+ All Categories
Home > Documents > 2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board...

2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board...

Date post: 27-Jun-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
4
2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board Meeting The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30 PM by Board President, Marty Lampner. He welcomed the Board back after being off for the summer. Marty recapped that during the summer period the community did not experience any major incidents. The minutes from the June Board meeting were approved. Treasurers Report by Bob Coale Bob provided each Board member with copies of the August 2019 treasures report as well as a copies of the Major outlays report for July 2019. The Board approved his reports. He indicated that the Capital Projects account will be moved from Wells Fargo Bank to County Bank. This transaction will be done at the convenience of the Board. Pool and Recreation Report by Adriana Hoffman Adriana reported that we had a wonderful summer season at the pool. There were no major issues reported. A copy of the pool attendance report is attached. The Adult Swim was well received. The Board would like to extend a big thanks to the volunteers who gave of their time to ensure this success. Thanks to Al Thomas and Jim Hayn for the Adult swim and Leslie Fatula for the aerobics activity. The pool had a new pump placed this year and a new pool cover was installed at the end of the season. There was an issue with the pool cover installation as the cover was not secured correctly. Best Aquatic Management will return to complete the installation. Renovations to the pool area were briefly discussed. An outdoor shower was proposed to help reduce the sand issue in the pool. Bathers would be asked to shower off prior to getting into the pool if coming from the beach. Another issue discussed was installing vents in the bathrooms to help with the odor issues. These issues will be further explored at a later meeting. The extension of the pool season and the use of pool management was also tabled until a future meeting. Roads and Grounds by Jack McAleer Jack and Stan Wildesen met with Jerrys Paving regarding the next phase of the community road resurfacing project. Mid-September will see the next phase begin. The areas for this phase will include Bridge Lane to Chad Place, Jaclyn Drive, and Hickman Drive up to the pool area. There was an issue identified with our community streets as grass growing into the road surface causes it to break down. The Board requests community members to edge their properties near the road to help prevent deterioration of the new surfaces. (cond’t, page 2—one of xxx)
Transcript
Page 1: 2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board Meeting The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30

2019 SEPTEMBER WCMPO NEWSLETTER

2019 WCMPOA September Board Meeting

The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30 PM by Board

President, Marty Lampner. He welcomed the Board back after being off for the summer. Marty

recapped that during the summer period the community did not experience any major incidents.

The minutes from the June Board meeting were approved.

Treasurers Report by Bob Coale

Bob provided each Board member with copies of the August 2019 treasures report as well as a copies

of the Major outlays report for July 2019. The Board approved his reports. He indicated that the

Capital Projects account will be moved from Wells Fargo Bank to County Bank. This transaction will

be done at the convenience of the Board.

Pool and Recreation Report by Adriana Hoffman

Adriana reported that we had a wonderful summer season at the pool. There were no major issues

reported. A copy of the pool attendance report is attached. The Adult Swim was well received. The

Board would like to extend a big thanks to the volunteers who gave of their time to ensure this

success. Thanks to Al Thomas and Jim Hayn for the Adult swim and Leslie Fatula for the aerobics

activity.

The pool had a new pump placed this year and a new pool cover was installed at the end of the

season. There was an issue with the pool cover installation as the cover was not secured correctly.

Best Aquatic Management will return to complete the installation.

Renovations to the pool area were briefly discussed. An outdoor shower was proposed to help reduce

the sand issue in the pool. Bathers would be asked to shower off prior to getting into the pool if

coming from the beach. Another issue discussed was installing vents in the bathrooms to help with

the odor issues. These issues will be further explored at a later meeting.

The extension of the pool season and the use of pool management was also tabled until a future

meeting.

Roads and Grounds by Jack McAleer

Jack and Stan Wildesen met with Jerrys Paving regarding the next phase of the community road

resurfacing project. Mid-September will see the next phase begin. The areas for this phase will

include Bridge Lane to Chad Place, Jaclyn Drive, and Hickman Drive up to the pool area.

There was an issue identified with our community streets as grass growing into the road surface

causes it to break down. The Board requests community members to edge their properties near the

road to help prevent deterioration of the new surfaces. (cond’t, page 2—one of xxx)

Page 2: 2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board Meeting The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30

2019 SEPTEMBER WCMPO NEWSLETTER (pg2)

Architectural Design Report by Laura Wildesen

Currently there are three lots under development; 609 Bridge Lane, 643 Bridge Lane, and 529 Harbor

Road. Recently two building projects were completed; 777 Hickman Drive and 139 Naomi Drive. A

request for approval of an addition to 152 Naomi Drive was received.

The Social Committee Report by Gloria Knittle

The Social Activities Committee along with Diana Griffiths are working on our Welcome Wagon

program to welcome new families to our community.

Colleen Coale will continue to coordinate our Happy Hours. A suggestion was made to move our

Adult Pool Party to after Labor Day so as to not disrupt the usage of the pool.

New Business

A request was made by a family member of a deceased homeowner for an exception to our rule

regarding yard sales. The family member would like to have an estate sale now to expedite the sale of

the property. The Board is aware that special circumstances sometimes require exceptions to this rule

as and such voted to approve this request for a ONE DAY sale only.

Old Business

The new phone directory is ready for review by the community. Gloria will attach a copy of it to her

newsletter. We are requesting that homeowner review their information and make any necessary

corrections. The distribution method(s) of this directory has not been finalized at this time.

