisal.

Point 2: Copy of the EC dated 18/10/2017 to be uploaded against column 6(d) otForm-2.

Glarification: Copy of the said EC letter had already been uploaded whilesubmitting the Form 2 along with EIA report online. As per your directions underlatest EDS; we are once again submitting a copy of the EC letter (dated 18.14.2017)for your reference and necessary further action.

Point 3: Firm commitment of the regulatory authority to supply surface water of 271cum/day.

Clarification: ln our Final EIA report submitted to MoEFCC; at Page No. 42; thetotal fresh water requirement in GIACL's integrated Project Complex (sugar; co-gen& distillery) has been pr^esented. Accordingly; it is seen that total annual fresh waterto the tune of 57,826 M3 (7,920 M3 During Sugarcane crushing Season + 49,906 M3 During

Non- Crushing season) is required (i.e. 0.057 Million Cu.M. I Annum). Also on the samepage, adequacy of total annual fresh water utilization by the industry complex (0.057Million Cu.M. / Annum) against sanctioned quota of 0.071 Million Cu.M. / AnnumbyIrrigation Department (lD); Govt. of Maharashtra is presented. From this it could beseen that the permitted fresh water quantity by lD; Govt. of Maharashtra is muchmore than actual requirement in the GIACL complex.

Herewith at Annexure -lll, the details of water consumption and adequacycalculations are presented for ready reference. Further at Annexure - IV, anagreement between GIACL and lrrigation Department; Govt. of Maharashtra isenclosed which gives the Industry a water lifting permission for 0.071 Million Cu.M. /Annum.

,:

We hope that the details presented above are in accordance with your requirements.Kindly consider our proposal at MoEFCC, New Delhi for grant of EC at your earliest.

Thinking you,

Yours faithfully,

a;N.rW*"*",(Chief Financial Officer)Gangamai Industries And Constructions Ltd. (GIACL)

Operation : Harinagar, Najik Babhulgaon, Post : Rakshi, Tq.Shevgaon, Dist. Ahmednagar (M.S.)-414502,Tel.: (02429) 217255,217309

Mob.: +91 - 9921994999, 9921995999, E-mail :[email protected], [email protected]

Corporate Office : 2nd Floor, Tapadia Terraces, Adalat Road, Aurangabad-431001(MS)lndia. Tel.: +91-24A-2333933, 2332572,

Fax: +91(240) 2333335, E-mail : [email protected]

Page 3: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

ANNEXURE– I

Acknowledgement Received from QCI- NABET

Page 4: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

(../Userdashboard/EIA_DashBoard.aspx)Welcome Equinox Environments India Pvt Ltd|| Home (EIA_DashBoard.aspx) || Logout

Org Name

Equinox Environments India Pvt Ltd

Application No

QCI/NABET/EIA/0306/RA00

Phase

1

Login Name

ORG000367

Application Status

Click Here T o View ApplicationGo To Report (EIA_EnclosuresList.aspx)

Current Application Status: Application Submitted Under Nabet Desktop Assessement.

Application Alert/s

Sr No Date Category Nabet Message Reply Reply

Page 5: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Sr.No. Date Category Nabet Message Reply ReplyDate

1 12/26/2018 ApplicationSubmitted

Dear Sir/Mam, EQUINOX ENVIRONMENTS INDIA PVT LTDOrganization have submitted the onlineapplication for accreditation of Organization. You can view the application by logging into thewebsite http://eia.nabet.qci.org.in/ using useridand password. In case of any observations /objections, kindly send the same [email protected].

From NABET Admin Date :26/12/2018

QCI © 2018 All Rights ReservedLast Login: 1/3/2019 10:01:04 AM IP: 203.192.213.168 / Chrome 71.0

Terms and Conditions (../TermsAndCondition.aspx) || Designed by : 7techies (http://www.7techies.com/)

Enviclean
Highlight
Enviclean
Highlight
Page 6: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

1/23/2019 Equinoxenvi Mail - Regarding queries w.r.t. online submission for Re-Accreditation assessment.

https://mail.google.com/mail/u/1?ik=74bfd25ec1&view=pt&search=all&permmsgid=msg-f%3A1623085119198279350&simpl=msg-f%3A16230851191… 1/1

Environment Impact Assessment (EIA) Dept. <[email protected]>

Regarding queries w .r.t. online submission for Re-Accreditation assessment.

Ms. Preeti Pawaria Khatri <[email protected]> Sat, Jan 19, 2019 at 4:13 PMTo: "Environment Impact Assessment (EIA) Dept." <[email protected]>, EIA <[email protected]>, Vaibhav Equinox<[email protected]>, Sulakshana Ayarekar <[email protected]>Cc: "Mr.A K Jha" <[email protected]>, Pawan <[email protected]>

Dear Sir/ Madam, This has reference to the trailing mail and telephonic conversation. We have been informed by outtechnical team that the application has been submitted by you on the portal which is now visiblealso. The application submitted by you for RA2 has been received and the same is under process. Weshall get back to you shortly on same. This is for your kind information please.