Being no further business, the meeting was adjourned at 6:45 PM.

Respectively submitted, Jan Albright

The August 2019 Pool Party, with the theme of “Havana Nights”, proved to be a huge success. The fun was there for everyone, with souvenirs, Cuban fans and hats and a complimentary Mojito to start the night off. We enjoyed singing and dancing to a variety of Latin music played by our favorite DJ, Paul Mayer. Dinner included Cuba Sandwiches, Havana Chicken, Spanish rice, purple cole slaw, and fruit salad. The food was managed by Jim Hayn. Desserts served was a cake decorated like the Havana theme, lemon bars and mini cheesecakes. The weather was perfect for an evening outdoors.

I wish to thank all of you who took part in making this a fantastic party. Coleen Coale

cond’t, page 3—one of 4)

Page 3: 2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board Meeting The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30

2019 SEPTEMBER WCMPO NEWSLETTER (pg3)

Social News

September Coffee

The first coffee hour of the Fall Season was

kicked off in style by Bob and Coleen Coale.

Bloody Marys and other special drinks were

served up by Bob (coffee, too), while Coleen

presented a delicious array of breakfast

savories and sweets. Sue Rothenhoefer

announced the dates and places of the

upcoming coffees and dinners (please see

announcements within) while everyone

lingered on to enjoy the great Coale hospitality

as they caught up with each other after a busy

summer.

September Dinner

Great discovery! On Thursday September 19th. when about 30 of us entered the doors of The Lobster Shanty, everything became almost magical after that. A funky little place in the marsh with great views to offer of the wetlands and the wildlife. For a better view you can ask for binoculars. The bar was awesome with a bartender that really made you feel like he was glad you were in his bar. The real experience came when we entered the dining room with a staff that was totally prepared for us. The staff was amazing as they truly made us believe it was their privilege to serve us and serve us, they did, with some of the most delicious dinners that I have ever eaten. Everyone seemed to share this opinion with me. This has become my favorite restaurant and I can’t wait to go again. Owners David and Janet Twinings secret of success is a pleasing decor, attentive staff, and an interesting menu with quality ingredients. They definitely nailed it....And that’s the way I see it. Coleen Coale

Social News

Upcoming Coffees Monthly coffees are held the 1st Wed of each month/10am

Wednesday, October 2

Ron and Marie Dennisen

431 Jackie Drive

Wednesday, November 13*

Dagsboro Days Coffee Shop

33130 Main Street, Dagsboro (pls note, this is the 2nd Wed of month)

Wednesday, December 4

Jim Hayn and Phil Mazzola

424 Jackie Drive

Upcoming Dinners Dinners are held 3rd Thurs, each month

Drinks 5:30pm/Dinner 6:00pm

(Call Sue Rothenhoefer (302-539-5127 for reservations)

Thursday, October 17

Ropewalk

8203 Coastal Hwy, Ocean City

Thursday, November 14

TBA

Thursday, December 19

Cripple Creek Country Club

29494 Cripple Creek Road, Dagsboro

cond’t on page 4—one of 4

Page 4: 2019 SEPTEMBER WCMPO NEWSLETTER...2019 SEPTEMBER WCMPO NEWSLETTER 2019 WCMPOA September Board Meeting The Tuesday, September 10, 2019, the Board meeting was called to order at 5:30

2019 SEPTEMBER WCMPO NEWSLETTER (pg4)

Please welcome the following new neighbors to our

White’s Creek Manor Community:

Kristin ad Scott Newkirk

725 Hickman Drive

443-643-5098

Kristin shares…”We are an Army family, with

Scott (active duty) getting ready to retire next

year, and I work for the Army too as a civilian

(unfortunately not ready to retire, LOL). We

have 3 kiddos- Isabelle (20) currently at

Belmont University in Nashville, Rhodes (13)

and Eden (9). We are really happy to have

found this house, and to be part of this

community, and so far, everyone we have met

has been very welcoming. “

Mark and Karen Labonte

412 Jackie Drive

Mark’s no. (781-771-4133)

Karen’s no. (603-489-9466)

Dan and Dawn Zitofsky

216 Chad Place Dan (718-541-0877)

Dawn (646-315-4846)

Mary Sheridan

201 Chad Place

410-218-3457

Jason and Michele Mitchell

519 Harbor Drive

302-531-6991

Please welcome the following new neighbors to our

White’s Creek Manor Community:

Bridget and Nathan Greene

701 Hickman Drive

Bridget (410-459-5918)

Nathan (443-966-1606)

A testament to our great neighborhood….

My husband, Mike, and I were wondering if

you can send a message out to our neighbors

who always help us out by bringing our

garbage cans back up the driveway when we

are not available to do so. This simple act of

kindness is very much appreciated.

Peace, Teri DeVito, 101 Naomi Drive

From the Roads and Grounds Committee:

The next phase for resurfacing of the

community’s roads will begin next week. The

areas for this phase will include Bridge Lane to

Chad Place, Jaclyn Drive, and Hickman Drive up

to the pool area. The prep work is expected

to take 2-3 days. The final resurfacing will

occur about a week after the prep work is

completed and will take an additional 2-3 days.

Stay in touch

WC Blog: http://wcmanor.wordpress.com

Access the rules/regulations; by-laws, etc.

Facebook: Search by using White’s Creek Residents

OR email Marty Lampner ([email protected])


Recommended