With best regards,

Pree� P awaria Khatri Accredita�on Officer | NABET Na�onal Accr edita�on Boar d for Educa�on and T raining Quality Council of India | www.qcin.org ITPI Building, 6th Floor, 4-A, I P Estate, Ring Road, New Delhi - 110002, India Work: +91-11-2332-3416 – 23, Ext:150 | Fax: +91-11-2332-3415 Facebook | Linked In | Twi� er

From: Environment Impact Assessment (EIA) Dept. <[email protected]> Sent: Thursday, January 10, 2019 1:10 PM To: Ms. Pree� Pawaria Khatri; EIA; Ms. Samra Khan; Mr.A K Jha; Pawan; Ms. Kri� ka Sharma; Ms. Meenakshi Arora Cc: Vaibhav Equinox; Sulakshana Ayarekar Subject: Regarding queries w.r.t. online submission for Re-Accredita� on assessment. [Quoted text hidden]

Page 7: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

ANNEXURE– II

List of QCI-NABET Accredited Consultant Published by QCI-

NABET

Page 8: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Scheme for Accreditation of EIA Consultant Organizations

List ‘1’ – Accredited EIA Consultant Organizations (ACOs) - as on December 17, 2018#

S. No. Consultant Organization

Scope of Accreditation As per NABET Scheme Project or Activity as

per Schedule of MoEFCC Notification dated September 14, 2006 and subsequent Amendments

Sector Number Name of Sector Category

1

Aadhi Boomi Mining and Enviro Tech Private Limited (formerly known as Suriya Mining Services) Address:3/216, K.S.V.Nagar, Narasothipatti, Salem-636004 Email:[email protected] Tel.:09842729655, 09443290855 Conditions apply

1 Mining of minerals – opencast only A 1 (a) (i)

3 River Valley Projects A 1 (c ) 7 Mineral beneficiation A 2 (b) 9 Cement Plants A 3 (b) 34 Highways B 7 (f)

38

Building and construction projects B 8(a)

2

Aakhivi Consultants Address:57 C, Block E5, Shatabdi Vihar, Sector 52, Noida, UP - 201 308

1 Mining of minerals - opencast only A** 1 (a) (i)

4 Thermal power plants A** 1 (d)

Page 9: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Scheme for Accreditation of EIA Consultant Organizations

S. No. Consultant Organization

Scope of Accreditation As per NABET Scheme Project or Activity as

per Schedule of MoEFCC Notification dated September 14, 2006 and subsequent Amendments

Sector Number Name of Sector Category

development projects

64

Equinox Environments (India) Private Limited Address: F-11, Namdev Nest, 1160- B, “E” Ward, Skyes Extension, Opp. Kamala College, Kolhapur- 416001 e.mail:[email protected], [email protected], [email protected], Tel.: 0231-2531231/ 2526337 09822045083, 09881121522 Conditions apply

1 Mining of minerals including opencast / underground mining A 1 (a) (i)

4 Thermal power plants B 1 (d)

8 Metallurgical industries(ferrous only) - both primary & secondary

B 3 (a)

12 Asbestos milling and asbestos based products A 4 (c )

13 Chlor-alkali industry A 4 (d)

17 Pesticides industry and pesticide specific intermediates (excluding formulations)

A 5 (b)

18

Petro-chemical complexes (industries based on processing of petroleum fractions & natural gas and/or reforming to aromatics)

A 5 (c )

20

Petrochemical based processing (processes other than cracking &reformation and not covered under the complexes)

A 5 (e)

21 Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and

A 5 (f)

Equinox Environmentts (India) Private Limited

Page 10: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Scheme for Accreditation of EIA Consultant Organizations

S. No. Consultant Organization

Scope of Accreditation As per NABET Scheme Project or Activity as

per Schedule of MoEFCC Notification dated September 14, 2006 and subsequent Amendments

Sector Number Name of Sector Category

intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)

22 Distilleries A 5 (g) 25 Sugar Industry B 5 (j)

32 Common hazardous waste treatment, storage and disposal facilities (TSDFs)

A 7 (d)

37 Common municipal solid waste management facility (CMSWMF) B 7 (i)

38 Building and construction projects B 8 (a)

39 Townships and Area development projects B 8 (b)

40 (ii) Electroplating and Metal Coating - -

40 (v) Food Processing - -

65

ERM India Private Limited Address: Building No. 10,Tower A, Fourth Floor, DLF Cyber City, Gurgaon - 122002 e. mail: [email protected]

1 Mining of minerals including Open cast/ Underground mining

A 1 (a) (i)

2 Off shore and on-shore oil and gas exploration, development & production

A 1 (b)

Page 11: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

ANNEXURE– III

Water Consumption and Adequacy Calculations at GIACL

Page 12: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Annexure-III

2.1.1.1 Total Water Requirement in GIACL Integrated Complex

Table 2.30 Water Requirement (During Crushing Season)

Sr. No.

Activity Fresh Water Consumption

(M3/Day)

Treated effluent / Condensate (M3/Day)

Total water

1. Distillery(150 KLPD) 41 1578 1619 2. Sugar - 5500 TCD&

Co-gen - 32 MW 3 3547 3550

Total 44 5125 5169

Table 2.31 Water Requirement (During Non-Crushing Season)

Sr. No.

Activity Fresh Water Consumption

(M3/Day)

Treated effluent / Condensate (M3/Day)

Total water

1. Distillery (150 KLPD) 271 1348 1619 2. Co-gen - 32 MW 178 17 195 Total 449 1365 1841

For the working pattern in GIACL complex, overall water requirement becomes as follows – A. For Crushing Season: 1. For Sugar Factory and Co-gen Plant; total fresh water requirement in a season of 180

Days shall be - 3 CMD X 180 Days = 540 M3/Season

2. For Distillery, total fresh water requirement in a season of 180 Days shall be - 41 CMD X 180 Days =7,380 M3/Season Hence, total water requirement during crushing shall be – 7,920 M3/Season.

B. For Non- Crushing Season: 1. For Co-gen Plant; total fresh water requirement in non crushing season of 52 Days shall

be - 178 CMD X 52 Days = 9,256 M3/Season

2. For Distillery, total fresh water requirement in a season of 150 Days shall be - 271 CMD X 150 Days = 40,650 M3/Season

Hence, total water requirement during non crushing shall be – 49,906 M3/Season.

From above calculations; it is seen that total annual fresh water requirement in GIACL campus is 57,826 M3 (7,920 M3+ 49,906 M3). This figure works out to be 0.057 Million M3.Permission granted to GIACL by Irrigation Department; Govt. of Maharashtra for lifting fresh water from the 'Jaikwadi Dam' reservoir is 0.071 Million M3 which is much higher than the actual total usage of water quantity.

Page 13: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

ANNEXURE– IV

Water Lifting permission

Page 14: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

tdn

q,rffi qfir+dT E lqry{r$ qrffi frrrFTqlerrrrc (wt) qaor,fr. siltrnqrq.

qffi i.oRy?l,RQRooryq*il.t.oRyll,R?QoyR

fqiil' - eejid-paith n @ moi l.wrd. maha roshtro. gov. i n

{I

i

, q.46

qr.i*;mlvrHl&.fu .m'trrqrqr t eapo,f, -motc'lti,t

/gfr, /,/r,.riqsf FsQq ffirs *eqEqT,

eif,tqif,RT qlqqiiT,

qrzmqgf qfcGitlR lqqf.f.Ftr=* (s+t) qaur.

fu.qrw srGIHt if{*, q[6liE[,+.qrq+ ar.teqiq fr. sltt'ndrq..

frqq:- qruft qm intrtrIrrlT mqd q g-{gi,TTr sql-qr rrtun q.rd qrqa.

{ilf '-1. qdfrrfi +,tffi q* iii.rcivn-i/qzli/fr.Ri/tt/Rotx.r.qr.ih.anilfuqrznivn-r lffi/E?x? /fr.ot /t? / ?otv.I .qr.*'/fq. gffq.q.S.qai q e'|e / ? o I Y - lq /kqi*.. o v / I R / ? o t x .

sq{tffi frrr$ q {qflrq rrn-{qn qrfi a+mT s{Rqrqr gd a.6{ +g,{

grqrBt m *qa srFrer $rqiffirs qldfum td sfit

+€r *.{rc{Exr+m H* sr& q ytf,t+ qffi{ qr&.

sftf,r qrk*{ilq a g#e $ffiwe.

rtqa:- 6{raHffi-q

ra:- arfr{ers qFr4ilr q s$Rrs',fusrg srfrrqrrul,*iTllqrE qiTr rTrtrfrffi qfujrq (Ktrfi:- srr furyFfrq qFqfdr,qq$qrs qre*flt sq frqrq;fi.q *t'rrqlE qi{r qrkfrffiq

g#d +,q m qnffisq renr ({t{fl o{rrqrqrrd)ra:-vrqftr+rfi EflT*-{* qe{Frr+cr {rr€T {rprflR lqRTUr) +dq qt{r qrkfrffi a g&e

q'ffiqrre 13rm. (Til-dd F{rfirqrrd).

Sichan d.j.Jagtap

Page 15: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

T6RTE MAHARA$SHTRA {1,r.... )..2.}.}.4.'..g'ht'' t 7

r1.ft q ft.'ci &sarrraq?eI A.IlD.'0f,

cilrrr,3togogl fu-J-

. AGREEMENTB,

(For Non-Irrieation water supphlt

AN AGREEMENT made on the 4th day of 2OL4, Dec. ('Srvo Ti:ousan<I

"""r,..[ r between 6ANGAMAI INDUSTzuES AND g6NSTRUCTI6NS

LIMITEB, the users such as Private Company/Industries/Entrepreneur/or

Organisation (which expression herein-after referred to as "the Company

shall, ur$ess excluded by or it be repugnant to the context or meaning thereof

be deer.nrd to include its successors and assigns) registered under tJ"e Indian

companies Act, 1913 (VII of 1913), the Companies Act, 1956 (I of 1956) and

having fs Registered Office at 2nd Floor, Tapadia Terraces, Adalat Road,

AuranSafad, hereinafter referred as "the Company of the one part" and

Governor of Maharashtra, hereinafter referred to as uthe Government" (which

q

Brf€nFtsarff'EW

&rich.d thnrtorf

'kt'!.1,.

--4fz3z--"ffiH.

wlq{,ltaur

q-il*,:irij;;ll# 1'tztc1v 20t{

s--_.

Page 16: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

aqpression shall unless excluded by or it be repugnant to the context or

meaning thereof be deemed to include his successors and assigns) of the

other Part.

WIIERE/ASttreComparryisdesirousofconstructionapur''Fingstationonthe

Comparry,sLarrdatJaylsradiResenroirfordrawingwaterfromthesourceJaykwadi Reservoir (hereinafter referred to as "the said source") for tJre use by

theComparry,sPlarrt(hereinafterreferredtoasthesaidPlant")arrdlayingunderground and surface pipes an drairrs for discharge of tl.e factory eifluent'

AIIDwllEREAstlrecomparryhasappliedtotheGovermnentforpermission

to draw 0.o71 million cubic meter ( mme) of water per yeaf from t].e said

source.

A}IDwIIEREAstt}recomparryhaspaidniltoGovernmenttowardstheproportional cost of capital outlay of the project' Company has laid its own

pipe line from Jaylsvadi Reservbir to its sugar Ii{ill and alliec! products' And

whereas the company has paid Rs' 600000/- to the government towarcls the

irrigation restoration charges wide cheque no.463607 dated a4/72/2AA

drawn on canara bank Aurangabad favoring Executive Engineer , Jayakrvadi

Irrigation Division Paithan.

AI{DwIIEREllst}reGovernmenthasageedto:grarrtthe.arforesaidpermissiontothecomrarryonthetermsand'conditionshereinafterappearing. ";

AI{D UIIIERTAS ITNDER the said terms and conditions t}re company has to

depositwith.theExecutiveEngineer,JaykuradilrrigationDivisiontotheGovernment a surn of Rs' SOTOOO/' As Security'"equivalent to two months

company' s probable water charges based on; years sanctioned and as

communicated by way of Pay order/cheque/FDR No'03t652 dated

for Rs. SOOOO/- {Rs. 3iffty Thousand Only} drawn on Allcr"t'',crJoei'4 bank

favouiiag Besuti*e Englneer, Jaylswadt Irggatiou Departme*t, Paithan,

or in the form of Fixed Deposit Receipt or a Bank Glarantel t""::U :'

scheduled / nationalized bank having its main/branch oflice sihrated locally

for the due obsenrance and performance by the iompany of the terms and

conditions of this Agreement And WHETHER the company has accordingly

rm0lomf ffiht

Page 17: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

prior to the execution of these presents deposited with the Government

Rs.50,000/- As security for the due observance and performance by the

company of the terms and conditions herein contained, AND WHEREAS it has

been agreed that the said a:nount will not carry any interest if deposited in

cash.

DEFIMTIONS:

Quota: Quota rneans yearly demand sanctioned and communicated to ------

--by the Executive Engineer.

Corporatloa: Corporation means the River Basin / Corporations like

Matrarashtra / IGishna Valley Development Corporation (MKVDC), GoCavari

Marathwada Irrigation Development Corporation (GMIDC) Tapi Irrigation

Development Corporation (TIDC), Kokan Irrigation Development Corporation

(KIDC) and Vidarbha lrrigation Development Corporation (VIDC), Municipal

Cerporations, Municipalities etc. I

MIDC: MIDC Means Matrarashtra Industrial Development corporation

MJP: MJP means Matrarastra Jeevan Pradhikarart

Yearly appllcable demaad: Yearly applicable demand means the water

demand communicated by the User for the period frlm 1"t November to 31"t

October to the E:<ecutive Engineer and sanctioned by Irrigation Department

every year in the mon h"pf September along with its bifurcation for industrial,

domestic and agriculhrral use.

USER: User .means water using agency like individual Cornpanies

user/ industry/ Entrepreneur

NOtrI THIS AGREEMEITT WITNESSIH AS FOLLOtrIS:

Of .(a) In Considerations of the comPany making payment to the Government

ad hereinafter specifed and observing and performing tJ:e convenience

and Conditions herein contained Government do hereby grants to the

Company permission to draw following quota of water for t]le specified

purpose.

Fon0mprrlhdrrdl f

Page 18: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

E

{I.!

.l

02.

And use the sane for the purpose of the company's said plant or

project, for supply to residential colonies and for agriculhrral use

(nursery/gardening)for 1 term of six years courmencing from the 4th

day of December 2a,+ ortthe following terms and conditions.

(b) The quota assigned for domestic use and for agricultural: use

shall not Exceed 10% each of the individual water demand. In

ttre case where in the water used for Domestic and Agricultural

use o<ceeds L0% in each case the excess use shall be charged at

industrial applicable rate specified in clause l l of this

agreement.

(c) Ttre Lrdustrial water requirement, the domestic water

requirement and agricultural (nursery/gardening) water

requirement of the company as demanded deemed to be

separate and independent for the sole purpose and water

charges assessment shall be accordingly seParate and

independent for otl:er clauses of agreement

The permission hereby granted shall be subject to the provisions of the

Malrarashtra Irrigation Acl,L976 and the Bombay canal Rules 1934

and subsequent revision ,if arry in force and any executive orders

Sr.

rlo.

Descriptlon / Use QuantityMM 3 Per Year

ot Total Sanctioned Quota

(for industrial use onlY)

0.0710 Mms

01.1 f'or Industry using potable water botfling plant

Nil

oL.2 For other than water as raw material

Industrial use

0.0710 Mms

o1.3 For domestic use Nil

01.4 For agricultural Use (nursery/gardening

Within tlre companY's Premises)

Nil

For€rngmd hdufrL. I

Page 19: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

TE

03.

issued in this behalf by Government and any statutory arrrencirnent

thereof from time to time and for the time being in force.

Nothing herein contained shall be deemed to imply and guarantee onthe part of the Goverrrment as to the availability or otherwise of any

specific quantity of water and Governrnent shall not be responsible for

the non-supply or in adequate supply of water on any account

whatsoever.

However in case of inadequate or non supply due to shortage of water

or reasons beyond the control of the Department, bill shall be charged

as per actual quantity of water lifted/supplied during such period.

?'lhe company shall use the water drawn from the said river for

purposes sf tJ'.e company's said plant and for supply to the residential

colonies constructed by the company with in tfre.area of tJ:e said Plant

for providing housing to its employees and workers (hereinafter referred

to as "the said residential Colonies"). tL" company shall not sell the

water from the said river top any other person, firm or compEuly,

corporation or other body. In the event of the company selling water

drawn from the said river, then the Government shall be entitled to

recover from the company the proceeds of any such sale made by the

company.

Government shall be entitled 1s u 'lize water of the said river available

after meeting tJle reasonable requirement of the company; as to rvhich

matter the decision of the Governrnent shall be Iinal and binding on the

Company, for such purpose as Government deems fit.

Ttre permission hereby granted shall not in any manner prejudicialiy

affect The oristing water rights vested in the upstrean riparian owtxers,

not shall it in arry way, prejudice Govemment's right to after launch or

implement in public interest any new scheme or schemes on its own,

on or in connection with the present source of channel of water supply

available to the company, subject hov;ever, to the safe guarding of its

reasonable demand referred to in clause (5) above.

The company shall not construct the pick-up weir in the.Godavari river

bed of the said river unless the proposals, Plans Drawings,

04.

05.

06.

07.

for0nfnl hOnlr I Ccndryrtom Ltd.,

ffi-,&**'

Page 20: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

1r*

Specifications, estimates and all other details tlr,ereof are previously

submitted to and approved in writing by an offi.cer authorized in that

behalf by the Government and while granting its approval to the

construction of the pick-up weir Government may impose such

eonditions as it may in its discretion think frt'

08.(a) For ascertaining the quantity of water drawn by the company, tJre

corBpany shatl forthwith at its own cost and after obtaining prior

approval in writing t]rereto of the Executive Engineer, Lestall

independent pipelines fitted with separate electronic water measuring

devices for use of water for the said independent intention (hereinafter

referred to as "the said Electxonic measuring devices") at such places

as.is indicated by the Executive Engineer. All the pipeline showing

locations of the metering equipment from the said source for different

purposes strall be got jointly verified and got approved from Executive

Engineer,IrrigationDepartment.Layoutfromthesaidsourceshallbe

aPproved from the Executive Engineer' No changes in the approved

layoutshallbemadewithoutthepriorwrittenapprovalfromtheExecutiveEngineer,IntheeventoftJrecomparryfalingtoinstallandkeepinproPerworkingorderthesaidelectronicmeasuringdevicesfor

useofwaterforthesaidPlantandsupplytot}resaidresidentialcoloniesasaforesaidthecompanyshallbeliabletopayforthefullsanctioned water quota as mentioned in clause 8(b) and II. During

suchperiodL2}o/ooftheproportionatesarrctionedquantitywiilbecharged at the prevailing rates for tl:e said plant. The said electronic

measuringdevicesshallalwaysbekeptundert}reiockandsealoftheExecutive Engineer and. tl.e key of such lock shall at all times remain

withtheDrecutiveEngineer.Ttrecomparryshallatalltimes,duringthesubstarrceoft}reagreementatitsowncostmaintainthesaidelectronic

measuring devices in proper working order and condition'

(b) Readings for the water so drawn by the company will be taken on the

' said Electronic measuring devices, on the I"t day of each month/at

agreed times, jointly by the authorized representatives of the Executive

Engineer and of the company'

II

For0mgnonl hduttL l

Page 21: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

,ru

l

1

Il

(c) If at arry time in the opinion of the Executive Engineer the said

electronic measuring devices are found defective, the sarne shall be

tested for its acsuracy and the cost of such testing shall'be borne and

paid by the company, if on such testing tl-e said electronic measuring

devices are found to be defective, the company shall forthwith get tl.e

same repaired and set right at its own cost and in the event of gernPany

fa[ing to do so within 30 (thirty) days thereafter t]re Executive Engineer

may proceed to do so on account and at the cost of the company'

In the event of the said electronic measuring devices going out of order

and becoming defective tl.e quantity of water drawn by the company

during the period when the meter was defective and not working shall

be ascertained in tlee following manner.

(I) If the said electronic measuring devices remain out of order for a

period of less than 30 days tl-en the quantity of water deemed to

be drawn by thL USER during the said period shall be taken to

be 9o%o of the yearly sanctioned demand as communicated in

clause No. 11 or average for the last six months whichever is

higher.

(u If tl.e said electronic measuring devices remain out of order for a

period exceeding 30 days then the quantity of water deemed to

be drawn by the usER during the said period shall be taken to

be 1i07o of the sa,ctioned demand as communicated in clause

Iloraveragefort]relastSixmonthswhicheverishigher.This. will be made applicable for the period during the measuring

devices remained out of order

Ttre aforesaid provisions will also apply when the quantity of

water drawn by the company cannot be measured on account of

removal of the said electronic measuring devices for repairs or

thesa-eintheopinionoftheE:recutiveEngineernotworkingproperly.

(u If Electronic meter meant for domestic or for agricultural use is

not fitted or remains out of order or is removed' ttre water

(d)

Page 22: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

-.q

G

charges will be levied as per the rates specified for the industrial

use for the total quota as referred to in clause I (a) of this

agreement.

Billingshouldbedoneonbi-monthlybasis.TheBillforthewaterdrawn by the Company during the previous calendar month shall be

sentinduplicate/triplicatebytheExecutiveEngineertotheolliceoftheComparrywithin15daysaftertheendoft]rewaterconsumptionmonth. The Comparry shall ttrereafter duly pay the same by a demand

dra.ftdrawninthenameoft]reExecutiveEngineer,JaylswadiIrrlgatlon division for and on behalf of the Government with a fortnig[t

fromthedateofreceiptofthebillarrdshallnotallowthesametofallinalTears.Ift}reComparryfailstopayt]rea:nountwithinthisstipulatedtime(l5daysfromthedateofreceiptofthebill.i.e.beforetheendofthe current month) extra charge not exceeding 10% per arurum of the

amount due will be charged' If the delay in payment of water charges

exceedssixmonths,theirrigationdepartmentreseryestherighttoterminate the water

"rpity with a notice of 15 days in advance'

Thecostofallworksinconnectionwiththearrangementsforwatersupplyincludingt]recostofmeasuringdevicesarrditsinstallationand

maintenance, shall be borne by the Company'

Subjecttot}reprovisionsofclause(8)hereof,tJrecompanyshallpayto

the Government at the time and in the manner specified in clause (12)

hereof water oharges for the quantity of water drawn by the company

fromthesaidriverasmeasuredbythesaid'electronicmeasuringdevices at the following rates, na:mely-

Here rates which are going to be applied to the Company with mention

ofpurposeofuseofwater,sanctionedquotaandpresentrate(Subject

to its revision) may be specified' The water lifted by the USER during

rainy season from the river where irrigation Department has not

,releasedthewater,concessionalrateasdecidedbytheirrigation

Department shall be charged'

I. Provided however that after the expiry of two years from the date the

companystartsdrawingwaterftomt}resaidriverifinarrymonth

"i!;l

I

9.

10.

11.

Page 23: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

I-E

(

the quantity of water drawn by the company is less than 90 percent

of the quantity of water specified in clause (1) hereof hen the

company shall pay to the Government water charges calculated for

90 percent of the quantity of water specified in clause (1) hereof or

for average of thb quantity of water drawn by the company during

the period of previous three months including the month in

question whichever is greater.

III.Forarryunforeseenreasons,ifthecompany/agencTrwouldliketoreduce/increase the demand of water made earlier/entered in the

agreement, they will be required to inake the revised annual

demand before the commencement of the year i'e' I't day of

November.onacceptarrceofsuchreviseddemandthecomparrywili

be charged as per changed demand for the period speci{ied' other

condition remainining same' A supplementar5r agreement on

hundred ruPees sta:rrp PaPer for this changed quantity' which will

form Part of main agreement'

I

m.NopenalratewillbeleviedforthequantitylimitedtoLoVoinexcessofthesarrctionedone.Forquantityusedinexcessofthis]'07owithoutpriorsarrctionapenalrateof25%rvillbechargedoverthebasicrate.Ttredelayinpaymentonaccountofthisalsowillbegoverned bY clause 9 above'

IV. For arry unforeseen reasons (such as sudden closure of the units or

suddenriseinproductionetc.)therecouldbeabruptfluctuationsinthedemarrdonbothsides.SuchcaseswillbedecidedatGovt.levelonly,byg.,inedueconsiderationstotleeavailabilityofwaterinthe

Particular sub-basin and so on'

V.Inadditiontothepa5mrentofwaterchargesreferredtoabovethecomPany shatl also pay to Government local fund cess at the rate of

20 paise per every ruPee of basic water charges'

u.WaterBills-Ttrebi-monthlybillsfortheperiodfromNovemberto' August (for 10 months) shall be prepared' on tlee basis of actual

quarrtityofwaterliftedattJreprevailingrate.Thebillfort]remonths

ofSeptemberarrdoctober(I'ltr,arrd12thmontlr)shaltbeprepared

by taking review of annual sanctioned demand and the terms and

conditionsoftheagreementandthenshallbeadjustedandpaid

s1D00rLE,

Ailod..d Slgnatotl

Page 24: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

lrq(

accordingly. while adjusting so it shall be considered that the 90%

of the annual sanctioned demand had been lifted /used'

The water lifted in excess, up to 1O% of sanctioned demand shall be

charged at sing[e and. excess above 1O% without, prior permission

will be charged at penal rate of 1.25 times of the normal rate, as

mentioned in the relevant clause. However, the local cess shall be

charges on singte rate onlY.

12.(a) The Company shall pay to the Executive Engineer' water rates and

local fund cess either in advance every alternate month on the basis of

anticipated quantum of water to be drawn by it from the said source

during the months or on monthly basis within fifteen (15) days from

thedateofreceiptoft}rebi-mont}rlydemandbytheUSERfromtheExecutiveEngineer.ondefaultoftheUSERtopaythewaterrateorlocal fund cess as aforesaid vide clause 9 and 11, Government shall

without prejudice to its any other rights and remedies be entitled to

terminate this agreemqrt forthwith as Per clause No' 9'

(b) In the case of disputes regarding quantity of water billed or rate at

which the bill is prepared tJre company/Firm/individual water user

shallfirstpaythecompleteamountofthebillarrdthenclairnforrefundofarrye:rcessbillctrargedgvingthereasons/justificationofwrongbi[ing.However,ttredecisionofSuperintendingEngineerand

administrator,commandareadwelopmentaut}rority,Aurarrgabadin

this regards'ghallbe final and binding on the Company' The company

hastoPaywaterchargesasfixedbycurrent'goverrrmentresolution

arrdasmodifiedbygovernmentfromtimetotime.Aspercurrentgovernmentresolutionwaterratechargedwillbeunderassuredwater

supplythatisRs.32l-perl.om3.Localbodycesswiltbe2oo/oofwatercharges in addition to water charges'

13. Government hereby reselves to itself the right to revise from time to

,timethewaterratesandlocalfundcessarrdcompanyshallpaythe

revisedwaterratesarrdlocalfundcessasmaybefixedbygovernment

frOm tittte tO time.

Page 25: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

E

t4. TheUSERshallnotdischargetheeffluentinanynallaorrivera:rdshall not pollute directly or indirectly any portion of the said nalla/river

even by septic tank effluents. If any water sources are polluted by any

industryaSindentifiedbyirrigation/pollutionControlBoard./MIDC/MJP the company shall be charged with a penalty of

rupees5,o0o/-persuchincidentperdaytillitisrectified.Ttreopinionof Maharashtra pollution control Board in respect of degree of pollution

will be binding on the cornPany'

TheCompanyshallrecycletleeeflluentwaterfortheirusesuchasgardening, recreation, cooting, cleaning, washing and manufacturing

process etc., so that at least 50% reduction in consumption of fresh

water is achieved.

The e{Iluent disposal arrangement made by the company/industry

shall be got approved by the company from the Maharashtra Pollution

ControlBoard/EnvironmentalDepartmentoftheGovernmentpriorto

commencing the operation of pumping/drawing water from the source'

TheCompanyshallatallthetimesallowarrofficeroflrrigationDepartmentoft}reGovernrnentauthorizedint}ratbehdftoinspecttlresaidworksaswellastheaccountsandcopiestakenofentriesfromtlre

records maintained by the Company'

Any notice or other document to be given to or senred upon tJre

company may be given or served on behalf of the Government by the

ExecrrtiveEngineer,'.JaylsvadilrrigationDivision,Nat}rNagar(North)

andanysuchnoticeordocumentsshallbedeemedtohavebeendulygiven to or.sewed upon the company or sent by registered posl to the

registered company if it is deilered at the registered ollice of the

company or sent by registered post to the registered address for the

time being of the comPany.

ThesaidsumofRs.50,o00/-depositedintheformofFDR/BankGuaiantee/ Cash/Cheque by the company with the E:recutive Engineer

JaykrradilrrigationDivisiontotheGovernmentasaforesaidshallbeheld by the Government as security for the due observance and

performance by the Company of tJle convenants' terrrs and conditions

15.

16.

17.

18.

f Ocr*SmL!"

bL"fdtotlld gerliorl

ForGrngrdhilrif..

Page 26: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

,-F(

. herein contained. In case of default on the part of tJre company toper{orrrr and observe any of the said covenants, ter:ms and conditions itshall be laurfirl for the Government in its absolute discretion to theforfeit ttre whole of the security deposit or any part thereof withoutprejudice nevertheless to any rights and remedies which theGovernment may have against the company under these presents forsuctr breadr and tJ:e company shall forthwith pay up the amount so

forfeited and shall always maintain the original arnount of deposit

throughout the period of this agreement. On the exprry of tJ:e terms ofthis agreement, the said security deposit of Rs. 50,000/- or such part

thereof as shall not have been appropriated as aforesaid shall be

refunded to the Comparry.

All amounts due to tJre Government by the Company under thisagreement shall be deemed to be arears of land revenue and may

without prejudice to any other rights and remedies of the Government

be recovered from the Company as arrears of land revenue.

On the exprry of the term of this agreement, Government may renew

this agreement within 90 days for such further period and on such

terms and conditions, as Government may at its absolute discretion

deem fit.

The cost incurred in the execution of this agreement including starnp

duty shall be borne and paid by the company.

Permission f6r extra water over and above the sanctioned quota will be

granted only when the written permission for expansion etc. isproduced by the Company from the tedustrial Deparbnent.

The agreement supercedes all the previous agreements entered into by

the USER with the Government in connection with tJ,.e supply of water

form Jaylavadi Resen oir.

The Comparry, should submit their water indent for every rotation to

the E:<ecutive Engineer Jaykwadi Inigation Division, Nath Nagar

(North) son or before starting of the rotation where the source is located

on canal. 'fhe cor,Fany should also furnish ttre exact quantity of water

actually drawn in each rotation after completion of the rotation.

f CmqftFon tE,(p)

19.

21.

24.

o,

23.

24-

For.0rngrrrl h(ff.r

fUiorhd Sfnrbry

Page 27: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

Fq(r\

25. The Company will have to make an arrangement at its own cost for

adequatestorage(BalarrcingTarrk)ofnotlessthantwomont]rsrequirement of water in case of perennial canal' five months

requirement in case of 8 monthly canal system' four months

requirementincaseofwatersourcefromseasonalriver/nallaandone

monttr water requirement in case of perennial water source of

river/nalla so as to take care of the closure period. But if unexpectedly

t]reclosureperiodisincreasedbymoret}rarrt}respecifiedperiodstipulated herein the company will have to make an alternative

alrangement for its water requirement at it own cost'

26.IFTHECoMPA}IYCoMMITSABREACHoFANyoFTHETERMSANDcoNDITIoNSTHEREoFGoVERNMENTSHALLBEENTITLEDTocANcELTHISPERMISSIoNANDDISCoNTINUETHESUPPLYoFWATERWITHoUTPAYMEI\IToFANYCoMPENSATIoNWHATSoEVER

TO THE COMPAI'IY.

- 27. Ttre Government hereby reserves to itself it right to Change / Amend I

Modiff/Carrcel/Revisearryoft}retermsandconditions,rulesarrdregulationsofwatermarragementandMaharashtralrrigationActand

ruleslaidundert}remwhichshallbeapplicableforthisAgreement'

IN *ITNESS WHERE oF THE common Sear of the Gangamai bedustries &

ConstructionslimitedLocationatNajikBabhulgaon'Talshevgaon'DistAtrmedrragarhasbeenhereuntoafExedANDtheExecutiveEngineer,Jaytnvadi Irrigation Division Paithan, Has for and on behalf of the Governor of

Maharashtra hereto set his hand and affixed the seal of his ofiice the day and

year first herein above written'

THEcoMMoNSEALoFtheComparrywasa.IlixedpursuanttoaResolution

of the Board of Directors of the comparry dated the 4tt' day of Dec 2014

i{,aI

:ffi;. Shrl Vtshru ShrlPatrao I(hedekar

Pinaace Manager

Gaagamal Industries Aad Coastructlons Ltd

tcnffiLu,,rat0rjnthriilt.

tllsy

Page 28: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

ili

I 'r

WItITES8

1. Shri Fatargo Milind Bharudas

2. Shri Pawar Somnath Vishqranath

SIGNED, SEALED AI{D DELSrERED by the Ebrcetrtive Engineer, Jaylnnradi

lrrigation Divisiorj lilo.l, Nath Nagar (Norttr), for and on behalf of the Governor

of Maharesh.tra in tlrc prcsence of---

rfifidcrtilr

&*,;c,0nfrllliillr

Page 29: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

G |ACl/aykwadt I ZOL -IS I t_t t,Date: OSILZIZO14 I

To

Executive EngineerJaykwadi trrigation Divislon No.1Nath Nagar (North), paithan,

Dist. Aurangabad.

Dear Sir

Sub: FDR against 2 months water bill as a security deposit.Ref: Water agreement dated O4hZ/ZOt4

As per conversation undersigned had with you, we have made FDR in Allahabad Bank, JalanaRoad Branch, Aurangabad in the name of Executive Engineer, Jayakwadi lrrigation Division,Nath Nagar (North), Paithan A/c Gangamai lndustries and constructions Limited of Rs.50000/-(Rupees Fifty Thousand only) as a security deposit against 2 months water bill.

we have attached herewith FDR (No.035652, dated og/Lzlzo].4)

We request you to acknowledge the same.

Thanks and regards.

For Gangamai lndustries andConstructions Llmited

z1Ir' I '

nuthorikd-signatory

ilt,\-_-

\'/

GANGAMAI INDUSTRIES& CONSTRUCTIONS LTD.

operations:Harinagar,NajikBabhulgaon.Post:Rakshi,Tq.shevgaon.Dist.Ahmednagar(M.s.)Telefax: +g1-2429-231251 .231255Gorp. Office : 2^" Floor, Tapadia Terraces, Adalat Road, Aurangabad-43i001. Tel.: +91-240-2333933, Z33ZS7Z..naiaa r_^;t. ^-^^,r_eih^6)^.nnAmA, anm

Page 30: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/... · 2019-01-25 · GIANGAMAI INDUSTRIES & CONSTRUCTIONS LTD. Ref. No. : G|ACU201B-191S93 Date: 22.A1.2019

rflg4boflg*-{FFrlc)rr,ru.t

TA,gfl-i,',c.z.tl

AA,4A,d1

A,el,-4,

a

od

e{rmiartfrqNOTTRANSF

(:)q)(rl(I)(,l'\)

:!_,. .,

NN'at444,11gs,

il1

lld,rrtlAEi,al

el"Qr (

0a\E.:

t

-t

o

t,oq

g,

Et

>d)47r.'p rd,

rd6'4n -ct

FJgt.z

:Li ifi_L I i7::tA.;, i i3:l : :-t1.l . &

ll : i\il I h:l : lo:l ". :):l i 4-li :'- :\:::s

l: i i,li i i ill: fl i 4 i\

t,IoB.g5f\)\

: ),,ci-$

tI..

i

g,

il"uD

A)

T6

\

vfl,qf,-d a)(<4

>4A .,4)

o

rgg4ata (n 9)dfl9, GLfi;adajl

Do-a-

gAA

aqoaFpo

tiYdd,

Uo

0)

o

g-01

d'oFl

'UaaaOA

Y,-4'

+r'tFd6

-tJoJ{

\r

Er++

$a+ffi'#[H-,

aaJ\

\o

ldd,nlA"o\

i,

00

qPo

d)d,ui.ll

I.b).s

B+

np1

r/t.Gooort

Csl'n4o a'1,a4f 8{.

Ea,4l9'


Recommended